Paw Paw High School - Asphalt Paving Parking Lot C.pdf

PDF 426 KB Posted

Attached to
Asphalt Paving-Paw Paw High School
Solicitation number
RFP PPP 200000000811 1
Issued by
Van Buren County, Michigan

About this file

This is a Request for Bid document issued by Paw Paw Public Schools in Michigan for asphalt paving work at Paw Paw High School, specifically for the renovation of Parking Lot C. The project encompasses two primary bid categories: Bid Category No. 01 covers earthwork activities including site demolition, grading, subbase construction with sand and gravel materials, topsoil management, seeding, and landscape restoration with a one-year maintenance warranty; Bid Category No. 02 addresses complete asphalt paving installation, fine grading, base material compaction, pavement markings and striping, and surface sweeping. A pre-bid meeting was held on February 4, 2020, at 10:00 a.m. at Paw Paw High School, 30609 Red Arrow Highway, Paw Paw, Michigan 49079, with attendance encouraged for all bidders. Sealed bids in triplicate were due on February 11, 2020, by 2:30 p.m. local time at the Paw Paw Administration Office, 119 Johnson Road, Paw Paw, Michigan 49079, with public opening scheduled for the same date and time. Bids were to be submitted by hand delivery or mail only, with faxed or emailed submissions rejected.

Bidders were required to provide 5% bid security in the form of a certified check, cashier's check, or bid bond, with the successful bidder required to furnish Performance, Labor, and Material bonds equal to 100% of the contract amount from a surety company rated A- or better for contracts at or exceeding $50,000. Bidder qualifications required a minimum of five years of successful experience on similar work, appropriate licensure, and ample financial resources. The bid document included two mandatory alternates—one to omit the 12-inch sand sub-grade and use native soils, and another to omit the 8-inch gravel sub-base and pulverize existing asphalt in place—as well as three unit price options for supplemental excavation and gravel materials. Bidders were required to submit a sworn and notarized Familial Disclosure Statement in accordance with Michigan's Revised School Code Section 1267 and an Affidavit of Compliance certifying non-compliance with Iran Economic Sanctions Act provisions. The contract was to be executed on AIA Document A101 Standard Form of Agreement, with the bid remaining binding for 60 days from opening date.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Paw Paw Public Schools – High School Paving

SUBMIT IN TRIPLICATE

Request for Bid

Asphalt Paving-Paw Paw High School

Public Bid

Paw Paw Public Schools

Bid Release Date: January 21, 2020

Pre-Bid Meeting Date: February 4, 2020

10:00 a.m., local time.

Paw Paw High School

30609 Red Arrow Highway East. Paw Paw, MI 49079

Proposal Due Date:

February 11, 2020 – 2:30 p.m., local time.

Return to:

Stephanie Walker Executive Director of Business Operations

Paw Paw Public Schools 119 Johnson Rd. Paw

Paw, MI 49079 269-415-5200

Late Proposals will be Rejected

ADVERTISEMENT FOR BIDS

BID PROPOSAL

Sealed bids, in triplicate, for the Paw Paw High School – Asphalt Paving, will be received at Paw Paw Administration Office, 119 Johnson Rd., Paw Paw, MI 49079, February 11th, 2020 until 2:30 pm local time. Bids received after this time (at this location) will not be accepted.

All proposals received by the time and date stated above will be opened and read publicly at 2:30 pm local time on February 11th, 2020 at the Paw Paw Administration Office, 119 Johnson Rd., Paw Paw, MI 49079.

Bids may be hand delivered to a representative of Paw Paw Public Schools just prior to the bid opening at this location.

Bids may be mailed to Paw Paw Administration Office, 119 Johnson Rd., Paw Paw, MI 49079. Mailed bids must be received prior to 2:30 pm local time, February 11th, 2020. FAXED OR EMAILED BIDS WILL

NOT BE ACCEPTED

In accordance with Section 1267 of the Revised School Code each bid must be accompanied by a sworn and notarized Familial Disclosure Statement completed by the bidder disclosing any familial relationship between the Owner or any employee of the Bidder and any member of the District’s Board of Education or the Superintendent of the District.

SITE INSPECTION

A construction pre-bid meeting will be held at Paw Paw High School, 30609 Red Arrow Highway, Paw Paw, MI 49079 on February 4th, 2020 at 10:00 am local time. All bidders are encouraged to attend.

BID DOCUMENTS

The Bidding Documents may be purchased from Kal-Blue, 914 E. Vine St., Kalamazoo, MI

(269) 349-8681.

The Bidding Documents may be examined at the following locations:

Builders Exchange plan rooms in Grand Rapids, Kalamazoo, and Lansing.

BIDDER QUALIFICATIONS

Bidders submitting a Bid for this Project shall have qualifications as follows:

a. Shall be a reputable, recognized organization, with at least five (5) years successful experience on work of this type and scope of this project.

b. Shall have a license where required by public authorities having jurisdiction.

c. Shall have ample financial resources for work of this magnitude.

BID SECURITY - PERFORMANCE BONDS

Each bid shall be accompanied by good and sufficient bid security or bid bond in an amount not less than 5% of the Bid amount and shall secure the Owner from loss or damage by reason of the withdrawal of the Bid by a Bidder or by failure of the successful Bidder to enter into a Contract with the Owner if his Bid is accepted by the Owner.

The successful Bidder will be required to secure Performance, Labor and Material bonds for all contracts at or exceeding $50,000, from a surety company having a rating of A- or better, for the full amount of the Contract.

Bidders are required to familiarize themselves with all BID CATEGORIES and Alternates.

BID CATEGORY NO. 01 - EARTHWORK

Include:

1. Site related demolition and earthwork related activities required for new asphalt paving and base materials as shown and/or required to complete parking lot C.

2. All necessary surveying and staking for this contractor’s work.

3. Applicable fees, permits, inspections, etc…as required for the completion of the work in this bid category.

4. Include temporary orange construction fencing and protection anywhere not shown but as required around all site work activities.

5. Slab sand pavement subbase construction per details. Gravel subbase to be graded and compacted to +/-0.05 foot. Final grading and proof rolling is the responsibility of asphalt paving contractor. This contractor is responsible for compaction and/or correction of any areas that do not pass tests.

6. Responsible for keeping public and private roads clean of construction traffic dirt and debris.

7. Coordinate work with all relevant authorities having jurisdiction related to work of this trade.

8. Temporary tree protection measures as needed.

9. Strip, stockpile and respread topsoil to machine grade +/-0.10 foot. Provide seeding and maintenance of all areas disturbed by construction.

10. Finish grade all topsoil, seeded and landscaped areas, including removal of stones, dirt clumps, sticks and weeds.

11. It is the responsibility of this contractor to provide all required means of watering and maintenance of turf and grasses for one (1) year period after substantial completion. Any areas that are deemed unacceptable or unestablished after the (1) year period will be removed and replaced at the expense of this bid category and a new (1) year maintenance and warranty period will be established for the new plantings.

12. Provide all saw-cutting related to work of this trade.

13. Soil erosion permit and erosion control.

14. Maintain and control grades to facilitate the run-off of site surface water.

Exclude:

1. Testing will be provided for and paid for by the Owner.

BID CATEGORY NO. 02 - ASPHALT PAVEMENTS

Include:

1. Complete asphalt paving as shown on the drawings and/or as required to complete parking lot C.

2. Fine grading and proof rolling of gravel subbase. The subbase will be brought to within +/- 0.05 foot of required final grade by the sitework contractor. Additional gravel or removal of excess gravel required to maintain final grade in this contractor’s responsibility.

3. Provide all fine grading and compaction of base materials to maintain all grades as shown on contract documents and positive flow to all drain areas so that there is no standing water in any area.

4. Furnish and install all pavement markings, striping, cold formed markings, cross hatching, etc. as shown on contract drawings and to proper mil thickness and coats.

5. Sweeping of base course prior to tack coat, top course and striping operation in all areas and phases.

Include one additional final sweeping of the entire parking lot, concrete paved areas and building sidewalks prior to key turnover.

6. This Bid Package is to coordinate traffic control with other bid packages and add additional measures if needed.

7. Protect any existing asphalt, concrete, etc. from damage during work.

Exclude:

1. Testing will be provided for and paid for by the Owner.

GENERAL COMMENTS

Consideration of Bids:

The Owner has the right to accept any and all submitted bids.

End of Instruction Bidders

BID FORM

BID TO: Paw Paw Public Schools 119 Johnson Street Paw Paw, MI 49079

BID FROM:

PROJECT: High School Paving

Ladies and Gentlemen:

The undersigned, having familiarized themselves with the local conditions affecting the cost of the Work and having examined the site, and Bidding Documents, hereby propose to furnish all labor, material, equipment, taxes and services required for the proper completion of each of the following categories for this Project, including all addenda issued thereto, for the sum of:

Bid Category No.01 Title: EARTHWORK

Dollars ($ ), Said amount constituting the Base Bid.

Breakdown: Base bid is split by location as follows:

Sand Sub-Grade: $

Gravel Sub-Base: $

(This needs to match you Base bid) Total $

Bid Category No.02 Title: ASPHALT

Dollars ($ ), Said amount constituting the Base Bid.

TAXES: Bid sum includes all applicable taxes, including Michigan Sales Tax. Confirm that your company can pay Michigan Sales and Use Tax: □ Yes □ No

ALLOWANCES: Base bid includes applicable allowance cost(s) as set forth in Section 01020 of the General Requirements and as identified in the Instruction to Bidders Bid Category Descriptions.

COST OF BONDS: Bid sum includes cost of furnishing a Performance Bond and Labor and a Material Payment Bond, each in the amount of 100% of Base Bid. (If required)

ACKNOWLEDGEMENT OF ADDENDA

The following addenda have been received, are hereby acknowledged, and their execution is included in the above Base Bid:

Addendum No. Dated Addendum No. Dated Addendum No. Dated Addendum No. Dated Addendum No. Dated Addendum No. Dated

ALTERNATES

Base bid amount may be increased or decreased in accordance with each of the following alternate bids as may be selected, following the procedures stated in the Instruction to Bidders. Refer to Section 01030.

Alternate No. 01: Provide pricing to omit 12” sand sub-grade as detailed and use native soils in place.

Add/Delete Dollars ($ )

Alternate No. 02: Provide pricing to omit 8” gravel sub-base as detailed and pulverize existing asphalt in place, combine with existing asphalt to shape, grade and compact to a 10” depth for required sub-base.

Remove access materials to maintain proper grades and drainage as necessary.

Add/Delete Dollars ($ )

VOLUNTARY ALTERNATES (Identify in detail on appropriate attachment any Voluntary Alternates shown here)

A

B

C

UNIT COSTS

Unit Price No. 1: Supplemental Excavation, Engineered Fill: $ /cy

- Description: Unit price for the removal of unforeseen unsatisfactory soil and replacement with engineered fill, according to Division 31 Section "Earth Moving."

- Unit of Measurement: Cubic yard.

- Locations: High School (Parking Lot C as shown on Map).

Unit Price No. 2: Supplemental Excavation, Satisfactory Soil Fill: $ /cy

- Description: Unit price for the removal of unforeseen unsatisfactory soil and replacement with satisfactory soil, according to Division 31 Section "Earth Moving."

Unit Price No. 3: MDOT 22A or 21AA Gravel: $ /cy

- Description: Unit price for MDOT 22A or 21AA gravel

BID SECURITY

Accompanying this Bid, as required by the Instructions to Bidders, is a bid security in the form of (Certified Check/Cashier's Check/Bidder's Bond) in the amount of:

I understand a 5% bid bond or certified check (5% of Total Bid),payable to the Owner, which it is agreed, shall be retained as liquidated damages, not as a penalty, by the Owner, if the undersigned fails to execute the Contract in conformity with the form of Contract incorporated in the Contract Documents and fails to furnish specified bonds within ten (10) days after date of issuance of Letter of Intent to the undersigned.

If awarded the Contract, the undersigned agrees to commence Work within ten (10) days after date of issuance of Letter of Intent, which shall be considered as the notice to proceed, and agrees to complete the Work in accordance with the Construction Progress Schedule.

CONSTRUCTION PROGRESS SCHEDULE

If awarded this Contract, the undersigned:

Endorses the Construction Progress Schedule:

Amends the Construction Progress Schedule as follows:

UNIT LABOR RATES

The undersigned further proposes and agrees that should the amount of work required be increased or decreased where unit prices have not been established, the following labor rates will be the basis for any change order proposal. Labor rates are to include all direct costs without mark-up as defined in Article 7.3 of the General Conditions. Prior to contract award, if requested by the Construction Manager, the successful bidder shall provide documentation substantiating the proposed labor rates.

Job

Classification

Hourly

Rate

Benefits Employer's

Liability

Payroll

Taxes

Total

FEES FOR ADDITIONAL WORK

1. There will be a fee of 10% applied to the total cost of materials purchased and work completed by a contractors own forces. This percentage represents both overhead and profit.

2. There will be a fee of 5% applied to the total cost of work completed by a subcontractor. This percentage represents both overhead and profit.

CREDIT FOR WORK DELETED

Should any work be deleted from Contract by order of the Owner, full cost savings realized thereby will be credited to Owner.

FAMILIAL DISCLOSURE

See Page 8 of this Bid Form for required statement.

AGREEMENT

The undersigned agree(s) to provide the post-bid information required within (10) days after notification of the Notice of Award and to execute an agreement for work covered by this Proposal on AIA Document A101, Standard Form of Agreement Between Owner and Contractor Where the Basis of Payment is a Stipulated Sum.

In submitting this bid, it is understood that the Owner reserves the right to reject any or all bids. It is further agreed that this bid is binding for a period of sixty (60) days from the opening thereof.

Respectfully submitted, Date , 2020

Firm Name

By

Signed

Title

Official Address

(If a corporation, affix seal) Telephone No. ( )

Fax Number ( )

E-Mail Address

Familial Disclosure Statement (Must be completed for bid to be considered)

In accordance with Section 1267 of the Revised School Code this bid must be accompanied by a sworn and notarized statement disclosing any familial relationship between the Owner or any employee of the Bidder and any member of the District’s Board of Education or Superintendent of the District.

No, there is not a familial relationship between the Owner or any employee of the Bidder and any member of the District’s Board of Education or Superintendent of the District.

Yes, there is a familial relationship between the Owner or an employee of the Bidder and a member of the District’s Board of Education or Superintendent of the District. The person(s) and relationship are as follows:

Bidder Board of Education or Superintendent

Subscribed and sworn this day of , 2020.

In the County of State of

By Notary Public Signature

My commission expires on: Seal or stamp:

Affidavit of Compliance – Iran Economics Sanctions Act

Michigan Public Act No. 517 of 2012

The undersigned, the owner or authorized office of the below-named contractor (the “Contractor”), pursuant to the compliance certification requirement provided in the St Joseph County ISD (“the School District”) Request for Proposals For Asphalt Paving, Paw Paw High School (“the RFP”), hereby certifies, represents and warrants that the Contractor (including its officers, directors, employees) is not an “Iran linked business” within the meaning of the Iran Economics Sanctions Act, Michigan Public Act No.517 of 2012 (“the Act”), and that in the event Contractor will not become an “Iran linked business” at any time during the course of performing any services under this contract.

The Contractor further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or 2 times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the School District’s Investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years form the date determined that the person had submitted the false certification.

Contractor:

(Name of Contractor)

By:

Title:

Date:

State of:

County of:

This instrument was acknowledged before me on the day of , 2020, by, , Notary Public

County, My Commission Expires:

Acting in the County of:

RESTRIPING s.HA.LL REC-REATE EXISTING STALL LAYOUT TYPIC-AL <1'xl8' STALLS WITH WHITE STRIPING GROSSViALKS NEAR SC,HOOL ENTRANGE SHALL BE WHITE

BARRIER FREE STALLS TO BE BLUE

218.58' r LOOP ROAD "D"

PARKING LOT REPAIR I IMPROVEMENTS