PCG3200_24031 Addendum _1_11_18_2024.pdf
PDF 23 KB Posted
- Solicitation number
- PE-72650-NONST-2025-000000020
- Issued by
- Seminole County, Georgia
About this file
This document is an Addendum to the solicitation for the City of Griffin's 2024 TSPLOST Paving - Year Three Streets project, Bid # 24-010. The addendum modifies the original bidding documents dated October 2024, including changes to the bid date, last day for questions, and a revised bid tabulation. The project involves paving remediation on multiple streets within the City of Griffin, with a total of approximately 73,000 square yards of work. The types of remediation include full depth reconstruction, cold in-place recycling, functional overlay, geosynthetic interlayer, slab replacement, microsurfacing treatment, and structural overlay. The revised bid tabulation includes an alternate for full depth reclamation in lieu of the original paving types. The selected contractor must provide proof of required insurance, executed construction agreement, and performance and payment bonds by December 3, 2024, and the project is scheduled to be awarded at the City of Griffin Board of Commissioners meeting on December 10, 2024. The addendum also provides clarification on lane closures and the use of the City's landfill for disposal of demolition debris and waste dirt.
The contract will be awarded to a single contractor. The addendum does not provide any details on pricing terms, set-asides, incumbents, funding requirements or sources, or any other financial information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2024 TSPLOST Paving _ Year Three Streets.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF GRIFFIN
2024 TSPLOST PAVING – YEAR THREE STREETS
BID # 24-010
FROM: PARAGON CONSULTING GROUP, INC.
350 AIRPORT ROAD
GRIFFIN, GA 30224
TO: ALL BIDDERS OF RECORD
RE: Addendum No. 1, dated November 18, 2024
This Addendum forms a part of the Contract Documents and modifies the original Bidding
Documents dated October 2024.
This Addendum consists of two (2) pages and a revised Bid Tabulation consisting of three (3) pages.
CONTRACT DOCUMENTS AND SPECIFICATIONS
Add. 1.1 Modification: The Bid Date has been changed to Tuesday, November 26, 2024, at 2:00PM. The location for the bid opening remains the same.
Add. 1.2 Modification: The last day for questions is Wednesday, November 20, 2024, at
5:00PM.
Add. 1.3 Modification: A revised ‘BID TABULATION’ dated 11/18/2024 is attached to this
Addendum and becomes a part of the Contract Documents. Contractors should use the revised Bid Tabulation when submitting a bid. The revised Bid Tabulation contains a section titled “ALTERNATE NO. 1 – FULL DEPTH RECLAMATION”. The section contains alternates for Full Depth Reclamation (FDR) in multiple locations in lieu of the paving types stated in the ‘PAVING REMEDIATION’ section of the
Bid Tabulation. As noted for each location, the contractor should assume a cement content of 60 LBS/SY. The two paving sections, including the FDR base, associated with the remediation are 8:3:1-1/2 and 6:2:1-1/4, as noted for each location. Each location also includes an associated line item for the contractor to provide the FDR mix design. The mix design and preparation of the FDR base should adhere to GDOT specifications.
Add. 1.4 Modification: Sections of South 6th Street were identified as North 6th Street in error on the original Bid Tabulation. These errors have been corrected on the revised Bid Tabulation.
Add. 1.5 Clarification: The selected contractor must provide proof of required liability insurance, an executed construction agreement, and executed Payment Bonds and Performance Bonds to Paragon Consulting Group no later than Tuesday, December 3, 2024, at 12:00PM. Award of the project is scheduled for the
December 10, 2024, City of Griffin Board of Commissioners meeting.
Add. 1.6 Contractor Question: Will full lane closures be allowed? Will the contractor be able to make the streets one way during construction?
Response: The City of Griffin will allow full lane closures, and the contractor may will be allowed to make the streets one-way during construction. The contractor must maintain driveway access for residents and businesses during construction.
Add. 1.7 Contractor Question: Is there an approved dumpsite for the concrete that is to be demolished, and the waste dirt?
Response: The City of Griffin Shoal Creek Landfill will accept demolition debris and waste dirt. The contractor is responsible for all related tipping fees. Use of the City’s landfill is not required. The contractor may use any legal, alternate dumping location.
End of Addendum No. 1