Patel_2C_Greene_and_Associates.pdf

PDF 12 MB Posted

Attached to
Professional Consulting Services Continuing Contracts
Solicitation number
26-039EN-RFQu
Issued by
Hillsborough County, Florida

About this file

Summary of Patel, 2C Greene and Associates Submission

This document is a professional qualifications submission to the City of Plant City, Florida for continuing professional consulting services in engineering and surveying disciplines. The City of Plant City issued a Request for Qualifications (RFQu) pursuant to Florida Statutes Section 287.055 (Consultants Competitive Negotiation Act) seeking qualified firms to provide on-call support for planning, design, permitting, bidding, construction administration, and related services for infrastructure and capital improvement projects with estimated construction costs not exceeding $7.5 million or study costs not exceeding $0.5 million. Seven discipline categories were available for competition: Site Development/General Civil, Transportation, Stormwater and Flood Mitigation, Mechanical/Electrical/Plumbing, Geotechnical & Materials Testing, Environmental Contamination, and Survey/Mapping & Subsurface Utility Engineering. The submission deadline was May 21, 2026, at 2:00 p.m. via the City's e-Procurement Portal, with evaluation committee meetings scheduled for May 27, 2026. The resulting contracts would be effective upon issuance and extend for three years, with renewal options for two additional two-year periods at the City Manager's discretion.

Patel, 2C Greene and Associates submitted this qualifications package to compete for the available disciplines. Professional liability insurance of $2 million for three years post-project completion, comprehensive liability insurance of $1 million, and workers' compensation coverage were required. Fees would remain firm for the initial contract term, with renewal period adjustments limited to a maximum 4% increase supported by Consumer Price Index documentation and written justification. Respondents maintaining a physical office within Plant City with at least two full-time employees, current Florida business tax certification, required professional licenses, and established for at least six months prior to the submission deadline were eligible for local preference points representing 1.5% of the total score. No minimum work volume was guaranteed, and the City reserved the right to select multiple firms to ensure adequate capacity and specialized expertise.

View the file

Other files

File Type Posted
Professional_Consulting_Services_Continuing_Contracts_(Addendum_#2_Revision).pdf PDF
Hyatt_RFQ_21-020EN-FC.pdf PDF
Inwood_RFQ21-020EN-FC.pdf PDF
JMTs_CoPC_Library_of_Eng_Services_21-020EN-FC.pdf PDF
Mead__26_Hunt.pdf PDF
OHC_Environmental_RFQ_21-020EN-FC_Plant_City.pdf PDF
PPM_Consultants_2C_Inc._RFQ_21-020-EN-FC_Library_of_Engineering_Services_for_Continuing_Contracts_(Cat_3).pdf PDF
PreproposalMeeting_042426.pdf PDF
RK_26K.pdf PDF
SGM_Submittal_RFQ_21-020EN-FC_Library_of_Engineering_Continuing_Contracts.pdf PDF
SinghofenAssociates_RFQ21-020EN-FC_PlantCity.pdf PDF
Southeastern_Surveying.pdf PDF
Hyatt_RFQ_21-020EN-FC.pdf PDF
Inwood_RFQ21-020EN-FC.pdf PDF
KCA_City_of_Plant_City_Library_of_Engineering_Svcs_for_Cont_Contracts_RFQ_21-020EN-FC.pdf PDF
Nova_-RFQ_21-020EN-FC_Library_of_Engineering_Services.pdf PDF
Reiss_-_Plant_City_RFQ_21_20_EN_FC_.pdf PDF
Hazen_and_Sawyer.pdf PDF
Nova_-RFQ_21-020EN-FC_Library_of_Engineering_Services.pdf PDF
PSI_RFQ_21-020EN-FC_submitted_by_Intertek.pdf PDF
Patel_2C_Greene_and_Associates.pdf PDF
ARMINIUS_CATEGORY_6.pdf PDF
Arehna_FQ_21-020EN-FC.pdf PDF
Atkins_RFQ-21-020EN-FC-Plant-City-FL-Gen-Eng-Svc.pdf PDF
Black_and_Veatch_RFQ21020ENFC.pdf PDF
Boggs_Enginering_RFQ_Response.pdf PDF
Carollo_Engineers.pdf PDF
CivilSurv.pdf PDF
DRMP_PlantCity_RFQ_21-020EN-FC.pdf PDF
DTC-RFQ_21-02EN-FC_Library_of_Engineering_Services_for_Continuing_Contract.pdf PDF
Wood_Bid_21-020EN-FC_Proposal_Final_12102020.pdf PDF
Applied_Sciences_Consulting.pdf PDF
Boggs_Enginering_RFQ_Response.pdf PDF
Carollo_Engineers.pdf PDF
Chastain_Skillman_SOQ-Plant_City_RFQ_2321-020EN-FC.pdf PDF
Curtoom_Libraries_of_Engineering_Services_RFQ_21_020EF_FC.pdf PDF
Florida_Transportation_Engineering.pdf PDF
Water_and_Wastewater_Engineering_Solutions.pdf PDF
Wood_Bid_21-020EN-FC_Proposal_Final_12102020.pdf PDF
Woodard__26_Curran.pdf PDF
Applied_Sciences_Consulting.pdf PDF
Ardaman__26_Associates.pdf PDF
Ardurra_RFQ_21-020EN-FC.pdf PDF
Cardno_2C_Inc.pdf PDF
Curtoom_Libraries_of_Engineering_Services_RFQ_21_020EF_FC.pdf PDF
Gallagher_Bassett_BSI_RFQ_21-020EN-FC_RESPONSE-121020.pdf PDF
Franks_Proposed_Eval_Memebers_(2).pdf PDF
2026-04-13_-_General_Engineering_Continuing_Agreement_-_Work_based_on_Work_order_(1).pdf PDF
2026-05-07_-_Surveying_and_mapping_-_by_Work_Order.pdf PDF
2026-04-13_-_General_Engineering_Continuing_Agreement_-_Work_based_on_Work_order_(1).pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Library of Library of Engineering Engineering Services for Services for Continuing Continuing ContractsContracts

Project Manager: Patel, Greene and Associates, LLC

John Previte, PE 215 East Main Street | Bartow, Florida 33830 john.previte@patelgreene.com 863.533.7317

RFQ # 21-020EN-FC

December 10, 2020

I

CITY OF PLANT CITY RFQ 21-020EN-FC | Library of Engineering Services for Continuing Contracts

EXECUTIVE SUMMARY

December 10, 2020

Purchasing Department 302 West Reynolds St.

Plant City, FL 33563

RE: RFQ #21-020EN-FC | Library of Engineering Services for Continuing Contracts

Dear Selection Committee:

Patel, Greene & Associates, LLC (PGA) is pleased to submit this letter to Plant City in response to the Request for Qualifications RFQ 21-020EN-FC Library of Engineering Services for Continuing Contracts. PGA’s responsible office is conveniently located in Bartow, only minutes from Plant City. We are excited for this opportunity to present our experience and qualifications for this important contract. Serving our local communities is a priority goal for PGA and we look forward to contributing professionally to Plant City’s future. In the proposal that follows, PGA is providing its qualifications in hopes of supporting the City in the following engineering categories:

Category No. Category Descriptions Checkbox 1 General Engineering P

2 Transportation Engineering P

3 Environmental Engineering P

4 Stormwater Engineering P

5 Geotechnical Engineering P

PGA has expertise in planning, PD&E, roadway, drainage, structures, traffic, environmental, program management and construction services to support the City. We currently hold Continuing Professional Consulting Services contracts with Haines City, Lakeland, Tampa, and Polk County. We were recently selected for continuing contracts with Winter Haven, Manatee County, and Pasco County, as well as being re-selected for a continuing contract with Haines City. We have also been selected on several FDOT Districtwide Contracts and were recently selected for a Drainage Districtwide Contract in District One. You will see from the list below that PGA is no stranger to task work order-based contracts. The list indicates the kind of work that we would expect from this contract should we be successful. It is a good sample of assignments PGA has completed, as well as some more recently assigned work demonstrating our clients’ trust in PGA and our familiarity with contracts of this type:

•Turn lane design on 9th Street at US 17 in Fort Meade – Polk County
•Comprehensive Plan Update for the City of San Antonio, FL
•Bridge Crossing and Alternatives Evaluation – Polk County
•Structural design support for signals – City of Tampa
•Numerous projects completed for FDOT under Districtwide Roadway and Drainage Contracts – FDOT
•N. Glen Ave. drainage – City of Tampa
•Bridge plans review (nearing completion) – City of Lakeland
•Green ARTery Resurfacing/Sidewalk from 22nd St. Park to Sulphur Springs Park – City of Tampa
•Roundabout design at entrance of Lakeland Linder International Airport – City of Lakeland

EXECUTIVE SUMMARY

II

PGA’s experience speaks for itself; for nearly ten years our staff have been developing and delivering projects of importance from planning to construction. We fully understand the significance of assignments that will come from this contract. While relatively small in nature, assignments from continuing contracts are required to meet specific needs. Additional expertise is often required because staffing levels within governmental agencies can be limited or because the required level of expertise is not held by current staff. At PGA, we are sensitive to those challenges. With many of us having come from government service ourselves, we know those struggles well and can proactively assist the City to fill gaps as needed.

PGA will also utilize resources from our subconsultant teaming partners to support the City with Potable Water Services, Wastewater/Reclaimed Water Services, Construction Services, some General Engineering Services, and Other Municipal Service areas.

We will approach this contract with a commitment to quality while embodying our team culture. You will find that our staff will always conduct themselves professionally, providing quality services consistently and on a timely basis. This is not a unique challenge for the PGA Team; we all adhere to our core ICE principles of Integrity, Commitment, and Excellence.

We at PGA want to thank you for taking the time to review our proposed team and the experience we bring to this contract and look forward to becoming one of the City of Clermont’s trusted engineering firms.

John Previte Contract Manager

863.533.7317 ext. 212 john.previte@patelgreene.com

Gordon Greene, PE Principal-in-Charge

863.533.7317 ext. 201 gordon.greene@patelgreene.com

EXECUTIVE SUMMARY

III

01.A. ABILITY OF
PROFESSIONAL PERSONNEL
& STAFF EXPERIENCE

04. B. RELEVANT EXPERIENCE

15. C. LOCATION/ACCESSIBILITY

16.D. VOLUME OF SIMILAR
CONTRACTS & PAST
PERFORMANCE
17.E. CURRENT AND PROJECTED
WORKLOAD
18.F. CERTIFIED MINORITY
BUSINESS ENTERPRISE
G1.G. APPENDIX: ADDENDA,
FORMS, AND CERTIFICATIONS

TABLE OF

CONTENTS

A

ABILITY OF

PROFESSIONAL

PERSONNEL & STAFF

EXPERIENCE

ABILITY OF PROFESSIONAL PERSONNEL & STAFF EXPERIENCE

John Previte, PE (43)

Contract Manager

Gordon Greene, PE (20)

Principal-in-Charge Quality Control Manager

Kenny Yinger, PE (14) Dwayne Allgire (22) Emily Nabong, EI (1)

Stormwater Related Services

Terry Cartwright (22) Susan Durrance (16) Andrew Harris (3)

Environmental & Permitting

Laura Lockwood-Herrscher, AICP (23) Peyton McLeod, PTP (17)

Greg Moore, PE (21)

Planning

Legend CivilSurv Design Group, Inc. - CSD

Tierra, Inc. - TIE

Test Lab, Inc. - TLI

- Key Staff (Resumes Incl.)

(XX) - Years of Experience

Joe Lauk, PE (14) Jonathan Jones, PE (8) Joanna Martinez (17)

Roadway

Michael Fury, PE (8) Kyle Southwell (35)

Traffic

Craig Fuller, PE (18) - CSD John Howle, PE (43) - CSD

Site & Utility Design

Joe Hitterman, PE (29) - Rdwy.

Tim Polk, PE (33) - Drainage Jack King, PE (43) - Traffic

Jose Rodriguez, PE (44) - Struct.

Quality Control Team

John Previte, PE (43)

CEI Services

Ken Glass, PSM (36) - CSD Tim Morris, PSM (20) - CSD

Survey & SUE

Igon Kratser, PE (16) - TLI Connie Johnson-Gearhart, PE (20) - TLI

Geotech

Kevin Scott, PE (19) - TIE Mike Bair, ASP (24) - TIE Larry Moore, PE (31) - TIE

Contamination & Enviro. Eng.

Chris Cromwell, PE (18) Spencer Baker, PE (5)

Structures

IV

ABILITY OF PROFESSIONAL PERSONNEL & STAFF EXPERIENCE

Patel, Greene and Associates – Chief Engineer 2 (2019 – Present) As a Chief Engineer with PGA, John is responsible for both the pursuit and design phases of municipal projects. His reviews have ensured quality on a variety of PGA projects including resurfacing, roundabout, pedestrian bridge, and reconstruction projects.

• SR 25 (US 27) from N. of US 98/SR 66 to S. of Highlands Ave (CR 17A) | Highlands County, FL | FDOT District One | Constructability Review | The goal of this RRR project is to correct the deficient pavement conditions and extend the service life of the existing roadway including all travel lanes, auxiliary lanes, shoulders, and crossovers. Additional improvements include the inclusion of bike lanes, signal upgrades at multiple intersections, and updates to various miscellaneous structures.

*Florida Department of Transportation – Senior Structures Design Engineer Production Management Office (1996 – 2000) John served as the Structures Engineer in charge of ensuring Department, State, Federal, and other applicable requirements were met during the project development phase. His duties included reviewing and approving design of structural elements, approving contract plans and documents, directing activities of the District Structures Design Unit, ensuring designs were cost effective and feasible, ensuring projects were kept on schedule, and ensuring quality control procedures were completed.

*Florida Department of Transportation – Senior Project Management Engineer (January 1995 – 1996) John was responsible for project management of roadway and bridge design projects under the department. He was responsible for all facets of management through the design process for minor and complex projects, maintaining the project scheduling system within acceptable float durations, providing scope of services documents, and adhering to scheduled milestones dates.

*Florida Department of Transportation – Resident Construction Engineer Project Management Office (1991 – 1995) As the District Specifications Engineer, John's responsibilities included performing plans preparation reviews, reviewing specifications for compatibility with plans, preparing & reviewing technical special provisions, reviewing and completing electronic delivery for plans, and preparing specifications for projects.

John is a Chief Engineer with Patel, Greene and Associates (PGA). He has over 43 years of engineering experience. His background includes over 20 years of service to the Florida Department of Transportation where he served in multiple capacities, providing management and design services in a myriad of departments including project management, specifications, structures, stormwater, and construction.

His responsibilities have included coordination with external and internal stakeholders, transportation design, plans review, and constructibility reviews.

JOHN PREVITE, PE | CONTRACT MANAGER & CEI SERVICES LEAD

EXPERIENCE Education M.B.A., University of South Florida, 1995 B.S., Civil Engineering, Purdue University, 1972 Registrations/Licenses Professional Engineer, Florida, 26713, 1978 Work Experience Patel, Greene & Associates 2019 - Present FDOT District One 1991 - 2013 Estech, Inc.

1978 - 1991 Globe Engineering 1972 - 1978 Contact 215 East Main Street Bartow, FL 33830 863.533.7317 john.previte@patelgreene.com *Experience prior to joining

PGA

V

ABILITY OF PROFESSIONAL PERSONNEL & STAFF EXPERIENCE

US 92 (SR 600) from West of North Mobley St. to North Howard St. | Hillsborough County, FL | FDOT District Seven | QC Manager | This milling and resurfacing project included the addition of sidewalks, operational improvements, ADA accommodations, and incorporating other safety improvements along an urban stretch of US 92 in Plant City, Florida. This 0.9-mile project presented several challenges including utility coordination anomalies, tight right-of-way and drainage improvements. Gordon was responsible for the management of Quality Control.

6th Street from Wood Ave. to E. Hinson Ave. (Complete Streets) | Polk County, FL | FDOT District One | Project Manager & EOR | This scenic enhancement project involved the addition of an 8’ sidewalk on the east side, a 5’ sidewalk on the west side, the addition of on-street parking, bulb-outs for landscaping, drainage improvements, and street lighting. PGA was successful in circumventing right-of-way constraints, flooding issues, and coordination issues with the city through design and construction.

Gordon was responsible for project management, as well as plans production and design documentation for the roadway and drainage efforts.

US 41 Business from Green Bridge to Riverside Drive (Complete Streets) | Manatee County, FL | FDOT District One | Drainage EOR | PGA served as the prime consultant for this project designing the reconstruction of existing parking lots along US 41 Business. Additions of 12’ multi-use paths on both sides of US 41 Business and along Riverside Drive were also included. Gordon was responsible for the drainage design, including the design of pervious pavers for the drainage improvements.

SR 64 at Rye Rd. Roundabout | Manatee County, FL | FDOT District One | Drainage EOR | PGA designed a multi-lane roundabout to accommodate a new leg of the intersection while improving the safety along SR 64. The project included major reconstruction of the intersection, drainage improvements, utility coordination and right-of-way coordination. Gordon led the drainage design and documentation efforts.

US 17 at 9th St. NE | Polk County, FL | QC Manager | This intersection improvement project widened the north side of 9th Street N in order to accommodate the addition of a right-turn lane. The design maintained existing drainage patterns and included the relocation of existing fencing and a driveway to complete the improvements. Gordon was responsible for the management of Quality Control.

Gordon is the Executive Vice President at Patel, Greene and Associates (PGA). With more than 20 years of experience, he has built a diverse technical foundation, serving as a project manager, engineer of record (EOR), and principal-in-charge on projects throughout Florida. Gordon has intimate knowledge of current design standards, bringing this experience to PGA along with a strong commitment to see his company gain a reputation for engineering excellence and superb client service.

GORDON GREENE, PE | QA/QC & PRINCIPAL-IN-CHARGE

EXPERIENCE

Education M.B.A., University of South Florida, 2008

B.S., Civil Engineering, University of South Florida, Registrations/Licenses Professional Engineer, Florida, 68368, 2008

Work Experience Patel, Greene & Associates July 2011 - Present Atkins North America Sept. 2001 - July 2011 FDOT District One May 2000 - Sept. 2001

Professional Certifications/ Affiliations Florida Engineering Leadership Institute (FELI) FDOT Advanced Maintenance of Traffic FDOT Specifications Contact 215 East Main Street Bartow, FL 33830

863.533.7317 ext. 201 gordon.greene@patelgreene.

com

VI

ABILITY OF PROFESSIONAL PERSONNEL & STAFF EXPERIENCE

Comprehensive Plan Update | Pasco County, FL | City of San Antonio, FL | Project Manager | PGA is assisting the City of San Antonio with bringing the Comprehensive Plan into compliance with the Department of Economic Opportunity (DEO). The PGA Planning Group is leading City staff through the process of updating the Comprehensive Plan correctly to incorporate the most recent Evaluation and Appraisal Report (EAR) amendments. In addition, small scale amendments to reflect land use changes and annexation of parcels were made.

*South Florida Avenue Corridor Master Plan | Polk County, FL | City of Lakeland | Project Manager, Urban Manager | Laura served as the FDOT Project Manager on this first of its kind Master Plan initiated and funded by FDOT. The project took a holistic approach to creating a master plan for a prime corridor within the City of Lakeland. A complete market analysis was accomplished for the study area, and informed decision makers about the type of development and re-development to consider for the corridor.

Traffic analysis and considerations for lane reduction was a main task and theme gathered from stakeholders within the community. The project received awards for planning excellence at both the local (Heart of Florida Chapter) and state levels (Florida Chapter) of the American Planning Association.

*Complete Streets Policy and Handbook | Polk County, FL | Polk County TPO | Senior Transportation Planner | As the Senior Transportation Planner, Laura developed a Complete Streets Policy and Handbook the TPO board adopted. She assisted with public meetings and presentations to boards and committees, as well as provided quality control/quality assurance on the final plan documents. Furthermore, the TPO achieved support from its member local governments with a joint resolution declaring all would consider the complete streets process when implementing transportation improvements in their jurisdictions.

*US 98 BUILD Grant | FDOT District Three | Project Manager, Planning Director | Laura was the Lead Author for the written narrative of a BUILD Grant application that assisted the District in applying for federal funding to further safety improvements along US 98. She reviewed PD&E documents and compiled data and information to address the criteria of the grant. This included analyzing crash data, mapping crash hot spots and providing traffic volume, LOS, and turning movement analysis for key intersections within the segment of US 98. The grant application included a project schedule and cost estimates to implement the proposed improvements.

Laura is a Chief Planner and the Planning Group Manager for Patel, Greene and Associates (PGA). She has more than 23 years of experience in the public sector and transportation industry. Her background includes leading and managing several aspects of the planning process including policy planning, long-range transportation plans (LRTP), transit planning, modal development, systems and corridor planning, and the Complete Streets process. Laura’s previous positions in leadership with the Florida Department of Transportation (FDOT) and the Polk Transportation Planning Organization (Polk TPO) have allowed her to form lasting relationships with key stakeholders across the state.

LAURA LOCKWOOD-HERRSCHER, AICP | PLANNING LEAD

EXPERIENCE Education M.A., Public Administration, Troy University, 2010 B.A., Public Administration, St. Leo University, 2003

Professional Certifications/ Affiliations American Institute of Certified Planners (AICP), 32061, 2019 Certified Public Manager

(CPM)

Florida Certified Contract Manager (FCCM)

Work Experience Patel, Greene & Associates 2019 - Present

HNTB

2018 - 2019 FDOT District One 2013 - 2018 Polk TPO 2003 - 2013 Polk County’s Sheriff’s Office 1997 - 2003

Contact 215 East Main Street Bartow, FL 33830

863.533.7317 ext. 204 laura.herrscher@patelgreene.com

VII

ABILITY OF PROFESSIONAL PERSONNEL & STAFF EXPERIENCE

JOSEPH LAUK, PE | ROADWAY LEAD

US 92 (SR 600) from West of North Mobley St. to North Howard St. | Hillsborough County, FL | FDOT District Seven | Project Manager & Roadway EOR | This milling and resurfacing project included the addition of sidewalks, operational improvements, ADA accommodations, and incorporating other safety improvements along an urban stretch of US 92 in Plant City, Florida. This 0.9-mile project presented several challenges including utility coordination anomalies, tight right-of-way and drainage improvements.

Joe was responsible for project management and roadway design.

SR 25 (US 27) from N. of US 98/SR 66 to S. of Highlands Ave (CR 17A) | Highlands County, FL | FDOT District One | Project Manager & Roadway EOR | This goal of this RRR project is to correct the deficient pavement conditions and extend the service life of the existing roadway including all travel lanes, auxiliary lanes, shoulders, and crossovers. Additional improvements include the inclusion of bike lanes, signal upgrades at multiple intersections, and updates to various miscellaneous structures. PGA is the prime consultant leading the roadway, structures, drainage, and environmental efforts.

Joe was responsible for project management and roadway design.

US 17 at 9th St. NE | Polk County, FL | Project Manager & Roadway/SAPM EOR | This intersection improvement project widened the north side of 9th Street N in order to accommodate the addition of a right-turn lane. The design maintained existing drainage patterns and included the relocation of existing fencing and a driveway to complete the improvements. Joe was responsible for project management and roadway design.

SR 64 at Rye Rd. Roundabout | Manatee County, FL | FDOT District One | Project Manager & Roadway EOR | PGA designed a multi-lane roundabout to accommodate a new leg of the intersection while improving the safety along SR 64. The project included major reconstruction of the intersection, drainage improvements, utility coordination and right-of-way coordination. PGA was the prime consultant handling the design for roadway, MOT, drainage, and miscellaneous structures. Joe was responsible for project management and roadway design.

SR 60 from Tiger Lake Rd. to East of CR 630 | Polk County, FL | FDOT District One | Project Manager & Roadway EOR | The purpose of this RRR project was to extend the service life of the existing roadway by milling and resurfacing travel lanes, auxiliary lanes, shoulders, and crossovers. The project also included widening at various locations for additional turn/keyhole lanes, reconstruction of existing concrete driveways, relocation of an existing median opening, and concrete overbuild due to segregation and potholes in the westbound lanes. Joe was responsible for project management and roadway design.

Joe is a Principal and the Roadway Group Manager for Patel, Greene and Associates (PGA). He has 14 years of experience, including seven years with FDOT District One managing high profile projects and serving on multiple committees to enhance effectiveness of statewide transportation initiatives. Joe’s experience working on both the client and consultant side of transportation design has also allowed him to form strong stakeholder relationships within municipalities and counties across the state.

EXPERIENCE Education B.S., Civil Engineering, University of South Florida, Registrations/Licenses Professional Engineer, Florida, 74639, 2012

Professional Certifications/ Affiliations Florida Engineering Leadership Institute (FELI) Advanced MOT FDOT Specifications

Work Experience Patel, Greene & Associates 2015 - Present

Florida Department of Transportation 2008 - 2015

Jacobs Engineering Group 2006 - 2008

Contact 215 East Main Street Bartow, FL 33830

863.533.7317 ext. 203 joseph.lauk@patelgreene.com

VIII

ABILITY OF PROFESSIONAL PERSONNEL & STAFF EXPERIENCE

Morris Bridge Rd. from Fowler Ave. to Fletcher Ave., from Davis Rd. to Fowler Ave.

| Hillsborough County, FL | FDOT District Seven | Drainage EOR | This RRR project includes the design of shoulders on each side of Morris Bridge Rd. to delineate bike lanes, adding bike lane keyholes, turn-lane additions, construction of a 10’ shared-use path, and constructing sidewalk. Kenny is the Drainage EOR responsible for drainage design and documentation.

Continuing Services – Drainage Design | FDOT District One | Contract Manager | This contract supports FDOT District One’s Drainage Department by providing miscellaneous design services such as drainage maps, location hydraulic reports, stormwater analysis, permitting services, field reviews, drainage connection permit reviews, FEMA “no-Rise” certifications, and other drainage related tasks. Kenny serves as the primary point of contact to FDOT for leading and delegating assignments.

*Districtwide Drainage Design | FDOT District One | Task Manager | This contract provided support for drainage design services for FDOT District One. Additional responsibilities under the contract included ERC plan reviews, flooding compliant studies, drainage design, and plans production. Kenny served as a task manager under this contract providing multiple ERC plan reviews.

Davenport Complete Streets Improvements | Polk County, FL | FDOT District One | Drainage EOR | PGA is leading the design of complete streets upgrades including milling & resurfacing, curb realignment, lane width reductions, wider sidewalks, street lighting, high-emphasis crosswalks, and minor drainage improvements. As a result, the existing wide typical sections are being reduced to incorporate parallel on-street parking as well as reverse-in angled parking, traffic separators, and narrow lane widths to help improve the safety.

SR 29 From CR 846 E to N. of New Market Rd. | Collier County, FL | FDOT District One | Drainage EOR | This project involves the design of a new, 3.35 mile four lane bypass road for the city of Immokalee to improve the mobility and connectivity within the regional transportation network. The contract requires significant coordination with local stakeholders to develop the most economical approach to provide water quality treatment for the corridor. Kenny is leading the drainage effort, which includes developing regional alternatives and completing floodplain modeling.

Kenny is the Drainage Group Manager with Patel, Greene and Associates (PGA). His 14 years of experience in stormwater design includes modeling several roadway stormsewer systems in compliance with FDOT and various municipality design criteria. He has completed pond siting analysis, designed stormwater management facilities, and floodplain compensation sites. Additionally, he has coordinated extensively with Florida water management districts and environmental regulatory agencies to obtain construction permits. He is a proven leader with past experience managing and directing communication.

KENNY YINGER, PE | DRAINAGE LEAD

EXPERIENCE Education B.S., Civil Engineering, University of South Florida, Registrations/Licenses Professional Engineer, Florida, 75595, 2013

Work Experience Patel, Greene & Associates April 2018 - Present

Kisinger, Campo & Assoc., Corp. February 2006 - April

Software Microstation, Geopak, ICPR, ASAD, MODRET, Ponds

Contact 12570 Telecom Drive Temple Terrace, FL 33637

813.978.3100 ext. 327 kenny.yinger@patelgreene.

com

IX

ABILITY OF PROFESSIONAL PERSONNEL & STAFF EXPERIENCE

Morris Bridge Rd. from Fowler Ave. to Fletcher Ave., from Davis Rd. to Fowler Ave. | Hillsborough County, FL | FDOT District Seven | Drainage EOR | This RRR project includes the design of shoulders on each side of Morris Bridge Rd. to delineate bike lanes, adding bike lane keyholes, turn-lane additions, construction of a 10’ shared-use path, and constructing sidewalk. Terry was responsible for assessing potential project effects to threatened and endangered species and environmental permitting.

SR 25 (US 27) from N. of US 98/SR 66 to S. of Highlands Ave (CR 17A) | Highlands County, FL | FDOT District One | Environmental Lead | This goal of this RRR project is to correct the deficient pavement conditions and extend the service life of the existing roadway including all travel lanes, auxiliary lanes, shoulders, and crossovers.

Additional improvements include the inclusion of bike lanes, signal upgrades at multiple intersections, and updates to various miscellaneous structures. PGA is the prime consultant leading the roadway, structures, drainage, and environmental efforts. Terry was responsible for assessing potential project effects to threatened and endangered species and environmental permitting.

*US 27 PD&E Studies from Highlands C/L to SR 60 | Polk County, FL | Lake Wales, FL | Environmental Scientist | Terry was responsible for studying the potential environmental impacts associated with the widening of US 27 in Lake Wales. Tasks included field reviews to verify wetland boundaries and land uses, listed species surveys to include the crested caracara, Florida scrub jay, gopher tortoise and sand skink, assess potential project effects to threatened and endangered species, and producing a wetlands and biological assessment report in support of the NEPA process.

*Feasibility Study, Florida Fish and Wildlife Conservation Commission (FWC) | Polk County, FL | Polk County Natural Resources | Environmental Scientist | Terry was responsible for studying the potential environmental impacts associated with the construction of a gravity or pumped outfall from Lake Garland, which is a closed drainage basin, to wetland areas that ultimately drain to Lake Pierce in eastern Polk County. Tasks included wetland delineation, and potential effects to threatened and endangered species.

*Proposed South County Ranch Development Environmental Study | Polk County, FL | Environmental Scientist | Terry was responsible for studying the potential environmental impacts of proposed mining followed by redevelopment of a 3,500-acre site containing wetland areas that ultimately drain to the Peace River. Tasks included field reviews to determine the approximate wetland boundaries and the potential effects to threatened and endangered species within the project study area.

Terry is the Environmental Group Manager with Patel, Greene and Associates (PGA). He has more than 22 years of experience and a diverse background in environmental permitting, wetlands ecology, biology, and natural resources planning. His specific expertise includes listed species assessments, wetland assessments, and wetland jurisdiction determinations. Prior to working as an environmental consultant, he was employed by the Florida Department of Environmental Protection (FDEP) for six years, performing a variety of wetland permitting activities including wetland delineations, seagrass surveys, and habitat assessments.

TERRY CARTWRIGHT | ENVIRONMENTAL LEAD

EXPERIENCE Education B.S., Forest Resources and Conservation, University of Florida, 1997

Work Experience Patel, Greene & Associates April 2017 - Present

AECOM

July 2006 - April 2017 Florida Department of Environmental Protection October 2000 - July 2006 Florida Department of Transportation November 1997 - October

Contact 12570 Telecom Drive Temple Terrace, FL 33637

813.978.3100 ext. 324 terry.cartwright@patelgreene.

com

X

ABILITY OF PROFESSIONAL PERSONNEL & STAFF EXPERIENCE

West Cypress St. at North Willow Ave. | City of Tampa, FL | Structures EOR | This intersection improvement project included milling & resurfacing, sidewalk design, and drainage and signal upgrades. The structures scope involves a design analysis for a mast arm using the FDOT Mast Arm LRFD program version 1.0. The proposed Mast Arm will be located on the southwest corner of the intersection (Cypress/Willow) and will span 78 feet diagonally across the intersection replacing the existing set of diagonal strain poles. There will be eight 3 Section signals with 6’’ wide Backplates. Chris held responsible charge for the structures plans and documentation.

Districtwide Structural Support | FDOT District Seven | Task Manager | PGA is the prime consultant providing miscellaneous engineering services for bridges, retaining walls, sign and signal structures, box culverts, and other structures. Specific responsibilities for the contract include performing load ratings on existing and proposed bridges, reviewing and processing shop drawings, and conducting reviews of structural design.

US 92 from Galloway Rd. to Wabash Ave. | Polk County, FL | FDOT District One | Structures EOR | The project included the design of a 5’ sidewalk to improve pedestrian mobility along US 92, design of a prefabricated steel truss pedestrian bridge structure adjacent to the existing highway bridge, and miscellaneous structures supporting the roadway improvements. Chris was responsible for the structures design and documentation. Chris is responsible for the design and documentation of structures.

Districtwide Structures Design Consultant | FDOT District One | Task Manager | Under this contract, PGA is the prime consultant serving as an extension of the District One Structures Design Office with structural design support, plans production, and plans review tasks such as contract plans and calculations, shop drawings, and cost saving initiative proposals.

SR 20/SR100 at CR 305 | Flagler County, FL | FDOT District Five | Structures EOR | PGA was the prime consultant leading this intersection improvement/safety project in Flagler County. The design included pavement widening to accommodate a left turn lane, resurfacing, a new drainage stormsewer system, shoulder gutter, guardrail, and cross drain replacement. Chris was responsible for the structures design and documentation.

Continuing Services - Roadway Design (BDI) | FDOT District Five | Structures Lead | This task work order-based contract provides roadway and other design services throughout District Five. Specific responsibilities on the contract include supporting in-house design efforts, conducting reviews for roadway plans. Chris is leading structures efforts for tasks assigned under this contract.

Chris is a Senior Structures Engineer with Patel, Greene and Associates (PGA). He has 18 years of experience in transportation design with a focus on structural engineering. His specific expertise includes preliminary and final design of new bridges, widening design of existing bridges, various sign and signal structures, tolling gantry structures, concrete box culverts, miscellaneous structures, and pier crash walls. In addition, Chris has experience serving in leadership capacities, providing management and oversight on projects for FDOT and municipalities across Florida.

CHRISTOPHER CROMWELL, PE | STRUCTURES LEAD

EXPERIENCE Education M.S., Civil Engineering Specializing in Structures University of South Florida, B.S., Civil Engineering Specializing in Structures University of South Florida, Registrations/Licenses Professional Engineer, Florida, 64751, 2006

Work Experience Patel, Greene & Associates February 2016 - Present

AECOM

March 2002 - January 2016

Contact 12570 Telecom Drive Temple Terrace, FL 33637 813.978.3100 chris.cromwell@patelgreene.

com

XI

ABILITY OF PROFESSIONAL PERSONNEL & STAFF EXPERIENCE

SR 39 (Paul S. Buchman Highway) from N of Knights Griffin Rd. to Pasco C/L | Hillsborough County, FL | FDOT District Seven | Traffic EOR | This project is intended to rehabilitate the flexible pavement along SR 39 (Paul S. Buchman Hwy) in Plant City, FL. This segment of SR 39 is a two-lane, rural, undivided facility with a design speed of 65 mph. The project also incorporates safety improvements to include shoulder widening, addition of a left turn lane, and upgrades to the existing guardrail systems. The project will be the first state roadway within FDOT District Seven to utilize Full Depth Reclamation (FDR) for pavement rehabilitation.

SR 758 from SR 72 to Shadowlawn Way | Sarasota County, FL | FDOT District One | Traffic EOR | This goal of this RRR project is to correct the deficient pavement conditions and extend the service life of the existing roadway including all travel lanes, auxiliary lanes, shoulders, and crossovers. Additional scope items include the redesign of two signalized intersections, intersection lighting, and signing and pavement marking.

Mike is the Traffic EOR responsible for the design and documentation of signing and pavement markings, lighting, and signals.

SR 35 (US 17) from Bell St. to South of Heartland Way | Hardee County, FL | FDOT District One | Traffic EOR | This project aims to extend the service life of the existing roadway by correcting the existing deficient pavement conditions of all travel and auxiliary lanes. Additional scope items include design of new sidewalk, ADA upgrades, and utility coordination. Mike is responsible for traffic design and documentation.

SR 33 from Parkview Place to Aida Street (Complete Streets) | Polk County, FL | District One | Signals EOR | This project is an approximately 1.1-mi complete street project in Downtown Lakeland which involves milling and resurfacing, signing and pavement markings, lighting, and signalization. The signalization efforts for this project include the addition of 4-section signal heads for protective/permissive movements, design of two new PHB signals, and re-timing and phasing four intersections. Mike is leading the design and documentation for traffic.

SR 70 (Okeechobee RRR) | Okeechobee County, FL | FDOT District One | Signals EOR | This task work order consists of an approximately 0.9-mi resurfacing project which includes the upgrade of one signalized intersection and the reconstruction of a second signalized intersection. Mike is leading design for the signalization scope, which includes: new pedestrian signals, new mast arms for the reconstructed intersection, and the inclusion of 4-section signal heads for protected/permissive movements.

Continuing Services – Resurfacing Design | FDOT District One | SAPM, Signals, Lighting Lead | This task work order-based contract provides miscellaneous design services such as resurfacing, widening, rigid pavement rehabilitation, and minor design.

Specific responsibilities on task work orders may include field surveys, roadway analysis and design, drainage analysis and design, utility relocation, utility, coordination, and temporary traffic control plan analysis. Mike is leading signing and pavement markings, signals, and lighting efforts for tasks assigned under this contract.

Michael is a Project Traffic Engineer with Patel, Greene and Associates (PGA). He has 8 years of experience includes districtwide projects, limited-access roads, intersections, rural, and urban roadways. Mike has significant in-house experience with FDOT, providing in-house services under several contracts to District Seven. His specific responsibilities have included lighting, signalization, traffic data collection, access management studies, access permitting, site observation, and project management.

MICHAEL FURY, PE | TRAFFIC LEAD

EXPERIENCE

Education M.C.E., Interdisciplinary Transportation, University of South Florida, 2017

B.S., Civil Engineering, Florida State University, 2014

Registrations/Licenses Professional Engineer, Florida, 86909, 2019

Work Experience Patel, Greene & Associates 2019 - Present

Gannett Fleming, Inc.

2014 - 2019

Blackhawk Engineering, Inc.

2013 - 2014

12570 Telecom Drive Temple Terrace, FL 33637

813.978.3100 ext. 307 mike.fury@patelgreene.com

XII

ABILITY OF PROFESSIONAL PERSONNEL & STAFF EXPERIENCE

US 92 (SR 600) from West of North Mobley St. to North Howard St. | Hillsborough County, FL | FDOT District Seven | Drainage QC | This milling and resurfacing project included the addition of sidewalks, operational improvements, ADA accommodations, and incorporating other safety improvements along an urban stretch of US 92 in Plant City, Florida. This 0.9-mile project presented several challenges including utility coordination anomalies, tight right-of-way and drainage improvements. Tim was responsible for reviewing drainage design and documentation.

*Short-Term Capital Improvement Program | Polk County, FL | FDOT District One | Drainage Engineer | This project for Polk County involved general engineering services to manage, review and provide administration, planning, permitting, right-of-way, survey, construction and public information services to the county for projects within its short-term capital improvement program. Assignments included design, traffic signals, signing, field surveys, geotechnical investigations, drainage, and permitting.

SR 25 (US 27) from N. of US 98/SR 66 to S. of Highlands Ave (CR 17A) | Highlands County, FL | FDOT District One | Drainage QC | This goal of this RRR project is to correct the deficient pavement conditions and extend the service life of the existing roadway including all travel lanes, auxiliary lanes, shoulders, and crossovers.

Additional improvements include the inclusion of bike lanes, signal upgrades at multiple intersections, and updates to various miscellaneous structures.

US 17 at 9th St. NE | Polk County, FL | Drainage QC | This intersection improvement project widened the north side of 9th Street N in order to accommodate the addition of a right-turn lane. The design maintained existing drainage patterns and included the relocation of existing fencing and a driveway to complete the improvements. Tim was responsible for reviewing drainage design.

*Districtwide Drainage Services | FDOT District One | Contract Manager | Tim served as a contract manager at District One for six years, working on over 45 drainage projects. Specific responsibilities include BHRs, LHRs, flood investigations, coastal sediment studies, value engineering, pipe video inspection, pollutant loading evaluations, major roadway reconstruction projects, and providing contract plans for FDOT.

Continuing Services – Drainage Design | FDOT District One | Drainage QC | This contract supports FDOT District One’s Drainage Department by providing miscellaneous design services such as drainage maps, location hydraulic reports, stormwater analysis, permitting services, field reviews, drainage connection permit reviews, FEMA “no-Rise” certifications, and other drainage related tasks. Tim is leading quality control efforts under this contract.

Tim is a Chief Drainage Engineer with Patel, Greene and Associates (PGA). His professional experience encompasses 33 years in transportation, focused on drainage design and permitting. He is a former District Drainage Engineer for District One and District Three. He exemplifies the FDOT/FHWA drainage culture of minimizing costs in drainage design and pond design using risk assessment with design alternatives and innovative drainage concepts. Tim has assisted in developing FDOT drainage criteria and has given FDOT Design Conference presentations as a subject matter expert.

TIMOTHY POLK, PE | DRAINAGE QC

EXPERIENCE Education B.S., Engineering (Structures, Materials, Fluids), University of South Florida, 1977

Registrations/Licenses Professional Engineer, Florida, 38784, 1987

Work Experience Patel, Greene & Associates October 2015 - Present

Atkins North America July 1998 - October 2015

FDOT District Three July 1994 - July 1998

FDOT District One December 1986 - July 1994

Westinghouse Electric Corporation August 1977 - June 1985

Contact 215 East Main Street Bartow, FL 33830

863.533.7317 ext. 205 tim.polk@patelgreene.com

XIII

ABILITY OF PROFESSIONAL PERSONNEL & STAFF EXPERIENCE

SR 25 (US 27) from N. of US 98/SR 66 to S. of Highlands Ave (CR 17A) | Highlands County, FL | FDOT District One | QC Reviewer | This goal of this RRR project is to correct the deficient pavement conditions and extend the service life of the existing roadway including all travel lanes, auxiliary lanes, shoulders, and crossovers. Additional improvements include the inclusion of bike lanes, signal upgrades at multiple intersections, and updates to various miscellaneous structures. PGA is the prime consultant leading the roadway, structures, drainage, and environmental efforts. Joe led efforts for roadway QC on this project.

Continuing Services – Resurfacing Design | FDOT District One | Roadway QC | This task work order-based contract provides miscellaneous design services such as resurfacing, widening, rigid pavement rehabilitation, and minor design. Specific responsibilities on task work orders may include field surveys, roadway analysis and design, drainage analysis and design, utility relocation, utility, coordination, and temporary traffic control plan analysis. Joe is a roadway QC reviewer for tasks assigned.

SR 572 at Don Emerson Dr. Roundabout | Polk County, FL | City of Lakeland | Roadway QC | This project involves the design of a roundabout at the entrance of Lakeland Linder International Airport to improve safety and mobility on the corridor.

Additional scope items include drainage improvements, utility coordination, and right-of-way acquisition. PGA is the prime consultant leading the roadway, drainage, and structures efforts. Joe was responsible for reviewing the roadway design and documentation.

*SR 60 (Adamo Drive), US 301 to I-75 | Hillsborough County, FL | FDOT District Seven | Project Manager & Roadway EOR | This project included multiple operational/ safety improvements to improve traffic operations through addition and extension of turn lanes, median opening modifications, and driveway improvements. Joe was responsible for overall project management and design documentation for the roadway plans.

*SR 595/Seminole Blvd. from 70th Ave. to E. Bay Drive | Pinellas County, FL | FDOT District Seven | Project Manager & Roadway EOR | The project included upgrades to meet ADA, addition of sidewalks to fill gaps, reconstruction of failed concrete box culvert, stormsewer replacement, traffic signal upgrades, and multiple safety/operational improvements at median openings, turn lanes, and driveways. Joe was responsible for overall project management and design documentation for the roadway plans.

Joe is a Chief Roadway Engineer with Patel, Greene and Associates (PGA). For 29 years, Joe has provided design engineering services encompassing nearly all aspects of highway design and project management. His areas of expertise include project management, highway design, traffic control plans, design-builds and pavement design. Throughout his career, Joe has served as a Design Project Manager, Roadway and TCP Engineer of Record, Quality Control Reviewer, Roadway Project Manager, and GEC Plans Review Supervisor.

JOSEPH HITTERMAN, PE | ROADWAY QC

EXPERIENCE

Education B.S., Mechanical Engineering, Purdue University, 1988

Registrations/Licenses Professional Engineer, Florida, 50598, 1996

Certifications Advanced MOT AASHTO Roadside Design Traffic Control Plan Design

Work Experience Patel, Greene & Assoc., LLC 2019 - Present

Volkert, Inc.

2016 - 2019

Atkins North America 2002 - 2016

FDOT District Seven 1991 - 2002

Contact 12570 Telecom Drive Temple Terrace, FL 33637

813.978.3100 ext. 338 joe.hitterman@patelgreene.

com

XIV

ABILITY OF PROFESSIONAL PERSONNEL & STAFF EXPERIENCE

Districtwide Structural Support | FDOT District Seven | Structures QC | PGA is the prime consultant providing miscellaneous engineering services for bridges, retaining walls, sign and signal structures, box culverts, and other structures. Specific responsibilities for the contract include performing load ratings on existing and proposed bridges, review and processing shop drawings, conducting reviews of structural design, and creating scope of services documents.

Riverstone Subdivision Structures Review | Polk County, FL | City of Lakeland | Structures Lead | PGA is assisting the City of Lakeland in reviewing plans for a 175', five-span bridge crossing a jurisdictional wetland located in a residential development.

The project is located near the southwest corner of West Pipkin Road and West Yates Road in Polk County. Jose's responsibilities under this contract include review of the contracts plans and documents in accordance with the City’s standards and specifications.

Documents include structural calculations, load ratings, and Bridge Hydraulic Report.

Districtwide Structures Design Consultant | FDOT District One | Structures QC | Under this contract, PGA is the prime consultant serving as an extension of the District One Structures Design Office with structural design support, plans production, and plans review tasks such as contract plans and calculations, shop drawings, and cost saving initiative proposals.

Continuing Services – Resurfacing Design | FDOT District One | Structures QC | This task work order-based contract provides miscellaneous design services such as resurfacing, widening, rigid pavement rehabilitation, and minor design. Specific responsibilities on task work orders may include field surveys, roadway analysis and design, drainage analysis and design, utility relocation, utility, coordination, and temporary traffic control plan analysis. Jose is a structures QC reviewer for tasks assigned.

US 92 from Galloway Rd. to Wabash Ave. | Polk County, FL | FDOT District One | Structures QC | The project included the design of a 5’ sidewalk to improve pedestrian mobility along US 92, design of a prefabricated steel truss pedestrian bridge structure adjacent to the existing highway bridge, and miscellaneous structures supporting the roadway improvements. Chris was responsible for the structures design and documentation. Chris is responsible for the design and documentation of structures.

Jose is a Chief Engineer with Patel, Greene and Associates (PGA). He has 44 years of structural experience involving the design and review of prestressed concrete and steel girder bridges, permanent and temporary retaining walls, and other transportation structures. He is knowledgeable in structural design, plans review, quality assurance/quality control (QA/QC), and project management. Jose is a former district structures engineer for FDOT District Seven, completing tasks such as scope preparations, negotiations, and plans reviews during his tenure.

JOSE RODRIGUEZ, PE | STRUCTURES QC

EXPERIENCE Education B.S., Civil Engineering, University of South Florida, Registrations/Licenses Professional Engineer, Florida, 20810,1979 Work Experience Patel, Greene & Associates 2016 - Present Atkins North America 2006 - 2016 FDOT District Seven 1992 - 2006 DSA Group, Inc.

1988 - 1992 & 1984 - 1985 Group Systems Corporation 1985 - 1988 Greiner, Inc.

1983 - 1984 Diaz, Seckinger & Assoc., Inc.

1977 - 1983 Watson & Company 1976 - 1977 Hendry Corporation 1973 - 1976 Contact 12570 Telecom Drive Temple Terrace, FL 33637

813.978.3100 ext. 315 jose.rodriguez@patelgreene.

com

XV

ABILITY OF PROFESSIONAL PERSONNEL & STAFF EXPERIENCE

SR 39 (Paul S. Buchman Highway) from N of Knights Griffin Rd. to Pasco C/L | Hillsborough County, FL | FDOT District Seven | Traffic QC | This project is intended to rehabilitate the flexible pavement along SR 39 (Paul S. Buchman Hwy) in Plant City, FL. This segment of SR 39 is a two-lane, rural, undivided facility with a design speed of 65 mph. The project also incorporates safety improvements to include shoulder widening, addition of a left turn lane, and upgrades to the existing guardrail systems. The project will be the first state roadway within FDOT District Seven to utilize Full Depth Reclamation (FDR) for pavement rehabilitation.

SR 33 from Parkview Place to Aida Street (Complete Street) | Polk County, FL | FDOT District One | Traffic QC | This project is an approximately 1.1 mi complete street project in downtown Lakeland which involves milling and resurfacing, signing and pavement markings, lighting, and signalization. The signalization efforts for this project include the addition of 4-section signal heads for protective/permissive movements, design of two new PHB signals, and re-timing and phasing four intersections. Jack was responsible for the QC of Phase II signals plans.

*SR 60 (Brandon Blvd) from Kingsway Rd. to East of Valrico Rd. | Hillsborough County, FL | FDOT District Seven | Roadway & Traffic EOR | Jack prepared and was EOR for the signalization plans, roadway design, signing and pavement marking, and street lighting for converting a two-lane rural roadway to an eight-lane divided curb-and-gutter roadway with a raised median for 1.7 miles. Jack coordinated environmental permitting and utility relocation plans. He also developed signal timings based on traffic volumes, design speeds, MUTCD pedestrian walking speeds, and completed lighting design calculations.

This is the start of the file's text. The full file is on GovTribe.