PCS21-007RFP_Electrical and Low Voltage Svcs.pdf
PDF 3 MB Posted
- Attached to
- Large Format Scanner (FI960-21)
- Solicitation number
- S-C25102-00000952
- Issued by
- Marion County, Oregon
About this file
This Request for Proposals document pertains to Marion County, Oregon, and the City of Salem's joint procurement for a large format scanner system. The solicitation seeks proposals for a scanner meeting specific technical specifications, including a minimum scan area of 25" x 36", optical resolution of at least 600 Pixels Per Inch (PPI), and 48-bit color depth. The procurement encompasses the scanner hardware, associated software, delivery, installation, training, and ongoing maintenance and support services. Proposals must include a Proposal Form, Reference Form, and Cost Proposal Submission Form. The submission deadline is 2:30 p.m. on November 3, 2021, with an anticipated contract start date of November 2021. The contract term is five years with potential extension up to 10 years. No bidders conference or site visit requirements are specified in the available documentation.
The evaluation criteria assess scanning ability, handling of fragile originals, ergonomics and mobility, software capabilities, maintenance and support, and cost, with each category weighted up to 20 points. The County reserves the right to award based on best overall value rather than lowest price. Vendors must submit pricing for the primary scanner with optional pricing for software add-ons, software and security updates, maintenance services, additional support services, and extended warranty options. Specific budget ranges are not disclosed, indicating flexibility for vendors to propose various configurations and service levels. The RFP contains no explicit set-aside designations or restrictions on respondent types, making the opportunity open to all qualified vendors. No incumbent vendor information is provided. Proposers must complete a Trade Secret Form and Certification Regarding Debarment, Suspension, and Other Responsibility Matters as required compliance documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FI960-21 - Att2 - Trade Secret Form.docx | DOCX document | |
| FI960-21 - Att3 - Reference Form.docx | DOCX document | |
| FI960-21 - Request for Proposal.pdf | ||
| FI960-21 - Att4 - Cost Proposal Submission Form.docx | DOCX document | |
| FI960-21 - Att1 - Proposal Form.docx | DOCX document | |
| FI960-21 - Exh1 - Sample Purchase Order.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
28JUN21RFP047
REQUEST FOR PROPOSALS
Solicitation No: PCS21-007RFP
Electrical Maintenance and Low Voltage Services
RFP Closing (Due Date & Time):
November 4, 2021 at 2:00 PM Pacific Time
Issued by:
Portland Community College
PO Box 19000 Portland, OR 97280-0990
October 8, 2021
28JUN21RFP047 i
Table of Contents
SUMMARY
SECTION I – INTRODUCTION
1. INTRODUCTION
2. DEFINITIONS
3. SOLICITATION REVIEW
4. BACKGROUND
5. SCOPE OF WORK
6. CONTRACT
7. AMENDMENTS
8. CONTRACT PERIOD & EXTENSION
9. COOPERATIVE PROCUREMENT - Pursuant to OAR 137-046-0430
10. CONTRACT ADMINISTRATOR
11. COLLEGE REPRESENTATIVE
12. SOLICITATION SCHEDULE
13. CONTACT DURING SOLICITATION
14. COVID-19 PANDEMIC CONDITIONS
15. OREGONBUYS
SECTION II – STATEMENT OF WORK
1. PURPOSE & INTRODUCTION
2. PROJECT DESCRIPTION
3. GENERAL REQUIREMENTS
4. SPECIFIC REQUIREMENTS
5. EMERGENCY DESIGNATED PERSONNEL
6. PROJECT SCHEDULE
7. BUSINESS EQUITY
8. SUSTAINABILITY COMMITMENT
9. ADDITIONAL REQUIREMENTS
SECTION III – RESPONSE AND EVALUATION
1. INTRODUCTION
2. PROPOSAL FORMAT
3. PROPOSAL CONTENT REQUIREMENTS
4. EVALUATION CRITERIA
5. PROPOSAL EVALUATION
6. EVALUATION COMMITTEE
7. INTERVIEWS (if conducted)
8. NEGOTIATIONS - Pursuant to OAR 137-047-0261
SECTION IV – INSTRUCTIONS TO PROPOSERS
1. FORMAL SELECTION PROCEDURE - Pursuant to OAR 137-047-0260
2. PRE-PROPOSAL CONFERENCE - Pursuant to OAR 137-047-0420
3. PROPOSALS ARE OFFERS - Pursuant to OAR 137-047-0310
4. ELECTRONIC PROCUREMENT - Pursuant to OAR 137-047-0330
5. PROPOSAL PREPARATION - Pursuant to OAR 137-047-0400
6. PROPOSAL SUBMISSION - Pursuant to OAR 137-047-0410
7. ADDENDA - Pursuant to OAR 137-047-0430
8. QUESTIONS/CLARIFICATIONS/CHANGES & SOLICITATION PROTEST
9. PRE-CLOSING MODIFICATION OR WITHDRAWAL OF PROPOSALS - Pursuant to OAR 137-047-0440
28JUN21RFP047 ii
10. RECEIPT, OPENING, & RECORDING OF PROPOSALS - Pursuant to OAR 137-047-0450
11. LATE PROPOSALS, LATE WITHDRAWALS, & LATE MODIFICATIONS - Pursuant to OAR 137-047-0460
12. MISTAKES - Pursuant to OAR 137-047-0470
13. TIME FOR AGENCY ACCEPTANCE - Pursuant to OAR 137-047-0480
14. EXTENSION OF TIME FOR ACCEPTANCE OF PROPOSAL - Pursuant to OAR 137-047-0490
15. EVALUATION & AWARD - Pursuant to OAR 137-047-0600
16. NOTICE OF INTENT TO AWARD - Pursuant to OAR 137-047-0610
17. REJECTION OF A PROPOSAL - Pursuant to OAR 137-047-0640
18. REJECTION OF ALL OFFERS - Pursuant to OAR 137-047-0650
19. SOLICITATION CANCELLATION - Pursuant to OAR 137-047-0660
20. PROPOSAL COSTS
21. SOLICITATION PROTEST - Pursuant to OAR 137-047-0730
22. CONTRACT AWARD PROTEST - Pursuant to OAR 137-047-0740
23. ADDITIONAL REQUIREMENTS
24. CONFIDENTIALITY OF PROPOSALS
25. MULTI-TIERED & MULTISTEP PROPOSALS – Pursuant to OAR 137-047-0261
SECTION V – INSTRUCTIONS TO PROPOSERS: PUBLIC WORKS
1. PUBLIC WORKS REQUIREMENTS
2. REGISTRATION REQUIREMENTS
3. BOLI/PWR REQUIREMENTS - Pursuant to ORS 279C.800 to 279C.875
4. BONDS: PERFORMANCE, PAYMENT & PUBLIC WORKS - Pursuant to OAR 137-049-0460 & ORS 279C
5. SUBSTITUTE CONTRACTOR - Pursuant to OAR 137-49-0470
6. FOREIGN CONTRACTOR - Pursuant to OAR 137-49-0490
7. CERTIFIED PAYROLL WITHHOLDING - Pursuant to ORS 279C.845
8. DRUG TESTING REQUIREMENT
9. OTHER TERMS AND CONDITIONS
SECTION VI – ATTACHMENTS
PROPOSAL SUBMISSION CHECKLIST
ATTACHMENT A - PROPOSER CERTIFICATION
ATTACHMENT B - CERTIFICATION STATEMENT FOR CORPORATION OR INDEPENDENT CONTRACTOR
ATTACHMENT C - AFFIDAVIT OF NON-COLLUSION / COMPLIANCE WITH TAX LAWS
ATTACHMENT D - NON-CONFLICT OF INTEREST CERTIFICATION
ATTACHMENT E - PROPOSER RESPONSIBILITY FORM
ATTACHMENT F - PROPOSER REFERENCE FORM
ATTACHMENT G – PRICE SCHEDULE - Electrical Maintenance Services
ATTACHMENT H – PRICE SCHEDULE - Low Voltage Services
ATTACHMENT I – SAMPLE CONTRACT: TRADE SERVICE PRICE AGREEMENT
Financial Services Procurement and Contract Services
PO Box 19000, Portland, OR 97280-0990 contracts@pcc.edu, 971-722-2821
28JUN21RFP047 1
REQUEST FOR PROPOSAL
Solicitation No: PCS21-007RFP
Electrical Maintenance and Low Voltage Services
SUMMARY
The purpose of this Request for Proposals (Solicitation) is to obtain competitive Proposals from qualified Proposers interested in the provision of Electrical Maintenance and Low Voltage Services for Portland Community College.
This is a public works project subject to ORS 279C.800 to 279C.875. The applicable Prevailing Wage Rates are the Prevailing Wage Rates for Public Works Contracts in Oregon effective July 1, 2021 and the Prevailing Wage Rate Amendments effective August 1, 2021 and October 1, 2021. The work may take place at PCC facilities in Multnomah, Washington, Yamhill, Clackamas, and Columbia County, Oregon.
No Pre-Proposal Conference is scheduled for this Solicitation.
Interested Proposers must submit a Proposal pursuant to the provisions of this Solicitation to Michael Mathews, College Purchasing Manager, or designee, at the secure email address:
electricalmaint21RFP@docs.e-builder.net
NOT LATER THAN:
SOLICITATION DUE DATE AND TIME (CLOSING):
November 4, 2021 at 2:00 PM Pacific Time
LATE PROPOSALS WILL NOT BE ACCEPTED.
Timely submitted Proposals will be opened and recorded. The number of Proposals received, the identity of Proposers, or the contents of any proposal will not be disclosed to the public until all proposals have been evaluated, negotiations completed if required, and a recommendation for Award has been published.
Proposers are solely responsible for ensuring that Portland Community College receives its Proposal.
Prospective Proposers must register with OregonBuys – https://oregonbuys.gov/bso/ to obtain the solicitation documents.
Emerging small businesses, as well as minority-owned, women-owned, service disabled veteran-owned, and disadvantaged business enterprises are encouraged to submit a response to this Solicitation.
PROPOSERS MUST FAMILIARIZE THEMSELVES WITH THE ENTIRE SOLICITATION.
All questions and comments regarding this solicitation must be directed ONLY IN WRITING to Gina Dowd, by email to: contracts@pcc.edu.
NOTE: This email address is NOT the secure email address to be used when submitting a Proposal.
PROPOSALS MUST BE PURSUANT TO THE PROVISIONS OF THIS SOLICITATION.
THE COLLEGE MAY REJECT ANY PROPOSAL NOT IN COMPLIANCE WITH ALL PRESCRIBED
REQUIREMENTS.
mailto:contracts@pcc.edu http://orpin.oregon.gov/
Electrical Maintenance and Low Voltage Services
28JUN21RFP047
SECTION I – INTRODUCTION
1. INTRODUCTION
1.1. This Solicitation is issued pursuant to ORS 279A, ORS 279B, ORS 279C and the PCC Community College Rules of Procurement.
2. DEFINITIONS
2.1. The term "College", “PCC”, or “Owner” throughout this document means Portland Community College.
The term “Proposer” means the person or firm that submits a Proposal in response to this Solicitation.
The term “Proposal” or “Offer” means a written response to provide Goods or Services in response to this Solicitation. “Closing” means the date and time specified in the Solicitation as the deadline for submitting Proposals. The term “Contractor” or “Supplier” means the firm awarded a Contract as a result of this Solicitation.
3. SOLICITATION REVIEW
3.1. Proposers must carefully review the Solicitation documents and are responsible for knowing and understanding all terms and conditions. Unless defects, ambiguities, omissions, or errors are brought to the College's attention by protest pursuant to QUESTIONS/CLARIFICATIONS/CHANGES & SOLICITATION PROTEST in SECTION IV – INSTRUCTIONS TO PROPOSERS, protests or appeals based on such defects, ambiguities, omissions or errors received after issuance of the Notice of Intent to Award (NOI) may not be favorably considered.
4. BACKGROUND
4.1. As the largest post-secondary institution in Oregon, Portland Community College serves over 60,000 full-time and part-time students. The College offers high-quality education and opportunities for its students, which in turn contributes to the vibrancy of Portland's economic community.
4.2. The College aims to educate a skilled workforce, prepare students to successfully transfer to four-year schools, enrich the community through lifelong learning, build a greener workforce and shrink our carbon footprint, and be a sound financial steward of public dollars.
4.3. Four comprehensive campuses, eight centers, and dozens of independent locations throughout the community offer courses and provide student services. Online Learning gives students the ability to take classes off campus.
SECTION I – INTRODUCTION
28JUN21RFP047 3
4.4. Potential work is to be performed on an as needed basis, or as otherwise directed, at these sites and any future properties or interests of the College.
Sylvania Campus 12000 SW 49th Avenue Portland, Oregon 97219
Southeast Campus 2305 SE 82nd Avenue Portland, Oregon 97216
Cascade Campus 705 N Killingsworth Portland, Oregon 97217
Rock Creek Campus 17705 NW Springville Road Portland, Oregon 97219
CLIMB Center 1626 SE Water Avenue Portland, Oregon 97214
Downtown Center 722 SW Second Avenue Portland, Oregon 97204
Willow Creek Center 241 SW Edgeway Drive Beaverton, Oregon 97006
Newberg Center 415 E Sheridan Newberg, Oregon 97132
Swan Island Training Center 6400 N Cutter Circle Portland, Oregon 97217
Metropolitan Workforce Training Center 5600 NE 42nd Avenue Portland, Oregon 97218
Columbia County Center (OMIC) 34001 NE Wagner Ct Scappoose, OR 97056
5. SCOPE OF WORK
5.1. The College is seeking a Contractor to provide electrical maintenance services OR low voltage services OR BOTH for the College. Services may include installations, repairs, small tenant improvements, emergency services (afterhours and weekends), and specialty projects for District wide line voltage, controls, voice and data cables, and troubleshooting. No public improvement work will be performed.
6. CONTRACT
6.1. The successful Proposer(s), selected by the College, will receive a Trade Services Price Agreement (TSPA). A sample is enclosed herein (See Attachments). The provisions of the Contract are in addition to the requirements set forth in this Solicitation.
6.2. Proposers are advised to thoroughly review and familiarize themselves with the standard contract.
Certain contract terms reflect state statute and may not be altered.
28JUN21RFP047 4
6.3. The Contractor will be expected to promptly sign a contract including all terms and conditions contained in the sample contract. The College will execute the Contract only after it has obtained all applicable required documents and approvals.
6.4. Personnel substitution – If the Contractor must substitute personnel included in the original Proposal, they must obtain written College approval of substituted personnel, prior to substitution.
6.5. Any references and/or requirements of the Contractor to the College must apply to sub-contractors’ requirements to the College and Contractor.
6.6. Individual Project Work Agreements or Task Orders will be issued by the College for specific work as needed.
7. AMENDMENTS
7.1. The College may amend a Contract without additional competition pursuant to OAR 137-047-0800.
8. CONTRACT PERIOD & EXTENSION
8.1. Selected Proposer(s) will be issued a Contract effective upon full execution, for an initial one (1) year term.
8.2. Should the College elect to extend the Contract for an additional one (1) year term, the College will send correspondence to the Contractor on or about two (2) months prior to Contract End Date for each consecutive contract period.
8.3. The College may elect to extend the Contract for a total of four (4) additional one (1) year terms.
8.4. The Contractor's Pricing and Rates must remain firm through the Contract End Date and through each contract period, when extended.
9. COOPERATIVE PROCUREMENT - Pursuant to OAR 137-046-0430
9.1. This Solicitation is a Permissive Cooperative Procurement.
9.2. Authorized agencies may utilize a Permissive Cooperative Contract pursuant to ORS 279A.215.
Generally:
9.2.1. Authorized agencies may establish contracts or price agreements with the Contractor to purchase the Goods and Services awarded by this Solicitation;
9.2.2. Authorized agencies may not materially change or alter the terms, conditions, or prices from the original contract between the Contractor and the College.
9.3. Proposers must state (on the Proposer Certification) that it will/will not extend the terms, conditions and prices to any authorized agency that desires to establish a contract awarded to the Contractor resulting from this Solicitation. Volumes of other agencies are not included in this Solicitation.
10. CONTRACT ADMINISTRATOR
The Contract Administrator for this Price Agreement will be the College Purchasing Manager, or designee.
11. COLLEGE REPRESENTATIVE
11.1. A College Representative will be designated for each individual Project Work Agreement or Task Order.
28JUN21RFP047 5
12. SOLICITATION SCHEDULE
12.1. The milestones for the selection process are set forth below. The dates are specific and will be followed to the extent reasonably possible. The purpose of this schedule is for Proposer information only.
Required dates for contract period milestones are provided elsewhere in this Solicitation. The College reserves the right to deviate from this schedule.
Solicitation Milestone Date
Deadline for Questions October 25, 2021
Closing November 4, 2021 at 2:00 PM Pacific
Interviews (if held) On or about November 19, 2021
Notice of Intent to Award (NOI) On or about November 19, 2021
13. CONTACT DURING SOLICITATION
13.1. Questions must be submitted in writing via email to contracts@pcc.edu as indicated on the Summary page of this Solicitation. No other contact regarding this Solicitation during the solicitation process is permitted. Unauthorized contact regarding this solicitation may subject the offender’s Proposal to rejection.
14. COVID-19 PANDEMIC CONDITIONS
14.1. Emergency Declaration. Due to the COVID-19 Pandemic, the College has declared an emergency, in accordance with PCC Community College Rules of Procurement and OAR 137-047-0280, OAR 137-048- 0200(1)(a), OAR 137-049-0150, ORS 279B.080, and ORS 279C.110(11).
14.2. Campus Restrictions. All College Campuses, Centers, and Offices are on a restricted schedule. Visits by potential Proposers are not possible and are prohibited during the campus restrictions. Attempted on-site visits to College Campuses, Centers, or Offices during the restrictions by any Proposer may result in rejection of its Proposal.
14.3. Pre-Proposal Conference. A Pre-Proposal Conference will not be held.
14.4. Electronic Proposals. Due to the COVID 19 Pandemic, electronic Proposals will be accepted and must be submitted no later than the Closing Date and Time to the secure email address indicated on the Summary Page of this Solicitation.
15. OREGONBUYS
15.1. Additional information regarding this solicitation and certain forms for download are available on the OregonBuys website: https://oregonbuys.gov/bso/ https://oregonbuys.gov/bso/
28JUN21RFP047
SECTION II – STATEMENT OF WORK
1. PURPOSE & INTRODUCTION
1.1. Portland Community College has the need to contract with one or more qualified firms to provide electrical maintenance and/or low voltage services for small tenant improvements, emergency services and specialty projects, on an as needed basis, and as requested by authorized Planning & Capital Construction or Facilities Management Services staff. The College may select one or more contractors to provide these services. The contractors can propose on one or both of the services. These services are needed to support the development and completion of the College’s annual capital and maintenance project plans; and other electrical services as requested.
2. PROJECT DESCRIPTION
2.1. Contractor shall provide Electrical maintenance and/or low voltage services for the College in accordance with the Solicitation. Services may include installations, repairs, small tenant improvements, emergency services (after hours and weekends), and specialty projects for district wide line voltage, controls, voice and data cables, and troubleshooting. No public improvement work will be performed.
2.2. Electrical Maintenance Services can include power distribution equipment, lighting, lighting controls, solar, EV stations, and metering.
2.3. Low Voltage Services can include voice/data cables and terminations, fire alarm, security and mass notification systems. The limited voltage services requested are to be performed by highly skilled professionals knowledgeable in industry best practices prescribed by BICSI, TIA, and NFPA. These services include but are not limited to fiber optic cabling testing, terminations, splices, installations, category ethernet cabling testing, terminations, installations, coax cabling, and other cabling infrastructure supporting Class 1, Class 2, and Class 3 systems. In the case of structured cabling (cat 6), Panduit installer certification is required.
3. GENERAL REQUIREMENTS
3.1. The following services will be required on an as-needed basis:
3.1.1. Read prints, plans, diagrams
3.1.2. New installations
3.1.3. Comply with all permitting requirements
3.1.4. Install per current building codes
3.1.5. Work with subcontractors
3.1.6. Work with architects and engineers
3.1.7. Comply with all ADA building requirements
3.1.8. Specialty projects
3.1.9. Other electrical maintenance and low voltage duties as requested
3.2. Contractor must be registered with the Oregon State Construction Contractors Board.
SECTION II – STATEMENT OF WORK
Electrical Maintenance and Low Voltage Services
28JUN21RFP047 7
3.3. All work must be performed by an individual licensed in Oregon at a level suitable to the job to be performed.
3.4. All work shall adhere to electrical safety practices and PCC safety requirements.
3.5. All work shall be permitted within the EMPP or City/County of authority having jurisdiction.
3.6. All work must be in accordance with the latest adoption of the NEC (NFPA 70).
3.7. All network cabling (cat 6, 6A) must be in accordance with the latest adoption of the BICSI, TDMM, and PCC’s Structured Cabling Standards included within the PCC Design and Construction Standards (https://www.pcc.edu/bond/standards/ (see Appendix A).
3.8. All work must conform to PCC Electrical Standards included within the PCC Design and Construction Standards (https://www.pcc.edu/bond/standards/).
3.9. Normal work hours are 6:00am – 2:30pm Pacific.
3.10. Upon completion, all work must be properly labeled identifying termination location, panel and port.
3.11. Contractor shall provide all tools and equipment necessary to perform the work.
3.12. Removed equipment and devices shall be properly disposed of.
3.13. Areas of work shall be returned to pre-work states of cleanliness.
3.14. All work shall be accomplished in a neat and workmanlike manner.
3.15. Personnel working on-site will be required to check in with a PCC representative.
3.16. A call to a PCC representative at the end of the work/work day is required.
3.17. Electrical license numbers for all employees of the Contractor expected to work on PCC property shall be supplied to the College.
3.18. Contractor must be licensed and bonded by the State of Oregon to do work under this Contract.
3.19. Contractor is responsible for obtaining and maintaining all licenses, permits, and certifications necessary to carry out this Contract. A minimum of an Oregon LEA license with Panduit certification for network cabling is required.
3.20. Contractor is responsible for obtaining the necessary permits for work under this contract.
3.21. Emergency response time: Work may be required during off hours. (i.e. evenings, weekends, holidays).
For off hours emergencies, Contractor must respond within 1 hour from receiving our call and must be onsite within 3 hours if needed.
3.22. Fire rating of any penetrated assemblies (like roof, columns, beams, joists, caulk, etc) on walls, ceilings or floors must be maintained.
3.23. Any damage incurred in the course of contracted work must be reported to the College Representative.
3.24. Contractor is responsible to provide a working environment which fosters respect, dignity, and equity for all of their employees as well as College staff and students. Contractor recognizes that everyone has a fundamental right to a workplace and learning environment free from harassment.
https://www.pcc.edu/bond/standards/ https://www.pcc.edu/bond/standards/
Electrical Maintenance and Low Voltage Services
28JUN21RFP047 8
4. SPECIFIC REQUIREMENTS
4.1. Electrical Maintenance Services
4.1.1. The following services will be required on an as-needed basis:
4.1.1.1. Electrical Repairs
4.1.1.2. Install electronic hardware for doors and relights
4.1.2. Panel schedules must be updated to reflect accomplished work as per PCC Electrical Standards.
4.1.3. All circuit changes shall be provided to College Representative as updated one-line diagram, electrical floor plans and panel schedule
4.2. Low Voltage Services
4.2.1. The following services will be required on an as-needed bases:
4.2.1.1. Panduit Certified
4.2.1.2. Ethernet and fiber optic cable testing
4.2.2. Install per PCC, BICSI, TIA, NFPA, and NEC codes and standards
4.2.3. All cabling changes shall be provided to FMS Document Administrator as updated red lined prints identifying pathway, termination points, and cable labels
5. EMERGENCY DESIGNATED PERSONNEL
5.1. After Contract Award, the Contractor shall designate one (1) Project Coordinator and one (1) additional person to be contacted in case the Project Coordinator is not available. The Project Coordinator shall be the sole contact person between the College and the Contractor, and will be responsible for communication and coordination of all work assignments, including emergency responses.
5.2. In case of area wide disaster, the College shall have priority for emergency responses by the Contractor as required by PCC.
6. PROJECT SCHEDULE
6.1. The contract milestones are set forth below. The dates are approximate but will be followed to the extent reasonably possible. The purpose of this schedule is for information only.
Milestone Date
Contract Award On or about December 1, 2021
7. BUSINESS EQUITY
7.1. Portland Community College is committed to a procurement strategy that achieves College wide race and gender contracting equity while providing small business opportunity and regional economic growth.
Electrical Maintenance and Low Voltage Services
28JUN21RFP047 9
8. SUSTAINABILITY COMMITMENT
8.1. Portland Community College is committed to the use and purchase of environmentally and socially responsible materials and products, which are fiscally responsible, reduce resource consumption and waste, perform adequately, and promote human health and well-being. Recognizing its regional economic role, the College will seek opportunities to educate, encourage, and influence their respective markets by utilizing, where feasible, products and services, including new environmentally preferable products, reusable products, recycled content, and recycled products.
9. ADDITIONAL REQUIREMENTS
9.1. Contractor must employ only persons duly licensed by the State of Oregon to perform the Work required under this Contract for which applicable Oregon Law requires a license.
9.2. The Contractor must meet the highest standards prevalent in the industry or business most closely involved in providing the Goods or Services requested by this Solicitation.
SECTION III – RESPONSE AND EVALUATION
1. INTRODUCTION
1.1. This Section prescribes the mandatory format for the presentation of a Proposal in response to this Solicitation. The purpose of this format is to ensure uniformity of the information from each Proposer and to aid in clear understanding and evaluation of each Proposal. Failure to provide any information requested in this Solicitation may result in rejection of the Proposal.
2. PROPOSAL FORMAT
2.1. Proposals should be typewritten with a font size no smaller than eleven (11) point sized to print on 8- 1/2 x 11 size paper. Spreadsheets may be sized to print on 8 ½ x 14 or 11x17.
2.2. Elaborate art work, expensive paper and visuals are not necessary. Brochures or other promotional presentations beyond that sufficient to present a complete and effective Proposal are not desired.
2.3. There is no page limit for Proposals, but the College encourages brevity.
2.4. A Proposer’s submitted Proposal must include all Forms (see SECTION VI – ATTACHMENTS) and required text (see SECTION III – RESPONSE AND EVALUATION) and must be submitted electronically as follows:
2.4.1. One (1) complete copy in searchable PDF format, labeled “COMPLETE”
2.4.2. One (1) copy of the Proposal in searchable PDF format omitting the Price Schedule, labeled
“COPY – NO PRICING”
2.4.3. One (1) copy of the Price Schedule labeled “PRICING”
2.5. Proposals are to be submitted via email to the following secure email address, and must be identified with the Solicitation Number and Solicitation Title in the subject line of the email:
electricalmaint21RFP@docs.e-builder.net
Please note that this is NOT the email address to be used for submitting questions, comments, or clarifications regarding this Solicitation.
3. PROPOSAL CONTENT REQUIREMENTS
3.1. REQUIRED AFFIDAVIT, CERTIFICATIONS AND FORMS: - See SECTION VI – ATTACHMENTS. The affidavit, certifications, and forms must be completed and submitted with the Proposal.
3.2. DETAILED PROPOSAL CONTENTS: The Proposer Certification Form (see Attachments) must be completed and submitted as the cover of the Proposer’s response. Proposers are cautioned to provide in their Proposals, in a brief and concise manner, as much detail as possible pertaining to their capabilities and experience in providing the services requested in this Solicitation. Do not assume the College has any prior knowledge of the Proposer.
Proposers must present a Proposal containing the specific information requested and submit all attachments as required. Proposers must provide a reply to each of the following items in the order listed below:
Electrical Maintenance and Low Voltage Services
28JUN21RFP047 11
3.2.1. EXPERIENCE & QUALIFICATIONS:
3.2.1.1. Provide a brief narrative of the Proposer’s history and capabilities.
3.2.1.2. Provide a description of the Proposer’s experience in providing the requested services.
3.2.1.3. State the number of years Proposer has provided the requested services.
3.2.2. STAFFING AND KEY-PERSONNEL:
3.2.2.1. Provide a company organization chart showing the proposed staffing approach for this account.
3.2.2.2. Provide a description of staffing levels.
3.2.2.3. Provide details of the Proposer’s standards for staff training.
3.2.2.4. Identify relevant certifications held by staff.
3.2.3. APPROACH AND OPERATIONS:
3.2.3.1. Describe in detail how the services will be provided. Address each item in SECTION II – STATEMENT OF WORK. Focus on the Proposer’s ability to perform all of the required tasks. Include policy and procedural manuals if available.
3.2.4. SAFETY:
3.2.4.1. Describe the Proposer’s safety program. Explain how workforce safety is implemented and monitored.
3.2.4.2. Provide a copy of the Proposer’s confined space training program.
3.2.4.3. Provide a copy of the Proposer’s “Lock Out/Tag Out” program.
3.2.5. REFERENCES:
3.2.5.1. Provide five (5) professional references from projects similar to the scope of this Solicitation, and from accounts of similar size and complexity. Community College or Higher Ed references are preferred. Use of the provided Proposer Reference Form (see SECTION VI – ATTACHMENTS) is required.
3.2.5.2. If the Proposer has performed any project or work with the College in the last ten
(10) years, one of the references must be from the Proposer’s most recent contract with the College.
Provide the name, telephone number, and email address of the client for each of these five
(5) references. These contacts will be used by the College for reference checks.
3.2.6. QUALITY OF PROPOSAL:
3.2.6.1. Provide a proposal that is responsive to the Solicitation requirements, terms, conditions, and is presented in a manner that is easily readable, neat, clear, logical, reasonable, and professional.
Electrical Maintenance and Low Voltage Services
28JUN21RFP047 12
3.2.7. PRICE SCHEDULE:
3.2.7.1. Use of the provided Price Schedule (see SECTION VI – ATTACHMENTS), is required.
Additional notes may be made at the bottom of the schedule by the Proposer if necessary.
4. EVALUATION CRITERIA
4.1. The College will score each Proposal by reviewing and evaluating the Proposal content requirements outlined above. The following table indicates how the total points in the scoring will be assigned by required Proposal item. Failure to meet minimum requirements for any individual item may disqualify the Proposal regardless of the total points scored for the other items. Each item will be evaluated as follows:
EVALUATION CRITERIA MATRIX
Maximum Points Possible
Experience & Qualifications 10
Staffing and Key-Personnel 10
Approach and Operations 20
Safety 10
References 10
Quality of Proposal 5
Price Schedule 30
SUB-TOTAL = 95
INTERVIEW (if held)
Interview 25
SUB-TOTAL = 25
GRAND-TOTAL = 120
5. PROPOSAL EVALUATION
5.1. Responsiveness and Responsibility: The College will utilize the following objective factors to determine if Proposals are Responsive and Proposers are Responsible:
5.1.1. Responsive Proposal (OAR 137-046-0110). A Responsive Proposal is a Proposal that substantially complies in all material respects with the requirements of this Solicitation.
5.1.2. Responsibility of Proposer (OAR 137-047-0500). Before awarding a Contract, the College shall determine that the Proposer submitting the most Advantageous Proposal is Responsible.
The College shall use the standards set forth in ORS 279B.110 and OAR 137-047-0640(1)(c)(F)
Electrical Maintenance and Low Voltage Services
28JUN21RFP047 13
to determine if a Proposer is Responsible. In the event the College determines a Proposer is not Responsible, it shall prepare a written determination of non-Responsibility as required by ORS 279B.110 and shall reject the Proposal
5.2. Contingent Proposals. The Proposer must not make its Proposal contingent upon the College's acceptance of any terms or conditions (including Specifications) other than those contained in this Solicitation.
5.3. Non-Resident Proposers. In determining the most Advantageous Responsible Proposal, the College shall apply the reciprocal preference set forth in ORS 279A.120(2)(b) and OAR 137-046-0310.
5.4. Identical Proposals. When one or more Proposals are identical under OAR 137-046-0300, the College shall award a Contract in accordance with the procedures set forth in OAR 137-046-0300.
5.5. Recycled Materials. The College may give preference for Recycled Materials as set forth in ORS 279A.125 and OAR 137-046-0320.
5.6. Clarification of Proposals. After Opening, the College may conduct Discussions with apparent Responsive Proposer(s) for the purpose of clarification and to assure full understanding of the Proposal.
5.7. Negotiation. The College may only conduct Discussions or Negotiate with Proposers. After Award of the Contract, the College may only modify an awarded Contract in accordance with OAR 137-047-0800.
5.8. Objective Criteria. The College may allow, at its discretion, certain other objective evaluation criteria.
Examples of such criteria include but are not limited to conversion costs, transportation cost, volume weighing, trade-in allowances, cash discounts, depreciation allowances, cartage penalties, ownership or lifecycle cost formulas.
5.9. Pricing. Pricing will be compared among all responsive Proposals submitted. The lowest overall priced proposal will receive the full points available. All other proposal pricing scores shall be weighted against the lowest price proposal (Lowest price scores the highest. All other higher priced proposals are weighted against the lowest priced proposal).
6. EVALUATION COMMITTEE
6.1. The Proposals will be evaluated by the Evaluation Committee consisting of not less than three (3) knowledgeable individuals (Evaluators) to review and score Proposals according to the evaluation criteria set forth in this Solicitation. The College may assign certain Evaluators to evaluate specific Proposal categories in keeping with the Evaluators’ area of expertise. Working as a Committee or independently (at the discretion of the College) with copies of the written Proposals, the Evaluators will independently assign scores to each Proposal received in accordance with the evaluation criteria defined herein. Evaluators will utilize the criterion (as objectively as possible) to measure the merit of each Proposal received in accordance with the subjective evaluation criteria to determine which Proposals(s) will provide the College with the most advantageous and best overall value. The recommendations of this committee will be a consensus and will be final.
7. INTERVIEWS (if conducted)
7.1. The evaluation committee may elect to interview Proposers if the evaluation committee considers it necessary or desirable. The top ranked Proposer, or Proposers if the scoring is close, may be invited to
Electrical Maintenance and Low Voltage Services
28JUN21RFP047 14
interview. If the evaluation committee conducts interviews, the interview process will be used to supplement and clarify the information contained in the proposal.
7.2. Based upon proposal scoring, as modified by the interview, and the results of reference checks, the Proposers will be given final ranking by the evaluation committee. The final ranking will be provided to the College for a final decision to award a contract.
7.3. Particular details about the interviews will be issued to those firms invited to interview.
7.4. The College may request Proposer to provide a live demonstration of Proposer’s work order system.
7.5. Such interviews and any presentation materials will be at the Proposer’s expense.
8. NEGOTIATIONS - Pursuant to OAR 137-047-0261
8.1. Based on the submittals and interviews, the Evaluation Committee will rank the Proposers and choose one Proposer as the highest ranked, successful respondent to this Solicitation. If the highest-ranked Proposal exceeds the College’s budget, the College may commence serial negotiations with the highest-ranked Proposers. The College reserves the right to negotiate any contract Terms and Conditions which it determines in the College’s sole discretion to be in the best interest of the College. The College may only conduct discussions or negotiate with Proposers in accordance with OAR 137-047-0261(7) and OAR 137-047-0261 (8). After Award of the Contract, the College may only modify an awarded Contract in accordance with OAR 137-047-0800.
SECTION IV – INSTRUCTIONS TO PROPOSERS
1. FORMAL SELECTION PROCEDURE - Pursuant to OAR 137-047-0260
1.1. The College may procure Goods or Services by competitive sealed Proposals as set forth in ORS 279B.060.
2. PRE-PROPOSAL CONFERENCE - Pursuant to OAR 137-047-0420
2.1. Purpose. The College may hold pre-Proposal conferences with prospective Proposers prior to Closing, to explain the procurement requirements, obtain information, and/or to conduct site inspections.
2.2. Required Attendance. The College may require attendance at the pre-Proposal conference as a condition for making an Offer. If the College’s pre-Proposal conference is mandatory (as indicated on the Summary Page), a Proposal submitted by a Proposer who did not attend the mandatory pre- Proposal conference will be rejected.
2.3. Statements Not Binding. Statements made by the College's representatives at the pre-Proposal conference do not change the Solicitation unless the College confirms such statements with a Written Addendum to the Solicitation.
3. PROPOSALS ARE OFFERS - Pursuant to OAR 137-047-0310
3.1. Offer and Acceptance. A Proposal submitted in response to this Solicitation is the Proposer’s offer to enter into a Contract. The Proposal is a "firm offer," and must be held open by the Proposer for the College's acceptance for sixty (60) days. The College may elect to accept the Proposal at any time during the specified period, and the College's Award of the Contract constitutes acceptance of the Offer and binds the Proposer to the Contract.
3.2. Contingent Proposals. The Proposer must not make its Proposal contingent upon the College's acceptance of any terms or conditions (including Specifications) other than those contained in this Solicitation.
3.3. Proposer’s Acknowledgement. By signing and submitting a Proposal, the Proposer acknowledges that it has read, understands, accepts and agrees to be bound by the terms and conditions contained in this Solicitation.
4. ELECTRONIC PROCUREMENT - Pursuant to OAR 137-047-0330
4.1. The College may conduct all phases of a procurement by electronic methods to the extent specified in the Solicitation.
4.2. If electronic Proposal submissions are allowed, the College will provide a secure email address for receipt of electronic Proposals and shall open electronic Proposals in accordance with the College’s electronic security measures. Proposers assume the risk of premature disclosure due to submission to any other email address.
4.3. Failure of the E-Procurement System. In the event of a failure of the College’s Electronic Procurement System that interferes with the ability of Proposers to submit Electronic Proposals, the College may cancel the Solicitation in accordance with OAR 137-047-0660, or may extend the date and time for
Electrical Maintenance and Low Voltage Services
28JUN21RFP047 16
receipt of Electronic Proposals by providing notice of the extension immediately after the Electronic Procurement System becomes available.
5. PROPOSAL PREPARATION - Pursuant to OAR 137-047-0400
5.1. Instructions. A Proposer must sign and submit its Proposal in accordance with the instructions set forth in this Solicitation. Failure to submit Proposals in accordance with the provisions of this Solicitation will be grounds to declare the Proposal as non-Responsive. Proposers must:
5.1.1. Submit a complete Proposal (a Proposal that meets all requirements of this Solicitation);
5.1.2. Initial any corrections or erasures to their Proposal prior to Closing;
5.1.3. Identify (on the Proposer Certification) whether the Proposer is/is not a "resident Proposer”, as defined in ORS 279A.120(1);
5.1.4. Provide (on the Proposer Certification) certification of nondiscrimination in obtaining any required subcontractors in accordance with ORS 279A.110(4); and
5.1.5. Provide (on the Proposer Certification) Written acknowledgment of receipt of all Addenda.
5.2. Documents. A Proposer must provide the College with all required and requested forms, documents, and descriptive literature;
6. PROPOSAL SUBMISSION - Pursuant to OAR 137-047-0410
6.1. Identification of Proposals. To ensure proper identification and handling, Proposals must be submitted in a sealed envelope appropriately marked with the Proposer’s name and address and the Solicitation number in large block numbers. Electronic Proposals, if allowed, must be identified with the Solicitation Number and Solicitation Title in the subject line of the email. Proposals must only be submitted to the person and location indicated on the Summary page of this Solicitation. Facsimile Proposals will not be accepted.
6.2. The College is not responsible for Proposals submitted in any manner, format, or to any delivery point other than as required in this Solicitation.
6.3. Receipt of Proposals. Proposers are solely responsible for ensuring that the College receives their Proposal at the required delivery point prior to Closing, regardless of the method used to submit or transmit the Proposal.
7. ADDENDA - Pursuant to OAR 137-047-0430
7.1. Issuance; Receipt. The College may change this Solicitation only by Written Addenda. A Proposer must provide written acknowledgement of receipt of all issued Addenda in the space provided on the Proposer Certification.
7.2. Notice and Distribution. The College will publish notice of all Addenda on the OregonBuys website.
Addenda may be downloaded from the OregonBuys website. It is the Proposers’ responsibility to inquire about Addenda. Proposers should frequently check the OregonBuys website until Closing (due date and time) about any Addenda issued, i.e., at least once weekly until the week of Closing and at least once daily the week of the Closing.
7.3. Timelines; Extensions. The College will issue Addenda within a reasonable time to allow prospective Proposers to consider the Addenda in preparing their Proposal. The College may extend the Closing if
Electrical Maintenance and Low Voltage Services
28JUN21RFP047 17
the College determines prospective Proposers need additional time to review and respond to Addenda.
Except to the extent required by public interest, the College will not issue Addenda less than 72 hours before the Closing unless the Addendum also extends the Closing.
7.4. Request for Change or Protest. Unless a different deadline is set forth in the Addendum, a Proposer may submit a Written request for change or protest to the Addendum, as provided in OAR 137-047- 0730, by the close of the College's next business day after issuance of the Addendum, or up to the last day allowed to submit a request for change or protest under OAR 137-047-0730, whichever date is later. If the date established in the previous sentence falls after the deadline for receiving protests to the Solicitation Document in accordance with OAR 137-047-0730, then the College may consider a Proposer’s request for change or protest to the Addendum only, and the College will not consider a request for change or protest to matters not added or modified by the Addendum.
8. QUESTIONS/CLARIFICATIONS/CHANGES & SOLICITATION PROTEST
8.1. Proposers may request changes or clarifications to, or protest, any provision, specification or Contract term contained in this Solicitation:
8.2. Questions, Clarifications, Changes. All questions regarding this Solicitation must reference the Solicitation number and must be submitted in writing via e-mail to the attention of the person indicated on the Summary page of this Solicitation. No oral questions will be accepted other than at the pre- Proposal conference (if any). Questions received by the College prior to deadline will be answered in written addenda.
8.3. Deadline. Questions, changes, clarifications, or protests must be received by the College by noon Pacific Time not later than ten (10) calendar days prior to the date Proposals are due, or as stated in the Solicitation Schedule in SECTION I - INTRODUCTION. The College will not consider any protest or request for change that is submitted after the submission deadline.
8.4. Response. Responses to questions/clarifications and notice of the College’s protest determination will be provided in written addenda pursuant to ADDENDA above. The College’s response to a Proposer, whether orally or in Writing, does not change the Solicitation and is not binding on the College unless the College amends the Solicitation by written Addendum.
9. PRE-CLOSING MODIFICATION OR WITHDRAWAL OF PROPOSALS - Pursuant to OAR 137-047-0440
9.1. Modifications. A Proposer may modify its Proposal in Writing only prior to Closing. A Proposer shall prepare and submit any modification to its Proposal to the College in accordance with OAR 137-047- 0400 and 137-047-0410. Any modification must include the Proposer's statement that the modification amends and supersedes the prior Proposal. The Proposer must deliver the submitted modification as described in PROPOSAL SUBMISSION above and mark it as follows:
9.1.1. “Proposal Modification”, and
9.1.2. Solicitation Number.
9.2. Withdrawals.
9.2.1. A Proposer may withdraw its Proposal by Written notice submitted on the Proposer's letterhead, signed by an authorized representative of the Proposer, delivered to the individual and location specified in the Solicitation (or the place of Closing if no location is specified), and received by the College prior to the Closing.
Electrical Maintenance and Low Voltage Services
28JUN21RFP047 18
9.2.2. The Proposer must mark the Written request to withdraw a Proposal as follows:
9.2.2.1. “Proposal Withdrawal”, and
9.2.2.2. Solicitation Number.
9.3. Proposers are responsible for ensuring that the College receives its modification or withdrawal.
10. RECEIPT, OPENING, & RECORDING OF PROPOSALS - Pursuant to OAR 137-047-0450
10.1. Receipt. The College will electronically or mechanically time-stamp or hand-mark each Proposal and any modification upon receipt. The College shall not open the Proposal or modification upon receipt, but shall maintain it as confidential and secure until Opening. If the College inadvertently opens a Proposal or a modification prior to the Opening, the College shall return the Proposal or modification to its secure and confidential state until Opening.
10.2. The Proposer is responsible for ensuring that the College receives its Proposal at the required delivery point prior to the Closing, regardless of the method used to submit or transmit the Proposal. The College will not be responsible for the premature opening or failure to open a Proposal that is not properly addressed and/or identified.
10.3. Opening and Recording. Proposals will be opened and recorded. The number of Proposals received, the identity of Proposers, or the contents of any Proposal will not be disclosed to the public until all Proposals have been evaluated, negotiations completed if required, and a recommendation for Award has been published.
11. LATE PROPOSALS, LATE WITHDRAWALS, & LATE MODIFICATIONS - Pursuant to OAR 137-047-0460
11.1. Any Proposal received after Closing is late. A Proposer’s request for withdrawal or modification of a Proposal received after Closing is late. The College will not consider late Proposals, withdrawals, or modifications except as permitted in MISTAKES below. The College reserves the right to consider Proposals that have been delayed or mishandled by the College.
12. MISTAKES - Pursuant to OAR 137-047-0470
12.1. Generally. To protect the integrity of the competitive Procurement process and to ensure fair treatment of Proposers, the College will carefully consider whether to permit waiver, correction, or withdrawal of Proposals for certain mistakes.
12.2. College Treatment of Mistakes. The College will not allow a Proposer to correct or withdraw a Proposal for an error in judgment. If the College discovers certain mistakes in a Proposal after Opening, but before Award of the Contract, the College may take the following action:
12.2.1. The College may waive, or permit a Proposer to correct, a minor informality. A minor informality is a matter of form rather than substance that is evident on the face of the Proposal, or an insignificant mistake that can be waived or corrected without prejudice to other Proposers. Examples of minor informalities include a Proposer’s failure to:
12.2.1.1. Return the correct number of signed Proposals or the correct number of other documents required by the Solicitation;
12.2.1.2. Sign the Proposal in the designated block, provided a Signature appears elsewhere in the Proposal, evidencing an intent to be bound; and
Electrical Maintenance and Low Voltage Services
28JUN21RFP047 19
12.2.1.3. Acknowledge receipt of an Addendum to the Solicitation, provided that it is clear on the face of the Proposal that the Proposer received the Addendum and intended to be bound by its terms; or the Addendum involved did not affect price, quality or delivery.
12.2.2. The College may correct a clerical error if the error is evident on the face of the Proposal or other documents submitted with the Proposal, and the Proposer confirms the College's correction in writing. A clerical error is a Proposer's error in transcribing its Proposal.
Examples are provided in OAR 137-047-0470(2)(b).
12.2.3. The College may permit a Proposer to withdraw a Proposal based on one or more clerical errors in the Proposal only in accordance with OAR 137-047-0470(2)(c) and (d).
12.3. Rejection for Mistakes. The College shall reject any Proposal in which a mistake is evident on the face of the Proposal and the intended correct Proposal is not evident or cannot be substantiated from documents submitted with the Proposal.
12.4. Identification of Mistakes after Award. Following Award, a Proposer is bound by its Proposal, and may withdraw its Proposal or rescind a Contract entered into pursuant to OAR 137-047 only to the extent permitted by applicable law.
13. TIME FOR AGENCY ACCEPTANCE - Pursuant to OAR 137-047-0480
13.1. A Proposer’s Proposal is a Firm Offer, irrevocable, valid, and binding on the Proposer for not less than the time period following Closing specified in this Solicitation.
14. EXTENSION OF TIME FOR ACCEPTANCE OF PROPOSAL - Pursuant to OAR 137-047-0490
14.1. The College may request, orally or in Writing, that Proposers extend, in writing, the time during which the College may consider their Proposal(s). If Proposer agrees to such extension, the Proposal shall continue as a Firm Offer, irrevocable, valid and binding on the Proposer for the agreed-upon extension period.
15. EVALUATION & AWARD - Pursuant to OAR 137-047-0600
15.1. Evaluation of Proposals
15.1.1. Award When Proposals are Identical. When Proposals are identical the College must Award the contract Pursuant to OAR 137-046-0300.
15.1.2. Public Printing. The College shall apply the public printing preference set forth in ORS
282.210 for the purpose of evaluating Proposals.
15.2. Clarification of Proposals. After Opening, the College may conduct discussions with apparent Responsive Proposers for the purpose of clarification to assure full understanding of the Proposals. All Proposals, in the College's sole discretion, needing clarification will be accorded such an opportunity.
15.3. Award.
15.3.1. Award in part or in whole is contingent upon available funding. In the event adequate funds are not appropriated and allocated by the Portland Community College Board of Directors, the College reserves the right to cancel any Solicitation at no penalty.
Electrical Maintenance and Low Voltage Services
28JUN21RFP047 20
15.3.2. If awarded, the College will award a Contract to the Responsible Proposer(s) that submitted the most advantageous Responsive Proposal(s), and that meets the requirements of this Solicitation.
15.3.3.
This is the start of the file's text. The full file is on GovTribe.