PD for RFI UC Server Replacement - 5.15.26.docx
DOCX document 115 KB Posted
- Solicitation number
- 36C10B26Q0444
About this file
This is a Product Description document for the Department of Veterans Affairs' Unified Communications Server Replacement Lifecycle Refresh project (TAC Number: VA-27-00001626). The VA's Office of Information and Technology seeks to replace End of Life/End of Service Cisco M5 servers deployed across multiple VA facilities. The replacement hardware must consist of two server types: Item 1 is a VMware VSAN-certified cluster server with 128GB memory, minimum 2.50 GHz CPU with 16 physical cores, 32GB ESXi and 5TB NVMe VSAN storage, quad-port 1GB Ethernet and quad-port 25GB fiber networking, dual power supplies, maximum 2RU rack configuration, and associated cabling. Item 2 is a single server with 64GB memory, minimum 2.50 GHz CPU with 8 physical cores, minimum 1TB RAID-5 SSD storage, quad-port 1GB Ethernet and dual-port 25GB fiber networking, 1RU rack configuration, and dual power supplies. Both require Out-of-Band management and seamless integration with existing collaboration hardware/software. The contractor must provide on-site installation services including complete site surveys documenting power, rack space, network infrastructure, and inventory; project management coordinating with VA Program Managers; and installation of servers, network and power cables, OBM configuration, and verification. Hardware delivery is required within 90 days of award, with installation completion within 180 days. The contractor must provide one-year standard manufacturer warranty and maintenance support for hardware and software, including technical support.
The document establishes comprehensive technical and security requirements including compliance with VA Technical Reference Model (TRM) and Zero Trust security controls mandatory by July 1, 2025; IPv6-only support alongside dual-stack capability; Section 508 accessibility standards; software licensing responsibility; Trusted Internet Connection 3.0 compliance; generative AI restrictions and governance if applicable; and extensive information security and privacy requirements. Contractor personnel require background investigations and security clearances commensurate with task risk levels, with all staff needing VA privacy and security training before system access. The VA retains unlimited rights to all data and intellectual property developed under the contract. Contractors must comply with supply chain security requirements including procurement from Original Equipment Manufacturers or authorized resellers, software bill of materials provision, tamper-evident packaging, product authenticity attestation, vulnerability disclosure procedures, and incident reporting within one hour of detection. Additional requirements include cryptographic compliance with FIPS 140-2 standards, annual security self-assessments, compliance with medical device cybersecurity practices if applicable, and data destruction in accordance with NARA requirements upon contract termination.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C10B26Q0444.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Unified Communications Server Replacement Lifecycle Refresh TAC Number: VA-27-00001626
PRODUCT DESCRIPTION (PD)
DEPARTMENT OF VETERANS AFFAIRS
Office of Information and Technology (OIT), Development, Security, and Operations (DevSecOps) Connectivity & Collaboration Services (CCS) Unified Communications (UC)
Unified Communications Server Replacement Lifecycle Refresh
Date: 4/30/2026
VA-27-00001626
PD Version Number: 1.0
Contents
| 1.0 | PRODUCT REQUIREMENTS | 3 |
| 1.1 | ITEM 1 SALIENT CHARACTERISTICS | 3 |
| 1.2 | ITEM 2 SALIENT CHARACTERISTICS | 3 |
| 1.4 | SERVICES | 4 |
| 2.0 | NOTICE OF THE FEDERAL ACCESSIBILITY LAW AFFECTING ALL INFORMATION AND COMMUNICATION TECHNOLOGY (ICT) PROCUREMENTS (SECTION 508) | 5 |
| 2.1 | SECTION 508 – INFORMATION AND COMMUNICATION TECHNOLOGY (ICT) STANDARDS | 5 |
| 2.2 | COMPATABILITY WITH ASSISTIVE TECHNOLOGY | 6 |
| 2.3 | ACCEPTANCE AND ACCEPTANCE TESTING | 6 |
| 3.0 | INFORMATION TECHNOLOGY USING SUSTAINABLE PRODUCTS | 6 |
| 4.0 | SHIPMENT OF HARDWARE OR EQUIPMENT | 6 |
| 4.1 | SPECIAL SHIPPING INSTRUCTIONS | 7 |
| 4.2 | NATIONAL ACQUISITIONS | 7 |
| 5.0 | GENERAL REQUIREMENTS | 8 |
| 5.1 | VA TECHNICAL REFERENCE MODEL | 8 |
| 5.2 | ZERO TRUST – VA CRITICAL SECURITY CONTROLS | 9 |
| 5.3 | SOCIAL SECURITY NUMBER (SSN) REDUCTION | 9 |
| 5.4 | INTERNET PROTOCOL VERSION 6 (IPV6) | 9 |
| 5.5 | SOFTWARE AND LICENSING REQUIREMENTS | 10 |
| 5.6 | TRUSTED INTERNET CONNECTION (TIC) | 10 |
| 5.7 | GENERATIVE ARTIFICIAL INTELLIGENCE REQUIREMENTS | 10 |
| 5.7.1 | AI SYSTEM/LLM DEVELOPMENT AND OPERATION DOCUMENTATION REQUIREMENTS | 12 |
| 5.7.2 | MONITORING, REPORTING, AND CORRECTIVE ACTION | 14 |
| 5.7.3 | AI MODEL UPDATES AND CHANGE DISCLOSURES | 14 |
| 6.0 | SECURITY AND PRIVACY REQUIREMENTS | 14 |
| 6.1 | POSITION/TASK RISK DESIGNATION LEVEL(S) | 14 |
| 6.2 | CONTRACTOR PERSONNEL SECURITY REQUIREMENTS | 16 |
| ADDENDUM B – VA INFORMATION AND INFORMATION SYSTEM SECURITY/ PRIVACY LANGUAGE | 18 |
PRODUCT REQUIREMENTS
VA Office of Information and Technology (OIT), Development, Security, and Operations (DevSecOps), Connectivity & Collaboration Services (CCS), Unified Communications (UC) has a requirement to replace End of Life (EOL) End of Service (EOS) Cisco M5 Servers currently in service at multiple facilities within the VA’s Enterprise UC environment. This new replacement hardware shall refresh the equipment with new hardware which will be able to be maintained and supported for several years. This hardware is needed to enhance and sustain operations. This Hardware shall be delivered to the site within 90 days of award. A list of requirements can be found in the table below.
Installation efforts shall be included in this effort and completed within 180 days.
The Contractor shall provide the 1-year standard manufacturer’s Warranty/Maintenance support for the hardware and software in addition to the maintenance and technical support.
ITEM 1 SALIENT CHARACTERISTICS
Cluster (per server):
· VMware Virtual Storage Area Network (VSAN) Certified
· Integrates seamlessly with collaboration hardware/software
· Memory: 128GB
· CPU: Minimum 2.50 GHz, Minimum 16 pCPU
· Storage: ESXi Minimum 32GB, VSAN Minimum 5TB (NVMe)
· Network: Quad Port 1GB Ethernet, Quad Port 25GB Fiber
· Power: 2 PSU, C13
· Management: OBM
· Rack: Max 2RU, Rail Kit
· Cables (type and lengths determined during onsite survey)
· 2 Cat8 (OBM)
· 2 Fiber (VSAN direct connects)
· 8 Cat8 or 4 Fiber (network connectivity)
ITEM 2 SALIENT CHARACTERISTICS
Single:
· Integrates seamlessly with collaboration hardware/software
· Memory: 64GB
· CPU: Minimum 2.50 GHz, Minimum 8 pCPU
· Storage: Minimum RAID-5 1TB (SSD)
· Network: Quad Port 1GB Ethernet, Dual Port 25GB Fiber
· Power: 2 PSU, C13
· Management: OBM
· Rack: 1RU, Rail Kit
· Cables (type and lengths determined during onsite survey)
· 2 Cat8 (OBM)
· 8 Cat8 or 4 Fiber (network connectivity)
1.3 Central Management Tool
Must be a large enterprise class central management tool that provides a single pane of glass to manage and monitor all servers deployed across the enterprise. If it is a cloud-based SaaS tool it must be FedRAMP authorized. If it is an on-premises based tool it must be VA TRM approved.
Management Features:
· Firmware upgrades
· Provisioning server configurations
· OS/hypervisor installation
· vKVM Monitoring Features:
· Inventory
· Reporting
· Alarms
· Email notifications Troubleshooting and log collection
0. SERVICES
The Contractor shall provide on-site installation of product including the below:
1. Site Survey
a. Complete site survey documentation to include information on:
i. Power
1. Identify, document and provide pictures of Power Distribution Units and Outlets
ii. Rack
1. Ensure available rack space, document and provide pictures of racks, front and back.
iii. Network
1. Identify, document and provide pictures of switches and ports
2. Measure distances for cable lengths and types and document
iv. Inventory
1. Complete inventory, document and provide pictures
b. Measure distances for cable lengths
c. Provide Pictures
i. Power (Power Distribution Units (PDUs) and Outlets)
ii. Equipment inventory
iii. Racks
iv. Switches and ports
2. Project management to include:
a. Works alongside VA PM
b. Coordinate shipping
i. Provide shipping tracker
c. Hosts weekly and ad-hoc meetings and provides updates
d. Coordinates onsite survey and installation activities
e. Hosts individual site meetings concerning survey and installation activities.
3. Installation
a. Unbox and discard shipping materials
b. Rack servers
c. Run and connect network cables
d. Run and connect power cables
e. Configure OBM
f. Contact VA for verification of installation and health of servers
g. Provide pictures to include
i. Racks
ii. Switches and ports
NOTICE OF THE FEDERAL ACCESSIBILITY LAW AFFECTING ALL INFORMATION AND COMMUNICATION TECHNOLOGY (ICT) PROCUREMENTS (SECTION 508)
SECTION 508 – INFORMATION AND COMMUNICATION TECHNOLOGY (ICT) STANDARDS
The Section 508 standards established by the Access Board are incorporated into, and made part of all VA orders, solicitations and purchase orders developed to procure ICT. These standards are found in their entirety at: Revised 508 Standards and 255 Guidelines (access-board.gov). A single PDF file version of the Revised Section 508 Standards and 255 Guidelines will be supplied upon request, or can be obtained from the Access Board website. Federal agencies must comply with the Rehabilitation Act of 1973, as amended.
The Contractor shall comply with “508 Chapter 2: Scoping Requirements” for all electronic ICT and content delivered under this contract. Specifically, as appropriate for the technology and its functionality, the Contractor shall comply with the technical standards marked here:
| ☐ | E205 Electronic Content – (Accessibility Standard -WCAG 2.0 Level A and AA Guidelines) |
| ☒ | E204 Functional Performance Criteria |
| ☒ | E206 Hardware Requirements |
| ☒ | E207 Software Requirements |
| ☒ | E208 Support Documentation and Services Requirements |
COMPATABILITY WITH ASSISTIVE TECHNOLOGY
The standards do not require installation of specific accessibility-related software or attachment of an assistive technology device. Section 508 requires that ICT be compatible with such software and devices so that ICT can be accessible to and usable by individuals using assistive technology, including but not limited to screen readers, screen magnifiers, and speech recognition software.
ACCEPTANCE AND ACCEPTANCE TESTING
Deliverables resulting from this solicitation will be accepted based in part on satisfaction of the Section 508 Chapter 2: Scoping Requirements standards identified above.
The Government reserves the right to test for Section 508 Compliance before delivery. The Contractor shall be able to demonstrate Section 508 Compliance upon delivery.
INFORMATION TECHNOLOGY USING SUSTAINABLE PRODUCTS
“Not Applicable”
SHIPMENT OF HARDWARE OR EQUIPMENT
Inspection: Destination Acceptance: Destination Free on Board (FOB): Destination
Ship To and Mark For:
Primary
Alternate
Name:
Name:
Address:
Address:
Voice:
Voice:
Email:
Email:
SPECIAL SHIPPING INSTRUCTIONS
Prior to shipping, Contractor shall notify Site POCs, by phone followed by email, of all incoming deliveries including line-by-line details for review of requirements. The Contractor shall not make any changes to the delivery schedule at the request of Site POC.
Contractors shall coordinate deliveries with Site POCs before shipment of all hardware to ensure sites have adequate storage space.
All shipments, either single or multiple container deliveries, shall bear the VA IFCAP Purchase Order number (if applicable) on external shipping labels and associated manifests or packing lists. In the case of multiple container deliveries, a statement readable near the VA Integrated Funds Distribution, Control Point Activity, Accounting and Procurement (IFCAP) Purchase Order (PO) or Contract number shall indicate total number of containers for the complete shipment (e.g. “Package 1 of 2”), clearly readable on manifests and external shipping labels.
Packing Slips/Labels and Lists shall also include the following:
IFCAP PO # or Contract No.: ____________ (e.g., 166-E11234 (the IFCAP PO number is located in block #20 of the Standard Form, SF 1449)) Project Description: (e.g. Tier I Lifecycle Refresh)
Total number of Containers: Package ___ of ___. (e.g., Package 1 of 3)
NATIONAL ACQUISITIONS
The Contractor shall complete the Master Delivery Schedule in accordance with the Instructions, and shall coordinate with the COR for specifics. The Master Delivery Schedule shall be provided after award and updated prior to and after each delivery timeframe.
Shipment/Delivery Kick-off Meeting
The Contractor shall conduct a Shipment/Delivery Kick-off Meeting with the VA Program Manager (PM), COR, Delivery Date Coordinator, Implementation Manager, and Facility CIOs (or designee) to discuss delivery schedule requirements and facilitate delivery of equipment. This meeting may be held in conjunction with the post award conference or identified technical kickoff meeting, if applicable. The Contractor shall also present the Shipment/Delivery Weekly Progress Report format for review and approval by the Government. This meeting, if held independently, shall be conducted telephonically within ten days after award and shall incorporate any delivery schedule changes to the draft Delivery Schedule identified by the Government.
Shipment/Delivery Weekly Progress Report
The Contractor shall provide a Shipment/Delivery Weekly Progress Report which shall identify the items shipped, the serial number associated with each piece of equipment; the date of each shipment; the status of each shipment, tracking information, and information relative to Government-receipt of the equipment items at each delivery site. In addition, the Shipment/Delivery Weekly Progress Report shall identify any problems and provide a description of how the problems were resolved/addressed. If problems have not been completely resolved, the Contractor shall provide an explanation and status of resolution. Shipment/Delivery Weekly Progress Reports shall be submitted in Microsoft Excel Format and shall clearly identify each serial number of the equipment being delivered with one (1) serial number per cell.
Inspection: Destination Acceptance: Destination Free on Board (FOB): Destination
Packing Slips/Labels and Lists shall also include the following:
IFCAP PO #: ____________ (e.g., 166-E11234 (the IFCAP PO number is located in block #20 of the SF 1449)) Project Description: (e.g. Tier 1 Lifecycle Refresh)
Total number of Containers: Package ___ of ___. (e.g., Package 1 of 3)
Deliverables:
A. Master Delivery Schedule B. Shipment/Delivery Weekly Progress Report
GENERAL REQUIREMENTS
VA TECHNICAL REFERENCE MODEL
The Contractor shall comply with the VA OIT Technical Reference Model (VA TRM). Compliance with the VA TRM is achieved by using only technologies and standards that are listed as approved for use in the VA TRM. The Contractor shall provide all necessary information requested by VA to ensure TRM approval is obtained prior to use on VA’s network.
ZERO TRUST – VA CRITICAL SECURITY CONTROLS
VA has established minimum mandatory security requirements and requires that any network connected software system or service must meet the VA Critical Security Controls as outlined in the VA Memorandum, “VA Security Controls”, https://www.voa.va.gov/DocumentView.aspx?DocumentID=5010. VA Critical Security Controls identify the minimum mandatory requirements that must be implemented across all VA enterprise infrastructure, cloud computing environments, information systems, networks, and specialized devices (medical devices/systems, special-purpose systems, and research scientific computing devices) that process, store, and/or transmit VA data. Effective July 1, 2025, the Contractor shall implement these VA Critical Security Controls, within any network connected software system or service prior to being authorized for use in the VA. This functional requirement is not negotiable, and Plan of Action & Milestones (POAM) will not be accepted in the event these controls cannot be implemented for new systems. Critical Security Controls are intended to increase VA’s security posture and provide security and privacy risk visibility into the VA network and is not a new requirement. The Contractor’s failure to maintain these VA Critical Controls after implementation will result in VA discontinuing the use of the system.
SOCIAL SECURITY NUMBER (SSN) REDUCTION
The Contractor solution shall support the Social Security Number (SSN) Fraud Prevention Act (FPA) of 2017 which prohibits the inclusion of SSNs on any document sent by mail. The Contractor support shall also be performed in accordance with Section 240 of the Consolidated Appropriations Act (CAA) 2018, enacted March 23, 2018, which mandates VA to discontinue using SSNs to identify individuals in all VA information systems as the Primary Identifier. The Contractor shall ensure that any new IT solution discontinues the use of SSN as the Primary Identifier to replace the SSN with the Integrated Control Number (ICN) in all VA information systems for all individuals. The Contractor shall ensure that all Contractor delivered applications and systems integrate with the VA Master Person Index (MPI) for identity traits to include the use of the ICN as the Primary Identifier. The Contractor solution may only use a Social Security Number to identify an individual in an information system if and only if the use of such number is required to obtain information VA requires from an information system that is not under the jurisdiction of VA.
INTERNET PROTOCOL VERSION 6 (IPV6)
The Contractor solution shall support IPv6-Only based upon the memo issued by the Office of Management and Budget (OMB) on November 19, 2020 (https://www.whitehouse.gov/wp-content/uploads/2020/11/M-21-07.pdf). Which defines IPv6-only as the state of an operational system or service when IPv4 protocol functions (addressing, packet forwarding) are not in use. The NIST USGv6 profile defines technical requirements for a product to be capable of operating in IPv6-Only environments. IPv6-Only technology, in accordance with the USGv6 Program (https://www.nist.gov/programs-projects/usgv6-program/usgv6-revision-1), NIST Special Publication (SP) 500-267B Revision 1 “USGv6 Profile” (https://doi.org/10.6028/NIST.SP.500-267Br1), and NIST SP 800-119 “Guidelines for the Secure Deployment of IPv6” (https://doi.org/10.6028/NIST.SP.800-119), compliance shall be included in all IT infrastructures, application designs, application development, operational systems and sub-systems, and their integration. In addition to the above requirements, all devices, applications, and systems shall support all applicable functionality on native IPv6-Only as well as dual stack (IPv6 / IPv4) connectivity without additional memory or other resources being provided by the Government, so that they can function in a mixed environment. All public/external facing servers and services (e.g., web, email, DNS, ISP services, etc.) shall support native IPv6-Only and dual stack (IPv6 / IPv4) users and all internal infrastructure and applications shall support using native IPv6-Only and dual stack (IPv6 / IPv4) for all functionality and operations.
SOFTWARE AND LICENSING REQUIREMENTS
The Contractor shall be responsible for the provision of all software licenses and any associated licensing maintenance required for any development, delivery, integration, operation, and/or maintenance associated with its proposed application(s), software products, software solution, and/or system including, but not limited to, any and all application(s), software and/or software products that comprise, are a part of, or integrate with the Contractor’s proposed application(s), software products, software solution, and/or system for the life of any resulting contract.
TRUSTED INTERNET CONNECTION (TIC)
The Contractor solution shall meet the requirements outlined in Office of Management and Budget Memorandum M-19-26, “Update to the Trusted Internet Connections (TIC) Initiative“ (https://www.whitehouse.gov/wp-content/uploads/2019/09/M-19-26.pdf), VA Directive 6513 “Secure External Connections”, and shall comply with the TIC 3.0 Core Guidance Documents, including all Volumes and TIC Use Cases, found at the Cybersecurity & Infrastructure Security Agency (CISA) (https://www.cisa.gov/publication/tic-30-core-guidance-documents.)
GENERATIVE ARTIFICIAL INTELLIGENCE REQUIREMENTS
If Artificial Intelligence (AI) is part of the Contractor system/solution, the Contractor shall be in compliance with E.O. 13960 and 14319, OMB Memorandums M-25-21, M-25-22, and M-26-04, and VA Directive and Handbook 6500 to support VA in trustworthy, secure, responsible, accountable, Truth Seeking, and Ideologically Neutral AI innovation.
No web-based, publicly available generative AI service has been approved for use with VA-sensitive data including, but not limited to OpenAI’s ChatGPT, Microsoft’s Copilot, Google’s Gemini, and Anthropic’s Claude. No PII, protected health information (PHI), or VA-sensitive data should be entered into these unapproved services. The entire definition of VA Sensitive Data can be found at 38 U.S.C. § 5727 (23). The Contractor shall protect VA Sensitive data from unauthorized disclosure or use, and from being used to train or improve the functionality of the vendor's commercial offerings without express permission from VA.
The Contractor shall deliver the services, technical data, configurations, models, weights, documentation or other information, including source code, developed during contract performance. The Contractor, in collaboration with VA, must evaluate the output of any AI tool for accuracy prior to using the output in VA efforts. All data, including models, weights, algorithms, and outputs generated using either Government-furnished data or data first developed under this contract shall be the property of the Government with unlimited rights as defined by FAR 52.227-14. The Contractor shall also deliver any custom-developed code developed with AI methodologies in accordance with the SHARE IT Act, if applicable. VA shall also retain unlimited rights to any improvements to that data, including the continued design, development, testing, and operation of AI systems and/or systems utilizing AI.
The Contractor shall ensure that all AI Systems, including Large Language Models (LLM), whether standalone LLMs or integrated into broader software platforms, procured under this effort and/or used in performance of this contract complies with the Unbiased AI Principles as defined in Executive Order 14319 and OMB Memorandum M-26-04, e.g. Truth Seeking and Ideologically Neutral, as applicable to the intended use of the system.
The Contractor shall ensure that AI System/LLM generated outputs are truthful in responding to user prompts seeking factual information or analysis, prioritize historical accuracy, scientific inquiry, and objectivity, as well as acknowledge uncertainty where reliable information is incomplete or contradictory and do not fabricate, hallucinate, or present unverifiable information as fact.
The Contractor shall ensure that LLMs and AI outputs are neutral, nonpartisan tools that do not manipulate responses in favor of ideological dogmas such as Diversity, Equity, and Inclusion (DEI). The Contractor shall ensure that the LLMs, including the AI System, are not intentionally encoded with partisan or ideological judgments within an AI System’s/LLM’s outputs unless those judgments are prompted by or otherwise readily accessible to the end user.
Compliance with the AI requirements of this contract, including adherence to the Unbiased AI Principles, Truth-Seeking and Ideological Neutrality requirements, disclosure obligations, monitoring and reporting requirements, and corrective action responsibilities, is a material condition of eligibility for payment and continued performance. In accordance with OMB Memorandum M-26-04, failure to comply with these requirements, or refusal to take timely and appropriate corrective action to remedy identified noncompliance, may constitute a material breach of contract and may result in remedies consistent with the terms of the contract and applicable law including but not limited to withholding of payment, termination for cause/default, or other appropriate contractual remedies, as determined by the Contracting Officer.
All AI for delivery and/or use in performance of the contract shall adhere to the VA Trustworthy AI Framework, available at https://department.va.gov/ai/trustworthy/. Once the Contractor has obtained CO authorization to use specific AI in contract performance, the Contractor shall provide the COR a signed Statement of Attestation prior to AI implementation as identified in the Artificial Intelligence in VA Contracts clause, to include its associated list of AI being used in contract performance.
Deliverable:
1. Statement of Attestation
AI SYSTEM/LLM DEVELOPMENT AND OPERATION DOCUMENTATION REQUIREMENTS
To enable Government continued assessment of compliance with Trustworthy AI requirements and both Unbiased AI Principles, Truth-seeking and Ideological Neutrality, in accordance with OMB M-26-04, the Contractor shall provide AI System/LLM Development and Operation Documentation Package to include, at a minimum:
1. Acceptable Use Policy The Contractor shall provide an Acceptable Use Policy document governing its AI operation that characterizes and differentiates appropriate and inappropriate use of their product offering
1. Model Cards, System Cards and/or Data Cards The Contractor shall provide documentation describing essential information about the model, system, and or data as it relates to the AI/LLM product offering. The documentation shall address summaries of training process, identified risks and mitigations, and model evaluation scores on LLM benchmarks at a minimum, where appropriate
1. End User Resources The Contractor shall provide documentation to include product tutorials, developer guides, and/or other tools to assist VA in ensuring proper use of the AI/LLM to maximize utility
1. Mechanism for End User Feedback The Contractor shall provide documentation describing the mechanism employed to provide feedback to the Offeror on outputs identified that violate the Unbiased AI Principles. This may be satisfied by a general inbox, specific Point of Contact, or similar feedback mechanism.
1. Pre-Training and Post-Training Activities of the AI System/LLM The Contractor shall provide documentation of Pre-Training and Post Training Activity that provides details on:
4. Actions taken that impact the factuality and grounding of AI System/LLM outputs
4. System-level prompts that provide natural language instructions to the model specifying guidelines on responding to user-generated queries, to include how a model responds when reliable information is incomplete, contradictory, or subject to individual interpretation
4. The type of outputs restricted via content moderation and safety filters
4. The use of red teaming as a means of continuously assessing the model to protect against incidents of bias in generated output.
4. Training or development, if any, that occurred outside the United States, to include the type of activity and the country in which it occurred.
4. Any modifications or configurations undertaken to comply with any regulation from a government other than the U.S. Federal Government.
1. Model Evaluation Results and Methodologies The Contractor shall provide documentation describing the Evaluation Results of bias evaluations conducted by the Vendor to include the methodology for performing such tests (e.g., testing prompt pairs for politically oriented topics).
The documentation shall also include Benchmark scoring results measuring the model’s bias, helpfulness, honesty, or accuracy when provided with ambiguous versus straightforward questions. (Including any benchmarks comparing performance across multiple languages, where applicable).
1. Description of Enterprise-Level Controls The Contractor shall provide documentation describing the Enterprise Governance tools and controls, such as:
6. Customizable system instructions that are additive to a base model’s system prompts or content generation filters.
6. Product features that require a model to cite sources of its outputs or otherwise provide visibility into the provenance of the model’s outputs.
6. AI System/LLM model evaluation tools that enable comparisons either between a model’s outputs, or across various models.
1. Third Party Modification Disclosure The Contractor shall disclose of any additional controls to modify an AI Model’s/LLM’s output applied by the Contractor if the Contractor is not a direct developer of the LLM (e.g., classifiers, system prompts, fine-tuning, content moderation and filters, etc.)
Deliverable:
A. AI System/LLM Development and Operation Documentation Package
MONITORING, REPORTING, AND CORRECTIVE ACTION
The Contractor shall develop and implement a Compliance Monitoring and Reporting Plan supporting ongoing monitoring processes to evaluate AI outputs for compliance with Trustworthy AI and Unbiased AI principles. This plan shall include the mechanism for authorized users to provide end user feedback to report suspected violations of Truth-Seeking or Ideological Neutrality requirements.
The Contractor shall notify the COR within 10 business days of identifying any material deviation from these principles and shall submit a written Corrective Action Plan describing mitigation steps, responsible parties, and timelines. Any material deviation, corrective action taken, and results shall be detailed in Progress Reports.
Deliverable:
1. Compliance Monitoring and Reporting Plan
1. Corrective Action Plan
AI MODEL UPDATES AND CHANGE DISCLOSURES
The Contractor, in an AI Model/LLM Change Disclosure, shall notify the Government throughout the P0P in advance of any material changes to AI models, including new AI enhancements, features and/or components, controls, retraining, classifiers, system prompts, fine-tuning, content moderation, filters, version replacement, or architectural changes, that could reasonably affect compliance with Trustworthy AI or Unbiased AI principles. Updated documentation shall be provided to VA for VA approval prior to implementation of such changes.
Deliverable:
1. AI Model/LLM Change Disclosure
SECURITY AND PRIVACY REQUIREMENTS
POSITION/TASK RISK DESIGNATION LEVEL(S)
In accordance with VA Handbook 0710, Personnel Vetting Program, the position sensitivity and the level of background investigation commensurate with the required level of access for the following tasks within the PD are:
Position Sensitivity and Background Investigation Requirements by Service Task/Item Number Service Task / Item Number
| Tier1 / Low Risk |
| Tier 2 / Moderate Risk |
| Tier 4 / High Risk |
| 1.1 | ||
| ☐ | ||
| ☐ | ☐ | |
| <1.2> | ||
| ☐ | ☐ | ☐ |
The Tasks identified above and the resulting Position Sensitivity and Background Investigation requirements identify, in effect, the Background Investigation requirements for Contractor individuals, based upon the tasks the particular Contractor individual will be working. The submitted Contractor Staff Roster must indicate the required Background Investigation Level for each Contractor individual based upon the tasks the Contractor individual will be working, in accordance with their submitted proposal.
CONTRACTOR PERSONNEL SECURITY REQUIREMENTS
Contractor Responsibilities:
1. The Contractor shall prescreen all personnel requiring access to the computer systems to ensure they maintain the appropriate Background Investigation, and are able to read, write, speak, and understand the English language.
Within 3 business days after award, the Contractor shall provide a roster of Contractor and Subcontractor employees to the COR to begin their background investigations in accordance with the PAL template artifact. The Contractor Staff Roster shall contain the Contractor’s Full Name, Date of Birth, Place of Birth, individual background investigation level requirement (based upon Section 6.2.1 Tasks), etc. The Contractor shall submit full Social Security Numbers either within the Contractor Staff Roster or under separate cover to the COR. The Contractor Staff Roster shall be updated and provided to VA within 1 day of any changes in employee status, training certification completion status, Background Investigation level status, additions/removal of employees, etc. throughout the Period of Performance. The Contractor Staff Roster shall remain a historical document indicating all past information and the Contractor shall indicate in the Comment field, employees no longer supporting this contract. The preferred method to send the Contractor Staff Roster or Social Security Number is by encrypted e-mail. If unable to send encrypted e-mail, other methods which comply with FIPS 140-2 (or its successor) are to encrypt the file, use a secure fax, or use a traceable mail service. (Note that by September 22, 2026, all FIPS 140-2 certificate validations will be placed on the Historical List. See FIPS Transition Effort Timeline for more details: https://csrc.nist.gov/projects/fips-140-3-transition-effort#schedule)
1. The Contractor should coordinate with the location of the nearest VA fingerprinting office through the COR. Only electronic fingerprints are authorized. The Contractor shall bring their completed Personnel Security Adjudication Center (PSAC) Fingerprint request form with them (see paragraph d.4. below) when getting fingerprints taken.
b. The Contractor shall ensure the following required forms are submitted to the COR within 5 days after contract award:
1) Optional Form 306
2) Self-Certification of Continuous Service
3) VA Form 0710
4) Completed PSAC Fingerprint Request Form The Contractor personnel shall submit all required information related to their background investigations (completion of the investigation documents (SF85, SF85P, or SF 86) utilizing the Defense Counterintelligence and Security Agency (DCSA) National Background Investigation Services (NBIS) Electronic Application (eAPP) (formerly e-QIP) after receiving an email notification from the PSAC.
The Contractor employee shall certify and release the eAPP document, print, and sign the signature pages, and send them encrypted to the COR for electronic submission to the PSAC. These documents shall be submitted to the COR within 3 business days of receipt of the eAPP) notification email. (Note: DCSA is moving towards a “click to sign” process. If click to sign is used, the Contractor employee should notify the COR within 3 business days that documents were signed via eAPP).
1. The Contractor shall be responsible for the actions of all personnel provided to work for VA under this contract. In the event that damages arise from work performed by Contractor provided personnel, under the auspices of this contract, the Contractor shall be responsible for all resources necessary to remedy the incident.
1. A Contractor may be granted unescorted access to VA facilities and/or access to VA Information Technology resources (network and/or protected data) with a favorably adjudicated Special Agreement Check (SAC), completed training delineated in VA Handbook 6500.6 (Appendix C, Section 4), signed “Contractor Rules of Behavior”, and with a valid, operational Personal Identity Verification (PIV) credential for PIV-only logical access to VA’s network. A PIV card credential can be issued once your SAC has been favorably adjudicated and your background investigation has been scheduled by DCSA. However, the Contractor will be responsible for the actions of the Contractor personnel they provide to perform work for VA. The investigative history for Contractor personnel working under this contract must be maintained in the database of DCSA.
1. The Contractor, when notified of an unfavorably adjudicated background investigation on a Contractor employee as determined by the Government, shall withdraw the employee from consideration in working under the contract.
Failure to comply with the Contractor personnel security investigative requirements may result in loss of physical and/or logical access to VA facilities and systems by Contractor and Subcontractor employees and/or termination of the contract for default.
PIV Credential Holders must follow all HSPD-12 policies and procedures as well as use and protect their assigned identity credentials in accordance with VA policies and procedures, displaying their badges at all times, and returning the identity credentials upon termination of their relationship with VA.
Deliverable:
A. Contractor Staff Roster
ADDENDUM B – VA INFORMATION AND INFORMATION SYSTEM SECURITY/ PRIVACY LANGUAGE
NOTE: In the event of a conflict, VA Acquisition Regulation (VAAR) Security Clauses take precedence over the language in this Addendum B.
APPLICABLE SECTIONS TAILORED FROM: VA NOTICE 24-12, APRIL 22, 2024, UPDATE TO VA HANDBOOK 6500.6, CONTRACT SECURITY, APPENDIX C VA INFORMATION AND INFORMATION SYSTEM SECURITY/PRIVACY LANGUAGE, FOR INCLUSION INTO CONTRACTS, AS APPROPRIATE
GENERAL
This entire section applies to all acquisitions requiring any Information Security and Privacy language. Contractors, contractor personnel, Subcontractors and subcontractor personnel will be subject to the same federal laws, regulations, standards, VA directives and handbooks, as VA personnel regarding information and information system security and privacy.
VA INFORMATION CUSTODIAL LANGUAGE
a. The Government shall receive unlimited rights to data/intellectual property first produced and delivered in the performance of this contract or order (hereinafter “contract”) unless expressly stated otherwise in this contract. This includes all rights to source code and all documentation created in support thereof. The primary clause used to define Government and Contractor data rights is FAR 52.227-14 Rights in Data – General.
b. Information made available to the Contractor by VA for the performance or administration of this contract will be used only for the purposes specified in the service agreement, SOW, PWS, PD, and/or contract. The Contractor shall not use VA information in any other manner without prior written approval from a VA Contracting Officer (CO). The primary clause used to define Government and Contractor data rights is FAR 52.227-14 Rights in Data – General.
c. VA information will not be co-mingled with any other data on the Contractor’s information systems or media storage systems. The Contractor shall ensure compliance with Federal and VA requirements related to data protection, data encryption, physical data segregation, logical data segregation, classification requirements and media sanitization.
d. VA reserves the right to conduct scheduled or unscheduled audits, assessments, or investigations of Contractor Information Technology (IT) resources to ensure information security is compliant with Federal and VA requirements. The Contractor shall provide all necessary access to records (including electronic and documentary materials related to the contracts and subcontracts) and support (including access to Contractor and Subcontractor staff associated with the contract) to VA, VA's Office Inspector General (OIG), and/or Government Accountability Office (GAO) staff during periodic control assessments, audits, or investigations.
e. The Contractor may only use VA information within the terms of the contract and applicable Federal law, regulations, and VA policies. If new Federal information security laws, regulations or VA policies become applicable after execution of the contract, the parties agree to negotiate contract modification and adjustment necessary to implement the new laws, regulations, and/or policies.
f. The Contractor shall not make copies of VA information except as specifically authorized and necessary to perform the terms of the contract. If copies are made for restoration purposes, after the restoration is complete, the copies shall be destroyed in accordance with VA Directive 6500, VA Cybersecurity Program and VA Information Security Knowledge Service.
g. If a Veterans Health Administration (VHA) contract is terminated for default or cause with a business associate, the related local Business Associate Agreement (BAA) shall also be terminated and actions taken in accordance with VHA Directive 1605.05, Business Associate Agreements. If there is an executed national BAA associated with the contract, VA will determine what actions are appropriate and notify the contractor.
h. The Contractor shall store and transmit VA sensitive information in an encrypted form, using VA-approved encryption tools which are, at a minimum, Federal Information Processing Standards (FIPS) 140-2, Security Requirements for Cryptographic Modules (or its successor) validated and in conformance with VA Information Security Knowledge Service requirements. The Contractor shall transmit VA sensitive information using VA approved Transport Layer Security (TLS) configured with FIPS based cipher suites in conformance with National Institute of Standards and Technology (NIST) 800-52, Guidelines for the Selection, Configuration and Use of Transport Layer Security (TLS) Implementations.
i. The Contractor’s firewall and web services security controls, as applicable, shall meet or exceed VA’s minimum requirements.
j. Except for uses and disclosures of VA information authorized by this contract for performance of the contract, the Contractor may use and disclose VA information only in two situations: (i) in response to a qualifying order of a court of competent jurisdiction after notification to VA CO (ii) with written approval from the VA CO. The Contractor shall refer all requests for, demands for production of or inquiries about, VA information and information systems to the VA CO for response.
k. Notwithstanding the provision above, the Contractor shall not release VA records protected by Title 38 U.S.C. § 5705, Confidentiality of medical quality-assurance records and/or Title 38 U.S.C. § 7332, Confidentiality of certain medical records pertaining to drug addiction, sickle cell anemia, alcoholism or alcohol abuse or infection with Human Immunodeficiency Virus (HIV). If the Contractor is in receipt of a court order or other requests for the above-mentioned information, the Contractor shall immediately refer such court order or other requests to the VA CO for response.
l. Information made available to the Contractor by VA for the performance or administration of this contract or information developed by the Contractor in performance or administration of the contract will be protected and secured in accordance with VA Directive 6500 and Identity and Access Management (IAM) Security processes specified in the VA Information Security Knowledge Service.
m. Any data destruction done on behalf of VA by a Contractor shall be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management, VA Handbook 6300.1, Records Management Procedures, and applicable VA Records Control Schedules.
n. The Contractor shall provide its plan for destruction of all VA data in its possession according to VA Directive 6500 and NIST 800-88, Guidelines for Media Sanitization prior to termination or completion of this contract. If directed by the COR/CO, the Contractor shall return all Federal Records to VA for disposition.
o. Any media, such as paper, magnetic tape, magnetic disks, solid state devices or optical discs that is used to store, process, or access VA information that cannot be destroyed shall be returned to VA. The Contractor shall hold the appropriate material until otherwise directed by the Contracting Officer’s Representative (COR) or CO. Items shall be returned securely via VA-approved methods. VA sensitive information must be transmitted utilizing VA-approved encryption tools which are validated under FIPS 140-2 (or its successor) and NIST 800-52. If mailed, the Contractor shall send via a trackable method (USPS, UPS, FedEx, etc.) and immediately provide the COR/CO with the tracking information. Self-certification by the Contractor that the data destruction requirements above have been met shall be sent to the COR/CO within 30 business days of termination of the contract.
p. All electronic storage media (hard drives, optical disks, CDs, back-up tapes, etc.) used to store, process or access VA information will not be returned to the Contractor at the end of lease, loan, or trade-in. Exceptions to this paragraph will only be granted with the written approval of the VA CO.
ACCESS TO VA INFORMATION AND VA INFORMATION SYSTEMS
a. A Contractor/Subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees and subcontractors only to the extent necessary to perform the services specified in the solicitation or contract. This includes indirect entities, both affiliate of Contractor/Subcontractor and agent of Contractor/Subcontractor.
b. Contractors and subcontractors shall sign the VA Information Security Rule of Behavior (ROB) before access is provided to VA information and information systems (see Section 4, Training, below). The ROB contains the minimum user compliance requirements and does not supersede any policies of VA facilities or other agency components which provide higher levels of protection to VA’s information or information systems. Users who require privileged access shall complete the VA elevated privilege access request processes before privileged access is granted.
c. All Contractors and Subcontractors working with VA information are subject to the same security investigative and clearance requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors shall be in accordance with VA Directive and Handbook 0710, Personnel Vetting Program. The Office of Human Resources and Administration/Operations, Security and Preparedness (HRA/OSP) is responsible for these policies and procedures. Contract personnel who require access to classified information or information systems shall have an appropriate security clearance. Verification of a Security Clearance shall be processed through the Special Security Officer located in HRA/OSP. Contractors shall conform to all requirements stated in the National Industrial Security Program Operating Manual (NISPOM).
d. All Contractors and subcontractors shall comply with conditions specified in VAAR 852.204-71(d); Contractor operations required to be in United States. All Contractors and Subcontractors working with VA information must be permanently located within a jurisdiction subject to the law of the United States or its Territories to the maximum extent feasible. If services are proposed to be performed abroad the Contractor must state where all non-U.S. services are provided. The Contractor shall deliver to VA a detailed plan specifically addressing communications, personnel control, data protection and potential legal issues. The plan shall be approved by the COR/CO in writing prior to access being granted.
e. The Contractor shall notify the COR/CO in writing immediately (no later than 24 hours) after personnel separation or occurrence of other causes. Causes may include the following:
(1) Contractor/Subcontractor personnel no longer has a need for access to VA information or VA information systems.
(2) Contractor/Subcontractor personnel are terminated, suspended, or otherwise has their work on a VA project discontinued for any reason.
(3) Contractor believes their own personnel or Subcontractor personnel may pose a threat to their company’s working environment or to any company-owned property. This includes Contractor-owned assets, buildings, confidential data, customers, employees, networks, systems, trade secrets and/or VA data.
(4) Any previously undisclosed changes to Contractor/Subcontractor background history are brought to light, including but not limited to changes to background investigation or employee record.
(5) Contractor/Subcontractor personnel have their authorization to work in the United States revoked.
(6) Agreement by which Contractor provides products and services to VA has either been fulfilled or terminated, such that VA can cut off electronic and/or physical access for Contractor personnel.
f. In such cases of contract fulfillment, termination, or other causes; the Contractor shall take the necessary measures to immediately revoke access to VA network, property, information, and information systems (logical and physical) by Contractor/Subcontractor personnel. These measures include (but are not limited to): removing and then securing Personal Identity Verification (PIV) badges and PIV – Interoperable (PIV-I) access badges, VA-issued photo badges, credentials for VA facilities and devices, VA-issued laptops, and authentication tokens. Contractors shall notify the appropriate VA COR/CO immediately to initiate access removal.
g. Contractors/Subcontractors who no longer require VA accesses will return VA-issued property to VA. This property includes (but is not limited to): documents, electronic equipment, keys, and parking passes. PIV and PIV-I access badges shall be returned to the nearest VA PIV Badge Issuance Office. Once they have had access to VA information, information systems, networks and VA property in their possessions removed, Contractors shall notify the appropriate VA COR/CO.
TRAINING
a. All contractors and subcontractors requiring access to VA information and VA information systems shall successfully complete the following before being granted access to VA information and its systems:
(1) VA Privacy and Information Security Awareness and Rules of Behavior course (Talent Management System (TMS) #10176) initially and annually thereafter.
(2) Sign and acknowledge (electronically through TMS #10176) understanding of and responsibilities for compliance with the Organizational Rules of Behavior, relating to access to VA information and information systems initially and annually thereafter; and
(3) Successfully complete any additional cyber security or privacy training, as required for VA personnel with equivalent information system or information access [to be defined by the VA program official and provided to the VA CO for inclusion in the solicitation document – i.e., any role-based information security training].
b. The Contractor shall provide to the COR/CO a copy of the training certificates and certification of signing the Organizational Rules of Behavior for each applicable employee within five days of the initiation of the contract and annually thereafter, as required.
c. Failure to complete the mandatory annual training is grounds for suspension or termination of all physical or electronic access privileges and removal from work on the contract until such time as the required training is complete.
SECURITY INCIDENT INVESTIGATION
a. The Contractor, Subcontractor, their employees, or business associates shall immediately (within one hour) report suspected security / privacy incidents to the VA OIT’s Enterprise Service Desk (ESD) by calling (855) 673-4357 (TTY: 711). The ESD is OIT’s 24/7/365 single point of contact for IT-related issues. After reporting to the ESD, the Contractor, Subcontractor, their employees, or business associates shall, within one hour, provide the COR/CO the incident number received from the ESD.
b. To the extent known by the Contractor/Subcontractor, the Contractor/Subcontractor's notice to VA shall identify the information involved and the circumstances surrounding the incident, including the following:
(1) The date and time (or approximation of) the Security Incident occurred.
(2) The names of individuals involved (when applicable).
(3) The physical and logical (if applicable) location of the incident.
(4) Why the Security Incident took place (i.e., catalyst for the failure).
(5) The amount of data belonging to VA believed to have been compromised.
(6) The remediation measures the Contractor is taking to ensure no future incidents of a similar nature.
c. After the Contractor has provided the initial detailed incident summary to VA, they will continue to provide written updates on any new and relevant circumstances or facts they discover. The Contractor, Subcontractor, and their employes shall fully cooperate with VA or third-party entity performing an independent risk analysis on behalf of VA. Failure to cooperate may be deemed a material breach and grounds for contract termination.
d. VA IT Contractors shall follow VA Handbook 6500, Risk Management Framework for VA Information Systems VA Information Security Program, and VA Information Security Knowledge Service guidance for implementing an Incident Response Plan or integrating with an existing VA implementation.
e. In instances of theft or break-in or other criminal activity, the Contractor/Subcontractor must concurrently report the incident to the appropriate law enforcement entity (or entities) of jurisdiction, including the VA OIG, and the VA Office of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .