PCT_FY23_Unit_2_ORTHO.pdf

PDF 2 MB Posted

Attached to
GFP Pre-Commercial Thinning FY2023
Solicitation number
22RFP7844
Issued by
Codington County, South Dakota

About this file

This document is a Pre-Commercial Thinning Unit Map and related RFP for a pre-commercial thinning project managed by the state of South Dakota. The project aims to improve forest health and productivity, increase fire resistance, and enhance wildlife habitat on approximately 555 acres. The RFP provides detailed specifications for Unit #2 Legion Lake, including the unit map, target tree per acre, average diameter at breast height, and maximum diameter to be cut. Interested offerors may submit inquiries to the designated contact by the specified deadline, and the RFP documents can be downloaded for more information.

The RFP does not provide specific pricing terms or set-asides, but notes that the goal of the project is to improve the residual forest stand. No additional details are given on funding requirements, sources, or incumbent contractors. Offerors are advised to review the full RFP document for comprehensive details on the scope of work, bid submission requirements, and evaluation criteria.

View the file

Other files

File Type Posted
PCT_FY23_Unit1_1_ORTHO.pdf PDF
PCT_FY23_Unit_5_ORTHO.pdf PDF
PCT_FY23_Unit_6_ORTHO.pdf PDF
PCT_FY23_Unit_7_ORTHO.pdf PDF
PCT_FY23_Vicinity_Map.pdf PDF
PCT_FY23_Access_Map_2.pdf PDF
2019_2021_PCT_WinningBids.xlsx XLSX spreadsheet
PCT_FY23_Unit1_2_ORTHO.pdf PDF
PCT_FY23_Unit_3_ORTHO.pdf PDF
PCT_FY23_Unit_4_ORTHO.pdf PDF
RFP_22RFP7844_PCT_FY23_Questions.docx DOCX document
PCT_FY23_Access_Map_1.pdf PDF
PCT_FY23_Access_Map_3.pdf PDF
RFP_22RFP7844.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Commercial Thinning Unit Map: Unit # 2 Legion Lake

Unit Unit

> Gate û Special Features

Powerlines Hiking Trails óóóó Fence

Roads Paved Gravel 2 - Track

Stream Courses Perennial Ephemeral Waterbodies Property Boundary

³ 1 in = 231 feet

Note:

Cut damaged trees and hanging deadfall to 5'' Lop & scatter woody debris within 33' of trail

Pre-TPA: 1671 Avg. DBH: 4.4 Max Cut DBH: 5

Target TPA: 1271 Target Spacing: 6

Legal: 25-3S-5E Acres: 22.7 Avg. Slope: 26.9

File details come from the government source that posted it. Updated .