Past Performance Assessment Worksheet.pdf
PDF 71 KB Posted
- Attached to
- Construction of the T2 Life Support Area
- Solicitation number
- W5J9JE23R0015
About this file
This document contains a past performance assessment worksheet template and information for federal contract opportunity number W5J9JE23R0015. The worksheet is to be completed for each past project submitted by offerors and includes details such as awarded and final construction costs, original and revised completion dates, scope of work, subcontracting breakdown, and relevancy criteria. The federal contract opportunity is for construction of the T2 Life Support Area with the Department of the Army Corps of Engineers. Offerors are to use this worksheet to provide past performance references for relevant previous projects involving civil site work, electrical work, plumbing work, or similar construction scopes to be considered for the contract award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCE SELECTION PLAN
RFP No. W5J9JE23R0015
CONTROLLED UNCLASSIFIED INFORMATION – SOURCE SELECTION INFORMATION FAR 2.101 AND 3.104
ATTACHMENT 1 –
PAST PERFORMANCE ASSESSMENT WORKSHEET
(To be completed for each project submitted)
CONSTRUCTION OR PRIME CONTRACTOR PROJECT #_
Offeror:
Project and Location:
Was this project performed by the division or unit of the company submitting the offer for
W5J9JE23R0015
Owner:
Owner’s Point of Contact for Reference: Telephone:
Awarded Construction Cost: Final Construction Cost:
Explain Cost Growth, if any:
Date of Award: Original Completion Date: Revised Completion Date: Percent Complete:
Explain Time Growth, if any:
General Scope of Construction and Offeror’s Role:
Work Your Company Self-Performed: Extent and Type of Work You Subcontracted Out:
Describe extent of relevancy and complexity of the project by checking all applicable boxes below. RELEVANCY:
Criteria 1: Civil Site Work (excavation, leveling, trenching, etc.)
Criteria 2: Electrical work Criteria 3: Plumbing Work
Provide any additional narrative to support relevancy assessment (in terms of scope, magnitude and complexity as compared to the scope of the RFP).
Your Performance Evaluation by Owner, if known :
File details come from the government source that posted it. Updated .