The document is a technical specification for high-performance coatings for the Homewood Park project, specifically detailing coating requirements for exterior and interior steel substrates. The specification covers surface preparation and application procedures for galvanized steel and an existing pedestrian bridge, with detailed requirements for cleaning, priming, and finishing using specific Tnemec coating products. The document provides comprehensive instructions for coating application, including surface preparation methods, specific coating layers, dry film thickness requirements, and application conditions such as temperature and humidity restrictions.
The specification includes specific manufacturer requirements, with Tnemec High Performance Coatings identified as the primary product, with Carboline and Dupont listed as alternative manufacturers. The coating system requires multiple layers, including shop primers, field touch-up coats, intermediate coats, and finish coats, with precise dry film thickness specifications ranging from 2.0 to 3.5 mils for different layers. The project includes sustainability performance requirements, with mandates for low-emitting materials and VOC content compliance. The specification also includes a 15-year manufacturer's warranty for color, gloss, and performance, emphasizing the long-term durability and quality expectations for the coating system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIVISION 9: FINISHES
09 9600 - HIGH-PERFORMANCE COATINGS
11/15/2022 - Bid Documents Homewood Park
High-Performance Coatings
03/31/2023 Bid Doc - Reissue
099600 - 1
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2
SUMMARY
A. Section includes surface preparation and the application of high-performance coating systems on the following substrates:
1. Exterior Substrates:
a. Galvanized Steel
b. Existing Pedestrian Bridge
2. Interior Substrates:
a. Steel.
B. Related Requirements:
1. Section 05 1200 "Structural Steel Framing" for shop priming of structural steel with primers specified in this Section.
2. Section 09 9113 "Exterior Painting" for general field painting.
3. Section 09 9123 "Interior Painting" for general field painting.
1.3
DEFINITIONS
A. MPI Gloss Level 5: 35 to 70 units at 60 degrees, according to ASTM D 523.
B. MPI Gloss Level 6: 70 to 85 units at 60 degrees, according to ASTM D 523.
C. MPI Gloss Level 7: More than 85 units at 60 degrees, according to ASTM D 523.
1.4
ACTION SUBMITTALS
A. Product Data: For each type of product. Include preparation requirements and application instructions.
1. Include printout of current "MPI Approved Products List" for each product category specified, with the proposed product highlighted.
2. Product Data: For paints and coatings used inside the weatherproofing system, indicating
VOC content and laboratory test reports showing compliance with requirements for low-emitting materials listed in Section 01 8116 “Low-Emitting Materials Restrictions”.
B. Samples for Initial Selection: For each type of topcoat product indicated.
C. Samples for Verification: For each type of coating system and each color and gloss of topcoat indicated.
1. Submit Samples on rigid backing, 8 inches square.
2. Apply coats on Samples in steps to show each coat required for system.
3. Label each coat of each Sample.
4. Label each Sample for location and application area.
11/15/2022 - Bid Documents Homewood Park
High-Performance Coatings
099600 - 2
D. Product List: Cross-reference to coating system and locations of application areas. Use same designations indicated on Drawings and in schedules. Include color designations.
1.5 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials, from the same product run, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Coatings: 5 percent, but not less than 1 gal. of each material and color applied.
1.6 QUALITY ASSURANCE
A. Material Performance Criteria:
1. Products: Provide certified test reports when submitting products other than those specified herein the specification. Test reports shall indicate the test method, system and requirements for those products being submitted, and shall meet or exceed the test criteria and performance values of the specified coatings herein.
B. Applicator Qualifications:
1. Preparation and Workmanship: A firm or individual with a minimum of (5) years experienced in applying coatings similar in material design, and extent to those indicated for a particular project, whose work has resulted in applications with a record of successful in-service performance.
C. Mockups: Apply mockups of each coating system indicated to verify preliminary selections made under Sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution.
1. Architect will select one surface to represent surfaces and conditions for application of each coating system.
a. Wall and Ceiling Surfaces: Provide samples of at least 100 sq. ft..
b. Other Items: Architect, or Landscape Architect, will designate items or areas required.
2. Final approval of color selections will be based on mockups.
a. If preliminary color selections are not approved, apply additional mockups of additional colors selected by Architect at no added cost to Owner.
3. Approval of mockups does not constitute approval of deviations from the Contract
Documents contained in mockups unless Architect specifically approves such deviations in writing.
4. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials to project site in manufacturer’s original, unopened packages and containers bearing manufacturer’s name and label and the following information.
1. Product name or title of material.
2. Product description (generic classification or binder type)
3. Manufacturer’s stock number and date of manufacture.
4. Contents by volume, for pigment and vehicle constituents.
5. Thinning instructions.
6. Application instructions.
7. Color name and number.
8. VOC content.
11/15/2022 - Bid Documents Homewood Park
High-Performance Coatings
099600 - 3
B. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures continuously maintained at not less than 45 deg F.
1. Maintain containers in clean condition, free of foreign materials and residue.
2. Remove rags and waste from storage areas daily.
1.8 FIELD CONDITIONS
A. Apply coatings only when temperature of surfaces to be coated and ambient air temperatures are between 50 and 95 deg F.
B. Do not apply coatings when relative humidity exceeds 85 percent; at temperatures less than 5 deg
F above the dew point; or to damp or wet surfaces.
C. Do not apply exterior coatings in snow, rain, fog, or mist.
1.9 PRODUCT WARRANTY
A. Provide manufacturer’s (15) year color and gloss, crack, check, peel warranty at the completion of the project.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Products: Subject to compliance with requirements, provide Tnemec High Performance
Coatings, or comparable products by one of the following:
1. Carboline
2. Dupont
2.2 HIGH-PERFORMANCE COATINGS, GENERAL
A. MPI Standards: Products shall comply with MPI standards indicated and shall be listed in its
"MPI Approved Products Lists."
B. Material Compatibility:
1. Materials for use within each paint system shall be compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.
2. For each coat in a paint system, products shall be recommended in writing by topcoat manufacturers for use in paint system and on substrate indicated.
3. Products shall be of same manufacturer for each coat in a coating system.
C. Sustainability Performance Requirements: For all permanently installed products and materials related to the work of this Section, provide products and materials that meet the Project's performance criteria as outlined in the following Section
1. 01 8116 “Low Emitting Materials Restrictions”.
D. Additional Low-emitting requirements – Paints and Coatings:
1. Show compliance with VOC limits as detailed in Section 01 8116 “Low-Emitting Materials
Restrictions”
11/15/2022 - Bid Documents Homewood Park
High-Performance Coatings
099600 - 4
E. Colors: Match Architect's samples.
1. Color and finish selection to match Architect’s sample and design intent of coordinated colors and finishes amongst various and multiple materials and systems as determined by the Architect. Selection of color and finish to be confirmed by Architect in conjunction with other adjacent material and system colors and finishes, to be provided by the
Contractor as samples and mock-ups as specified.
2.3 SOURCE QUALITY CONTROL
A. Testing of Coating Materials: Owner reserves the right to invoke the following procedure:
1. Owner will engage the services of a qualified testing agency to sample coating materials.
Contractor will be notified in advance and may be present when samples are taken. If coating materials have already been delivered to Project site, samples may be taken at
Project site. Samples will be identified, sealed, and certified by testing agency.
2. Testing agency will perform tests for compliance with product requirements.
3. Owner may direct Contractor to stop applying coatings if test results show materials being used do not comply with product requirements. Contractor shall remove noncomplying coating materials from Project site, pay for testing, and recoat surfaces coated with rejected materials. Contractor will be required to remove rejected materials from previously coated surfaces if, on recoating with complying materials, the two coatings are incompatible.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.
B. Verify suitability of substrates, including surface conditions and compatibility, with existing finishes and primers.
C. Proceed with coating application only after unsatisfactory conditions have been corrected.
1. Application of coating indicates acceptance of surfaces and conditions.
3.2 PREPARATION
A. Comply with manufacturer's written instructions and recommendations in "MPI Architectural
Painting Specification Manual" applicable to substrates and coating systems indicated.
B. Remove hardware, covers, plates, and similar items already in place that are removable and are not to be painted. If removal is impractical or impossible because of size or weight of item, provide surface-applied protection before surface preparation and painting.
1. After completing painting operations, use workers skilled in the trades involved to reinstall items that were removed. Remove surface-applied protection if any.
C. Clean substrates of substances that could impair bond of coatings, including dust, dirt, oil, grease, and incompatible paints and encapsulants.
1. Remove incompatible primers and reprime substrate with compatible primers or apply tie coat as required to produce coating systems indicated.
11/15/2022 - Bid Documents Homewood Park
High-Performance Coatings
099600 - 5
D. Steel Substrates: Remove rust, loose mill scale, and shop primer if any. Clean using methods recommended in writing by paint manufacturer.
E. Shop-Primed Steel Substrates: Clean field welds, bolted connections, and areas where shop paint is abraded. Paint exposed areas with the same material as used for shop priming to comply with
SSPC-PA 1 for touching up shop-primed surfaces.
F. Galvanized-Metal Substrates: Remove grease and oil residue from galvanized sheet metal by mechanical methods to produce clean, lightly etched surfaces that promote adhesion of subsequently applied coatings.
3.3 APPLICATION
A. Apply high-performance coatings according to manufacturer's written instructions and recommendations in "MPI Architectural Painting Specification Manual."
1. Use applicators and techniques suited for coating and substrate indicated.
2. Coat surfaces behind movable equipment and furniture same as similar exposed surfaces.
Before final installation, coat surfaces behind permanently fixed equipment or furniture with prime coat only.
3. Coat backsides of access panels, removable or hinged covers, and similar hinged items to match exposed surfaces.
4. Do not apply coatings over labels of independent testing agencies or equipment name, identification, performance rating, or nomenclature plates.
B. Tint each undercoat a lighter shade to facilitate identification of each coat if multiple coats of the same material are to be applied. Tint undercoats to match color of finish coat, but provide sufficient difference in shade of undercoats to distinguish each separate coat.
C. If undercoats or other conditions show through final coat, apply additional coats until cured film has a uniform coating finish, color, and appearance.
D. Apply coatings to produce surface films without cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other surface imperfections. Produce sharp glass lines and color breaks.
3.4 FIELD QUALITY CONTROL
A. Dry Film Thickness Testing: Owner may engage the services of a qualified testing and inspecting agency to inspect and test coatings for dry film thickness.
1. Contractor shall touch up and restore coated surfaces damaged by testing.
2. If test results show that dry film thickness of applied coating does not comply with coating manufacturer's written recommendations, Contractor shall pay for testing and apply additional coats as needed to provide dry film thickness that complies with coating manufacturer's written recommendations.
3.5 CLEANING AND PROTECTION
A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from
Project site.
11/15/2022 - Bid Documents Homewood Park
High-Performance Coatings
099600 - 6
B. After completing coating application, clean spattered surfaces. Remove spattered coatings by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.
C. Protect work of other trades against damage from coating operation. Correct damage to work of other trades by cleaning, repairing, replacing, and recoating, as approved by Architect, and leave in an undamaged condition.
D. At completion of construction activities of other trades, touch up and restore damaged or defaced coated surfaces.
3.6 EXTERIOR HIGH-PERFORMANCE COATING SCHEDULE
A. Exposed Galvanized-Steel Substrates:
1. Cleaned via SSPC-SP-16
2. Shop Primer:
a. Tnemec Series 27 WB Typoxy
b. applied at 2.5 to 3.5 mils DFT
3. Field Touch-up:
a. Tnemec Series V69 Hi-Build Epoxoline II to touch-up the shop primer Series 27
b. applied at 2.5 to 3.5 mils DFT
4. Intermediate Coat:
a. Tnemec Series 1095 Endura-Shield
b. Applied at 2.5 to 3.5 mils DFT
5. Finish Coat
a. Fluoropolymer, Pigmented Coating
1) Product: Tnemec Series 1071V Fluoronar
2) applied at 2.0 to 3.0 mils
3) Finishes:
a) Series 1070V - Gloss
b) Series 1071V – Semi-Gloss
B. Existing Pedestrian Bridge
1. Surface Preparation
a. Method 2 or Method 3 commercial or brush-off blast
2. Field Touch-up and Finish Coat
a. Single package moisture cured Urethane primer (type 9)
b. Acrylic polyurethane gloss (Type 6)
c. Or Semigloss (Type 7)
END OF SECTION