pdf_net_Decatur_Legacy_Park_Edwards_and_Trust.pdf
PDF 1 MB Posted
- Solicitation number
- PE-64458-NONST-2026-000000023
- Issued by
- Dekalb County, Georgia
About this file
Decatur Legacy Park Edwards and Trustees Renovation - Bid Package
This is a sealed bid solicitation issued by the City of Decatur, Georgia for renovation of two historic cottages (Edwards and Trustees) located at 500 South Columbia Drive, Decatur, Georgia 30030. The project encompasses roofing, plumbing, HVAC system installation, and interior and exterior repairs to support conversion of these buildings into affordable residential apartments and artist studio spaces as part of the Creative Village component of the Legacy Park Master Plan. The Edwards Cottage contains five apartments requiring roof replacement with 30-year asphalt shingles, new HVAC systems (two 4-ton electric AC units and two 4-ton electric furnaces), water heater installation, interior painting and repairs, kitchen and bathroom updates including granite countertops and comfort-height toilets, flooring repairs, washer/dryer installation, and electrical work to separate power meters. The Trustees Cottage contains three apartments requiring similar scope of work with additional specifications for accessible walk-in shower installation, floor leveling in one bathroom, and window blind installation. Both buildings require new gutters and downspouts, exterior trim repairs, attic insulation to R-38, and fire safety verification. A mandatory pre-bid conference is scheduled for February 24, 2026 at 10:00 AM on-site. Sealed bids are due by March 10, 2026 at 10:00 AM, with three copies required (one marked original). Bidders must submit proposals to the City Manager's Office, second floor of Decatur City Hall. Questions must be submitted by email to Felix Floyd, Assistant Public Works Director (felix.floyd@decaturga.com) no later than March 4, 2026 at 3:00 PM. The contract award will be made by the Decatur City Commission following bid review and contractor qualification verification. The completion timeline is 60 days from the Notice to Proceed, with liquidated damages of $200 per calendar day assessed for delays beyond this deadline.
The bid package requires a lump sum proposal for all project work, with pricing to include all labor, materials, equipment, permits, and disposal costs within the established budget. Contractors must demonstrate experience on at least three similar Georgia projects and provide superintendent resumes with their bids. The successful bidder must provide a Certificate of Insurance prior to commencing work, including Commercial General Liability ($1,000,000 per occurrence/$2,000,000 general aggregate), Automobile Liability ($1,000,000 combined single limit), Umbrella coverage ($1,000,000 or greater of contract value), and Workers' Compensation Insurance. All work is subject to a 12-month warranty covering materials and labor defects from the date of substantial completion. The contractor is responsible for site security, refuse disposal, and maintaining construction hours of 7:00 AM to 6:00 PM Monday through Friday and 9:00 AM to 5:00 PM on Saturdays. Payment will be made upon final invoice submission within 30 days of project completion and acceptance, with 10 percent retainage withheld until substantial completion. The bid package is available at no cost at www.decaturga.com/requestforproposals. All contractors and subcontractors must comply with E-Verify requirements and Georgia D.O.L. regulations and provide non-collusion affidavits with proposals.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Decatur Legacy Park Edwards and Trustees Renovation
Owner:
City of Decatur
509 North McDonough Street
P. O. Box 220
Decatur, Georgia 30031
February 6, 2026
TABLE OF CONTENTS
ITEM PAGE NUMBER
Notice to Bidders NTB-1
Instructions to Proposers IP-1 to IP-3
Non-Collusion Affidavit NC-1
Proposal P-1 to P-2
Agreement A-1 to A-2
General Conditions GC-1 to GC-8
Special General Conditions SGC-1 to SGC-2
E-Verify and SAVE Requirements E-1 to E-5
Scope of Work SCOPE-1
NOTICE TO BIDDERS
The City of Decatur will receive sealed bids for the Decatur Legacy Park Edwards and
Trustees Renovation, Decatur, Georgia 30030, until March 10, 2026 at 10:00 AM in the City
Commission Room at Decatur City Hall, 509 North McDonough Street, Decatur, Georgia, 30030, at that time and place all bids will be publicly opened and read aloud. This work project includes renovating the Edwards and Trustees Cottages at 500 South Columbia Drive, Decatur, Georgia 30030.
The proposals must be mailed or hand delivered to the City Manager’s Office on the 2nd
Floor of the Decatur City Hall (509 North McDonough Street, Decatur, GA 30030) and shall be marked “Decatur Legacy Park Edwards and Trustees Renovation” The bidder must submit three (3) copies of their proposal with one marked original.
A mandatory pre-bid conference is scheduled for 10:00AM, February 24, 2026, onsite at 500 South Columbia Drive, Decatur, GA 30030 in the Edwards and Trustees Buildings. Any questions regarding bids and/or misunderstandings that may arise from this proposal should be submitted, via email and should be directed to Felix Floyd, Assistant Public Works Director, at felix.floyd@decaturga.com, no later than March 4, 2026 at 3:00PM.
The bid package for the Decatur Legacy Park Edwards and Trustees Renovation is available online at no charge at www.decaturga.com/requestforproposals.
The Contractor must ensure that employees and applicants for employment are not discriminated against because of their gender, race, color, genetic information, religion, national origin, political affiliation, age, handicapped status, sexual orientation, sexual preference, or gender identity and expression.
Proposals will be considered only from experienced and well-equipped contractors. Prior to beginning construction, the successful bidder will file with the City a certificate of insurance.
The City reserves the right to reject any or all bids or to waive informalities in the bidding.
Bids may be held by the City for a period not to exceed sixty (60) days from the date of the opening of bids for the purpose of reviewing the bids and investigating the financial stability of the bidders and their demonstrated ability to perform satisfactorily, prior to awarding the contract.
NTB-1
INSTRUCTIONS TO PROPOSERS
1. EXAMINATION OF SITE AND CONTRACT DOCUMENTS
(a) Proposers shall inform themselves of all conditions under which the work is to be performed, concerning the site of the work, the structure of the ground, the obstacles which may be encountered, whether shown in the Contract Specifications or not, and all other relevant matters concerning the work to be performed.
A Contractor to whom a contract is awarded will not be allowed any extra compensation by reason of any such matters or things concerning which the Contractor did not inform themself prior to proposing. The successful Contractor must employ, as far as possible, such methods and means in the carrying out of this work as will not cause any interruption or interference with any other Contractors.
(b) Proposers must satisfy themselves by personal examination of the locations of the proposed work and by such other means as they may prefer locations of the proposed work and by such other means as they may prefer as to the correctness of any quantities listed in the proposal, and shall not, after submission of their proposal, dispute or complain of such estimate nor assert that there was any misunderstanding in regard to the nature or amount of work to be done.
(c) Before submitting a proposal, each Proposer shall examine carefully the complete Contract
Documents, including but not limited to Instructions to Proposers, Non-Collusion Affidavit, General Conditions, Special Conditions, the Form of Agreement and Bonds (if any), Plans and
Specifications and all Addenda thereto, all of which contain provisions applicable not only to the successful Proposer but also to any of your subcontractors.
(d) Each proposer is expected to base their proposal on materials and equipment complying fully with the Contract Specifications, and in the event you name or include in your proposal, materials or equipment which do not conform you will, if awarded a contract, be responsible for furnishing materials and equipment which fully conform at no change in his contract price.
Proposer hereby certifies that ____________________________________________, a
(Name) duly qualified representative of , (Firm Name) inspected all job locations on ____________________________________________.
(Fill in Dates)
IP-1
2. INTERPRETATION OF CONTRACT DOCUMENTS
If any person contemplating submitting a proposal on this project is in doubt as to the true meaning of any part of the Contract Specifications or other Sections of the Contract Documents, you may submit to the Owner a written request for an interpretation thereof. The person submitting the request will be responsible for its prompt delivery. Any interpretation of the
Contract Documents including the Contract Specifications will be made only by addendum duly issued or delivered by the Owner to each person receiving a set of such documents. The Owner will not be responsible for any other explanations or interpretations of the Contract Documents including the Contract Specifications.
3. APPROXIMATE QUANTITIES
On all items on which proposals are to be received on a unit price basis the quantities stated in the Proposal will not be used in establishing final payment due the Contractor. The quantities stated on which unit prices are so invited, are approximate only, and each proposer shall make their own estimate from the Contract Specifications of the quantities required on each item and calculate your unit price proposal for each item accordingly. Proposals will be compared on the basis of the number of units stated in the Proposing Schedule set forth in the Proposal. Payment on the contract on unit price items will be based on the actual number of units installed on the completed work. Lump Sum proposal items shall be supported by a Schedule of Values as established in the Contract Specifications.
4. SIGNING OF PROPOSALS
If the proposer is a corporation, the legal name of the corporation shall be set forth together with the signature of the officer or officers authorized to sign contracts on behalf of the corporation; if proposer is a co-partnership, the true name of the firm shall be set forth together with the signatures of all the partners; and if proposer is an individual, his signature shall be inscribed. If signature is by agent, other than an officer of a corporation or a member of a partnership, a power of attorney must be on file with the Owner prior to opening proposals or submitting proposals; otherwise, the proposal may be disregarded as irregular and unauthorized.
5. QUALIFICATION OF PROPOSERS
It is the intention of the Owner to award a contract only to a proposer who furnishes satisfactory evidence that they have the requisite experience and ability and that he/she has sufficient capital, facilities and plant to enable them to prosecute the work successfully and promptly, and to complete the work within the time named in the Contract Documents.
IP-2
To determine the degree of responsibility to be credited to a proposer, the Owner will weigh any evidence that the proposer or personnel guaranteed to be employed in responsible charge of the work has or has not performed satisfactorily on other contracts of like nature and magnitude or comparable difficulty at similar rates of progress.
6. DISQUALIFICATION OF PROPOSERS
More than one proposal for the work described in this Document, to be included under a
Contract, from an individual, firm or partnership, a corporation or an association under the same or different names, will not be considered. Reasonable grounds for believing that any proposer is interested in more than one proposal for the work contemplated will cause the rejection of all proposals in which such proposer is interested. If there are reasonable grounds for believing that collusion exists among the proposers, the proposals of the participants in such collusion will not be considered.
7. AGREEMENT, BONDS, INSURANCE
The attention of proposers is specifically directed to the forms of agreement and bonds to be executed and types of insurance to be taken out in the event a contract award is made.
8. FAILURE TO EXECUTE AGREEMENT AND FILE REQUIRED BONDS AND
INSURANCE
Failure of a successful proposer to execute the agreement and file required bonds and insurance within the required time shall be just cause for the annulment of the award. On failure of a successful proposer to execute the agreement and file the required bonds and insurance within the required time, he shall forfeit his proposal security as agreed as liquidated damages, and the proposer, by filing a proposal, agrees to this proviso. Upon annulment of an award as aforesaid, the Owner may then award a contract to the next lowest responsible proposer.
9. PROPOSALS
Proposals shall include the following forms properly executed by the Proposer:
Instructions to Proposers Form
Proposal for Construction
Non-Collusion Affidavit
Special General Conditions Form
E-Verify Forms
IP-3
NON-COLLUSION AFFIDAVIT OF PRIME BIDDER
State of ______________.
County of ______________.
______________________________________, being first duly sworn deposes and says that:
(1) He/She is ______________________________________________ of
(owner, partner, officer representative, or agent)
_____________________________________________, the Bidder that has submitted the attached Bid;
(2) He/She is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not collusive or sham bid;
(4) Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, has in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted or to refrain from bidding in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Bidder, firm or person to fix the price or prices in the attached Bid or of any other Bidder, or, to fix any overhead, profit or cost element of the bid price or the bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantage against the City of Decatur, Georgia or any person interested in the proposed Contract; and
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affiant.
Signed: ________________________________
(Title)
Subscribed and sworn to before me this ________day of ______________, 20____
Notary Public
My commission expires _____________________ .
NC-1
PROPOSAL FOR CONSTRUCTION
STATE OF GEORGIA,
COUNTY OF DeKALB
PROPOSAL OF:
TO THE CITY MANAGER OF THE CITY OF DECATUR, GEORGIA:
The undersigned, as contractor, hereby submits this proposal for
The contractor has made a personal examination of the site of the proposed work and proposes and agrees that if this proposal is accepted to provide the necessary labor, machinery, tools, apparatus, equipment and all things necessary to complete the work in the manner and within the time stipulated in the General Conditions and proposal, all of which documents contractor declares he has carefully examined and same are annexed to and made a part of this proposal, for the Lump Sum set out below, to wit:
1. Edwards and Trustees Renovation
Total: $ _____________________
Total (written) __________________________________________________________
Pricing Alternative:
P-1
No contractor may withdraw his/her proposal within sixty (60) days after the actual date of the opening of thereof. Proposals may be held by the City for a period not to exceed sixty (60) days from the date of the opening of Proposals for the purpose of reviewing the Proposals and investigating the qualifications of the contractor prior to awarding the contract.
If awarded a Contract under the Proposal, the undersigned proposes to complete work within sixty (60) days of the notice to proceed.
If this proposal is accepted by the City of Decatur and the undersigned shall fail to execute a satisfactory Contract in the form of said proposed Contract and give satisfactory bonds and insurance as required by the City within ten days (Sunday excepted) from the date of notification of acceptance by the City, then the City may at its option determine that the undersigned abandoned the Contract and thereupon this proposal shall be null and void.
Contractor further declares that the full name and residence address of all persons and parties interested in the foregoing proposal as principals are as follows:
Signed, sealed and dated this_________ day of
_____________________, 20_______.
By __________________________
(Title)
P-2
AGREEMENT
GEORGIA, DeKALB COUNTY
THIS AGREEMENT, made and entered into this _________ day of
_____________________, 20______, by and between the City of Decatur, Georgia, Party of the
First Part, hereinafter referred to as the City, and
(Corporation, Partnership or Proprietorship) of the State of Georgia, Party of the Second Part, hereinafter called the Contractor.
WITNESSETH:
That the Contractor has agreed and by these presents does agree with the City to furnish all equipment, tools, materials, skill, labor of every description, and all things necessary to carry out and complete in a good, firm, substantial and workmanlike manner the work and construction in strict conformity with the specifications for:
which together with the Proposal, Instructions to Proposers, Non-Collusion Affidavit, General
Conditions, Special General Conditions, and E-Verify Forms, and Project Plans and
Specifications are incorporated in and made a part of this Contract by reference.
The Contractor shall commence work under this Contract as soon as possible after the award and must complete work no later than 60 (sixty) days after the Notice to Proceed.
If said work is not completed within the time stated above, the Contractor shall be liable and hereby agrees to pay the City as liquidated damages and not as a penalty the sum of $200 dollars per calendar day for each and every day or part of a day thereafter that said work remains incomplete.
As full payment for the faithful performance of this Contract, the City shall pay said
Contractor for the actual quantities of work done at the price set forth in the proposal.
Payments shall be made as follows: Upon the presentation of a Final Invoice for Payment within thirty days after the work is fully completed and accepted by the City of Decatur, the balance due hereunder shall be paid; provided, however, that final payment shall not be made until said Contractor shall submit satisfactory proof to the City that all just claims for labor, material, skill, tools, and equipment incident to said work have been
A-1 fully paid by said Contractor, and that said Contractor has settled and satisfied every lawful claim for damages against the Contractor incident to said work.
Within ten calendar days from the date of this Contract, the Contractor as principal shall provide the required Certificate of Insurance as outlined in the General Conditions for the amounts and terms as specified therein.
This Contract, executed in triplicate, constitutes the full agreement between the parties, and no part of this Contract shall be sublet by the Contractor without written approval of the
City.
IN WITNESS WHEREOF, the parties hereto have set their hands and caused their seals to be affixed hereupon the day and year first above written.
CITY OF DECATUR, GEORGIA
(Party of the First Part)
By: ________________________
City Manager
ATTEST:
Clerk
Contractor
(Party of the Second Part)
By: _______________________
Title: ______________________
A-2
GENERAL CONDITIONS
1. HOLD HARMLESS AGREEMENT, INTERMEDIATE FORM
2. CONTRACTOR'S BONDS
3. CONTRACTOR’S WARRANTY
4. CONTRACTOR'S INSURANCE
5. NONDISCRIMINATION IN EMPLOYMENT
6. DEFINITIONS
7. SAFETY
8. LAWS TO BE OBSERVED
9. PROVISIONS OF LAW
10. SUBCONTRACTORS
11. LICENSES, PERMITS, AND REGULATIONS
12. TAXES
13. LOCATION OF EXISTING UTILITIES AND PIPING
14. PROGRESS ESTIMATES AND PAYMENTS
15. CHANGE IN WORK, ALTERATIONS, OMISSIONS & EXTRA WORK
16. E-VERIFY AND SAVE REQUIREMENTS
GC-1
1. HOLD HARMLESS AGREEMENT, INTERMEDIATE FORM
The Contractor agrees to indemnify and save harmless the Owner, the Architect, the Engineer, and all of their officers, partners, agents and employees from and against all loss or expense (including court costs and attorney's fees) by reason of liability imposed by law upon Owner, Architect or Engineer for damages because of bodily injury, including death at any time, resulting therefrom sustained by any person or persons or on account of damage to or destruction of property, real or personal, including loss of use thereof, arising out of or in consequence of performance of this work, whether such injuries to property are due or claimed to be due to the negligence of the Contractor, his Sub-Contractors, the Owner, Architect or Engineer, their officers, Partners, agents and employees except only such injury, death or damage as shall have been occasioned by the sole negligence of the Owner, Architect or Engineer.
2. CONTRACTOR’S WARRANTY
Contractor warrants to the Owner that, for a period of one (1) year from the date of substantial completion, the work performed under this Contract will conform to the requirements of the Contract
Drawings and Specifications and will be free from defects. If at any time prior to substantial completion or within one (1) year after substantial completion, Owner discovers that the work does not conform to the requirements of the Contract Drawings and Specifications or is not free from defects, Contractor shall promptly correct such work within a reasonable time of receiving written notice from the Owner. If the work is not corrected by Contractor within a reasonable time of receiving written notice from the Owner, Owner may undertake to correct the work. Owner’s undertaking of such corrective work shall not limit in any way Owner’s rights of recourse against Contractor or Owner’s rights of recourse against Contractor’s surety under the Faithful Performance Bond.
3. CONTRACTOR'S INSURANCE
The Contractor shall, at the time of execution of this Contract, file with the Owner the certificate of insurance as contained in the Agreement, which shall cover all of the Contractor’s insurance as required herein including evidence of payment of premiums thereon, and the policy or policies of insurance covering said Owner, the Engineer and their officers, agents and employees. Each such policy and certificate shall be satisfactory to the Owner and shall bear an endorsement precluding the cancellation or reduction in coverage without giving the Owner at least fifteen (15) days prior notice thereof in writing. All policies shall be written by insurers licensed to do business in the State of Georgia and acceptable to the Owner, with a current A.M. Best rating of no less than A-:VII. All coverages indicated on the certificate of insurance shall be included in the Comprehensive General Liability and
Automobile Liability insurance policies unless they are not applicable due to the nature of the work under this Contract Document. Nothing contained in these insurance requirements is to be construed as limiting the extent of the Contractor's responsibility for payment of damages resulting from its operations under this Contract.
On all required coverages, the Contractor shall secure from all subcontractors certificates of insurance as evidence that each subcontractor carries insurance to provide coverage under this Contract up to the same minimum limits required of the Contractor in this Agreement. The Contractor shall submit copies of its subcontractors’ insurance certificates to the Owner and Engineer as evidence of such insurance coverage. The Contractor acknowledges and agrees that each subcontractor performing work for this Contract will meet these minimum insurance requirements and that any costs or uninsured events arising from or involving a subcontractor working on behalf of the Contractor for this Contract is the sole
GC-2
responsibility of the Contractor. The Contractor agrees to indemnify said Owner for any costs, expenses or damages that may arise from any subcontractor having insufficient insurance coverage.
(a) Public Liability and Property Damage Insurance – The Contractor shall take out, pay for, and maintain until completion and acceptance of the work required by this Contract, public liability and property damage insurance as shall protect the Contractor and the said Owner from all claims for bodily injury and property damage which may arise because of the nature of the work or from operations under
The Contractor is not required to have its subcontractors named as co-insureds in the Contractor’s policy of public liability and property damage; but the policy shall protect the Contractor and the Owner from contingent liability which may arise from operations of subcontractors.
Each of said policies of insurance shall provide coverage in the following minimum amounts:
Commercial general liability insurance with a minimum combined bodily injury and property damage limit of One Million Dollars ($1,000,000) per occurrence, a personal and advertising injury limit of One
Million Dollars ($1,000,000), a products-completed operations aggregate limit of Two Million Dollars
(2,000,000) and a general aggregate limit of Two Million Dollars ($2,000,000) per location.
$1,000,000 Each Occurrence Limit
$1,000,000 Personal and Advertising Injury Limit
$2,000,000 Products/Completed Operations Aggregate
$2,000,000 General Aggregate
(b) Comprehensive Automobile Liability - The Contractor shall also take out, pay for, and maintain until completion and acceptance of the work required by this Contract, automobile public liability and property damage insurance as shall protect the Contractor and said Owner from claims for bodily injury or property damage which may arise from the use of motor vehicles engaged in various operations under this Contract.
The policy or policies of automobile insurance shall provide coverage in the following minimum amounts: Automobile liability insurance covering owned, hired and non-owned vehicles, with separate coverage in an amount not less than One Million Dollars ($1,000,000) combined single limit for bodily injury and property damage.
$1,000,000 Bodily Injury or death to any one person
$1,000,000 Bodily Injury, each occurrence
$1,000,000 Property Damage, each occurrence
(c) Umbrella Policy- The Contractor shall have an umbrella policy over General Liability, Automobile Liability, Workers’ Compensation/Employers’ Liability and any such policies that the umbrella can be placed over that involves insurance that is applicable to the work under this contract or at least applicable to the minimum required insurance under this contract. The policy shall be placed in the amount of One Million Dollars ($1,000,000) or an amount equal to that to be paid for the work being performed under this agreement, whichever is greater.
GC-3
(d) Workers’ Compensation Insurance - Before beginning the work, the Contractor shall furnish to the Owner satisfactory proof that it has taken out, for the period covered by the work under this
Contract, Statutory Workers’ Compensation and Employers’ Liability Insurance. Such insurance shall be maintained in full force and effect during the period covered by this Contract.
(e) Notification of Insurance Companies - The Contractor shall advise all insurance companies to familiarize themselves with all of the conditions and provisions of this Contract, and insurance companies shall waive the right of special notification or any change or of decreased or increased work, or of cancellation of the Contract or of any other act or acts by the Owner or its authorized employees and agents, under the terms of this Contract and failure to so notify the aforesaid insurance companies of changes shall in no way relieve the insurance companies of their obligation under this Contract.
(f) Indemnification - The Contractor shall indemnify and save harmless the Owner, the Engineer and all of their officers, agents, and employees from all suits, actions or claims of any character brought for or on account of any injuries to or death of or damages received by any person, persons or property resulting from the operations of the Contractor or any of its subcontractors, in prosecuting the work under
(g) Additional Insured-The Contractor shall name the Owner as an additional insured and shall provide Owner with proof thereof with the certificate of insurance and copy of endorsement that meets the additional insured requirement or specifically lists owner as additional insured for said contract in the policy for said work by Contractor on behalf of this Contract.
(h) Subrogation Waiver-The Contractor waives all rights of subrogation against the Owner.
Written evidence that each respective insurer acknowledges and agrees to such waivers of subrogation rights shall be submitted to Owner prior to commencement of the project (at minimum, a certificate of insurance, followed by a copy of an endorsement or policy language evidencing the insurer’s acknowledgement of and agreement to such waiver). In the event such requirement is not met and/or any subrogation proceeding is commenced by or on behalf of the Contractor or its insurers, the Contractor shall fully indemnify and save harmless the Owner for all costs, expenses and damages resulting therefrom, and shall take action necessary to stop any subrogation proceedings by the Contractor’s insurers.
4. NONDISCRIMINATION IN EMPLOYMENT
During the performance of this Contract, the Contractor agrees as follows:
The Contractor will not discriminate against any employee or applicant for employment because of race, creed, color, religion, sex, national origin, age or disability. The Contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their gender, race, color, genetic information, religion, national origin, political affiliation, age, handicapped status, sexual orientation, sexual preference, or gender identity and expression. Such action shall include, but not be limited to the following: employment, upgrading, demotion, or transfer;
recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation;
and selection for training, including apprenticeship.
GC-4
6. DEFINITIONS
(a) "Owner" shall mean the City of Decatur, Georgia.
(b) "Engineer" shall mean the (Senior Engineer)(Assistant City Manager for Public
Works) (Deputy City Manager) or his/her duly authorized representative.
(c) “Substantial Completion” shall mean the stage in the progress of the work when the work or designated portion thereof is sufficiently complete in accordance with the Contract Documents so that the
Owner can occupy or utilize the work for its intended use.
7. SAFETY
In accordance with generally accepted construction practice, the Contractor will be solely and completely responsible for conditions of the job site, including safety of all persons and property during performance of the work. This requirement will apply continuously and not be limited to normal working hours.
The duty of the Engineer to conduct construction review of the Contractor's performance is not intended to include review of the adequacy of the Contractor's safety measures, in, on, or near the construction site.
8. LAWS TO BE OBSERVED
The Contractor shall keep himself fully informed of all existing and future Federal, State, County, and municipal laws, ordinances and regulations which in any manner affect those engaged or employed in the work or the materials used in the work or the conduct of the work or the rights, duties, powers or obligations of the Owner or of the Contractor or which otherwise affect the Contract, and of all orders and decrees of bodies or tribunals having any jurisdiction or authority over the same. He shall at all times observe and comply with, and shall cause all his agents, sub-contractors and employees to observe and comply with, all such laws, ordinances, regulations, orders and decrees; and shall protect and indemnify the Owner, the Engineer and all of their officers, agents and employees, against any claim, loss or liability arising or resulting from or based upon the violation of any such laws, ordinance, regulation, order or decree, whether by himself or by his agents, sub-contractors or employees. If any discrepancy or inconsistency is discovered in the plans, Contract Drawings, Contract Specifications or other Contract
Documents for the work in relation to such laws, ordinance, regulation, orders or decree, the Contractor shall forthwith report the same to the Engineer.
9. PROVISIONS OF LAW
It is specifically provided that this Contract is subject to all applicable laws and that the rules of law shall prevail over any provision contained in any of the Contract Documents which may be in conflict thereto or inconsistent therewith.
10. SUBCONTRACTORS
The Contractor shall notify the Owner in writing of the names of all Subcontractors he proposes to employ on the Contract and shall not employ any Subcontractors until the Owner's approval in writing covering such Subcontractors has been obtained.
GC-5
The Contractor agrees to be fully and directly responsible to the Owner for all acts and omissions of his Subcontractors and of any other person employed directly or indirectly by the Contractor or
Subcontractors, and this contract obligation shall be in addition to the liability imposed by law upon the
Contractor.
Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the Owner. It shall be further understood that the Owner will have no direct relations with any Subcontractor. Any such necessary relations between Owner and Subcontractor shall be handled by the Contractor.
The Contractor agrees to bind every Subcontractor (and every Subcontractor of a Subcontractor, etc.) by all terms of the Contract Documents as far as applicable to the Subcontractors work unless specifically noted to the contrary in a subcontract approved in writing as adequate by the Owner.
Should any Subcontractor fail to perform in a satisfactory manner the work undertaken by him, such subcontract shall be terminated immediately by the Contractor upon notice from the Owner.
11. LICENSES, PERMITS, AND REGULATIONS
The Contractor shall secure all Federal, State and Local licenses required by law. Contractor shall obtain and pay for all necessary permits. Contractor shall give all notices and comply with all laws, ordinances and regulations bearing on the conduct of the work as drawn and specified. If the Contractor observes that the drawings or Contract Specifications are at variance therewith, they shall promptly notify the Engineer in writing, and any necessary changes shall be adjusted as provided in the Contract for changes in the work.
12. TAXES
Contractor shall, without additional expense to the Owner, pay all applicable Federal, State and local sales and other taxes, except taxes and assessments on the real property comprising the site of the project.
13. LOCATION OF EXISTING UTILITIES AND PIPING
The location of existing and underground utilities, such as gas mains, water mains, electric lines, etc., as shown on the Contract Drawings, have been taken from the record drawings of the parent utility companies where available. However, the Owner does not assume responsibility for the possibility that during construction utilities other than those shown may be encountered or that the actual location of those shown may be different from the locations designated on the Contract Drawings. At the locations wherein detailed positions of these facilities become necessary to the new construction, the contractor shall, at his own expense, furnish all labor and tools to either verify and substantiate the record drawing location or definitely establish the position of the facilities.
Because of the nature of the work, adjustments may be required in new construction to meet existing conditions. Such adjustments shall be made by the Contractor without additional cost to the
Owner.
GC-6
14. PROGRESS ESTIMATES AND PAYMENTS
No payments under this Contract will be made except upon the presentation of Periodical
Estimate for Partial Payment prepared by the Contractor on forms, supplied by Owner, and approved in writing by the Engineer which shall show that the work covered by the payments has been done and the payments therefore are due in accordance with this Contract. Such Payment Forms shall be submitted to the Engineer on the 25th day of a calendar month to permit checking before the end of the calendar month.
Upon presentation of certified copies of purchase bills and freight bills the Owner will, unless specifically stated otherwise in the General Conditions of Contract, include in such monthly estimates payments for materials that will eventually be incorporated in the project, providing that such material is suitably stored on the site of the project, at the time of submission of the estimate for payment. At the time the next following monthly estimate is submitted, certified copies of receipt purchase and freight bills for the stored materials included in the previous monthly payment estimate shall be submitted. If the
Contractor fails to submit proof of payment with the next monthly payment estimate, those items of stored materials for which no proof of payment has been submitted will be deleted from the current payment estimate. Such materials when so paid for by the Owner will become the property of the Owner and in case of default on the part of the Contractor the Owner may use or cause to be used by others these materials in construction of the project. However, the Contractor shall be responsible for safeguarding such materials against loss or damage of any nature whatsoever, and in case of any loss or damage the
Contractor shall replace such lost or damaged materials at no cost to the Owner.
Except as otherwise provided in the immediately preceding paragraph, the first estimate shall be of the value of the work done and of materials proposed and suitable for permanent incorporation in the work, delivered and suitably and safely stored at the site of the work since the Contractor shall have begun the performance of this contract, and every subsequent estimate, except the final estimate, shall be of the value of the work done and materials delivered and suitably stored at the site of the work since the last preceding estimate was made; provided, however, that should the Contractor fail to adhere to the program of completion fixed in this Contract, the Engineer shall deduct from the next and all subsequent estimates the full calculated accruing amount of the liquidated damages (if any) to the date of said estimate, until such time as the compliance with the program has been restored; and provided, also that materials delivered to the site for which payment is included in the estimate shall not be removed from the site of the work prior to its completion without the written consent of the Engineer.
The estimates shall be signed by the Engineer and approved by the Owner, and after such approval the Owner, subject to the foregoing provisions, will pay or cause to be paid to the Contractor, in the manner provided by law, the estimated value of the work performed and of the value of the materials furnished and delivered and unused and suitably and safely stored at the site of the work, such materials to be those which are proposed and suitable for permanent incorporation in the work, less retainage of ten percent (10%).
When fifty percent (50%) of the contract value including change orders and other additions to the contract value provided for by the contract documents is due and the manner of completion of the contract work and its progress are reasonably satisfactory to the Engineer, the Owner shall withhold no more retainage. At the discretion of the Owner and with the approval of the Contractor, the retainage of each subcontractor may be released separately as the subcontractor completes his or her work.
GC-7
If, after discontinuing the retention, the Engineer determines that the work is unsatisfactory or has fallen behind schedule, retention may be resumed at the previous level. If retention is resumed by an
Owner, the contractor and subcontractors shall be entitled to resume withholding retainage accordingly.
At Substantial Completion of the work or such other standard of completion as may be provided in the contract documents and as Engineer determines the work to be reasonably satisfactory, the Owner shall, within 30 days after invoice and other appropriate documentation as may be required by the contract documents are provided, pay the retainage to the Contractor. If at that time there are any remaining incomplete minor items, an amount equal to 200 percent of the value of each item as determined by the Engineer shall be withheld until such item or items are completed. The reduced retainage shall be shared by the Contractor and subcontractors as their interests may appear.
15. CHANGE IN WORK, ALTERATIONS, OMISSIONS & EXTRA WORK
Owner reserves the right to increase or decrease the quantity of any item or portion of the work, or to omit portions of the work, as may be deemed necessary or advisable by the Owner, and, also, to make such alterations or deviations, additions to, or omissions from the work or the Contract
Drawings and Specifications, as may be determined during progress of the work to be necessary or advisable for the proper completion thereof. Upon written order of the Owner, the Contractor shall proceed with the work as increased, decreased or altered.
The Engineer is authorized to order, on behalf of the Owner, minor changes in the work which do not involve extra cost to Owner and which do not change the character of the work; he is not authorized to order any other changes, alterations, omissions, additions, or extra work, unless the same are approved in a Contract Supplement properly authorized in writing by the governing unit of the Owner. No claim of
Contractor for extra compensation because of any change, alteration, omission, addition or extra work will be paid or be payable unless a written order for such charge, alteration, omission, addition or extra work, is signed by the authorized representative of the Owner.
When any changes decrease the amount of work to be done, such changes shall not constitute a basis or reason for any claim by Contractor for extra compensation or damages on account of any anticipated profits which he thereby loses on the omitted work; and Contractor shall not be entitled to any compensation or damages therefore.
16. E-VERIFY REQUIREMENTS
The Contractor shall comply with O.C.G.A. sec. 13-10-19 and Georgia D.O.L. Rule 300-1.02.
The Contractor and any subcontractors shall provide evidence of compliance by executing the Contractor
Affidavit and Agreement included in the Request for Proposal.
GC-8
SPECIAL GENERAL CONDITIONS
A. USE OF EQUIVALENT MATERIALS, PRODUCTS AND EQUIPMENT.
The materials, products and equipment described in the Plans and Specifications establish a standard of required function, dimension, appearance and quality to be met by any proposed equivalent. Proposer shall provide manufacturer's specifications and system description, product data and installation instructions, and warranty, as applicable.
B. BIDDER MUST CHECK APPLICABLE BLANK BELOW:
Proposer affirms it meets exactly the project specifications:
YES__________________ NO__________________
C. DEVIATION FROM PROJECT SPECIFICATIONS MUST BE COMPLETELY
EXPLAINED BY THE PROPOSER. The Owner reserves an absolute right to approve or reject any proposed equivalent materials, products and equipment and may reject any bid which does not exactly meet the Project Specifications.
Proposer will explain exact particulars where the proposal does not meet the Project
Specifications if "NO" is checked above. Use additional sheets and provide drawings, performance and test data as necessary.
D. DELIVERY/COMPLETION. The work must be completed no later than sixty (60) days from the date of the notice to proceed. Proposer shall provide firm dates of work based on a notice to proceed within the stipulated City bid review period:
Start date: ________________________________
Finish date: _______________________________
E. EXPERIENCE. Proposer shall submit a list of at least three (3) projects within the State of
Georgia, of similar size and scope. List shall include project name, location, contact person, telephone number, contract amount and completion date.
Contractor shall use an adequate number of workers who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specific requirements and methods needed for proper performance of this work.
F. WARRANTY AND/OR GUARANTY. All installation shall be under warranty, including all materials and labor, for a period of twelve (12) months against defects, defective materials and/or workmanship, such period to start upon final acceptance of work by the City of Decatur, as required by the General Conditions.
SGC-1
G. SILENCE OF SPECIFICATIONS. The apparent silence of these specifications and any supplemental specifications as to any detail or omission from these specifications of a detailed description concerning any point shall be regarded as meaning only that the best commercial practices are to prevail and that only materials of first quality and correct size, type and design are to be used. All interpretations of the specifications shall be made upon the basis of this statement with the City’s interpretation to prevail.
H. PRE-CONSTRUCTION MEETING. Prior to the City issuing a Notice to Proceed for the commencement of work the Contractor and any designated subcontractor(s) shall attend a pre-construction meeting with representatives of the City. The purpose of this meeting will be to establish the goals and objectives and proposed schedule for the performance of the work. The
City will notify the Contractor of the date and time for this meeting once an award of contract has been made by the City Commission.
I. HOURS OF OPERATION. The hours of operation available to the Contractor to perform the construction for this project are from 7:00 AM to 6:00 PM, Mondays through Fridays and from 9:00 AM to 5:00 PM on Saturdays.
J. ACCESS, SECURITY AND DISPOSAL OF REFUSE.
-Contractor shall arrange access to site with Owner.
-Contractor shall maintain a clean, safe site and shall be responsible for security and protection of site during construction.
-Contractor shall remove and properly dispose of all refuse and materials generated through demolition and construction, and leave site in a clean condition at end of construction.
K. ON-SITE SUPERINTENDENT. Contractor shall employ an experienced superintendent to supervise construction operations and oversee safety at the site. The superintendent shall be an employee of the Contractor and shall be present to supervise all operations by sub-contractors at the site and to receive instructions and other communications from the Owner’s representatives at the site. Contractor shall provide the name and resume of its superintendent with its bid.
SGC-2
BACKGROUND
Legacy Park is a 77-acre park, with 25 historic buildings that once served as the United
Methodist Children’s Home. The property was purchased by the City of Decatur in 2017. A master plan for Legacy Park was adopted by the Decatur City Commission in December, 2018 and is available here: https://www.decaturnext.com/wp-content/uploads/2018/12/Decatur-
Legacy-Park-Master-Plan-FINAL-DRAFT.pdf. The master plan was developed with robust community input and provides a blueprint that balances multiple interests and goals in a way that honors the history and unique characteristics of the property. The Master Plan designated four of the original group homes to serve as the Creative Village. The Creative Village will provide affordable residential apartments in three of the buildings and affordable artist studio spaces in the fourth. This project is focused on upgrades to two of the buildings designated for residential use.
SCOPE OF WORK
DECATUR LEGACY PARK EDWARDS AND TRUSTEES RENOVATION
The professional services sought in this request include roofing, plumbing, HVAC, and interior and exterior repairs as needed. Care is to be exercised to ensure the cost of construction does not exceed the budget. The goal is to repair when possible and replace when necessary. All associated costs must be met from within the budget, including equipment and all permit related expenses.
Edwards Cottage: There are five apartments included in this building. A specific listing of repairs by apartment is available but generally needed work includes:
● New asphalt shingled roof to include repair of rotted roof decking and soffit as needed
○ The Contractor shall remove all existing roofing material down to the decking.
○ The Contractor shall remove all gutters.
○ The Contractor shall inspect decking for damaged decking and replace all damaged decking.
○ The Contractor shall inspect 2X6 rafters and replace damaged rafters.
○ The contractor shall install ice and water barriers in valleys and around roof accessories.
○ The contractor shall install synthetic underlayment Summit 60 or equivalent over the entire deck.
○ The contractor shall install wind resistant starter strips.
○ The Contractor shall install 30 year 3-tab fiberglass shingles in accordance with the manufacturer’s specifications.
○ The Contractor shall install shingles using 4 nails per shingle.
○ The Contractor shall install a new drip edge around the entire roof.
○ The Contractor shall replace all pipe boots using neoprene boots and caps.
SCOPE-1
https://www.decaturnext.com/wp-content/uploads/2018/12/Decatur-Legacy-Park-Master-Plan-FINAL-DRAFT.pdf https://www.decaturnext.com/wp-content/uploads/2018/12/Decatur-Legacy-Park-Master-Plan-FINAL-DRAFT.pdf
○ The Contractor shall install new flashing around the sidewall, pitch breaks
○ and plumbing boots.
○ The Contractor shall install 6 inch seamless gutters.
○ The Contractor shall install downspouts for gutters.
○ The Contractor shall place tarps around the building to catch debris and nails.
○ The Contractor shall dispose of all debris.
● New energy efficient HVAC system, including (2) 4 ton electric AC units, (2) 4 ton electric furnaces with programmable and lockable thermostat and give option for electric HVAC System.
● Installation of two 40-gallon electric water heaters to serve the building
● Repair and replacement of exterior trim, including building columns to match existing materials
● Scraping and painting exterior trim
● Repair window sashes as needed and insure that all windows are operable
● Interior painting and repairs as required to five existing apartments to include:
The installation of low flow, comfort height toilets
Reglaze bathroom fixtures or replace as needed
Repair bathroom and kitchen cabinets and paint
Install new kitchen countertops with heat-resistant granite countertops
Replace oven hoods as required
Repair flooring as required
Patch sheetrock as needed
Install stove and refrigerator in each apartment
Install two residential washer and dryer units in the former “shared” bathroom area and repair sheetrock and paint as needed
Repair plumbing as required
● The Contractor shall install insulation in attic to R-38.
● The Contractor shall verify or replace Fire panel and devices.
● The Contractor shall separate each apartment for 5 power meters.
Apartment #1
A. Patch floor in front room.
B. Replace closet doors in room A and B.
C. Replace toilet.
D. Reglaze tub and sink.
E. Replace light near closet.
SCOPE-2
Apartment #2
A. Replace kitchen hood.
B. Replace 3 closet doors.
C. Replace toilet.
D. Reglaze tub and sink.
E. Replace light near the closet in room B.
F. Repair drywall in room A.
Apartment #3
A. Replace kitchen hood.
B. Replace toilet
C. Reglaze tub and sink.
Apartment #4
B. Replace counter tops.
C. Repair bathroom vanity.
D. Repair leak under sink
E. Replace toilet.
F. Reglaze tub and sink
G. Replace light fixture in closet in room A.
Apartment #5
B. Replace flooring under hood area.
C. Patch drywall.
D. Replace window frame in kitchen.
E. Replace closet light in Room A.
F. Reglaze tub and sink.
G. Replace toilet.
Shared Room
A. Patch drywall.
B. Install washer and dryer.
C. Paint Room.
Trustees Cottage: There are three apartments in this building. A specific list of repairs by apartment is available but work generally includes:
● New asphalt shingled roof to include repair of rotted roof decking and soffit as needed
○ The Contractor shall remove all existing roofing material down to the decking.
○ The Contractor shall remove all gutters.
○ The Contractor shall inspect decking for damaged decking and…
This is the start of the file's text. The full file is on GovTribe.