This addendum to the Pueblo Community College ADA Upgrades Davis Academic Building project (Project No. 2026-049M25) modifies the construction documents and bidding procedures for the competitive sealed best value solicitation. The project encompasses ADA accessibility upgrades to the Davis Academic Building located at 900 W. Orman Avenue, Pueblo, Colorado. Key modifications include the removal of BuyClean Colorado Act requirements, deletion of SLFRF supplementary provisions, and the addition of Section 28 31 05 for modifications to existing fire detection and alarm systems. A mandatory site visit is scheduled for November 12, 2026 at 3:00 p.m. (MST), with bidders required to coordinate with Michael Posteraro at Pueblo Community College. The request for clarifications deadline is November 13, 2026 at 5:00 p.m. (MST), qualifications are due November 24, 2026 at 2:00 p.m. (MST), and bids are due December 3, 2026 at 2:00 p.m. (MST) with a public bid opening scheduled for 2:15 p.m. the same day. Significant revisions were made to multiple electrical drawings (E1.01, E1.02, E1.03, E4.01, E4.02, E4.03, E4.04, E5.01), architectural drawings (A2.22, A2.40), and mechanical drawings (M1.01) to reflect design modifications, including wall relocations, floor finish plan revisions, and occupancy indicator light updates.
The addendum does not establish any specific set-asides or pricing terms, as it functions solely as a modification document clarifying technical requirements and project procedures. The project includes three additive alternates: Additive Alternate #1 for tile carpeting and acoustical wall treatment in a sensory room, Additive Alternate #2 for pipe railings, and Additive Alternate #3 for plastic-laminate-clad architectural cabinets. All bidders must acknowledge receipt of the addendum by addendum number and date on their bid forms. Questions regarding the project modifications should be directed to Nick Palaski at Wember (npalaski@wember.com). The construction documents are part of a bid set that includes comprehensive specifications covering divisions 0 through 32, with particular emphasis on electrical, mechanical, plumbing, fire protection, and accessibility work throughout the building's lower level, main level, and upper level.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pueblo Community College Addendum No. 1 ADA Upgrades Davis Academic Building 11/10/2026 Page 1 of 4
1935 Dominion Way, Suite 202
Colorado Springs, CO 80918
Office: 719.277.7300
ADDENDUM NUMBER 1
PROJECT: Pueblo Community College DATE: November 10, 2026 ADA Upgrades Davis Academic Building Project No.: 2026-049M25
OWNER: Pueblo Community College 900 W. Orman Ave.
Pueblo, Colorado 81004
The Drawings, Specifications and Contract Documents on the subject project are modified, corrected, supplemented and/or superseded as hereinafter described.
The following additions, deletions, changes and information shall become a part of and modify all work shown or described in the Drawings and Project Manual.
All bidders shall make necessary adjustments in their bid on account of this addendum.
Each and every bidder, subcontractor, and material supplier shall be responsible for reading each item in this addendum to ascertain to what extent and in what manner it affects the work in which they are interested. Each Bidder shall indicate on the Bid Form their acknowledgment of receipt of this addendum document by addendum number and addendum date.
GENERAL
1. Advertisement for Bids: The published Due Date for Request for Clarifications on the Advertisement for Bids has been moved to November 13, 2026. See item #3 for updated schedule reminders.
2. It was announced during the October 29 mandatory pre-bid conference that the building will be made available for bidders to review the jobsite. A date has been scheduled for this separate site visit: Thursday, November 12 at 3pm (MST).
Bidders will be required to coordinate their visit with Michael Posteraro, Pueblo Community College: Michael.Posteraro@pueblocc.edu, copy to Nick Palaski / Wember: npalaski@wember.com. See item #3 for updated schedule reminders.
3. BID SCHEDULE REMINDERS:
Bidders site visit November 12, 2026, 3:00 p.m. (MST)
Request for Clarifications Due: November 13, 2026, 5:00 p.m. (MST) Email Questions to npalaski@wember.com
Final Addendum Issued (anticipated) November 17, 2026
Qualifications Due November 24, 2026, 2:00 p.m. (MST) mailto:Michael.Posteraro@pueblocc.edu mailto:npalaski@wember.com mailto:npalaski@wember.com
11/10/2026 Page 2 of 4
Bids Due December 3, 2026, 2:00 p.m. (MST)
Public Bid Opening December 3, 2026, 2:15 p.m. (MST)
4. The sign-in sheet from the mandatory pre-bid conference conducted on 10/29/2026 is attached to this addendum.
QUESTIONS
Note: Submitted bidder questions not included in this addendum will be responded to in a future addendum.
SPECIFICATIONS
5. Reissued “TABLE OF CONTENTS” – Deleted BuyClean Colorado Act; EPD Submittal
& Sign-Off; deleted SLFRF Supplementary General Conditions; deleted SLFRF Terms and Conditions; revised document footer to read, “TABLE OF CONTENTS Construction Documents – Bid Set (Addendum #1)”; deleted Division 26 Sections, 26 05 33.13 and 26 05 33.16; added Division 28, Section 28 31 05.
6. Note: This project is not subject to the BuyClean Colorado Act EPD Submittal requirements. Removed EE5.2, instructions, submittal and sign-off forms.
7. Reissued Section 26 00 10 GENERAL ELECTRICAL.
8. Reissued Section 26 05 05 SELECTIVE DEMOLITION FOR ELECTRICAL.
9. Reissued Section 26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS
AND CABLES.
10. Reissued Section 26 05 26 GROUNDING AND BONDING FOR ELECTRICAL
SYSTEMS.
11. Reissued Section 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL
SYSTEMS.
12. Reissued Section 26 05 33 RACEWAYS AND BOXES FOR ELECRICAL SYSTEMS.
13. Reissued Section 26 05 34 WIRING DEVICES.
14. Reissued Section 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS.
15. Reissued Section 26 28 13 FUSES.
16. Reissued Section 26 28 16 ENCLOSED SWITCHES.
17. Reissued Section 26 51 13 INTERIOR LIGHTING FIXTURES.
11/10/2026 Page 3 of 4
18. Added Section 28 31 05 MODIFICATIONS TO EXISTING FIRE DETECTION AND
ALARM SYSTEM (DELEGATED DESIGN)
DRAWINGS
19. Architectural Drawing A2.22 has been reissued. Enlarged Demo Plan 1/A2.22 was revised. Wall target L4W was relocated at Enlarged RCP 4/A2.22. Floor Plan Keynote 8 was revised. RCP Keynote 5 was revised. Revisions are clouded.
20. Architectural Drawing A2.40 has been reissued. Detail targets were added to Floor
Finish Plans – LL Restroom 1/A2.40, - ML Restroom 2/A2.40, and -UL Restroom 3/A2.40. Keynote 1 was revised. “LEGEND’ graphic for CT-1 was revised. Revisions are clouded.
21. Mechanical Drawing M1.01 has been reissued. Add Alternate #1 label has been added to New Work Plan – Lower Level Sensory Room, and Key Plan. New Work Keynote 3 was revised. Revisions are clouded.
22. Electrical Drawing E1.01 has been reissued. General Note 1 was added. Revisions are clouded.
23. Electrical Drawing E1.02 has been reissued. General Note 1 was added. Revisions are clouded.
24. Electrical Drawing E1.03 has been reissued. General Note 1 was added. Revisions are clouded.
25. Electrical Drawing E4.01 has been reissued. General Note 1 was added. New Work
Keynote 7 was revised for occupancy indicator light. Revisions are clouded.
26. Electrical Drawing E4.02 has been reissued. General Note 1 was added. New Work
Keynote 5 was revised for occupancy indicator light. Revisions are clouded.
27 Electrical Drawing E4.03 has been reissued. General Note 1 was added. New Work
Keynote 5 was revised for occupancy indicator light. Revisions are clouded.
28. Electrical Drawing E4.04 has been reissued. General Note 1 was added. Revisions are clouded.
29. Electrical Drawing E5.01 has been reissued. Note for Indicator Light was revised at
Occupancy Indicator Light Diagram. Sequence of Operation note revised for Occupancy Indicator Light Diagram. Revisions are clouded.
END OF ADDENDUM NUMBER 1
11/10/2026 Page 4 of 4
Attachments: Attendance sign-in sheet, Mandatory Pre-bid Conference, 10/29/2026 Revised Project Manual Table of Contents Revised Division 26 Specifications Added Fire Alarm Specification 28 31 05
Revised Architectural Drawings A2.22, A4.00, dated 11/9/2026 Revised Mechanical Drawing M1.01, dated 11/9/2026 Revised Electrical Drawings E1.01, E1.02, E1.03, E4.01, E4.02, E4.03, E4.04, E5.01, dated 11/9/2026
Pueblo Community College
Project Number: #2026-049M25 – Construction Documents – Bid Set
TABLE OF CONTENTS Construction Documents – Bid Set (Addendum #1) 00 00 02 - 1
CONSTRUCTION DOCUMENTS – BID SET SPECIFICATIONS
TABLE OF CONTENTS (Addendum #1)
DIVISION 0 – Contract Forms & General Conditions
BIDDING REQUIREMENTS
Advertisement for Bids for Competitive Sealed Best Value Bidding – Prepared by Owner 07/2025
AFB CSBV
Information for Bidders SBP-6.12 07/2025 Bid Form SBP-6.13 07/2025 Bid Alternate Form SBP-6.131 07/2025 Bid Bond SBP-6.14 07/2025
CONTRACT FORMS & EXHIBITS
Notice of Award SBP-6.15 10/2025 Contractor’s Agreement SC-6.21 07/2026 Performance Bond SC-6.22 07/2022 Labor and Material Payment Bond SC-6.221 07/2022 Apprenticeship Utilization Certification SBP-2.1 07/2025 Direct Labor Burden Calculation SBP-6.18 08/2023 Notice to Proceed SBP-6.26 07/2025 Contractor’s App. And Certificate for Payment SBP-7.2 07/2025 Change Order Bulletin SC-6.311 01/2022 Change Order Proposal SC-6.312 07/2022 Change Order SC-6.31 07/2025 Emergency Field Change Order SC-6.31E 07/2025 Pre-Acceptance Checklist SBP-05 07/2025 Notice of Partial Substantial Completion SBP-071 07/2025 Notice of Substantial Completion SBP-07 07/2025 Notice of Approval of Occupancy/Use SBP-01 07/2022 Notice of Partial Final Acceptance SBP-6.271 07/2025 Notice of Final Acceptance SBP-6.27 07/2025 Notice of Partial Contractor’s Settlement SBP-7.31 07/2025 Notice of Contractor’s Settlement SBP-7.3 07/2025 OSA Five Most Costly Goods Form SBP-091 07/2025 Contractor Application for Exemption Form DR 0172 10/2024 BuyClean Colorado Act: EPD Submittal & Sign-Off EE 5.2 01/2026 Addendum #1
CONDITIONS OF THE CONTRACT
General Conditions of the Contract SC-6.23 07/2025 SLFRF Supplementary General Conditions – Federal Provisions SC-SGC 07/2022 Addendum #1 SLFRF Terms & Conditions 02/2022 Addendum #1
DRAWINGS
Sheets as listed in the “Drawing Index” on Construction Drawings Cover Sheet
DIVISION 1 – General Requirements 01 10 00 Summary of Work 01 23 00 Alternates 01 26 00 Contract Modification Procedures
Davis Academic Building ADA Upgrades
Project Number: #2026-049M25
TABLE OF CONTENTS Construction Documents – Bid Set (Addendum #1) 00 00 02 - 2
01 29 00 Payment Procedures 01 31 00 Project Management and Coordination 01 32 13 Schedules and Reports 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 50 00 Temporary Facilities and Controls 01 55 00 Site Access Staging and Phasing 01 60 00 Product Requirements 01 70 00 Execution Requirements 01 73 10 Cutting and Patching 01 77 00 Closeout Procedures
DIVISION 2 – EXISTING CONDITIONS
02 41 19 Selective Demolition
DIVISION 3 – CONCRETE
Not Used
DIVISION 4 – MASONRY
Not Used
DIVISION 5 – STEEL
05 52 10 Pipe Railing – Additive Alternate #2
DIVISION 6 – WOOD AND PLASTICS
06 10 53 Miscellaneous Rough Carpentry 06 41 16 Plastic-Laminate-Clad Architectural Cabinets – Additive Alternate #3
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
07 21 00 Building Insulation 07 92 00 Joint Sealants
DIVISION 8 – OPENINGS
08 11 00 Steel Doors and Frames 08 14 16 Flush Wood Doors 08 31 00 Access Panels and Frames 08 71 00 Door Hardware 08 80 00 Glass and Glazing 08 87 33 Decorative Films
DIVISION 9 – FINISHES
09 21 16 Gypsum Board Assemblies 09 30 13 Ceramic Tiling 09 51 13 Acoustical Panel Ceilings 09 65 13 Resilient Base and Accessories 09 68 13 Tile Carpeting – Additive Alternate #1 09 84 13 Acoustical Wall Treatment – Additive Alternate #1 09 90 00 Painting
DIVISION 10 – ACCESSORIES
10 14 67 Tactile signage 10 21 13 Toilet Compartment Accessories 10 26 13 Corner Guards 10 28 10 Toilet Accessories
TABLE OF CONTENTS Construction Documents – Bid Set (Addendum #1) 00 00 02 - 3
DIVISION 11 – EQUIPMENT
Not Used
DIVISION 12 – FURNISHINGS
12 36 61.16 Solid Surfacing Countertops & Trim
DIVISIONS 13 – 20
Not Used
DIVISION 21 – FIRE SUPPRESSION
21 01 00 Fire Protection Submittals 21 05 00 Common Work Results for Fire Suppression
DIVISION 22 – PLUMBING
22 00 00 Plumbing General Provisions 22 01 00 Plumbing Submittals 22 05 00 Basic Plumbing Materials and Methods 22 05 23 General Duty Valves for Plumbing Piping 22 07 00 Plumbing Insulation 22 11 16 Domestic Water Piping 22 13 16 Sanitary Waste and Vent Piping 22 40 00 Plumbing Fixtures
DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING (HVAC)
23 00 00 Mechanical General Provisions 23 01 00 Mechanical Submittals 23 03 00 Electrical Provisions of Mechanical Work and Mechanical Provision of Electrical Work 23 05 00 Basic Mechanical Materials and Methods 23 05 29 Hangers and Supports 23 05 93 Testing, Adjusting, and Balancing 23 07 00 Mechanical Insulation 23 09 00 Electric Control System 23 31 13 Metal Ducts 23 33 00 Duct Accessories 23 34 23 Power Ventilators 23 37 13 Diffusers, Registers, and Grilles 23 82 50 Terminal Units
DIVISIONS 24 – 25
Not Used
DIVISION 26 – ELECTRICAL
26 00 10 General Electrical Addendum #1 26 05 05 Selective Demolition for Electrical Addendum #1 26 05 19 Low-Voltage Electrical Power Conductors and Cables Addendum #1 26 05 26 Grounding and Bonding for Electrical Systems Addendum #1 26 05 29 Hangers and Supports for Electrical Systems Addendum #1 26 05 33 Raceways and Boxes for Electrical Systems Addendum #1 26 05 33.13 Conduit for Electrical Systems Addendum #1 26 05 33.16 Boxes for Electrical Systems Addendum #1 26 05 34 Wiring Devices Addendum #1 26 05 53 Identification for Electrical Systems Addendum #1 26 28 13 Fuses Addendum #1
TABLE OF CONTENTS Construction Documents – Bid Set (Addendum #1) 00 00 02 - 4
26 28 16 Enclosed Switches Addendum #1 26 51 13 Interior Lighting Fixtures Addendum #1
DIVISIONS 27
Not Used
DIVISIONS 28
28 31 05 Modifications to Existing Fire Detection and Alarm System (Delegated Design) Addendum #1
DIVISIONS 29 – 31
Not Used
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 13 13 Portland Cement Concrete Paving – Additive Alternate #2
Project Number: #2026-049M25 – Construction Documents – Bid Set
Fire Detection and Alarm – Addressable Type System (Addendum #1)
26116 28 31 05-6 existing system components and restoration of required system functions.
C. Perform contractor pretesting before scheduling final acceptance testing. Coordinate required inspections and acceptance testing with the Owner, AHJ, and fire alarm system manufacturer's authorized representative, as applicable.
D. Provide completed test documentation, required certificates, and evidence of AHJ acceptance.
Correct deficiencies and retest as necessary before final acceptance.
2.8 LABELING
A. Identify new and modified fire alarm devices, modules, circuits, and equipment in accordance with NFPA 72, the approved fire alarm design, and existing system identification conventions.
B. Device addresses, circuit identification, and descriptions shall correspond to the final fire alarm programming, record drawings, and system documentation.
C. Provide identification for concealed devices and remote test stations where required for operation and maintenance.
2.9 SYSTEM INTEGRATION
A. Integrate new and modified devices with the existing building fire alarm control system. Provide programming, equipment configuration, circuit modifications, and other work required to maintain the existing system's alarm, supervisory, trouble, and monitoring functions.
B. Maintain compatibility with the existing building fire alarm system and campus monitoring arrangements. Coordinate modifications affecting central monitoring, annunciation, or system reporting with the Owner and authorized fire alarm service provider.
C. Verify that new and modified devices are properly identified, annunciated, and monitored. Test affected interfaces and confirm successful restoration of normal system operation.
END OF SECTION 28 31 05
UPPER LEVEL
ENLARGED
FLOOR PLANS
A2.22
A2.22
ENLARGED DEMO. PLAN
SCALE: 1/4" = 1'-0" PLAN
NORTH
SHEET NO.:
DATE:
REV:
AD
A
U
PG
R
AD
ES
D
AV
IS
A C
AD
. B
LD
G
PU
EB
LO
C O
M M
U N
IT
Y
C O
LL
EG
E
W
. O R
M
AN
A
VE
N U
E
PU
EB
LO
, C O
11/9/2026
D O
M
IN
IO
N
W
AY
, S U
IT
E
C O
LO
R
AD
O
S
PR
IN
G
S, C
O
PH
O N
E:
9)
-7 ã
H
AL
L
AR
C H
IT
EC
TS
SHEET TITLE:
.\p ue bl oc c_ lo go _p ro fil e.
jp g
CONSTUCTION
DOCUMENTS
BID SET
C :\U se rs
\A ut o C
7\ Ap pD at a\ Lo ca l\M ic ro so ft\
W in do w s\
IN
et C ac he
\C on te nt
.O ut lo ok
\G
SQ
JF
H \H
A lo go _1
0- 7-
.jp g
A2.22
ENLARGED FLOOR PLAN
SCALE: 1/4" = 1'-0" PLAN
NORTH
A2.22
ENLARGED R.C.P.
SCALE: 1/4" = 1'-0" PLAN
NORTH
A2.22
ENLARGED DEMO. R.C.P.
SCALE: 1/4" = 1'-0"
UPPER LEVEL KEY PLAN
AREA OF WORK
PLAN
NORTH
PLAN GENERAL NOTES:
FLOOR PLAN KEY NOTES:
CEILING FRAMING SCHEDULE
1 LAYER 5 8" GYP BD
MAXIMUM SPAN W/OUT MID-SPAN SUPPORT
2 LAYERS 5 8" GYP BD
FRAMING AT 16" OC
REFLECTED CEILING PLAN KEY NOTES:
DEMO. REFLECTED CLG PLAN KEY NOTES:
DEMOLITION FLOOR PLAN KEY NOTES:
DEMOLITION GENERAL NOTES:
PLAN
NORTH
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text 250E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSTRUCTOR
AutoCAD SHX Text
%%UCUBICLES
AutoCAD SHX Text
AutoCAD SHX Text
%%UHALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%URESTROOM
AutoCAD SHX Text 250E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E3W
AutoCAD SHX Text L4W
AutoCAD SHX Text B3W
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
250EA
AutoCAD SHX Text 250B
AutoCAD SHX Text
AutoCAD SHX Text D3W
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A7.00
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A7.00
AutoCAD SHX Text
AutoCAD SHX Text A9.00
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SIM.
AutoCAD SHX Text 8'-2" A.F.F.
AutoCAD SHX Text %%P8'-6" A.F.F.
AutoCAD SHX Text 10'-0" A.F.F.
AutoCAD SHX Text %%P8'-2" A.F.F.
AutoCAD SHX Text 10'-0" A.F.F.
AutoCAD SHX Text %%P8'-2" A.F.F.
AutoCAD SHX Text
%%URESTROOM
AutoCAD SHX Text 250E
AutoCAD SHX Text 9'-6" A.F.F.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E3W
AutoCAD SHX Text L4W
AutoCAD SHX Text B3W
AutoCAD SHX Text D3W
AutoCAD SHX Text A9.00
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text 250E
AutoCAD SHX Text
INSTRUCTOR
AutoCAD SHX Text
%%UCUBICLES
AutoCAD SHX Text
AutoCAD SHX Text
%%UHALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SAWCUT AND REMOVE (E) GYP BD PARTITION
AutoCAD SHX Text
SCALE: 1/128"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WATER CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UNDERMOUNT LAVATORY
AutoCAD SHX Text
SOLID SURFACE LAVATORY COUNTERTOP W/TRASH HOLE
AutoCAD SHX Text
BABY CHANGING STATION
AutoCAD SHX Text
AutoCAD SHX Text
SOAP DISPENSER
AutoCAD SHX Text
AutoCAD SHX Text
PAPER TOWEL DISPENSER
AutoCAD SHX Text
AutoCAD SHX Text
TOILET PAPER DISPENSER
AutoCAD SHX Text
AutoCAD SHX Text
SANITARY PRODUCT DISPOSAL
AutoCAD SHX Text
AutoCAD SHX Text
FLOOR DRAIN, SEE DTL. 12/A9.00
AutoCAD SHX Text
AutoCAD SHX Text
MIRROR
AutoCAD SHX Text
AutoCAD SHX Text
STAINLESS STEEL GRAB BARS
AutoCAD SHX Text 9'-6"
AutoCAD SHX Text 2 x 20 GA12 x 20 GA
AutoCAD SHX Text 10'-6"
AutoCAD SHX Text 3 x 25 GA58 x 25 GA
AutoCAD SHX Text 18'-11"
AutoCAD SHX Text 6 x 20 GA
AutoCAD SHX Text 6'-7"
AutoCAD SHX Text 2 CH x 25 GA12 CH x 25 GA
AutoCAD SHX Text 16'-6"
AutoCAD SHX Text 12'-6"
AutoCAD SHX Text 11'-0"
AutoCAD SHX Text 9'-0"
AutoCAD SHX Text 8'-3"
AutoCAD SHX Text 10'-3"
AutoCAD SHX Text 2 CH x 20 GA12 CH x 20 GA
AutoCAD SHX Text 9'-4"
AutoCAD SHX Text 2 CH x 22 GA12 CH x 22 GA
AutoCAD SHX Text 7'-3"
AutoCAD SHX Text 6'-10"
AutoCAD SHX Text 7'-11"
AutoCAD SHX Text 2 x 25 GA12 x 25 GA
AutoCAD SHX Text 12'-8"
AutoCAD SHX Text 3 x 20 GA58 x 20 GA
AutoCAD SHX Text 11'-0"
AutoCAD SHX Text 4 x 25 GA
AutoCAD SHX Text 13'-8"
AutoCAD SHX Text 4 x 20 GA
AutoCAD SHX Text 9'-4"
AutoCAD SHX Text 4 CH x 25 GA
AutoCAD SHX Text 14'-6"
AutoCAD SHX Text 4 CH x 20 GA
AutoCAD SHX Text 11'-11"
AutoCAD SHX Text 8'-3"
AutoCAD SHX Text 7'-6"
AutoCAD SHX Text 5'-6"
AutoCAD SHX Text 7'-9"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ACOUSTIC PANEL CEILING & GRID
AutoCAD SHX Text
1. REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS/SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THEIR RESPECTIVE DISCIPLINES. 2. SEE CODE COMPLIANCE PLANS FOR GENERAL RATING REQUIREMENTS. SEE CODE COMPLIANCE PLANS FOR GENERAL RATING REQUIREMENTS. 3. ALL DIMENSIONS ARE TO FACE OF MASONRY WALL, CONCRETE COLUMN, OR ALL DIMENSIONS ARE TO FACE OF MASONRY WALL, CONCRETE COLUMN, OR FACE OF GYPSUM BOARD (OR CEMENT BACKER BOARD) MATERIAL AT STUD WALLS, UNLESS NOTED OTHERWISE. 4. PROVIDE SEALANT AT ALL JOINTS OR CRACKS WHICH OCCUR WHERE PROVIDE SEALANT AT ALL JOINTS OR CRACKS WHICH OCCUR WHERE MATERIALS INTERSECT UNLESS OTHERWISE NOTED. 5. PROVIDE ROOM SIGNAGE TO MATCH EXISTING SIGNAGE STYLE, FOR ANY ROOM PROVIDE ROOM SIGNAGE TO MATCH EXISTING SIGNAGE STYLE, FOR ANY ROOM NOT PREVIOUSLY IDENTIFIED. 6. CENTER CEILING GRIDS IN ROOM TYPICALLY EXCEPT WHERE DIMENSIONS ARE CENTER CEILING GRIDS IN ROOM TYPICALLY EXCEPT WHERE DIMENSIONS ARE PROVIDED, UNLESS OTHERWISE NOTED. 7. CENTER FIXTURES, EQUIPMENT, AND SPRINKLER HEADS IN CEILING TILES OR CENTER FIXTURES, EQUIPMENT, AND SPRINKLER HEADS IN CEILING TILES OR HALF TILES AS SHOWN. 8. ARCHITECT SHALL BE CONSULTED FOR LOCATION OF ALL REQUIRED ACCESS ARCHITECT SHALL BE CONSULTED FOR LOCATION OF ALL REQUIRED ACCESS PANELS. GENERAL CONTRACTOR SHALL COORDINATE LOCATION OF ALL ABOVE CEILING EQUIPMENT AND ASSOCIATED ACCESS PANELS PRIOR TO INSTALLATION OF EQUIPMENT, CONDUIT, OR PIPING. 9. CONTRACTOR SHALL REMOVE, REPLACE, OR REINSTALL SUSPENDED ACOUSTIC CONTRACTOR SHALL REMOVE, REPLACE, OR REINSTALL SUSPENDED ACOUSTIC PANEL CEILING AND SUPPORT GRID AS NECESSARY TO FACILITATE THE MECHANICAL, AND ELECTRICAL WORK INDICATED ELSEWHERE IN THESE DOCUMENTS. ALL DAMAGED COMPONENTS SHALL BE REPLACED WITH NEW TO MATCH EXISTING. 10. GYPSUM BOARD CEILING SHALL BE FRAMED PER SCHEDULE BELOW, UNLESS GYPSUM BOARD CEILING SHALL BE FRAMED PER SCHEDULE BELOW, UNLESS OTHERWISE NOTED. 11. PROVIDE CONTROL JOINTS IN GYPSUM BOARD CEILING CONSTRUCTION AS PROVIDE CONTROL JOINTS IN GYPSUM BOARD CEILING CONSTRUCTION AS INDICATED; WHERE NOT INDICATED, PROVIDE MAXIMUM SPACING BETWEEN JOINTS OF 30 FEET. VERIFY FINAL CONTROL JOINT LOCATIONS WITH ARCHITECT PRIOR TO STARTING WORK. 12. PROVIDE SEALANT AT ALL JOINTS OR CRACKS WHICH OCCUR WHERE PROVIDE SEALANT AT ALL JOINTS OR CRACKS WHICH OCCUR WHERE MATERIALS INTERSECT UNLESS OTHERWISE NOTED. 13. RELOCATE (E) FIRE SPRINKLER HEADS AS NECESSARY TO ACCOMMODATE RELOCATE (E) FIRE SPRINKLER HEADS AS NECESSARY TO ACCOMMODATE ALTERATIONS TO CEILING ELEVATIONS.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REMOVE (E) DOOR, SIDELITE, AND FRAME
AutoCAD SHX Text
1. REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS/SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THEIR RESPECTIVE DISCIPLINES. 2. CONTRACTOR SHALL LEGALLY DISPOSE OF ALL DEMOLITION/CONSTRUCTION CONTRACTOR SHALL LEGALLY DISPOSE OF ALL DEMOLITION/CONSTRUCTION WASTE. 3. DURING CONSTRUCTION, CONTRACTOR SHALL PROTECT ALL EXISTING DURING CONSTRUCTION, CONTRACTOR SHALL PROTECT ALL EXISTING ELEMENTS TO REMAIN. 4. FLOORING TO BE REMOVED SHALL BE REMOVED TO EXISTING SLAB UNLESS FLOORING TO BE REMOVED SHALL BE REMOVED TO EXISTING SLAB UNLESS OTHERWISE NOTED. PATCH, REPAIR, AND LEVEL TO RECEIVE NEW MATERIAL UNLESS OTHERWISE NOTED. 5. PATCH AND LEVEL ALL EXISTING FLOOR SLABS TO REMAIN AS REQUIRED FOR PATCH AND LEVEL ALL EXISTING FLOOR SLABS TO REMAIN AS REQUIRED FOR SMOOTH AND LEVEL SURFACE EQUAL TO NEW FLOOR SLABS. 6. CAP ALL DISCONNECTED MECHANICAL PIPING LINES WITHIN THE WALL OR CAP ALL DISCONNECTED MECHANICAL PIPING LINES WITHIN THE WALL OR FLOOR. PATCH AND FINISH AS REQUIRED TO MATCH NEW OR EXISTING ADJACENT SURFACE. 7. FOR ALL SALVAGED ITEMS TO BE REUSED, CONTRACTOR SHALL THOROUGHLY FOR ALL SALVAGED ITEMS TO BE REUSED, CONTRACTOR SHALL THOROUGHLY CLEAN AND PREPARE FOR NEW FINISH IF SCHEDULED. 8. EXISTING FIRE ALARM SYSTEM SHALL REMAIN IN SERVICE DURING EXISTING FIRE ALARM SYSTEM SHALL REMAIN IN SERVICE DURING DEMOLITION. DETECTORS MAY BE CAPPED. 9. UNLESS OTHERWISE NOTED, EXISTING FIXTURES, CASEWORK, DOORS/FRAMES, UNLESS OTHERWISE NOTED, EXISTING FIXTURES, CASEWORK, DOORS/FRAMES, GLAZING, CEILING PANEL SYSTEMS, AND EQUIPMENT NOTED TO BE REMOVED IS TO BE SALVAGED TO THE OWNER. 10. FURNITURE, EQUIPMENT, AND STORAGE ITEMS TO BE REMOVED BY OWNER FURNITURE, EQUIPMENT, AND STORAGE ITEMS TO BE REMOVED BY OWNER FROM AREAS OF WORK; U.N.O.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(E) LAY-IN CEILING TO BE REMOVED
AutoCAD SHX Text
(E) ELEC FIXTURE TO BE REMOVED; SEE ELEC DWGS
AutoCAD SHX Text REMOVE (E) CPT FLR FINISH AND WALL BASE; PREPARE (E) FLR SLAB AS REQD BY FLR FINISH MFR TO RECEIVE (N) FLR FINISH
AutoCAD SHX Text
AutoCAD SHX Text
GYP BD CLG; FRAME PER CLG FRAMING SCHEDULE; PAINT
AutoCAD SHX Text
AutoCAD SHX Text
MECH. G/R/D W/ASSOCIATED DUCTWORK; SEE MECH. DWGS.
AutoCAD SHX Text
AutoCAD SHX Text
ELEC. LIGHT FIXTURE; SEE ELEC. DWGS.
AutoCAD SHX Text
AutoCAD SHX Text
MECH CHASE; SEE MECH DWGS
AutoCAD SHX Text
REMOVE (E) BULLETIN BOARD; SALVAGE TO OWNER FOR REINSTALLATION
AutoCAD SHX Text
AutoCAD SHX Text
(E) RESILIENT FLOORING AND WALL BASE TO REMAIN; PROTECT DURING CONSTRUCTION.
AutoCAD SHX Text
AutoCAD SHX Text
REMOVE (E) FLOOR TRANSITION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(E) ELEC FIXTURE TO REMAIN; PROTECT DURING CONSTRUCTION; SEE ELEC DWGS
AutoCAD SHX Text
AutoCAD SHX Text
(E) GYP BD SOFFIT TO REMAIN; PROTECT DURING CONSTRUCTION
AutoCAD SHX Text
AutoCAD SHX Text
FLOOR TRANSITION
AutoCAD SHX Text
AutoCAD SHX Text
(N) PAINTED GYP BD SOFFIT W/BULLNOSE TRIM TO MATCH PROFILE AND ELEVATION OF (E) ADJ. SOFFIT.
AutoCAD SHX Text
AutoCAD SHX Text
TACTILE SIGNAGE WITH INTERNATIONAL SYMBOL OF ACCESSIBILITY.
AutoCAD SHX Text
AutoCAD SHX Text
OCCUPANCY INDICATOR LIGHT ALCOVE
AutoCAD SHX Text
REMOVE (E) WIRELESS CARD READER. SALVAGE FOR RELOCATION.
AutoCAD SHX Text
AutoCAD SHX Text
REMOVE (E) DOOR STOP. REPAIR WALL.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CORNER GUARD
AutoCAD SHX Text
AutoCAD SHX Text
ADDENDUM #1 11/9/2026
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FLOOR FINISH
PLANS
A2.40
FINISH FLOOR PLAN GENERAL NOTES:
KEY NOTES:
SHEET NO.:
DATE:
REV:
AD
A
U
PG
R
AD
ES
D
AV
IS
A C
AD
. B
LD
G
PU
EB
LO
C O
M M
U N
IT
Y
C O
LL
EG
E
W
. O R
M
AN
A
VE
N U
E
PU
EB
LO
, C O
11/9/2026
D O
M
IN
IO
N
W
AY
, S U
IT
E
C O
LO
R
AD
O
S
PR
IN
G
S, PH
O N
E:
9)
-7 ã
H
AL
L
AR
C H
IT
EC
TS
SHEET TITLE:
.\p ue bl oc c_ lo go _p ro fil e.
jp g
CONSTUCTION
DOCUMENTS
BID SET
C :\U se rs
\A ut o C
7\ Ap pD at a\ Lo ca l\M ic ro so ft\
W in do w s\
IN
et C ac he
\C on te nt
.O ut lo ok
\G
SQ
JF
H \H
A lo go _1
0- 7-
.jp g
A2.40
FLOOR FINISH PLAN - LL RESTROOM
SCALE: 3/8" = 1'-0" PLAN
NORTH
A2.40
FLOOR FINISH PLAN - ML RESTROOM
SCALE: 3/8" = 1'-0" PLAN
NORTH
A2.40
FLOOR FINISH PLAN - UL RESTROOM
SCALE: 3/8" = 1'-0" PLAN
NORTH
LEGEND:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TYP. @ RESTROOM PERIMETER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TR1
AutoCAD SHX Text
TR6
AutoCAD SHX Text A9.01
AutoCAD SHX Text
AutoCAD SHX Text A9.00
AutoCAD SHX Text
AutoCAD SHX Text A9.00
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TYP. @ RESTROOM PERIMETER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TR5
AutoCAD SHX Text A9.00
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TYP. @ RESTROOM PERIMETER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TR1
AutoCAD SHX Text
TR1
AutoCAD SHX Text A9.01
AutoCAD SHX Text
AutoCAD SHX Text A9.01
AutoCAD SHX Text
AutoCAD SHX Text A9.00
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
1. GENERAL CONTRACTOR AND FLOORING CONTRACTOR SHALL ATTEND GENERAL CONTRACTOR AND FLOORING CONTRACTOR SHALL ATTEND PRE-INSTALLATION MEETING ON SITE WITH ARCHITECT TO VERITY PROJECT REQUIREMENTS. SEE PRODUCT SPECIFICATION 09 30 13 FOR MORE INFORMATION. 2. INSTALL FLOOR TILE SO THAT CHANGE OF TILE IS CENTERED UNDER CLOSED INSTALL FLOOR TILE SO THAT CHANGE OF TILE IS CENTERED UNDER CLOSED DOOR.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text NEW METAL FLOORING TRANSITION; INSTALL TRANSITION STRIP TO BE CENTERED UNDER CLOSED DOOR (IF APPLICABLE, AND UNLESS OTHERWISE NOTED). SEE 1/A9.01 FOR TYPICAL FLOORING TRANSITION CONDITION. SEE 1/A9.01 FOR TYPICAL FLOORING TRANSITION CONDITION. NEW METAL WALL TO FLOOR TRANSITION (E) EXPOSED CONCRETE SLAB. (E) LVT TO REMAIN. PROTECT DURING CONSTRUCTION. (E) PORCELAIN TILE TO REMAIN. PROTECT DURING CONSTRUCTION. (E) CARPET TILE TO REMAIN. PROTECT DURING CONSTRUCTION. ADD ALT #3: (E) FLOORING TO REMAIN. PROTECT DURING CONSTRUCTION. NEW RUBBER WALL BASE (N) RUBBER TRANSITION, SEE DETAIL 10/A9.00
AutoCAD SHX Text
CT 1 - 12" X 24" PORCELAIN TILE - DALTILE REKINDLE "MEDIUM GREY" (RK13)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ADDENDUM #1 11/9/2026
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MENS
STORAGE
BREAKROOM
STAIRS
S2
RESTROOM
MENS
STAIRS
S2
STORAGE
BREAKROOM
RESTROOM
DRESS B
STAGE
SUPPORT
015B
SHEET NO.:
DATE:
REV:
AD
A
U
PG
R
AD
ES
D
AV
IS
A C
AD
. B
LD
G
PU
EB
LO
C O
M M
U N
IT
Y
C O
LL
EG
E
W
. O R
M
AN
A
VE
N U
E
PU
EB
LO
, C O
10/14/2026
D O
M
IN
IO
N
W
AY
, S U
IT
E
C O
LO
R
AD
O
S
PR
IN
G
S, PH
O N
E:
9)
-7 ã
H
AL
L
AR
C H
IT
EC
TS
SHEET TITLE:
CONSTRUCTION
DOCUMENTS
BID SET
C
* PH. (719) 637-8850 * sec@secengr.com
5145 CENTENNIAL BLVD. SUITE 200
COLORADO SPRINGS, CO 80919
ONSULTING NGINEERS
ORPORATION
NGINEERING
CHENDTS E
C E
ADDENDUM NO. 1
11/09/20261
NEW WORK KEYNOTES
KEY PLAN
MECHANICAL
NEW WORK PLAN
LOWER LEVEL
M1.01
MECHANICAL PIPING NEW WORK PLAN - LOWER LEVEL MECHANICAL HVAC NEW WORK PLAN - LOWER LEVEL
ADD ALTERNATE #1: MECHANICAL HVAC NEW WORK PLAN - LOWER LEVEL SENSORY ROOM
J
T
T
SHEET NO.:
DATE:
REV:
AD
A
U
PG
R
AD
ES
D
AV
IS
A C
AD
. B
LD
G
PU
EB
LO
C O
M M
U N
IT
Y
C O
LL
EG
E
W
. O R
M
AN
A
VE
N U
E
PU
EB
LO
, C O
10/14/2026
D O
M
IN
IO
N
W
AY
, S U
IT
E
C O
LO
R
AD
O
S
PR
IN
G
S, PH
O N
E:
9)
-7 ã
H
AL
L
AR
C H
IT
EC
TS
SHEET TITLE:
CONSTRUCTION
DOCUMENTS
BID SET
C
* PH. (719) 637-8850 * sec@secengr.com
5145 CENTENNIAL BLVD. SUITE 200
COLORADO SPRINGS, CO 80919
ONSULTING NGINEERS
ORPORATION
NGINEERING
CHENDTS E
C E
ADDENDUM NO. 1
11/09/20261
KEYNOTES
LOWER LEVEL - ELECTRICAL & SPECIAL SYSTEMS PLAN
LOWER LEVEL
ELECTRICAL &
SPECIAL SYSTEMS
PLAN
E1.01
GENERAL NOTES
CR
CR
J
J
T
T
T
T
J
J J
SHEET NO.:
DATE:
REV:
AD
A
U
PG
R
AD
ES
D
AV
IS
A C
AD
. B
LD
G
PU
EB
LO
C O
M M
U N
IT
Y
C O
LL
EG
E
W
. O R
M
AN
A
VE
N U
E
PU
EB
LO
, C O
10/14/2026
D O
M
IN
IO
N
W
AY
, S U
IT
E
C O
LO
R
AD
O
S
PR
IN
G
S, PH
O N
E:
9)
-7 ã
H
AL
L
AR
C H
IT
EC
TS
SHEET TITLE:
CONSTRUCTION
DOCUMENTS
BID SET
C
* PH. (719) 637-8850 * sec@secengr.com
5145 CENTENNIAL BLVD. SUITE 200
COLORADO SPRINGS, CO 80919
ONSULTING NGINEERS
ORPORATION
NGINEERING
CHENDTS E
C E
ADDENDUM NO. 1
11/09/20261
MAIN LEVEL
ELECTRICAL &
SPECIAL SYSTEMS
PLAN
E1.02MAIN LEVEL - ELECTRICAL & SPECIAL SYSTEMS PLAN
KEYNOTES
ADD ALTERNATE KEYNOTES
DEMOLITION KEYNOTES
F H
JJ
T
J
J
J
J
J J
SHEET NO.:
DATE:
REV:
AD
A
U
PG
R
AD
ES
D
AV
IS
A C
AD
. B
LD
G
PU
EB
LO
C O
M M
U N
IT
Y
C O
LL
EG
E
W
. O R
M
AN
A
VE
N U
E
PU
EB
LO
, C O
10/14/2026
D O
M
IN
IO
N
W
AY
, S U
IT
E
C O
LO
R
AD
O
S
PR
IN
G
S, PH
O N
E:
9)
-7 ã
H
AL
L
AR
C H
IT
EC
TS
SHEET TITLE:
CONSTRUCTION
DOCUMENTS
BID SET
C
* PH. (719) 637-8850 * sec@secengr.com
5145 CENTENNIAL BLVD. SUITE 200
COLORADO SPRINGS, CO 80919
ONSULTING NGINEERS
ORPORATION
NGINEERING
CHENDTS E
C E
ADDENDUM NO. 1
11/09/20261
UPPER LEVEL
ELECTRICAL &
SPECIAL SYSTEMS
PLAN
E1.03UPPER LEVEL - ELECTRICAL & SPECIAL SYSTEMS PLAN
KEYNOTES
M
M
M
F
CR M
M
LOWER LEVEL STORAGE ROOM 036 - ENLARGED DEMOLITION PLAN
SHEET NO.:
DATE:
REV:
AD
A
U
PG
R
AD
ES
D
AV
IS
A C
AD
. B
LD
G
PU
EB
LO
C O
M M
U N
IT
Y
C O
LL
EG
E
W
. O R
M
AN
A
VE
N U
E
PU
EB
LO
, C O
10/14/2026
D O
M
IN
IO
N
W
AY
, S U
IT
E
C O
LO
R
AD
O
S
PR
IN
G
S, PH
O N
E:
9)
-7 ã
H
AL
L
AR
C H
IT
EC
TS
SHEET TITLE:
CONSTRUCTION
DOCUMENTS
BID SET
C
* PH. (719) 637-8850 * sec@secengr.com
5145 CENTENNIAL BLVD. SUITE 200
COLORADO SPRINGS, CO 80919
ONSULTING NGINEERS
ORPORATION
NGINEERING
CHENDTS E
C E
ADDENDUM NO. 1
11/09/20261
DEMOLITION KEYNOTES
LOWER LEVEL
ENLARGED ELECTRICAL
& SPECIAL SYSTEMS
PLANS
E4.01
LOWER LEVEL RESTROOM 036 - ENLARGED NEW WORK PLAN
NEW WORK KEYNOTES
LOWER LEVEL DRESS A 015A - ENLARGED DEMOLITION PLAN LOWER LEVEL SENSORY ROOM 015A - ENLARGED NEW WORK PLAN
ADD ALTERNATE KEYNOTES
J
M
F
SHEET NO.:
DATE:
REV:
AD
A
U
PG
R
AD
ES
D
AV
IS
A C
AD
. B
LD
G
PU
EB
LO
C O
M M
U N
IT
Y
C O
LL
EG
E
W
. O R
M
AN
A
VE
N U
E
PU
EB
LO
, C O
10/14/2026
D O
M
IN
IO
N
W
AY
, S U
IT
E
C O
LO
R
AD
O
S
PR
IN
G
S, PH
O N
E:
9)
-7 ã
H
AL
L
AR
C H
IT
EC
TS
SHEET TITLE:
CONSTRUCTION
DOCUMENTS
BID SET
C
* PH. (719) 637-8850 * sec@secengr.com
5145 CENTENNIAL BLVD. SUITE 200
COLORADO SPRINGS, CO 80919
ONSULTING NGINEERS
ORPORATION
NGINEERING
CHENDTS E
C E
ADDENDUM NO. 1
11/09/20261
MAIN LEVEL
ENLARGED ELECTRICAL
& SPECIAL SYSTEMS
PLANS
E4.02
MAIN LEVEL MAINTENANCE ROOM 144A - ENLARGED NEW WORK PLANMAIN LEVEL MAINTENANCE ROOM 144A - ENLARGED DEMOLITION PLAN
DEMOLITION KEYNOTES
NEW WORK KEYNOTES
M
F
M
SHEET NO.:
DATE:
REV:
AD
A
U
PG
R
AD
ES
D
AV
IS
A C
AD
. B
LD
G
PU
EB
LO
C O
M M
U N
IT
Y
C O
LL
EG
E
W
. O R
M
AN
A
VE
N U
E
PU
EB
LO
, C O
10/14/2026
D O
M
IN
IO
N
W
AY
, S U
IT
E
C O
LO
R
AD
O
S
PR
IN
G
S, PH
O N
E:
9)
-7 ã
H
AL
L
AR
C H
IT
EC
TS
SHEET TITLE:
CONSTRUCTION
DOCUMENTS
BID SET
C
* PH. (719) 637-8850 * sec@secengr.com
5145 CENTENNIAL BLVD. SUITE 200
COLORADO SPRINGS, CO 80919
ONSULTING NGINEERS
ORPORATION
NGINEERING
CHENDTS E
C E
ADDENDUM NO. 1
11/09/20261
UPPER LEVEL
ENLARGED ELECTRICAL
& SPECIAL SYSTEMS
PLANS
E4.03
UPPER LEVEL RESTROOM 250E - ENLARGED NEW WORK PLANUPPER LEVEL RESTROOM 250E - ENLARGED DEMOLITION PLAN
DEMOLITION KEYNOTES
NEW WORK KEYNOTES
PENTHOUSE #1
H F
HD
J
SHEET NO.:
DATE:
REV:
AD
A
U
PG
R
AD
ES
D
AV
IS
A C
AD
. B
LD
G
PU
EB
LO
C O
M M
U N
IT
Y
C O
LL
EG
E
W
. O R
M
AN
A
VE
N U
E
PU
EB
LO
, C O
10/14/2026
D O
M
IN
IO
N
W
AY
, S U
IT
E
C O
LO
R
AD
O
S
PR
IN
G
S, PH
O N
E:
9)
-7 ã
H
AL
L
AR
C H
IT
EC
TS
SHEET TITLE:
CONSTRUCTION
DOCUMENTS
BID SET
C
* PH. (719) 637-8850 * sec@secengr.com
5145 CENTENNIAL BLVD. SUITE 200
COLORADO SPRINGS, CO 80919
ONSULTING NGINEERS
ORPORATION
NGINEERING
CHENDTS E
C E
ADDENDUM NO. 1
11/09/20261
ROOF
ELECTRICAL &
SPECIAL SYSTEMS
PLAN
E4.04
ROOF PENTHOUS #1 - NEW WORK PLAN
NEW WORK KEYNOTES
SHEET NO.:
DATE:
REV:
AD
A
U
PG
R
AD
ES
D
AV
IS
A C
AD
. B
LD
G
PU
EB
LO
C O
M M
U N
IT
Y
C O
LL
EG
E
W
. O R
M
AN
A
VE
N U
E
PU
EB
LO
, C O
10/14/2026
D O
M
IN
IO
N
W
AY
, S U
IT
E
C O
LO
R
AD
O
S
PR
IN
G
S, PH
O N
E:
9)
-7 ã
H
AL
L
AR
C H
IT
EC
TS
SHEET TITLE:
CONSTRUCTION
DOCUMENTS
BID SET
C
* PH. (719) 637-8850 * sec@secengr.com
5145 CENTENNIAL BLVD. SUITE 200
COLORADO SPRINGS, CO 80919
ONSULTING NGINEERS
ORPORATION
NGINEERING
CHENDTS E
C E
ADDENDUM NO. 1
11/09/20261
ELECTRICAL
DETAILS
E5.01
IN USE
| DIVISION 0 � Contract Forms & General Conditions |
| BIDDING REQUIREMENTS |
| CONTRACT FORMS & EXHIBITS |
| CONDITIONS OF THE CONTRACT |
| DRAWINGS |
| DIVISION 1 � General Requirements |
| 01 50 00 Temporary Facilities and Controls |
| 26-00-10 - General Electrical |
| 26-05-05 - Selective Demolition for Electrical |
| 26-05-19-Low-Voltage-Electrical-Power-Conductors-and-Cables |
| 26-05-26-Grounding-and-Bonding-for-Electrical-Systems |
| 26-05-29-Hangers-and-Supports-for-Electrical-Systems |
| 26-05-33-Raceways-and-Boxes-for-Electrical-Systems |
| 26-05-34 - Wiring Devices |
| 26-05-53-Identification-for-Electrical-Systems |
| 26-28-13 - Fuses |
| 26-28-16-Enclosed-Switches |
| 26-51-13-Interior-Lighting-Fixtures |
| 28-31-05 - Modifications to Existing Fire Detection & Alam System |
| Sheets and Views |
| A2.22 |
| Sheets and Views |
| A2.40 |
File details come from the government source that posted it. Updated .