PEABODY-610544-135966-CDSP.pdf
PDF 197 MB Posted
- Solicitation number
- 610544-135966
- Issued by
- Essex County, Massachusetts
About this file
This is a project description document for the Multi-Use Path Construction of Independence Greenway at I-95 and Route 1, prepared by Peabody, Massachusetts. The project involves the construction of approximately 1.579 miles of bituminous asphalt shared use path extending from Lt. Ross Park to the Peabody Road trailhead. The scope of work includes construction of two pedestrian bridges: MassDOT Bridge No. P-03-018(CFC) spanning Route 1 and MassDOT Bridge No. P-03-028(CFD) crossing Proctor Brook. Bidders must be pre-qualified by the Massachusetts Department of Transportation in either the Bridge – Construction or Highway – Construction category to be eligible to submit bids. The bid due date was extended via Addendum No. 9 to October 14, 2026, at 2:00 PM.
The document specifies requirements for bidder qualifications and establishes the technical standards for the construction work. Contractors interested in this project should verify their pre-qualification status with MassDOT and review all contract documents and addenda prior to bid submission. The project represents a significant infrastructure investment in pedestrian and bicycle connectivity within the region.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .