36C24621R0021 0002.pdf
PDF 142 KB Posted
- Attached to
- Y1DB--New 4th MRI Addition Project 652-CSI-204
- Solicitation number
- 36C24621R0021
About this file
This document provides responses to questions on a solicitation for a new MRI addition project at a Department of Veterans Affairs medical center. The solicitation seeks a contractor to furnish all labor, materials, equipment, and supervision for a new approximately 2,785 square foot single story addition to house two new MRIs adjacent to an existing MRI suite. The project scope includes site preparation, demolition, building the new addition to match the exterior of the existing facility, and relocating an existing MRI trailer and associated services. Safety rails will be required for roof work and testing is mandated for all contractor employees. Acceptable forms of documentation for guard rounds and communication devices were clarified. The response deadline was not extended. A past performance questionnaire was provided as an attachment for contractors to submit in addition to CPARs reports.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and ame ndment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this am endment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, rema ins unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solic itation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 5
0002 01-07-2021
652-CSI-204
Department of Veterans Affairs
Network Contracting Office 6
1201 Broad Rock Blvd
Richmond VA 23249
Department of Veterans Affairs
Network Contracting Office 6
1201 Broad Rock Blvd
Richmond VA 23249
To all Offerors/Bidders
36C24621R0021
12-22-2021
X
X X
X 1
The purpose for this amendment to the solicitation is to provide responses to several of the RFIs received.
The remaining responses to RFIs submitted timely will be posted to the Contracting Opportunities by next week.
SEE CONTINUATION PAGE AND ATTACHMENTS
NOTE: All Contractors’ personnel, including subcontractors, shall be required to undergo a COVID-19 Screening
Each person is required to complete the Corona Virus Screening upon entering the facility and worksite thereof and/or while on the hospital campus.
Vangie T. Miller
Contracting Officer
CONTINUATION PAGE
Origination
Date
Question Respondent Response
1/5/2021 Safety Railing is currently being installed on most other existing roofs – will safety rails be required on this project?
VA Safety rails are required on the roof.
1/5/2021 Does the SSHO need to be a separate person, or can superintendent also fulfill this roll?
VA The site superintendent may also be the SSHO, however, the superintendent
CANNOT be both the SSHO and Site QC Manager.
1/5/2021 Specification 01 00 00-2 requires unarmed guard after normal working hours. Does this guard have to be DCJS certified employee of a licensed security agency, or can it be a contractor employee?
VA There is no requirement in the specification for the guard to be a DCJS certified employee of a licensed security agency. The guard may be a contractor employee.
1/5/2021 Specification 01 00 00-2 requires contractor to provide guards and police with communication devices as directed. Can this be a cell phone?
VA Cell phones are acceptable.
1/5/2021 Normal two-way radios will not have the power to transmit distances inside the building.
Will the VA provide the contractor with a police radio?
VA The VA will not provide the contractor with a police radio.
1/5/2021 Specification requires the contractor to install equipment for recording guard rounds to ensure systematic checking of the premises. Is this necessary for this solicitation. If so, please provide information on typical acceptable system(s)
VA Contractor is responsible for provide a system of documenting rounds. It is up to the contractor to determine how this is accomplished. Any documentation methodology is acceptable.
1/5/2021 TB Tests – do all contractor and subcontractor employees need to have current TB tests? How recent does the test have to be, if required?
VA Yes, testing is required.
Testing must have been completed within 90 day prior to coming on site. (see specification 01 35 26 paragraph 1.13)
1/5/2021 Who will physically move the
MRI trailer, does this need to be done through Siemens?
VA Relocation of the trailer must be conducted through
Siemens using a
Manufacturer approved company.
1/5/2021 Who does the ancillary work associated with the MRI machine such as camera mounts, blocking for siemens mounts, etc?
VA The construction contractor is responsible for putting in all necessary ancillary work associated with the installation of the MRI
(including but not limited wall blocking, conduits in floors, walls, ceiling, mounting plates, structural supports, and so forth.)
1/5/2021 Will VA flash badging be acceptable for all workers working inside and outside of the hospital? If not what type of badging will be required and what is the lead time of acquiring this badging?
VA VA safety badging, provided when the contract workers get onsite safety training, is sufficient.
1/6/2021 Para 7.3.1, Criteria, line 8, requires projects to “exceed” $1 million. Request requirement be amended to state that “project exceeding $1M may be rated higher”. This change will allow contractors who have completed complex imaging projects, such as MRI, CT, Radiography and
Hybrid OR facilities within a hospital environment but for which the final contract price may be slightly lower than the currently specified $1M threshold to submit those projects to be considered for relevance based on the project complexity and other relevant factors, rather than against a specific dollar threshold. There may be many technically relevant projects completed by contractors that fall slightly under the $1M threshold.
VA/CO VA: I do not have a problem lowering the threshold from $1M to
$500K to get a better picture of the contractor’s experience. CO: All instances in Eval criteria that required $1M Threshold are lowered to $500K.
1/6/2021 Based on limited access to government personnel dictated by COVID restrictions on work hours, a large volume of retirements and reassignments and wide use of MATOC Task
Orders that may not receive individual CPARS reports please allow contractors to submit previously completed PPQ documents.
VA/CO VA: If that wasn’t in the solicitation, I don’t have a problem with adding PPQs so we have a good picture of the contractor’s past performance. CO: PPQ
Form provided as attachment to this amendment. PPQ may be submitted in addition to
CPARS or in lieu of
CPARS, if contractor does not have CPARS reports.
36C24621R0021 0002 Attachments
See attached document: Attachment C - Past Performance Questionnaire.