PE23248_Addendum_1_Generator.pdf

PDF 149 KB Posted

Attached to
RFP - New Towable Generator
Solicitation number
PE-66741-NONST-2024-000000001
Issued by
Douglas County, Georgia

About this file

This document is Addendum Number 1 to a solicitation for a new towable generator by the City of Springfield. The addendum addresses several contractor questions, including the acceptability of Triton Power and Blue Star generator brands, the fuel tank requirement, and the need for a factory load bank test. The addendum confirms that the City has the necessary equipment on site to offload the generator from a flatbed truck.

The addendum does not provide details on the overall project scope, quantities, response deadlines, contract term, or other key solicitation information. Pricing terms, funding sources, or incumbent information are also not included in this addendum.

View the file

Other files

File Type Posted
RFP_Generator.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NUMBER 1

March 11th, 2024

Project: Parker Engineering Project Number: PE23248 New Towable Generator City of Springfield

ACKNOWLEDGE RECEIPT OF THIS ADDENDUM BY INSERTING ITS NUMBER IN YOUR

PROPOSAL SUBMISSION FORM-ATTACHMENT I. FAILURE TO DO SO MAY SUBJECT

BONA FIDE BIDDERS TO DISQUALIFICATION. THIS ADDENDUM FORMS A PART OF

THE BIDDING DOCUMENTS WHICH ARE HERBY MODIFIED IN THE FOLLOWING

RESPECTS:

I. CONTRACTOR QUESTIONS

A. Would Triton Power brand generator be acceptable?

Answer: A triton brand generator would be acceptable. All specs should meet the requirements in the RFP.

B. Would Blue Star brand generator be acceptable?

Answer: A Blue Star generator would be acceptable. All specs should meet the requirements in the RFP.

C. Is a fuel tank of at least ½ full a hard requirement for this project?

Answer: No. Since DOT regulations prohibit transporting equipment with fuel, this will be waived.

D. Would a documented 2 hr. load bank test at factory be acceptable?

Answer: This will suffice.

E. Is there equipment on site to offload from a flatbed truck?

Answer: Yes.

END ADDENDUM #1

File details come from the government source that posted it. Updated .