PDPG26-2400 WMWD - PFAS Groundwater Soil Contamination-SOW.pdf
PDF 364 KB Posted
- Solicitation number
- PDPG262400
About this file
This is a Statement of Work for construction disposal services related to PFAS (per- and polyfluoroalkyl substances) contaminated soil remediation at March Air Reserve Base, California under Project No. PDPG26-2400, managed by the 452d Civil Engineer Squadron.
The contractor shall provide all equipment, labor, and supervision necessary to dispose of PFAS-contaminated soil in compliance with federal, state, and local regulations. Key requirements include: (1) on-site handling and storage with stockpile control using plastic sheeting and berms, non-RCRA contaminated soil limited to 90-day accumulation on impermeable surfaces, and continuous air monitoring during excavation; (2) testing and classification of excavated soil at certified laboratories to determine hazard status—RCRA Hazardous materials exceeding federal EPA toxicity thresholds require disposal in Class I hazardous waste landfills, while California Hazardous (Non-RCRA) materials containing substances like aerially deposited lead or petroleum hydrocarbons exceeding Title 22 limits require appropriate classification; (3) transportation and tracking via hazardous waste manifests using state tracking systems, licensed hazardous waste transporters only, and vehicle decontamination before leaving the site. The contractor must comply with applicable federal, state, and local statutes, Air Force/DoD instructions, Unified Facilities Criteria (UFC), OSHA regulations, March ARB Environmental Protection Guide, Specification 01 57 19 Temporary Environmental Controls, and California Department of Environmental Protection rules. The performance period is referenced to a separate project schedule document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI_PFAS_20260810.pdf | ||
| PDPG26-2400 WMWD - PFAS Soil Contamination-PWS 14Jul26.pdf | ||
| Official_RFI_Response_Document.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK WMWD Sewer Rehabilitation Project - PFAS Groundwater Contamination
MARCH ARB, CA 1
CUI
CUI
STATEMENT OF WORK
FOR
WMWD Sewer Rehabilitation Project - PFAS Groundwater Soil Contamination
PROJECT NO:
PDPG26-2400
452d CIVIL ENGINEER SQUADRON
452d MISSION SUPPORT GROUP
June 1, 2026
STATEMENT OF WORK WMWD Sewer Rehabilitation Project - PFAS Groundwater Contamination
MARCH ARB, CA 2
CUI
TABLE OF CONTENTS
PART 1 - INTRODUCTION
1.1 SCOPE
1.2 ON-SITE HANDLING AND STORAGE
1.2.1 Stockpile Control
1.2.2 Non-RCRA contaminated soil
1.2.3 Air Monitoring
1.3 TESTING AND CLASSIFICATION
1.3.1 RCRA Hazardous
1.3.2 California Hazardous (Non-RCRA)
1.4 TRANSPORTATION AND TRACKING
1.4.1 Hazardous Waste Manifest
1.4.2 Licensed Haulers
1.4.3 Vehicles
PART 2 - ADMINISTRATIVE AND MANAGERIAL REQUIREMENTS
STATEMENT OF WORK WMWD Sewer Rehabilitation Project - PFAS Groundwater Contamination
MARCH ARB, CA 3
CUI
CUI
PART 1 - INTRODUCTION
This Statement of Work (SOW) defines the requirements for construction disposal services at March ARB, CA.
The Contractor shall provide all equipment, labor, and supervision necessary for PDPG26-2400 WMWD Sewer Rehabilitation Project - PFAS Groundwater Soil Contamination disposal at March Air Reserve Base, California in accordance with the terms and conditions of the contract, contract statement of work contract specifications, federal, state, and local codes, laws, and regulations.
All quantities, dimensions and areas given within the statement of work are approximation only.
Contractor is responsible to verify all quantities, dimensions, and areas.
Work shall include, but is not limited to the following:
1.1 SCOPE
This SOW defines the scope for this task order to dispose of PFAS contaminated soil. Work shall be in accordance with Air Force technical guidelines and regulatory requirements.
1.2 ON-SITE HANDLING AND STORAGE
To prevent cross-contamination and runoff during excavation, sites must follow best management practices:
1.2.1 Stockpile Control: Soil piles must be covered with plastic sheeting or tarps and surrounded by berms.
1.2.2 Non-RCRA contaminated soil can only be accumulated on-site for up to 90 days on impermeable surfaces (like HDPE liners) before transport.
1.2.3 Air Monitoring: Dust and air quality must be continuously monitored during excavation and loading.
1.3 TESTING AND CLASSIFICATION
Prior to disposing of any soils taken from the construction site, obtain samples representative of possible PFAS. Do not transport material from the project site either for reuse or disposal until tests have been approved. Positive test soils to be removed off site in accordance with Resource Conservation and Recovery Act (RCRA) guidelines for off-site disposal. Excavated soil must be analyzed at a certified laboratory to determine its hazard classification:
1.3.1 RCRA Hazardous: Exceeds federal EPA toxicity thresholds (e.g., highly toxic, corrosive, or reactive). Must be disposed of in a specialized Class I hazardous waste landfill.
STATEMENT OF WORK WMWD Sewer Rehabilitation Project - PFAS Groundwater Contamination
MARCH ARB, CA 4
1.3.2 California Hazardous (Non-RCRA): Contains specific chemicals (like aerially deposited lead or petroleum hydrocarbons) at levels exceeding California's Title 22 limits.
1.4 TRANSPORTATION AND TRACKING
Moving hazardous dirt off-site requires strict logistical and legal tracking.
1.4.1 Hazardous Waste Manifest: All shipments must be documented using the state's tracking system.
1.4.2 Licensed Haulers: Soil must be hauled by registered hazardous waste transporters.
1.4.3 Vehicles: Transport trucks must be decontaminated before leaving the site to prevent off-site tracking of hazardous material.
PART 2 - ADMINISTRATIVE AND MANAGERIAL REQUIREMENTS
The Contractor shall provide management, planning, performance measurement, and cost status reporting pertinent to the performance of the requirements identified in this SOW.
Governing Codes, Criteria, Regulations and Industry Guidance.
Contractor shall comply with the following:
All applicable federal, state, and local statutes, instructions, manuals, handbooks, regulations, guidance, policy letters, and rules (including all changes and amendments), and Presidential Executive Orders, pertaining to the work. It is contractor responsibility to know the requirements of the latest editions and changes and follow the requirements. Contractor must raise any questions in the form of a request for Information (RFI) to seek clarification of the applicability or conflicts between the applicable requirements. General requirements to be followed include:
Air Force/DoD Military instructions, manuals, handbooks, regulations, guidance, and policy letters, Construction must meet the latest requirements set forth in the following guidance and are applicable in the priority listed:
• UNIFIED FACILITIES CRITERIA (UFC) - http://www.wbdg.org/ffc/dod/unified-facilities-criteria-UFC
• OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION (OSHA)
REGULATIONS UL SAFETY STANDARDS
• SPECIFIC AND LOCAL REQUIREMENTS:
O MARCH ARB ENVIRONMENTAL PROTECTION GUIDE REPLACES UFS
STATEMENT OF WORK WMWD Sewer Rehabilitation Project - PFAS Groundwater Contamination
MARCH ARB, CA 5
CUI
CUI
SPECIFICATION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
O CALIFORNIA DEPARTMENT OF ENVIRONMENTAL PROTECTION
RULES AND REGULATIONS
Total performance period for the entire contract is See Project Schedule.
END OF STATEMENT OF WORK.
| part 1 - INTRODUCTION |
| 1.1 SCOPE |
| 1.2 On-site Handling and Storage |
| 1.2.1 Stockpile Control: Soil piles must be covered with plastic sheeting or tarps and surrounded by berms. |
| 1.2.2 Non-RCRA contaminated soil can only be accumulated on-site for up to 90 days on impermeable surfaces (like HDPE liners) before transport. |
| 1.2.3 Air Monitoring: Dust and air quality must be continuously monitored during excavation and loading. |
| 1.3 Testing and classification |
| Prior to disposing of any soils taken from the construction site, obtain samples representative of possible PFAS. Do not transport material from the project site either for reuse or disposal until tests have been approved. Positive test soils to be re... |
| 1.3.1 RCRA Hazardous: Exceeds federal EPA toxicity thresholds (e.g., highly toxic, corrosive, or reactive). Must be disposed of in a specialized Class I hazardous waste landfill. |
| 1.3.2 California Hazardous (Non-RCRA): Contains specific chemicals (like aerially deposited lead or petroleum hydrocarbons) at levels exceeding California's Title 22 limits. |
| 1.4 TRANSPORTATION AND TRACKING |
| 1.4.1 Hazardous Waste Manifest: All shipments must be documented using the state's tracking system. |
| 1.4.2 Licensed Haulers: Soil must be hauled by registered hazardous waste transporters. |
| 1.4.3 Vehicles: Transport trucks must be decontaminated before leaving the site to prevent off-site tracking of hazardous material. |