Part2_S02 Combined Dwgs BD 11-12-20.pdf
PDF 7 MB Posted
- Attached to
- Y1DB--New 4th MRI Addition Project 652-CSI-204
- Solicitation number
- 36C24621R0021
About this file
This solicitation is for project 652-CSI-204, a new fourth MRI addition at the Hunter Holmes McGuire VA Medical Center in Richmond, Virginia. The project includes demolishing existing structures and completely preparing the site for building operations. The single story addition will provide approximately 2,785 square feet of space to house two new MRIs adjacent to the existing MRI suite on the first floor. Interior finishes will match standard facility materials, colors, and patterns. Relocation of an existing MRI trailer and its associated services is also within scope. The contractor must furnish all labor, materials, supervision, and equipment to perform the work in accordance with provided drawings, specifications, and the statement of work.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SS
SS
SS
SS
SS
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
NEW MRI ADDITION
FFE= 199.01
SS
SS
SS
SS
SS
SS
SS
SS
SS
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLODLODLODLODLODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLODLODLODLODLODLODLODLODLO
D
LO
D
LODLODLODLODLODLOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD LOD
LO
D
LOD LOD
LO
D LOD LOD LOD
LOD
LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
IP
IP
IP
TS
MU
TS
MU
TS
MU
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SINGLE ROW OF SILT FENCE
(TYP.)
CONSTRUCTION LAYDOWN
AREA
SS
SS
SS
SS
SS
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
SS
SS
SS
SS
SS
SSSSSSSSSSSSSS
SS
SS SS
SS
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
RELOCATED MRI TRAILER
FFE= 202.61
W W
W W
W W
SS
SS
SS
SS
SS
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LODLOD
LO
D
LO
D
LO
D
LO
DLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
W W
W W
W W
SS
SS
SS
SS
SS
SS
SS
SS
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
NEW 4TH MRI ADDITION
652-GSI-204
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
19-088
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.fg-inc.net
BID DOCUMENTS
#500
OCTOBER 7, 2020
SITE DATA
TOTAL DISTURBED AREA = 0.16 AC.
1" = 10'
SCALE IN FEET
10 5 10 20
EROSION CONTROL PLAN - TRAILER RELOCATION - AREA B
SCALE: 1"=10'
EROSION CONTROL PLAN - BUILDING EXPANSION - AREA A
SCALE: 1"=10'
1" = 10'
SCALE IN FEET
10 5 10 20
A
M
CG102
NRSNSY
EROSION AND SEDIMENTATION
CONTROL PLAN
5 10
EROSION AND SEDIMENT CONTROL LEGEND
DETAIL MAP SYMBOLPRACTICECODE
MULCHING
LIMITS OF DISTURBANCE
FABRIC DROP INLET
PROTECTION
LOD
N/A
IP
SEDIMENT BARRIERSEDIMENT BARRIER
SF
SILT FENCE
SF
MU
TS
MU
TS
3.07
VA DEQ STD & SPEC
3.35
3.31
N/A
3.05
TEMPORARY SEEDING
GENERAL NOTES:
1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND
STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL
BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM
STANDARDS AND SPECIFICATIONS OF THE VIRGINA EROSION AND
SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS
EROSION AND SEDIMENT CONTROL REGULATIONS.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN
QUALIFIED PROFESSIONAL ADVICE WHEN QUESTIONS ARISE
CONCERNING DESIGN AND EFFECTIVENESS OF EROSION CONTROL
DEVICES. 24 HR CONTACT: NATHAN SPENCE, P.E., (205) 397-0370.
3. THE INSTALLATION OF EROSION CONTROL MEASURES AND
PRACTICES SHALL TAKE PLACE PRIOR TO OR CONCURRENT WITH
ALL LAND DISTURBING ACTIVITIES THROUGHOUT THE ENTIRE
PROJECT.
4. ANY AREA THAT HAS BEEN DISTURBED AND WILL REMAIN SO
FOR MORE THAN 7 DAYS SHALL BE SEEDED AND MULCHED WITHIN 5
DAYS OF BEING DISTURBED.
5. EROSION AND SEDIMENT CONTROL MEASURES WILL BE
MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE
APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION
CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL
MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE
SEDIMENT SOURCE.
6. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE
PREVENTED BY THE INSTALLATION OF EROSION CONTROL
MEASURES AND PRACTICES PRIOR TO, OR CONCURRENT WITH, ALL
LAND DISTURBING ACTIVITIES THROUGHOUT THE ENTIRE PROJECT.
7. SEDIMENT STORAGE INDICATORS MUST BE INSTALLED IN
SEDIMENT STORAGE STRUCTURES, INDICATING THE 1/3 FULL
VOLUME.
8. WHEN SILT FENCES BECOME 1/4 FULL OF SEDIMENT, THE
SEDIMENT MUST BE REMOVED.
9. MAINTENANCE OF ALL SOIL EROSION AND SEDIMENTATION
CONTROL MEASURES AND PRACTICES, WHETHER TEMPORARY OR
PERMANENT, SHALL BE AT ALL TIMES THE RESPONSIBILITY OF THE
CONTRACTOR.
10. ALL FILL SLOPES SHALL HAVE SILT FENCE PLACED AT THE
SLOPE'S TOE.
11. CONCENTRATED FLOW AREAS AND ALL SLOPES GREATER
THAN 3:1 SHALL BE STABILIZED WITH APPROPRIATE EROSION
CONTROL MATTING.
12. THE PROFESSIONAL WHO SEALS THIS PLAN CERTIFIES UNDER
PENALTY OF LAW THAT THIS PLAN WAS PREPARED AFTER A SITE
VISIT TO THE LOCATIONS DESCRIBED HEREIN BY THE
PROFESSIONAL OR THE PROFESSIONAL'S AUTHORIZED AGENT,
UNDER THE PROFESSIONAL'S DIRECT SUPERVISION.
13. EROSION CONTROL DEVICES THAT ARE INSTALLED AS
DIRECTED BY THE COR OR ENGINEER BUT NOT SHOWN ON THE
APPROVED PLAN AND WHICH ALSO SUBSEQUENTLY FAIL, ARE THE
RESPONSIBILITY OF THE CONTRACTOR.
14. ALL TEMPORARY AND PERMANENT SEEDING MUST BE
PERFORMED AT THE APPROPRIATE SEASON. ADDITIONAL
PLANTINGS WILL BE NECESSARY IF A SUFFICIENT STAND OF GRASS
FAILS TO GROW. REFER TO SHEET CG502 FOR PLANTING
SCHEDULES.
15. TOPSOIL SHALL BE STOCKPILED AND USED TO DRESS FINAL
GRADES.
16. THE CONTRACTOR WILL CLEAN OUT ACCUMULATED SILT IN THE
STORM DRAINAGE PIPES AT THE END OF CONSTRUCTION WHEN
DISTURBED AREAS HAVE BEEN STABILIZED.
17. APPROVAL OF THESE PLANS DOES NOT CONSTITUTE
APPROVAL BY THE VA OR VADEQ OF ANY LAND DISTURBING
ACTIVITIES WITHIN WETLAND AREAS. IT IS THE RESPONSIBILITY OF
THE PROPERTY OWNER TO CONTACT THE APPROPRIATE
REGULATORY AGENCY FOR APPROVAL OF ANY WETLAND THAT IS
DISTURBED.
18. APPROVAL OF THESE PLANS DOES NOT CONSTITUTE
APPROVAL BY THE VA OR VADEQ OF ANY LAND DISTURBING
ACTIVITIES WHICH MAY IMPACT AN ENDANGERED SPECIES. IT IS
THE RESPONSIBILITY OF THE PROPERTY OWNER TO CONTACT THE
APPROPRIATE REGULATORY AGENCY FOR APPROVAL OF ANY
DISTURBANCE WHICH MAY HAVE THIS EFFECT.
19. ADDITIONAL BMPS MAY BE REQUIRED BY THE ENGINEER
AND/OR COR OVER THE COURSE OF THE PROJECT TO MINIMIZE
SEDIMENT RELEASE FROM THE SITE.
20. CONTRACTOR SHALL HAVE ALL BMP'S SHOWN ON THE EROSION
CONTROL PLAN INSTALLED PRIOR TO ANY MASS CLEARING OR
GRADING OPERATIONS.
21. SEDIMENT REMOVED FROM BMPs (SEDIMENT BASINS, SEDIMENT TRAPS, SILT FENCES, ETC.) IS TO BE STOCKPILED
ONSITE. PERMITTEE WILL INSTALL APPROPRIATE SEDIMENT
BARRIERS AROUND STOCKPILE. SEDIMENT FROM STOCKPILE WILL
BE USED TO ADDRESS GRADES OR BE HAULED OFFSITE.
DRAWING REFERENCE:
1) H.H. MCGUIRE VAMC - CONSTRUCT SPINAL CORD
ENHANCEMENT CENTER CIVIL CONSTRUCTION DRAWINGS, DATED
09/11/2017 (VA PROJECT NUMBER 652-314)
NOT TO SCALE
KEY PLAN
AREA A
AREA B
DocuSign Envelope ID: D8F2CD59-3E32-4621-AF1A-6C893039CB12
10/7/2020
E le va ti on
1" = 50' H, 1"=5' V
EX STORM
-0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00
E le va ti on
1" = 50' H, 1"=5' V
STR 100 TO STR 104
-0+50 0+00 0+50 1+00 1+50
X
G
R A
T E
L
O C
A T
D
A
N
S
U R
V E
Y E
D
I N
V
I N
E
X
R
C P
I N
V
I N
E
X
R
C P
I N
V
O
U T
E
X
R
C P
R I M
EX1
EX 24" RCP @ 0.26%
A P
P R
O X
L
C
A T
I O
N
O
F
E
X
M
H
N
T
F
U
I
F
E
L D
I N
V
I N
E
X
R
C P
P P
R O
X
I N
V
I N
E
X
R
P P
R O
X
I N
V
I N
E
X
R
P P
R O
X
I N
V
O
U T
E
X
R
P P
R O
X
R I M
A
P P
R O
X
EX2
EX 8" PVC
SANITARY SEWER
(APPROX)
EX 8" PVC
SANITARY SEWER
(APPROX)
P-101
29 LF OF
12" PVC
@ 1.00%
N Y
O P
L A
A
A
I N
I N
V
I N
P
P
V C
I N
V
O
U T
P
P
V C
R I M
P-103
54 LF OF
12" PVC
@ 1.00%
N Y
O P
L A
A
A
I N
I N
V
O
U T
P
P
V C
R I M
V D
G
H O
U S
E
M
H
W I T
H
G
R A
P
I N
V
I N
E
X
R
C P
I N
V
I N
P
R
D
R A
N
E
P
V C
I N
V
I N
P
P
V C
I N
V
O
U T
E
X
R
C P
R I M
EX 24" RCP @ 0.26%
V D
G
H O
U S
E
M
H
W I T
H
G
R A
P
I N
V
I N
E
X
R
C P
I N
V
I N
P
R
D
R A
N
E
P
V C
I N
V
I N
P
P
V C
I N
V
O
U T
E
X
R
C P
R I M
PROPOSED FFE OF MRI
EXPANSION = 199.01
EX GRADE
PR GRADE
PR GRADE
EX GRADE
PR SEWER SERVICE
MRI EXPANSION
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
NEW 4TH MRI ADDITION
652-GSI-204
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
19-088
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.fg-inc.net
BID DOCUMENTS
#500
OCTOBER 7, 2020
1" = 5'
VERTICAL: SCALE IN FEET
5 2.5 5 10
1" = 50'
HORIZONTAL: SCALE IN FEET
50 25 50 100
GENERAL NOTES:
1) PIPE LENGTHS REFLECT THE PIPES LINEAR LENGTH AND ARE SHOWN FROM CENTER OF
STRUCTURE TO CENTER OF STRUCTURE.
2) EXISTING UTILITY DEPTHS ARE APPROXIMATED BASED ON 4 FT COVER FROM THE
EXISTING GROUND SURFACE. PROPOSED UTILITY DEPTHS ARE BASED ON 4 FT OF COVER
FROM THE PROPOSED GROUND SURFACE. CONTRACTOR SHALL FIELD VERIFY ALL UTILITY
DEPTHS AT CROSSING AND CONTACT ENGINEER IMMEDIATELY IF CONFLICTS ARE
ENCOUNTERED.
3) CONTRACTOR TO FIELD VERIFY EXISTING ELEVATIONS OF UTILITIES TO AVOID
CONFLICTS. CONTACT ENGINEER IMMEDIATELY IF FIELD ELEVATIONS DIFFER FROM THE
DESIGN DRAWINGS.
A
M
CG201
NRSNSY
STORM DRAINAGE PROFILES
6 10
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
NEW 4TH MRI ADDITION
652-GSI-204
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
19-088
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.fg-inc.net
BID DOCUMENTS
#500
OCTOBER 7, 2020
A
M
CG501
NRSNSY
STORM DRAINAGE DETAILS (1 OF 2)
7 10
VDOT STANDARD PRECAST MANHOLE TOP UNITS
CG501
VDOT STANDARD PRECAST REDUCER AND RISER UNITS
CG501
VDOT STANDARD PRECAST BASE UNITS
CG501
VDOT STANDARD PRECAST TOP UNITS
CG501
VDOT STANDARD STRUCTURE STEP
CG501
VDOT STANDARD BEDDING FOR STRUCTURES
CG501
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
NEW 4TH MRI ADDITION
652-GSI-204
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
19-088
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.fg-inc.net
BID DOCUMENTS
#500
OCTOBER 7, 2020
A
M
CG502
NRSNSY
STORM DRAINAGE DETAILS (2 OF 2)
8 10
PVC STORM PIPE DETAIL
CG502
PVC STORM PIPE BACKFILL DETAIL
CG502
NYOPLAST GRATE DRAIN DETAIL
CG502
NYOPLAST GRATE DRAIN INSTALLATION DETAIL
CG502
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
NEW 4TH MRI ADDITION
652-GSI-204
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
19-088
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.fg-inc.net
BID DOCUMENTS
#500
OCTOBER 7, 2020
A
M
CG503
NRSNSY
EROSION CONTROL DETAILS
9 10
VA DEQ SILT FENCE DETAIL
CG503
VA DEQ INLET PROTECTION DETAIL
CG503
VA DEQ MULCHING
CG503
VA DEQ TEMPORARY SEEDING
CG503
PROPOSED MEDICAL GAS
AND HOT WATER UTILITIES
(BY OTHERS, AS PART OF
SCI ADDITION PROJECT)
SS
SS
SS
SS
SS
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
SS
SS
SS
SS
SS
SSSSSSSSSSSSSS
SS
SS SS
SS
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
RELOCATED MRI TRAILER
FFE= 202.61
W W
W W
W W
SS
SS
SS
SS
SS
W W
W W
W W
SS
SS
SS
SS
SS
SS
SS
SS
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
PROPOSED 3/4" WATER
SERVICE LINE
(SEE PLUMBING PLANS
FOR DETAILS)
EXISTING 8" SANITARY
SEWER MAIN
PROPOSED 3" SANITARY SEWER
SERVICE LINE
(SEE PLUMBING PLANS FOR DETAILS)
CONTRACTOR TO LOCATE AND
POTHOLE EXISTING SEWER MAIN AT
THIS LOCATION. COORDINATE DEPTH
AND LOCATION WITH ENGINEER PRIOR
TO INSTALLING PROPOSED WATER
AND SEWER SERVICE
PROPOSED WATER MAIN
RELOCATION
(BY OTHERS, AS PART OF
SCI ADDITION PROJECT)
PROPOSED SEWER MANHOLE
(BY OTHERS, AS PART OF SCI
ADDITION PROJECT)
PROPOSED SANITARY
SEWER MAIN RELOCATION
(BY OTHERS, AS PART OF
SCI ADDITION PROJECT)
PROPOSED SANITARY
SEWER MAIN RELOCATION
(BY OTHERS, AS PART OF
SCI ADDITION PROJECT)
EXISTING 12" WATER MAIN
(TO BE RELOCATED AND
ABANDONED BY OTHERS, AS
PART OF SCI ADDITION PROJECT)
EXISTING SANITARY SEWER MAIN
(TO BE RELOCATED AND
ABANDONED BY OTHERS, AS
PART OF SCI ADDITION PROJECT)
PROPOSED ELECTRICAL LINES
(SEE ELECTRICAL PLANS FOR
DETAILS, TYP.)
PROPOSED COMMUNICATION LINE
(SEE ELECTRICAL PLANS FOR DETAILS, TYP.)
SS
SS
SS
SS
SS
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
NEW MRI ADDITION
FFE= 199.01
SS
SS
SS
SS
SS
SS
SS
SS
SS
TOP= 197.29'
F/L= 179.65'
SIZE N/A
STACKED PIPE
INV. = 182.44'
INV. = 179.6'
DIRECTION
ONLY
APPROXIMATE LOCATION OF EXISTING
8" SANITARY SEWER SERVICE.
CONTRACTOR TO POTHOLE AND VERIFY
EXACT LOCATION AND DEPTH PRIOR TO
DEMOLITION OR CONSTRUCTION
APPROXIMATE LOCATION OF EXISTING
SANITARY SEWER MANHOLE.
CONTRACTOR TO POTHOLE AND VERIFY
EXACT LOCATION AND DEPTH PRIOR TO
DEMOLITION OR CONSTRUCTION
SEE PLUMBING PLANS FOR UTILITY
CONNECTIONS IN BUILDING (TYP.)
EXISTING SANITARY
SEWER MANHOLE
PROPOSED 3" SANITARY SEWER SERVICE LATERAL
(SEE PLUMBING PLANS FOR DETAIL, TYP.)
PROPOSED SANITARY SEWER CLEANOUT
TO BE PLACED 5' OUTSIDE BUILDING
CONSTRUCTION LAYDOWN
AREA
APPROXIMATE LOCATION OF EXISTING 8"
SANITARY SEWER SERVICE. CONTRACTOR TO
POTHOLE AND VERIFY EXACT LOCATION AND
DEPTH PRIOR TO DEMOLITION OR
CONSTRUCTION
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
NEW 4TH MRI ADDITION
652-GSI-204
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
19-088
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.fg-inc.net
BID DOCUMENTS
#500
OCTOBER 7, 2020
CONTRACTOR TO CONTACT UTILITIES PROTECTION
CENTER PRIOR TO ANY EXCAVATION
1) COORDINATE AS REQUIRED WITH VA INSPECTIONS DURING
CONSTRUCTION FOR REQUIRED INSPECTIONS.
2) ALL ON-SITE PVC PIPE SHALL HAVE CLASS B BEDDING.
3) ALL CONDUIT, PIPE, AND CHASE PIPE SHALL BE WRAPPED WITH
THE APPROPRIATE LOCATION WIRE AND TAPE.
4) NOTIFY WATER AND SEWER INSPECTOR PRIOR TO START OF
CONSTRUCTION.
5) THE CONTRACTOR SHALL PROVIDE A COMPLETE SET OF
AS-BUILT DRAWINGS INCLUDING ALL RIM ELEVATIONS, INVERT
ELEVATIONS, PIPE SIZES, AND PIPE MATERIAL FOR ALL MAINS TO THE
ENGINEER AS SOON AS INSTALLATION IS COMPLETE.
6) CONTRACTOR SHALL INSTALL THE DOWNSTREAM SANITARY
SEWER CONNECTION PRIOR TO THE INSTALLATION OF THE ON-SITE
SERVICE LATERALS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
UTILITIES SHOWN ON THE PLANS BY POT HOLING THE LINES. THE
CONTRACTOR SHALL HAVE THE LINES SURVEYED, INCLUDING
HORIZONTAL AND VERTICAL LOCATION, AND THE SURVEYED POINTS
SENT TO THE PROJECT ENGINEER TO DETERMINE IF ANY UTILITY
CONFLICTS WILL AFFECT THE CURRENT SANITARY SEWER DESIGN.
7) NOTIFY THE COR OF ANY SCHEDULED OUTAGES 7 DAYS PRIOR
TO THE OUTAGE.
LEGEND
EXISTING UNDERGROUND POWER LINE
EXISTING UNDERGROUND TELEPHONE LINE
EXISTING GAS LINE
EXISTING SANITARY SEWER LINE
EXISTING WATER LINE
EXISTING STORM LINE
PROPOSED SANITARY SEWER LINE
PROPOSED WATER LINE
UG/E UG/E
UG/T UG/T
GAS GAS
SS SS
SS SS
W W
W W
1" = 10'
SCALE IN FEET
10 5 10 20
A
M
CU101
NRSNSY
CIVIL UTILITY PLAN
10 10
1" = 10'
SCALE IN FEET
10 5 10 20
UTILITY PLAN - TRAILER RELOCATION - AREA B
SCALE: 1"=10'
UTILITY PLAN - BUILDING EXPANSION - AREA A
SCALE: 1"=10'
SHEET NOTES:
DRAWING REFERENCE:
1) H.H. MCGUIRE VAMC - CONSTRUCT SPINAL CORD
ENHANCEMENT CENTER CIVIL CONSTRUCTION DRAWINGS, DATED
09/11/2017 (VA PROJECT NUMBER 652-314)
NOT TO SCALE
KEY PLAN
AREA A
AREA B
| 01-Gen BD |
| GI002 - FIRST FLOOR LIFE SAFETY |
| GI003 - INFECTION CONTROL RISK ASSESSMENT - (ICRA) |
| GI004 - INTERIM LIFE SAFETY PLAN |
| 02A-Civil BD |
| 02-Civil BD |
| Sheets and Views |
| V-101 SITE SURVEY - AREA A |
| V-102 SITE SURVEY - AREA B |
| 02B-Civil BD |
| CG102 EROSION AND SEDIMENTATION CONTROL PLAN |
| CG201 STORM DRAINAGE PROFILES |
| CG501 STORM DRAINAGE DETAILS (1 OF 2) |
| CG502 STORM DRAINAGE DETAILS (2 OF 2) |
| CG503 EROSION CONTROL DETAILS |
| CU101 CIVIL UTILITY PLAN |
| 03-Struct BD |
| 19-E223-S-001 |
| 19-E223-S-101 |
| 04A-Arch BD |
| AD101 - FIRST FLOOR DEMOLITION PLAN |
| A001 - ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES |
| A002 - PARTITION TYPES AND DETAILS |
| A-101 - FIRST FLOOR PLAN |
| A-102 - ROOF PLAN |
| A-201 - EXTERIOR ELEVATIONS AND BUILDING SECTIONS |
| A-202 - BUILDING SECTIONS |
| A-203 - MRI MAGNETIC SHIELDS |
| A-301 - WALL SECTIONS |
| A-302 - WALL SECTIONS |
| A-401 - ENLARGED FLOOR PLAN LAYOUTS |
| A-501 - EXTERIOR WALL AND COLUMN DETAILS |
| A-601 - DOOR SCHEDULE, TYPES, DETAILS |
| A-701 - WINDOW ELEVATIONS AND DETAILS |
| 05-Interior BD |
| I-001 - FINISH SCHEDULE |
| I-101 - FIRST FLOOR FINISH PLAN |
| I-120 - FIRST FLOOR FLOOR PATTERN PLAN |
| I-130 - FIRST FLOOR WALL PROTECTION PLAN |
| I-131 - WALL PROTECTION DETAILS |
| I-201 - CASEWORK ELEVATIONS |
| I-202 - CASEWORK DETAILS |
| I-203 - INTERIOR ELEVATIONS |
| I-204 - INTERIOR ELEVATIONS |
| I-401 - FIRST FLOOR EQUIPMENT PLAN |
| I-402 - ENLARGED TOILET PLAN |
| I-601 - EQUIPMENT SCHEDULE |
| 06-FP BD |
| FX001 - FIRE PROTECTION GENERAL INFORMATION |
| FX101 - FIRST FLOOR FIRE PROTECTION PLAN - MRI SUTIE |
| 09-Elec BD |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| E-601 - ONE-LINE DIAGRAM |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| E-501 - ELECTRICAL DETAILS |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| E-502 - ELECTRICAL DETAILS |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| E-503 - ELECTRICAL DETAILS |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| E-601 - ONE-LINE DIAGRAM |
| E-601 - ONE-LINE DIAGRAM |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| E-602 - ELECTRICAL SCHEDULES |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
File details come from the government source that posted it. Updated .