PCC ADA Upgrades Davis Academic Bldg_ADDENDUM #4_11-19-2026.pdf
PDF 7 MB Posted
- Attached to
- ADA Upgrades
- Solicitation number
- IFB1 GJKA 2027000046 7
- Issued by
- Ouray County, Colorado
About this file
This Addendum #4 document is issued by Pueblo Community College for the ADA Upgrades Davis Academic Building project (Project No. 2026-049M25) located at 900 W. Orman Avenue, Pueblo, Colorado. The project encompasses various accessibility improvements to the three-story Davis Academic Building, including creation of single-occupant restrooms, door hardware modifications, stair tread replacement, HVAC modifications, plumbing fixture upgrades, fire protection enhancements, and electrical modifications. The project includes four additive alternates and is administered by the Architect (Hall Architects) and Owner's Project Manager (Wember). The mandatory site walk-through for all General Contractor bidders has already occurred. Sealed qualifications are due November 24, 2026, at 2:00 p.m. MST, with bids due December 3, 2026, at 2:00 p.m. MST and public bid opening scheduled for December 3, 2026, at 2:15 p.m. MST. The anticipated Notice to Proceed is January 4, 2027, with Substantial Completion and Final Completion dates to be determined through mutual agreement between the General Contractor and PCC. The work involves sequential segmented phasing to accommodate continued limited occupancy of the building during construction.
The project has a budget of $824,000, which includes the cost of alternates, and will be tracked under state prevailing wage requirements without involvement of SLFRF federal funds, Davis-Bacon Act provisions, Buy American/BABA requirements, or SAM registration. The contractor must carry performance and payment bonds for the full contract amount (100%) and maintain a one-year warranty on all work. State prevailing wage determinations are included in the project exhibits, and the contractor is responsible for certified payroll tracking and LCPTracker fees, which are managed by the Owner. Apprenticeship Utilization will not be required for this project. The Owner has designated preferred vendors for certain work including Linx for communication cabling and access control, Johnson Controls for fire alarm systems, and KBL for low voltage/IT work. The reroofing contractor (Strong Contractors) will handle all roof penetrations, patching, and flashing required by this project. No hazardous materials abatement is required as PCC is already cleared for abatement and none were found on-site.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pueblo Community College Addendum No. 4 ADA Upgrades Davis Academic Building Page 1 of 15
1935 Dominion Way, Suite 202
Colorado Springs, CO 80918
Office: 719.277.7300
ADDENDUM NUMBER 4
PROJECT: Pueblo Community College DATE: November 19, 2026 ADA Upgrades Davis Academic Building Project No.: 2026-049M25
OWNER: Pueblo Community College 900 W. Orman Ave.
Pueblo, Colorado 81004
The Drawings, Specifications and Contract Documents on the subject project are modified, corrected, supplemented and/or superseded as hereinafter described.
The following additions, deletions, changes and information shall become a part of and modify all work shown or described in the Drawings and Project Manual.
All bidders shall make necessary adjustments in their bid on account of this addendum.
Each and every bidder, subcontractor, and material supplier shall be responsible for reading each item in this addendum to ascertain to what extent and in what manner it affects the work in which they are interested. Each Bidder shall indicate on the Bid Form their acknowledgment of receipt of this addendum document by addendum number and addendum date.
GENERAL
1. This is the last Addendum to be issued for this project.
2. NOTE: All bidder questions that have been submitted throughout this bid period have been incorporated and responded to between Addendum #3 issued 11/17/2026 and this Addendum #4. Please refer to both addenda to review questions and responses.
3. BID SCHEDULE REMINDERS:
Final Addendum Issued (anticipated) November 19, 2026
Qualifications Due November 24, 2026, 2:00 p.m. (MST) Bids Due December 3, 2026, 2:00 p.m. (MST)
Public Bid Opening December 3, 2026, 2:15 p.m. (MST)
QUESTIONS
(Note: For visual clarity, answers to the questions will be presented in bold text.)
ADA Upgrades Davis Academic Building Page 2 of 15
4. Q: The prevailing wage and Davis-Bacon boxes are unchecked, but SLFRF federal provisions are bound into the manual and the apprenticeship utilization box is checked. Confirm the wage basis and whether certified payroll is required
A: No SLFRF funds are involved in this project. We will be tracking Prevailing Wages, and the wage determinations are included in the exhibit list posted with the RFP. Davis-Bacon, BABA and SAM do not apply.
5. Q: The AFB requires state prevailing wage and LCPTracker. The Project Manual also includes the SLFRF federal provisions. In SC-6.21, neither the Davis-Bacon box nor the State Prevailing Wage box is checked. The wage rates (Appendix D) were not included in the posted documents.
Please confirm whether federal (SLFRF) funds are involved; which wage determination(s) apply (state prevailing wage, Davis-Bacon, or both); whether federal provisions such as Buy American/BABA and SAM registration apply; and please issue the applicable wage rates.
A: No, SLFRF funds are involved in this project. We will be tracking Prevailing
Wages, and the wage determinations are included in the exhibit list posted with the RFP. Davis-Bacon, BABA and SAM do not apply.
6. Q: Please confirm that the required warranty period for all scopes is 1-year as mentioned in the general conditions.
A: Yes, everything is a one-year warranty.
7. Q: Will bid qualifications be allowed as an additional attachment to the bid form?
A: No. Qualifications will be due on November 24th 2026. Bids are due separately on December 3rd 2026.
8. Q: Please provide wage determination sheet for this project.
A: It is listed in the Exhibit list, as well as Addendum 03.
9. Q: Please confirm the prevailing wage decision that will be used for the entirety of the project. If the wage rate decision may change, please confirm a change order will be issued for the difference in costs.
A: Wage Decision is included in the exhibit list of the RFP. They will remain the same for the entirety of the project.
10. Q: Please confirm that the Direct Labor Burden sheets are not required to be provided with the Bid proposal on December 3, 2026. It is our understanding that these forms will be required of the successful bidder upon project award.
A. Labor Burden Sheets will be part of the successful bidder's contract. It does not have to be included in the proposal/qualifications.
11. Q: Please confirm if commissioning will be required for this project.
ADA Upgrades Davis Academic Building Page 3 of 15
A: It will not be needed.
12. Q: Please confirm if a hazardous materials investigation report will be provided. The mandatory site walk indicated that there are not hazardous materials on-site.
A: PCC is already cleared for Abatement. There are no hazardous materials, and abatement it will not be needed on this project.
13. Q: Please confirm that abatement of hazardous materials is to be excluded in the
Contractor’s scope.
A: PCC is already cleared for Abatement, it will not be needed on this project.
14. Q: Please confirm the enforcement of the Apprenticeship Utilization Certifications requirements for all mechanical, sheet metal, fire suppression, sprinkler fitting, electrical, and plumbing scopes of work as these requirements significantly reduce the amount of local and South-West regional subcontractor participation for this project.
A: Apprenticeship Utilization will not be required for this project.
15. Q: Please confirm the Owner / Principal Representative is responsible for contracting and paying for independent testing of concrete, soils, and other additional testing required by the specifications per Article 14 sections 14.3 & 14.4 of the General Conditions.
A: PCC will be responsible for procuring 3rd party testing. The contractor will be responsible for defining which tests are needed and coordinating and scheduling them.
16. Q: The submission instructions for both the Sealed Qualifications and Bids reference two delivery methods: (1) email submission or (2) in-person delivery of three hard copies and an electronic copy on a USB drive (for qualifications) / an original signed bid package (for the bid). Can PCC clarify whether firms may choose one of these two methods, or if both email and in-person submissions are required for both the qualifications and bid portions.
A: You can do either submission method; both are not required.
17. Q: Is there a preferred Pueblo Community College vendor/subcontractor for communication cabling, access control, video surveillance, or the fire alarm system?
Please provide contact information for preferred vendors/subcontractors.
A: PCC works with the following vendors/subcontractors: Linx for communication cabling and access control; Johnson Controls for fire alarm systems; KBL for low voltage/IT. PCC self-performs surveillance work. See reissued Specification 01 10 00 SUMMARY OF WORK in this Addendum for additional information.
ADA Upgrades Davis Academic Building Page 4 of 15
18. Q: What completion date would we carry? The specifications reference required dates, but the schedule still shows TBD. Will there be liquidated damages?
A: The final completion date is to be agreed upon with the awarded bidder.
This should be part of your phasing plan that is included in your proposal, and will be part of the scoring process. There are no liquidated damages on this
19. Q: Does all demolition and noisy work need to be finished by January 19? After classes start, what hours can we work, and what work will be allowed during the day?
A: PCC prefers hours of construction to take place between 7:00am-5:00pm, Monday-Friday. Working times outside these constraints will be discussed with the successful bidder. PCC would prefer most of the demo work to be completed before January 19th, but this will also depend on the phasing plan put in place by the contractor and agreed upon by PCC.
20. Q: Is there a preferred order for the restroom work? Can we work on all three at once? Please let us know of any campus events or dates we need to work around.
A: There is no preferred order for the restroom work. The contractor should propose their best idea for phasing these restrooms around working in a building that is occupied at all hours of the day. PCC’s Academic and Event Calendars are included in this addendum.
21. Q: Where can we put a dumpster and store materials? If needed, can we use the building’s elevators? Can the functioning restrooms be used by construction workers?
Is there designated contractor parking?
A: All of this will be discussed with the successful bidder. There will be defined areas for dumpsters and contractor parking. Restrooms can be used and elevators can be accessed.
22. Q: What permit and inspection fees should we carry, including any State code consultant fees?
A: The Compliance Notice, including inspection recommendations, are included in this addendum. Any State Code Consultant Fees will be handled by
PCC.
23. Q: Please confirm the wage rates and apprenticeship requirements we need to use.
Are there any LCPTracker fees we need to include?
A: Wage Rates are included in the RFP exhibit list and posted again in Addendum 03. PCC has an account with LCP Tracker, and the owner will be responsible for all fees. Apprenticeship Utilization is not required on this
24. Q: Will the price score be based on the base bid or include alternates? Does the
$824,000 budget include the alternates?
ADA Upgrades Davis Academic Building Page 5 of 15
A: Scoring will be based on the Base Bid. Yes, the $824,000 budget does include the alternates.
25. Q: Should we carry performance and payment bonds at 100%? The RFP mentions
50%, but the General Conditions call for the full contract amount.
A: Performance and Payment Bonds should be for the full contract amount (100%).
26. Q: Please confirm we can submit directly by email as stated in the RFP. The attached bidder instructions still reference Box.com. We also need the Acknowledgement and Attestation form and confirmation of whether unit prices and labor rates are due with the bid.
A: Qualifications and Bids can either be submitted through email, or delivered in person. Please disregard the Box.Com that is stated on the "Information to Bidders" form. Any email submissions should go directly to ED Iniguez (edmond.iniguez@pueblocc.edu.) The Attestation form will be provided with this addendum. Union prices will not apply and Labor rates will be included in the successful bidders contract, they do not need to be included on the bid.
27. Q: You have requested examples of estimates in the qualifications package, but the instructions say no pricing. Should we remove the dollar amounts from those examples?
A: Any examples that include pricing for projects outside of the PCC Davis Academic Building are OK to include. We cannot have any pricing related to the Davis Academic Building included in the Qualifications. All pricing for this project will be submitted on December 03, 2026.
28. Q: Please provide a specification section for Division 03. For infill of concrete, PSI information will be needed.
A: There is no specification section for Division 03. Information on concrete work for slab infill has been expanded upon in revised demolition keynote, Sheet A2.20 in this Addendum.
29. Q: Confirm the Division 26 scope at card reader locations. Is the access control system Owner-furnished and Owner-installed? Is any 120V power needed at access control panels or electrified hardware??
A: The access control system components will be furnished and installed by the Owner’s separate vendor. Contractor shall provide rough-in conduits and boxes as required.
30. Q: Identify which new restroom walls/ceilings and existing corridor walls are rated, so that rated boxes, putty pads and firestop systems can be priced.
A: Fire-rated walls have already been identified on drawing sheets G1.00, G1.01, and G1.02. None of the ceilings in the new restrooms are fire-rated.
ADA Upgrades Davis Academic Building Page 6 of 15
31. Q: Does the “Buy American Act” option paragraph in 26 51 13 apply? Is the spare fuse cabinet required when the only fused device may be at EF-5?
A: The optional Buy American paragraph cited in the question is not included in the Addendum 1 version of Section 26 51 13. Section 26 28 13, as revised, does not require a spare fuse cabinet. Provide the fused disconnect and fuses indicated in the equipment connection schedule; omission of a spare cabinet does not delete the scheduled EF-5 protection.
32. Q: Three different lists of automatic door operator locations: A6.00 Note 9 lists 26 existing doors to be “repaired/replaced” (010I, 032B, 035A, 037A, 046A, 051A, 052A, 078A, 134BA, 134DA, 140A, 148B, 150FA, 174B, 174BA, 180A, 182A, 210MA, 244A, 266B, 268A, 270A, 270B, 272A, 272B, 288A). Hardware Set 6 lists 10 doors (078, 140A, 174B, 174BA, 180A, 182A, 244A, 270A, 270B, 272A). Electrical panel schedules show new operator circuits at 140, 174B, 180, 182, 242/244, 262, 266B and 268. Spec 2.8 calls for wireless push buttons; A9.02 and E-sheet keynotes show hardwired actuators per E5.01. The electrical drawings also show operator power and card reader relocations at Classroom 078 (E1.01), Accessibility Center 120, Tutoring 174B, Restrooms 180/182 and Men's 140 (E1.02), and Rooms 242/244, [text cut off in source PDF]
Please provide a single definitive list of doors receiving automatic operators, and for each door state whether the work is a new operator or repair of an existing operator. If repair, please define the repair scope or add a unit price/allowance. Please also confirm whether actuators are wireless (Spec 08 71 00 §2.8) or hardwired (A9.02 / E5.01). Please also confirm that the LCN 9540IQ (174B/174BA) and LCN 6440 (all other doors) named in 08 71 00 §2.8 are the basis of design.
A: Specification 08 71 00 has been reissued in this Addendum. The LCN 9540IQ and LCN 6440 are the Basis of Design operators. Both operators employ wireless actuators; this is noted in Hardware Set 7. Keynotes 12 at Sheets A2.00, A2.01 and A2.02 have been revised in this Addendum. Sheet A6.00 has been reissued - Door Schedule and Notes have been revised to clarify the doors receiving new operators and clarify repair of existing operators in this Addendum.
33. Q: A6.00 Note 8 lists wired glass replacement at six doors (194A, 210BA, 248A, 248B, 250B, 270A), but Demo Key Note 5 on A1.01/A1.02 tags many additional doors and sidelites. Window Types A–K are not keyed to plan locations and no quantities are given. Spec 08 80 00 includes only 1/4" clear tempered glass (no fire-rated glazing). Wired glass is commonly found in fire-rated openings.
Please provide a schedule of all door lites, sidelites and window types to receive new glazing (location and quantity). Please confirm that none of these openings are in fire-rated assemblies (stair enclosures, shafts, rated corridors); if any are rated, please specify the required fire-rated glazing.
A: See reissued Sheet A6.00 in this Addendum for schedule of door lites, sidelites and window types. None of these openings are in fire-rated assemblies. Note: Demolition Plans A1.01 and A1.02 intentionally do not have
ADA Upgrades Davis Academic Building Page 7 of 15
Window Types; Window Types are found in reissued New Work Plans A2.01 and A2.02 in this Addendum.
34. Q: The cylinder/core type is described inconsistently: “SFIC (Small Format
Interchangeable Cores)”, “LFIC-6 pin Corbin Russwin (No Substitutions)”, and “FSIC (Full Size Interchangeable Cores)”. The spec says cores are Owner-furnished and housings are Contractor-furnished.
Please confirm the required core type (SFIC, LFIC or FSIC) and manufacturer so that compatible cylinder housings and cams can be priced. Please confirm that the Owner furnishes all permanent cores and keys.
A: PCC’s required core type is dependent on door location, as it is believed the Davis Academic Building has both Corbin Russwin LFIC and SFIC cores – PCC to confirm the specifications with the awarded GC; see reissued Door Hardware specification in this Addendum. PCC will furnish cores and GC to furnish housings, PCC to confirm all cylinders with the awarded GC.
35. Q: Door 250B: A6.00 Note 1 calls for a new card reader and electric strike, with the
Contractor doing rough-in only and the Owner's vendor doing the rest; Hardware Set 5 instead says “existing card reader mounted to door” with electrified hinges. Door 015AA (AA#1) requires a card reader to “coordinate w/ Owner's specs.” Door 120A card reader/actuator to be relocated. A2.22 Demo KN 7 salvages a wireless card reader for relocation. E5.01 shows conduit and boxes for card readers, maglocks, REX sensors and strikes, but no access control specification is included.
Please confirm that the Owner's access control vendor furnishes, installs, wires and programs all card readers and controllers. Please confirm who furnishes electric strikes, electrified hinges and power supplies, and whether 250B receives a new reader or reuses the existing wireless reader. Please confirm that the Division 26 scope is conduit and box rough-in only, and identify who furnishes, terminates and programs the access control devices and head-end equipment.
A: The Owner’s access control vendor Linx furnishes, installs, wires and programs all card readers and controllers, and furnishes, terminates and programs the access control devices and head-end equipment. GC is responsible for Division 26 conduit and box rough-in only and coordinating with Linx’s work on CR relocation and reinstallation and new CR work. The “Single Door Security Rough-In Diagram” is intended to generally address a variety of conditions that are not necessarily in the project scope. See Door Schedule in Sheet A6.00 being reissued in this Addendum.
Owner’s access control vendor furnishes, installs, wires and programs all card readers and controllers. Door 250B will receive existing wireless reader.
36. Q: Hardware Sets 2 and 4 call for mortise locks with occupancy indicators and deadbolt monitors, coordinated with a corridor-side light fixture. The electrical sheets call for an SPDT RIB relay and interconnecting wiring to deadbolt dry contacts.
Hardware Sets 2 and 4 include a deadbolt monitor and one electrified hinge.
ADA Upgrades Davis Academic Building Page 8 of 15
Please confirm which trade furnishes and wires the relay, the power supply, and the deadbolt monitor contact through the door, electrified hinge and frame (Division 08 or Division 26).
A: Division 26 shall furnish and install the indicator, compatible power supply, relay, and external field interconnections through the approved door-hardware interfaces. Hardware Sets 2 and 4 identify the deadbolt monitor and electrified hinge. Operate the indicator ON when the deadbolt is closed and OFF when open, as shown on E5.01. Submit coordinated hardware ratings and point-to-point wiring before installation.
37. Q: Drawings and Section 01 10 00 include stair tread replacement at Stairs S2 and
S4 in the base bid, but the AFB scope does not mention it and no specification section covers stair treads, nosings, contrasting striping or landing flooring. The existing tread substrate is not described.
Please confirm that stair tread replacement is base bid, identify which flights are included, and provide a specification (product, nosing, contrasting stripe, adhesive, landing flooring). Please describe the existing substrate, and confirm whether these egress stairs may be closed one at a time during the work.
A: The stair tread replacement is in the Base Bid scope. The stair tread replacement affects 10 flights of stairs between Stair 2 (4) and Stair 4 (6). Detail 4/A9.02 indicates, “STAIR TREAD REPLACEMENT”. Refer to Specification 09 65 13, paragraph 2.3 STAIR TREADS for product information.
38. Q: Sprinkler modifications are a deferred submittal and P0.02 states “the sprinkler layout will need to be reviewed/revised,” but no fire protection drawings are included.
P0.02 requires all relocated heads to be replaced with new concealed pendant heads.
Please confirm that the Contractor's sprinkler subcontractor is responsible for design, hydraulic calculations and permitting. Please advise whether the Owner requires a specific sprinkler contractor, and state any drain-down or fire watch requirements.
A: Confirmed; the Contractor’s fire sprinkler subcontractor is responsible for design, hydraulic calculations, and permitting. The Owner does not require a specific fire sprinkler contractor. Drain-down and fire watch requirements are per the AHJ (AEC-West and Pueblo Fire Department).
39. Q: Section 23 09 00 lists “Existing Controls contractor” as the only acceptable manufacturer for the EF-5 controls, damper interlock and BAS integration. Controls scope includes EF-5 DDC control, the interlocked motorized damper, and relocated thermostats.
Please identify the existing building automation system and controls contractor, with contact information, so bidders can obtain pricing before bid day.
A: Trane is the Existing Controls Contractor. PCC’s main point of contact is Tyler Will; phone number: (719) 396-0145.
ADA Upgrades Davis Academic Building Page 9 of 15
40. Q: Reroofing of the Davis Academic Building will happen at the same time as this project. This project requires capping an existing VTR at the roof, a new vent into the penthouse, an exhaust fan gooseneck sealed to an existing roof curb, and roof electrical work. The general notes state “all roofing work shall be provided by original roofing contractor to maintain roof warranty.”
Please confirm whether the roof penetrations, patching and flashing required by this project will be performed by the reroofing contractor under its own contract, or must be subcontracted by the GC. Please identify the roofing contractor and provide the reroof schedule.
A: All work associated with patching and flashing of roof penetrations required by this work will be performed by Owner’s reroofing contractor, Strong Contractors.
41. Q: Floor drains and new waste piping require coring and sawcutting the elevated slabs at the Main and Upper Levels. Detail 12/A9.00 says to “review and confirm location of existing structural joists.” Demo General Note 1 refers to structural drawings, but none are included and no structural engineer is listed.
Please identify the existing floor slab type (pan joist, post-tensioned, etc.). Please confirm that GPR/X-ray scanning is the Contractor's responsibility, and identify the structural engineer of record if a joist or tendon conflicts with a core location. Please confirm whether any structural review is required for the AA#2 exterior stair replacement.
A: Existing lower level floor slab is slab on grade over spread footings. Existing main level slab is 10-1/2” thick cast-in-place post-tensioned slab with drop panels. Existing upper level slab is 4” concrete slab on 1” x 26 ga. form deck on steel joists and beams. GPR/X-ray scanning is the Contractor’s responsibility.
There is no structural engineer of record for this project, and structural review is not required for AA#2 exterior stair replacement (however submittal of concrete mix, reinforcement & railing shop drawings, etc. are still required).
Record drawings of existing building will be made available to awarded Contractor.
42. Q: The Lower Level keynote says “Remove existing fire/smoke damper and repair duct.” New Restroom 036 is next to the 1-hour Stair S2 enclosure shown on G1.00.
Please confirm that the fire/smoke damper to be removed is not in a rated assembly, or that its removal has been reviewed and accepted by the AHJ.
A: Confirmed. Refer to code plans for all rated assemblies. Building corridors were originally constructed as fire-rated, but are no longer required to be since the building became fully fire-sprinklered.
43. Q: New exhaust ductwork rises through the floors with combination fire/smoke dampers “at floor.” The L4 shaft-type wall in the partition schedule shows “UL-XXX” with no fire rating.
ADA Upgrades Davis Academic Building Page 10 of 15
Please confirm whether a rated shaft enclosure is required for the new exhaust risers, and provide the required rating and UL design number. Please confirm the size and rating of access panels at the fire/smoke dampers.
A: By placing fire/smoke dampers at the floors the duct chases are not required to be fire-rated. Refer to code plans for all rated assemblies.
44. Q: The luminaire schedule does not show where the remote driver for the Type B tape light is to be located.
Please confirm the driver location and access requirements for the Type B tape light.
A: Provide a listed 24 VDC constant-voltage driver compatible with the scheduled Type B indicator, with input voltage matching its branch circuit.
Locate the driver and associated relay in accessible enclosures above the associated restroom door; provide an architectural access panel where the ceiling is not accessible. The driver and relay shall be serviceable without removing permanent finish. Retain the deadbolt-controlled ON/OFF sequence on E5.01
45. Q: The partition schedule has “STC-XX” and “UL-XXX” placeholders and 25 ga studs, including at tiled walls with grab bars and the adult changing station. Wall tags show “W” (to deck), but 1/A9.00 shows walls ending 6" above the ceiling with kicker braces.
A2.50 KN 7 adds a layer of Type X gypsum board to an existing wall.
Please confirm the required stud gauge (20 ga minimum at tile and wall-mounted accessories?), the partition heights (to deck or 6" above ceiling), the STC/UL values, and whether any new or modified wall, including the AA#1 wall, is fire-rated.
A: Stud gage confirmed accurate as noted. No new partitions under this project’s scope of work are required to be fire-rated, however there are existing fire-rated assemblies adjacent to some of the work that must be maintained.
See drawing sheets G1.00, G1.01, & G1.02 for existing fire-rated assembly locations. No specific STC rating is required for new partitions, but all new partitions shall be provided with acoustic batt insulation.
46. Q: Adult changing station TA12 (BOD Ascent 70) is shown on the 250E elevations, and E6.03 shows a circuit only for 250E. The quantity is not otherwise stated.
Please confirm the quantity and location(s) of adult changing stations, that they are
Contractor-furnished, and the required wall reinforcement.
A: This project has one (1) adult changing station, located in Restroom 250E.
Keynote at Sheet A2.22 has been updated. The electrical drawings provide one changing-station power connection in Restroom 250E: E4.03 keynote 6 and panel L3C-58 on E6.03. Section 10 28 00 identifies a 120 V, 60 W connection for the specified TA12 adult changing station. Coordinate the final connection arrangement with the selected station and architectural mounting location. See reissued Sheets A2.22 and A6.00 for mounting wall information.
ADA Upgrades Davis Academic Building Page 11 of 15
47. Q: Section 09 30 13 says CT1 is for “New Restroom, Corridor floors,” but the Room Finish Schedule shows the Corridor 250F floor as existing.
Please confirm that no corridor floor tile is included in the base bid.
A: Corridor 250F shall receive new CT1. Room Finish Schedule has been updated.
48. Q: Please provide demolition sheets for Plumbing. We believe there may need to be more plumbing infills than expected when sawcutting the (E) floor slab at required areas on sheet A2.20, Demolition keynote 4.
A: Plumbing Demolition information is provided in the following statements:
Lower Level: Existing lower level floor slab is slab on grade over spread footings – field verify conditions. Review areas of sawcutting and verify the sawcut areas are located and floor drain is centered to avoid structural reinforcement. GPR/X-ray scanning is the Contractor’s responsibility.
Main Level: Existing main level slab is 10-1/2” thick cast-in-place post-tensioned slab with drop panels – field verify conditions. Verify the floor drain is centered to avoid structural reinforcement and supports. GPR/X-ray scanning is the Contractor’s responsibility.
Upper Level: Existing upper level slab is 4” concrete slab on 1” x 26 ga. form deck on steel joists and beams. Verify the floor drain is centered to avoid structural reinforcement, joists and beams. GPR/X-ray scanning is the Contractor’s responsibility.
Demo as required to connect to the existing building main. Original plans show the building main located in the storage room and hallway.
49. Q: The documents indicate that surfaces affected by repairs are to be repainted corner to corner. For additional repairs resulting from other trade work that cannot be quantified before construction, should the associated patching and repainting be included in the base bid or handled as T&M/additional work?
A: All repair work described in this project scope is the responsibility of the GC, and should be accounted for in the base bid.
50. Q: Is there a preferred order for the restroom work? Can we work on all three at once? Please let us know of any campus events or dates we need to work around.
A: There is no preferred order for the restroom work. The contractor should propose their best idea for phasing these restrooms around working in a building that is occupied at all hours of the day. Academic and Event Calendars will be issued with Addenda 04.
51. Q: Can you provide the existing fire alarm system information, drawings, and service contractor’s contact? Is there a specific vendor we need to use for programming?
ADA Upgrades Davis Academic Building Page 12 of 15
A: PCC has a Simplex System with a Simplex Panel Model 4100U. Johnson Controls is the service provider.
SPECIFICATIONS
52. Reissued Table of Contents and Specification 01 10 00 SUMMARY OF WORK: This section has been replaced in its entirety.
53. Reissued Specification 08 71 00 DOOR HARDWARE: This section has been replaced in its entirety. Reissued Specification 10 14 67 TACTILE SIGNAGE: This section has been replaced in its entirety.
54. Specification 09 65 13 RESILIENT BASE AND ACCESSORIES, Resilient Schedule, Add Alt. #1: Replace the words, “Blue Lagoon” 92 with “Black”.
DRAWINGS
55. Sheet A1.00, DEMOLITION KEY NOTES, keynote 1: Replace keynote 1 to read as follows, “REMOVE (E) RESILIENT STAIR TREADS. SEE 4/A9.02”.
56. Sheet A1.00, Lower Level Demolition Plan, near grid coordinates 3/F: Remove the note “RO”.
57. Sheet A1.00, Lower Level Demolition Plan, near grid coordinates 3/F: Add the Room
Name and Room Number, “DRESS A” and “015A” adjacent to Room “DRESS B”.
58. Sheet A1.01, First Level Demolition Plan: In the title, replace the word, “FIRST” with
“MAIN”.
59. Sheet A1.01, NW exterior stairs: Remove new handrail from plan.
60. Sheet A1.01, at MAINTENANCE 144A: Remove the keynote 6.
61. Sheet A1.01, at MEN’S 140: Add keynote 3 to the existing urinal closest to the door.
62. Sheet A1.01, at MEN’S 182: Add keynote 16 to the door at the existing accessible toilet stall.
63. Sheet A1.01, DEMOLITION KEY NOTES, keynote 1: Replace keynote 1 to read as follows, “REMOVE (E) RESILIENT STAIR TREADS. SEE 4/A9.02.”
64. Sheet A1.01, DEMOLITION KEY NOTES, keynote 13: Replace word, “(EO” to read, “(E)”.
65. Sheet A1.01, DEMOLITION KEY NOTES: Add keynote 16, to read as follows, “REMOVE TOILET PARTITION DOOR. SALVAGE FOR REINSTALLATION. SEE
SHT. A2.21.”
66. Sheet A1.02, at CORRIDOR 250F: Replace three keynotes 2 with keynotes 3.
ADA Upgrades Davis Academic Building Page 13 of 15
67. Sheet A1.02, at MEN’S 244: Replace keynote 2 with keynote 3.
68. Sheet A1.02, at WOMEN’S RESTROOM 286: Replace Room Number “268” with
“286”.
69. Sheet A1.02, at MEN’S RESTROOM 288: Add elevation marker “5/A9.00” to urinal along east wall.
70. Sheet A1.02, at MEN’S RESTROOM 288: Add keynote 6 to urinal along east wall.
71. Sheet A1.02, DEMOLITION KEY NOTES, keynote 1: Replace keynote 1 to read as follows, “REMOVE (E) RESILIENT STAIR TREADS. SEE 4/A9.02”.
72. Sheet A1.02, DEMOLITION KEY NOTES: Add keynote 6 to read as follows, “REMOVE (E) URINAL AND WALL TILE. SALVAGE URINAL FOR
REINSTALLATION. SEE DETAIL 5/A9.00”.
73. Reissued Sheet A2.00. Revised keynotes. Relocated keynotes. Added keynotes for existing doors with closers, operators.
74. Reissued Sheet A2.01. Revised floor plan title. Revised keynotes, relocated keynotes.
Removed window marker “I”. Added keynotes for existing doors with closers, operators.
75. Reissued Sheet A2.02. Revised Room number Restroom “268” to read “286”. Revised “268A” to read “286A”. Revised keynotes, relocated keynotes.
Added keynotes for existing doors with closers, operators.
76. Sheet A2.20, FLOOR PLAN KEY NOTES: Replace keynote 8 to read as follows:
“SANITARY PRODUCT DISPOSAL”.
77. Sheet A2.20, ENLARGED FLOOR PLAN: Swapped keynote 7 & 8.
78. Sheet A2.21, FLOOR PLAN KEY NOTES: Replace keynote 8 to read as follows:
“SANITARY PRODUCT DISPOSAL”.
79. Sheet A2.21, ENLARGED FLOOR PLAN: Swapped keynote 7 & 8.
80. Reissued Sheet A2.22. Added keynote 17 for Adult Changing Station unit wall support information. Revised keynotes.
81. Sheet A1.02, DEMOLITION KEY NOTES: Add keynote 6 to read as follows, “REMOVE (E) URINAL AND WALL TILE. SALVAGE URINAL FOR
REINSTALLATION. SEE DETAIL 5/A9.00”.
82. Not used.
83. Sheet A2.50, at Sensory Room FLOOR PLAN KEY NOTES: Replace keynote 3 to read as follows: FLOORING TRANSITION STRIP; INSTALL TRANSITION STRIP TO
BE CENTERED UNDER CLOSED DOOR. SEE 1/A9.01 FOR FLOORING
TRANSITION CONDITION.”
ADA Upgrades Davis Academic Building Page 14 of 15
84. Sheet A2.50 at Vending Area DEMOLITION FLOOR PLAN KEY NOTES: Replace keynote 3 to read as follows: “(E) VENDING MACHINES TO REMAIN. PROTECT
DURING DEMOLITION.”
85. Sheet A2.50, at Vending Area FLOOR PLAN KEY NOTES: Replace keynote 4 to read as follows: “(E) VENDING MACHINES SHOWN FOR REFERENCE AND ADA FLOOR
CLEARANCE.”
86. Sheet A2.51 at ENLARGED NW STAIR PLAN ADD ALT. #2: Adjust note leader lines to only encompass (E) turf.
87. Reissued Sheet A6.00. Adjusted and added schedules. Adjust door schedule notes.
Added and removed from Window Types.
88. Sheet A7.0: Replaced “OFCI” with “OFOI” for ISA signage. Add detail target A6/A9.01
Occupancy Indicator Detail to Interior Elevations at (3) Restroom Entries. Visible size of light fixture channel is approximately 1.3” w x 18” long.
89. Sheet A9.00 at ROOM 140 URINAL DEMO AND NEW WORK: Adjust note leader line to point to (N) 6x6 ceramic tile.
90. Reissued Sheet A9.01. Adjusted hatching in several areas. Added details 4, 5 and 6.
91. Sheet A9.02, ENLARGED PLAN DOOR 150DA: Adjusted door tag position to be legible.
92. Sheet A9.02, ENLARGED PLAN DOOR 150DA: Adjusted height of 5’-1” F.V. text to be 3/32” tall.
93. Sheet A9.02, ENLARGED PLAN DOORS 174B/174BA: Added threshold for 174B and added note “(N) THRESHOLD”
94. Reissued Plumbing Sheet P1.03.
95. Reissued Electrical Drawing E4.01.
96. Reissued Electrical Drawing E4.02.
97. Reissued Electrical Drawing E4.03.
98. Reissued Electrical Drawing E6.04.
END OF ADDENDUM NUMBER 4
ADA Upgrades Davis Academic Building Page 15 of 15
Attachments: PCC Academic Calendars PCC Events Calendar for Academic Building
Appendix D Prevailing Wage Determinations Project Inspection Recommendations
Acknowledgement & Attestation Form Revised Project Manual Table of Contents
Specification 01 10 00 SUMMARY OF WORK Specification 08 71 00 DOOR HARDWARE Specification 10 14 67 TACTILE SIGNAGE
Revised Architectural Drawings A2.00, A2.01, A2.02, A2.22, A6.00, A9.01, dated 11/19/2026
Revised Plumbing Drawings P1.03, dated 11/19/2026 Revised Electrical Drawings E4.01, E4.02, E4.03, E6.04, dated 11/19/2026
Summer 2026 Registration Begins Monday March 9, 2026 Non-Payment Warning Wednesday May 13, 2026 Tuition Due Date Wednesday May 20, 2026 Non-Payment Warning Wednesday May 20, 2026 Registration Ends Friday May 22, 2026 Memorial Day Monday May 25, 2026 Classes Begin Tuesday May 26, 2026 Schedule Adjustment Period Tues - Wed May 26-27, 2026 Non-Payment Warning Wednesday May 27, 2026 End of Refund Period/Census Thursday June 4, 2026 Juneteenth Friday June 19, 2026 Independence Day Holiday Friday July 3, 2026 Last Day to Withdraw Tuesday July 21, 2026 Classes End Monday August 3, 2026 Grades Due Tuesday August 4, 2026
Registration Begins Monday March 9, 2026 Registration Ends Friday May 22, 2026 Classes Begin Tuesday May 26, 2026 Schedule Adjustment Period Tuesday May 26, 2026 End of Refund Period/Census Monday June 1, 2026 Juneteenth Friday June 19, 2026 Last Day to Withdraw Monday June 22, 2026 Classes End Monday June 29, 2026 Grades Due Tuesday June 30, 2026
Registration Begins Monday March 9, 2026 Classes Begin Tuesday June 30, 2026 Schedule Adjustment Period Tuesday June 30, 2026 Independence Day Holiday Friday July 3, 2026 End of Refund Period/Census Monday July 6, 2026 Last Day to Withdraw Monday July 27, 2026 Classes End Monday August 3, 2026 Grades Due Tuesday August 4, 2026
Pueblo Community College Academic Calendar AY2026-27 (202710, 202720, 202730)
202710 Full Term Session (Does not apply to Colorado Online courses.)
PUEBLO - FREMONT - SOUTHWEST
First 5 Week Session (Does not apply to Colorado Online courses.)
Second 5 Week Session (Does not apply to Colorado Online courses.)
Fall 2026 Registration Begins Monday March 9, 2026 Chairs Return Monday August 10, 2026 Faculty Return Tuesday August 11, 2026 Tuition Due Date Wednesday August 12, 2026 Non-Payment Warning Wednesday August 12, 2026 Faculty Professional Development Day Thursday August 13, 2026 Registration Ends Friday August 14, 2026 Full-Term Classes Begin Monday August 17, 2026 Schedule Adjustment Period Monday - Friday Aug. 17-21, 2026 Non-Payment Warning Wednesday August 19, 2026 Non-Payment Warning Wednesday August 26, 2026 Labor Day Holiday Monday September 7, 2026 End of Refund Period/Census Wednesday September 2, 2026 Midterm Week Mon - Fri Oct. 5-9, 2026 Last Day to Withdraw Thursday November 12, 2026 Thanksgiving Break (No Classes) Mon-Sat Nov. 23-28, 2026 Thanksgiving Thursday November 26, 2026 Final Week of Classes Mon - Sat Dec. 7-12, 2026 Last Faculty Day Friday December 11, 2026 Classes End Saturday December 12, 2026 Grades Due Monday December 14, 2026 Holiday Break (Offices Closed) Friday-Friday Dec. 25, 2026 - Jan. 1, 2027 All Staff Return Friday January 4, 2027
Registration Begins Monday March 9, 2026 Faculty Professional Development Day Thursday August 13, 2026 Registration Ends Friday August 14, 2026 Session Begins Monday August 17, 2026 Schedule Adjustment Period Mon-Tues Aug. 17-18, 2026 End of Refund Period/Census Monday August 24, 2026 Labor Day Holiday Monday September 7, 2026 Last Day to Withdraw Tuesday September 29, 2026 Classes End Saturday October 10, 2026 Grades Due Monday October 12, 2026
Registration Begins Monday March 9, 2026 Session Begins Monday October 12, 2026 Schedule Adjustment Period Mon-Tues Oct. 12-13, 2026 End of Refund Period/Census Tuesday October 20, 2026 Thanksgiving Break (No Classes) Mon-Sat Nov. 23-28, 2026 Last Day to Withdraw Monday November 30, 2026 Last Faculty Day Friday December 11, 2026 Classes End Saturday December 12, 2026 Grades Due Monday December 14, 2026
Full-Term Classes (Does not apply to Colorado Online courses.)
202720
Fall I (Does not apply to Colorado Online courses.)
Fall II (Does not apply to Colorado Online courses.)
Spring 2027 Registration Begins Monday October 26, 2026 All Staff Return Monday January 4, 2026 Non-Payment Warning Wednesday January 6, 2027 Chairs Return Monday January 11, 2027 Faculty Return Wednesday January 13, 2027 Non-Payment Warning Wednesday January 13, 2027 Tuition Due Date Wednesday January 13, 2027 Faculty Professional Development Day Thursday January 14, 2027 Registration Ends Friday January 15, 2027 Full-Term Classes Begin Tuesday January 19, 2027 Schedule Adjustment Period Tuesday - Friday January 19-22, 2027 Non-Payment Warning Wednesday January 20, 2027 End of Refund Period/Census Wednesday February 3, 2027 Midterm Monday - Saturday Mar. 8-13, 2027 Spring Break ALL Campuses Monday - Saturday Mar. 22-27, 2027 Last Day to Withdraw Thursday April 15, 2027 Final Week of Classes Monday - Saturday May 10-15, 2027 Last Faculty Day Friday May 14, 2027 Commencement (Pueblo and Fremont Campus) Thursday May 13, 2027 Classes End Saturday May 15, 2027 Commencement (PCC Southwest) Saturday May 15, 2027 Grades Due Monday May 17, 2027
Registration Begins Monday October 26, 2026 Faculty Professional Development Day Thursday January 14, 2027 Registration Ends Friday January 15, 2027 Session Begins Tuesday January 19, 2027 Schedule Adjustment Period Tuesday - Wednesday Jan. 19-20, 2027 End of Refund Period/Census Tuesday January 26, 2027 Last Day to Withdraw Wednesday March 3, 2027 Classes End Sunday March 14, 2027 Grades Due Monday March 15, 2027
Registration Begins Monday October 26, 2026 Session Begins Monday March 15, 2027 Schedule Adjustment Period Monday - Tuesday Mar. 15-16, 2027 Spring Break ALL Campuses Monday - Saturday Mar. 22-27, 2027 End of Refund Period/Census Tuesday March 23, 2027 Spring Break ALL Campuses Monday - Saturday Mar. 22-27, 2027 Last Day to Withdraw Monday May 3, 2027 Commencement (Pueblo and Fremont Campus) Thursday May 13, 2027 Classes End Saturday May 15, 2027 Commencement (PCC Southwest) Saturday May 15, 2027 Grades Due Monday May 17, 2027
Final and Approved by everyone:
202730 Full Term Classes (Does not apply to Colorado Online courses.)
Spring I (Does not apply to Colorado Online courses.)
Spring II (Does not apply to Colorado Online courses.)
Summer 2027 Registration Begins Monday March 8, 2027 Non-Payment Warning Wednesday May 19, 2027 Tuition Due Date Wednesday May 26, 2027 Non-Payment Warning Wednesday May 26, 2027 Registration Ends Friday May 28, 2027 Memorial Day Monday May 31, 2027 Classes Begin Tuesday June 1, 2027 Schedule Adjustment Period Tues - Wed June 1-2, 2027 Non-Payment Warning Wednesday June 2, 2027 End of Refund Period/Census Thursday June 10, 2027 Juneteenth Friday June 18, 2027 Independence Day Holiday Monday July 5, 2027 Last Day to Withdraw Tuesday July 27, 2027 Classes End Monday August 9, 2027 Grades Due Tuesday August 10, 2027
Registration Begins Monday March 8, 2027 Registration Ends Friday May 28, 2027 Classes Begin Tuesday June 1, 2027 Schedule Adjustment Period Tuesday June 1, 2027 End of Refund Period/Census Monday June 7, 2027 Juneteenth Friday June 18, 2027 Last Day to Withdraw Monday June 28, 2027 Classes End Monday July 5, 2027 Grades Due Tuesday July 6, 2027
Registration Begins Monday March 8, 2027 Classes Begin Tuesday July 6, 2027 Schedule Adjustment Period Tuesday July 6, 2027 Independence Day Holiday Monday July 5, 2027 End of Refund Period/Census Monday July 12, 2027 Last Day to Withdraw Monday August 2, 2027 Classes End Monday August 9, 2027 Grades Due Tuesday August 10, 2027
First 5 Week Session (Does not apply to Colorado Online courses.)
Second 5 Week Session (Does not apply to Colorado Online courses.)
Pueblo Community College Academic Calendar AY2027-28 (202810, 202820, 202830)
202810 Full Term Session (Does not apply to Colorado Online courses.)
PUEBLO - FREMONT - SOUTHWEST
Fall 2027 Registration Begins Monday March 8, 2027 Chairs Return Monday August 16, 2027 Faculty Return Tuesday August 17, 2027 Tuition Due Date Wednesday August 18, 2027 Non-Payment Warning Wednesday August 18, 2027 Faculty Professional Development Day Thursday August 19, 2027 Registration Ends Friday August 20, 2027 Full-Term Classes Begin Monday August 23, 2027 Schedule Adjustment Period Monday - Friday Aug. 23-27, 2027 Non-Payment Warning Wednesday August 25, 2027 Labor Day Holiday Monday September 6, 2027 End of Refund Period/Census Wednesday September 8, 2027 Midterm Week Mon - Fri Oct. 11-15, 2027 Last Day to Withdraw Thursday November 18, 2027 Thanksgiving Break (No Classes) Mon-Sat Nov. 22-27, 2027 Thanksgiving Thursday November 25, 2027 Final Week of Classes Mon - Sat Dec. 13-18, 2027 Last Faculty Day Friday December 17, 2027 Classes End Saturday December 18, 2027 Grades Due Monday December 20, 2027 Holiday Break (Offices Closed) Friday-Friday Dec. 24 - Dec. 31, 2027 All Staff Return Monday January 3, 2028
Registration Begins Monday March 8, 2027 Faculty Professional Development Day Thursday August 19, 2027 Registration Ends Friday August 20, 2027 Session Begins Monday August 23, 2027 Schedule Adjustment Period Mon-Tues Aug. 23-24, 2027 End of Refund Period/Census Monday August 30, 2027 Labor Day Holiday Monday September 6, 2027 Last Day to Withdraw Tuesday October 5, 2027 Classes End Saturday October 16, 2027 Grades Due Monday October 18, 2027
Registration Begins Monday March 8, 2027 Session Begins Monday October 18, 2027 Schedule Adjustment Period Mon-Tues Oct. 18-19, 2027 End of Refund Period/Census Tuesday October 26, 2027 Thanksgiving Break (No Classes) Mon-Sat Nov. 22-27, 2027 Last Day to Withdraw Monday December 6, 2027 Last Faculty Day Friday December 17, 2027 Classes End Saturday December 18, 2027 Grades Due Monday December 20, 2027
Fall I (Does not apply to Colorado Online courses.)
Fall II (Does not apply to Colorado Online courses.)
Full-Term Classes (Does not apply to Colorado Online courses.)
202820
Spring 2028 Registration Begins Monday October 25, 2027 All Staff Return Monday January 3, 2028 Non-Payment Warning Wednesday January 5, 2028 Chairs Return Monday January 10, 2028 Faculty Return Wednesday January 12, 2028 Non-Payment Warning Wednesday January 12, 2028 Tuition Due Date Wednesday January 12, 2028 Faculty Professional Development Day Thursday January 13, 2028 Registration Ends Friday January 14, 2028 Full-Term Classes Begin Tuesday January 18, 2028 Schedule Adjustment Period Tuesday - Friday January 18-21, 2028 Non-Payment Warning Wednesday January 19, 2028 End of Refund Period/Census Wednesday February 2, 2028 Midterm Monday - Saturday Mar. 6-10, 2028 Spring Break ALL Campuses Monday - Saturday Mar. 20-25, 2028 Last Day to Withdraw Thursday April 13, 2028 Final Week of Classes Monday - Saturday May 8-13, 2028 Last Faculty Day Friday May 12, 2028 Commencement (Pueblo and Fremont Campus) Thursday May 11, 2028 Classes End Saturday May 13, 2028 Commencement (PCC Southwest) Saturday May 13, 2028 Grades Due Monday May 15, 2028
Registration Begins Monday October 25, 2027 Faculty Professional Development Day Thursday January 13, 2028 Registration Ends Friday January 14, 2028 Session Begins Tuesday January 18, 2028 Schedule Adjustment Period Tuesday - Wednesday Jan. 18-19, 2028 End of Refund Period/Census Tuesday January 25, 2028 Last Day to Withdraw Wednesday March 1, 2028 Classes End Sunday March 12, 2028 Grades Due Monday March 13, 2028
Registration Begins Monday October 25, 2027 Session Begins Monday March 13, 2028 Schedule Adjustment Period Monday - Tuesday Mar. 13-14, 2028 End of Refund Period/Census Tuesday March 21, 2028 Spring Break ALL Campuses Monday - Saturday Mar. 20-25, 2028 Last Day to Withdraw Monday May 1, 2028 Commencement (Pueblo and Fremont Campus) Thursday May 11, 2028 Classes End Saturday May 13, 2028 Commencement (PCC Southwest) Saturday May 13, 2028 Grades Due Monday May 15, 2028
Full Term Classes (Does not apply to Colorado Online courses.)
Spring I (Does not apply to Colorado Online courses.)
Spring II (Does not apply to Colorado Online courses.)
202830
"General Decision Number: CO20260027 05/18/2026
State: Colorado
Construction Types: Building
Counties: Colorado Counties of Pueblo
Modification Number Publication Date 0 01/02/2026 1 05/18/2026
ASBE0028-002 07/01/2025
Rates Fringes
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL
(DUCT, PIPE & MECHANICAL SYSTEM INSULATION).........$ 36.98 16.82
ELEC0012-005 09/01/2025
Rates Fringes
ELECTRICIAN.........................................$ 35.40 16.06
ENGI0009-017 05/01/2024
Rates Fringes
POWER EQUIPMENT OPERATOR: CRANE (91 TO 140 TONS)....$ 37.34 15.20
POWER EQUIPMENT OPERATOR: CRANE (51 TO 90 TONS).....$ 36.09 15.20
POWER EQUIPMENT OPERATOR: CRANE (50 TONS AND UNDER).$ 35.78 15.20
POWER EQUIPMENT OPERATOR: CRANE (141 TONS AND OVER).$ 39.80 15.20
IRON0024-009 11/01/2024
Rates Fringes
IRONWORKER: ORNAMENTAL..............................$ 39.21 12.50
IRON0024-010 11/01/2024
Rates Fringes
IRONWORKER, STRUCTURAL..............................$ 39.21 12.50
PAIN0079-009 08/01/2024
Rates Fringes
PAINTER (SPRAY).....................................$ 27.41 11.56
PLAS0577-002 05/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER......................$ 34.73 15.15
PLUM0058-005 07/01/2025
Rates Fringes
6/26/26, 7:14 AM SAM.gov https://sam.gov/wage-determination/CO20260027/1 1/5
PIPEFITTER, EXCLUDES HVAC DUCT AND PIPE
INSTALLATION........................................$ 47.60 18.10
PLUM0058-006 07/01/2025
Rates Fringes
PLUMBER (EXCLUDES HVAC DUCT AND PIPE INSTALLATION)..$ 47.60 18.10
SHEE0009-008 07/01/2025
Rates Fringes
SHEET METAL WORKER (INCLUDES HVAC DUCT AND PIPE
INSTALLATION).......................................$ 43.05 22.65
SUCO2013-013 07/31/2015
Rates Fringes
TRUCK DRIVER: DUMP TRUCK...........................$ 17.34 0.00
ROOFER..............................................$ 16.71 0.00
PAINTER (BRUSH AND ROLLER)..........................$ 17.20 0.00
OPERATOR: GRADER/BLADE.............................$ 21.50 0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER............$ 18.58 2.42
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE...............$ 20.26 8.62
LABORER: PIPELAYER.................................$ 16.96 3.68
LABORER: MASON TENDER - CEMENT/CONCRETE............$ 16.00 0.00
LABORER: MASON TENDER - BRICK......................$ 15.99 0.00
LABORER: COMMON OR GENERAL.........................$ 13.67 1.36
CARPENTER...........................................$ 20.64 0.00
BRICKLAYER..........................................$ 21.96 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to…
This is the start of the file's text. The full file is on GovTribe.