Part1_S02 Combined Dwgs BD 11-12-20.pdf
PDF 8 MB Posted
- Attached to
- Y1DB--New 4th MRI Addition Project 652-CSI-204
- Solicitation number
- 36C24621R0021
About this file
This document package includes construction drawings and specifications for Project 652-CSI-204, a new fourth MRI addition at the Hunter Holmes McGuire VA Medical Center in Richmond, Virginia. The project scope involves constructing a new single-story 2,785 square foot addition to house two new MRIs adjacent to an existing MRI suite. Interior finishes will match standard facility materials. Relocation of an existing MRI trailer and associated services is included. Work encompasses complete site preparation including demolition and removal of existing structures to provide the building addition. Construction must match the exterior of the existing facility. All labor, materials, supervision and equipment are to be furnished to complete the project in accordance with the drawings, specifications and statement of work.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT LOCATION MAP
PROJECT SITE MAP - AREA A PROJECT SITE MAP - AREA B
/7 /2
:2
:1
A
M
GI001
COVER
1 4RER
NEW 4TH MRI ADDITION
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD.
RICHMOND, VA 23249 OCTOBER 7, 2020
BID DOCUMENTS
652-CSI-20419-088
NEW 4TH MRI ADDITION
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD.
RICHMOND, VA 23249
VA PROJECT #: 652-CSI-204 APOGEE PROJECT #: 19-088
LCW
DRAWING LIST
GENERAL
GI001 COVER 1 4
GI002 FIRST FLOOR LIFE SAFETY 2 4
GI003 INFECTION CONTROL RISK ASSESSMENT - (ICRA) 3 4
GI004 INTERIM LIFE SAFETY PLAN 4 4
SITE SURVEY
V101 SITE SURVEY 1 2
V-102 SITE SURVEY - AREA B 2 2
CIVIL
CD101 CIVIL DEMOLITION PLAN 1 10
CS101 CIVIL SITE PLAN 2 10
CS501 CIVIL DETAILS 3 10
CG101 CIVIL GRADING & DRAINAGE PLAN 4 10
CG102 EROSION AND SEDIMENTATION CONTROL PLAN 5 10
CG201 STORM DRAINAGE PROFILES 6 10
CG501 STORM DRAINAGE DETAILS (1 OF 2) 7 10
CG502 STORM DRAINAGE DETAILS (2 OF 2) 8 10
CG503 EROSION CONTROL DETAILS 9 10
CU101 CIVIL UTILITY PLAN 10 10
STRUCTURAL
S-001 NOTES & SCHEDULES 1 10
S-101 FOUNDATION PLAN 2 10
S-102 SLAB-ON-GRADE PLAN 3 10
S-103 WALL PLAN 4 10
S-104 ROOF PLAN 5 10
S-201 WALL SECTIONS 6 10
S-202 WALL SECTIONS 7 10
S-301 COLUMN/BEAM DETAILS 8 10
S-302 DETAILS 9 10
S-303 DETAILS 10 10
ARCHITECTURAL
AD101 FIRST FLOOR DEMOLITION PLAN 1 35
A001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 2 35
A002 PARTITION TYPES AND DETAILS 3 35
A-101 FIRST FLOOR PLAN 4 35
A-102 ROOF PLAN 5 35
A-110 FIRST FLOOR REFLECTED CEILING PLAN 6 35
A-201 EXTERIOR ELEVATIONS AND BUILDING SECTIONS 7 35
A-202 BUILDING SECTIONS 8 35
A-203 MRI MAGNETIC SHIELDS 9 35
A-301 WALL SECTIONS 10 35
A-302 WALL SECTIONS 11 35
A-401 ENLARGED FLOOR PLAN LAYOUTS 12 35
A-501 EXTERIOR WALL AND COLUMN DETAILS 13 35
A-601 DOOR SCHEDULE, TYPES, DETAILS 14 35
A-701 WINDOW ELEVATIONS AND DETAILS 15 35
QH101 SIEMENS MRI - MAGNETOM VIDA 16 35
QH102 SIEMENS MRI - MAGNETOM VIDA 17 35
QH103 SIEMENS MRI - MAGNETOM VIDA 18 35
QH104 SIEMENS MRI - MAGNETOM VIDA 19 35
QH105 SIEMENS MRI - MAGNETOM VIDA 20 35
QH106 SIEMENS MRI - MAGNETOM VIDA 21 35
QH107 SIEMENS MRI - MAGNETOM VIDA 22 35
QH108 SIEMENS MRI - MAGNETOM VIDA 23 35
QH109 SIEMENS MRI - MAGNETOM VIDA 24 35
QH110 SIEMENS MRI - MAGNETOM VIDA 25 35
QH111 SIEMENS MRI - MAGNETOM SOLA 26 35
QH112 SIEMENS MRI - MAGNETOM SOLA 27 35
QH113 SIEMENS MRI - MAGNETOM SOLA 28 35
QH114 SIEMENS MRI - MAGNETOM SOLA 29 35
QH115 SIEMENS MRI - MAGNETOM SOLA 30 35
QH116 SIEMENS MRI - MAGNETOM SOLA 31 35
QH117 SIEMENS MRI - MAGNETOM SOLA 32 35
QH118 SIEMENS MRI - MAGNETOM SOLA 33 35
QH119 SIEMENS MRI - MAGNETOM SOLA 34 35
QH120 SIEMENS MRI - MAGNETOM SOLA 35 35
INTERIORS
I-001 FINISH SCHEDULE 1 12
I-101 FIRST FLOOR FINISH PLAN 2 12
I-120 FIRST FLOOR FLOOR PATTERN PLAN 3 12
I-130 FIRST FLOOR WALL PROTECTION PLAN 4 12
I-131 WALL PROTECTION DETAILS 5 12
I-201 CASEWORK ELEVATIONS 6 12
I-202 CASEWORK DETAILS 7 12
I-203 INTERIOR ELEVATIONS 8 12
I-204 INTERIOR ELEVATIONS 9 12
I-401 FIRST FLOOR EQUIPMENT PLAN 10 12
I-402 ENLARGED TOILET PLAN 11 12
I-601 EQUIPMENT SCHEDULE 12 12
FIRE PROTECTION
FX001 FIRE PROTECTION GENERAL INFORMATION 1 2
FX101 FIRST FLOOR FIRE PROTECTION PLAN - MRI SUTIE 2 2
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 10
PD101 FIRST FLOOR PLUMBING DEMOLITION PLAN 2 10
PW101 FIRST FLOOR DRAIN, WASTE, AND VENT PLAN - MRI SUITE 3 10
PP101 FIRST FLOOR DOMESTIC WATER PLAN - MRI SUITE 4 10
PP102 FIRST FLOOR PLUMBING PLAN - MOBILE MRI - AREA B 5 10
PP103 ROOF PLUMBING PLAN 6 10
PG101 FIRST FLOOR MEDICAL GAS PLAN - MRI SUITE 7 10
P-501 PLUMBING DETAILS 8 10
P-901 PLUMBING RISERS & STORM DRAINAGE 9 10
P-902 PLUMBING RISERS - MEDICAL GAS 10 10
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 10
MH101 FIRST FLOOR HVAC PLAN - MRI SUITE 2 10
MH102 ROOF HVAC PLAN 3 10
MP101 FIRST FLOOR MECHANICAL PIPING PLAN - MRI SUITE 4 10
MP102 MECHANICAL ROOM PIPING PLAN 5 10
M-501 MECHANICAL DETAILS 6 10
M-502 MECHANICAL DETAILS 7 10
M-503 MECHANICAL CONTROLS 8 10
M-504 MECHANICAL CONTROLS 9 10
M-601 MECHANICAL SCHEDULES 10 10
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 15
E-002 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 2 15
ES101 FIRST FLOOR ELECTRICAL PLAN - OVERALL 3 15
ED101 FIRST FLOOR ELECTRICAL DEMOLITION PLAN 4 15
EP101 FIRST FLOOR ELECTRICAL PLAN - MRI SUITE 5 15
EP102 ROOF POWER PLAN 6 15
EP103 FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI 7 15
EP104 PARTIAL BASEMENT ELECTRICAL PLAN 8 15
EL101 FIRST FLOOR LIGHTING PLAN - MRI SUITE 9 15
E-401 ELECTRICAL RACEWAY PLAN 10 15
E-501 ELECTRICAL DETAILS 11 15
E-502 ELECTRICAL DETAILS 12 15
E-503 ELECTRICAL DETAILS 13 15
E-601 ONE-LINE DIAGRAM 14 15
E-602 ELECTRICAL SCHEDULES 15 15
PROJECT SITE (AREA A)
N
NEW ADDITION
PROJECT SITE (AREA B)
NEW RAMP
MRI TRAILER
N
N
DocuSign Envelope ID: 35F56701-DC70-47B5-A50E-7108A2FACA35
10/8/2020
CG
C G
C G C
G
C G
C G
CG
DN
CG
CG
C G
3 HOUR FIRE/SMOKE SEPARATION
2 HOUR FIRE/SMOKE SEPARATION
1 HOUR FIRE SEPARATION
1 HOUR SMOKE RATED
SMOKE RATED
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
EGRESS IDENTIFICATION
AREA OF REFUGE
HAZARDOUS LOCATION
FIRE EXTINGUISHER BRACKET
FIRE EXTINGUISHER CABINET
FIRE BLANKET CABINET
EMERGENCY RESPONSE REFERENCE
CONTROLLED ACCESS - ALWAYS
UNLOCKED IN DIRECTION OF EGRESS
KNOX BOX
DELAYED EGRESS W/ ALARM
EXISTING BUILDING - NOT IN SCOPE
CA
DE
KB
XXX
XXX
FEB
FEC
FBC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS
CAPACITY
C' C'
2 3
B' B'
A' A'
2.11.4
DRESS
1Y-152
DRESS
1Y-153
TLT
1Y-154
CORRIDOR
C1Y-4
MRI 2
1Y-156
MRI 1
1Y-158
EQUIPMENT
1Y-159
EQUIPMENT
1Y-155
CHANGING RM
1Y-114
IMAGING RM
1Y-115
OFFICE
1Y-126
BREAK RM
1Y-111
IV PREP
1Y-110
FEMALE TOILET
1Y-109
MALE TOILET
1Y-108
OFFICE
1Y-106
CORRIDOR
C1Y-1
MECH/ELEC
1Y-113
CHANGING RM
1Y-112
STATION
1Y-114A
CONTROL RM
1Y-131
MAGNET RM
1Y-129
TEACHING LAB-1
1Y-128
RADIOLOGIST
1Y-127
DRESSING RM
1Y-123MAMMOGRAPHY
1Y-122
STAFF
1Y-118
SECRETARY CATH
LAB
1Y-117
HOUSEKEEPING
1Y-116
OFFICE
1Y-120
CORRIDOR
C1Y-3
SECRETARY
1Y-124
CORRIDOR
C1Y-3SINK
1Y-121
CORRIDOR
C1G-19
CARDIOLOGY
STORAGE RM
1Y-125
MECHANICAL
1Y-133
MRI READING RM
1Y-103
RECEPTION
1Y-101
OFFICE
1Y-102
WAITING
1Y-100
FILM VIEWING
1G-231
EQUIPMENT RM
1Y-132
MRI READING RM
1Y-103
RECEPTION
1Y-101
OFFICE
1Y-102
WAITING
1Y-100
FILM VIEWING
1G-231
CATH LAB
1G-230
CORRIDOR
C1G-229
CONTROL RM
1G-232
EQUIPMENT RM
1G-233
EXIT DISTANCE 92'-0"
EXIT DISTANCE 227'-0"
EXIT DISTANCE 84'-7"
(277 S.F.)
(503 S.F.)
(460 S.F.)
(160 S.F.)
(185 S.F.)
(168 S.F.)
CONTROL
ROOM
1Y-151D
(51 S.F.)
(55 S.F.)
(53 S.F.)
PREP
1Y-151
BAY 1
1Y-151A
BAY 2
1Y-151B
BAY 3
1Y-151C
STORAGE
1Y-150 (40 S.F.)
(120 S.F.)
(95 S.F.)
(46 S.F.)
(44 S.F.)
RECLINER
BED
RECLINER
IT ROOM
1Y-107
CAPACITYCLR
EXTERIOR
EXIT
44" 220
EXISTING WALL
NEW WALL
DEMOLISHED WALL
8. APPLICABLE CODES - DEPARTMENT OF VETERANS AFFAIRS
TABLE 102. 10: CODES REFERENCE GUIDE
OCCUPANCY CLASSIFICATION
BUILDING CONSTRUCTION TYPES INCLUDING ALLOWABLE HEIGHT,
ALLOWABLE BUILDING AREAS, AND REQUIREMENTS FOR THE
SPRINKLER PROTECTION RELATED TO MINIMUM BUILDING CONSTRUCTION TYPES
MEANS OF EGRESS
STANDPIPES
INTERIOR FINISH
HVAC SYSTEMS
VERTICAL OPENINGS
SPRINKLER SYSTEMS MINIMUM CONSTRUCTION STANDARDS
FIRE ALARM SYSTEMS
SMOKE ALARM AND SMOKE DETECTION SYSTEMS
PORTABLE FIRE EXTINGUISHERS
COOKING EQUIPMENT
FUEL FIRE APPLIANCES
LIQUID PETROLEUM GAS
COMPRESSED NATURAL GAS
PRIMARY
LSC
IBC
LSC
IBC
LSC
IMC
LSC
LSC
LSC
IFC
LSC & NFPA
IFGC
NFPA 58
NFPA 52
SECONDARY
IBC
LSC
NONE
IFC
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NFPA 54
NFPA 54 & IFGC
NONE
MRI ADDITION
1. OCCUPANCY CLASSIFICATION
(SMOKE COMPARTMENTS)
IBC 2018 6 INSTITUTIONAL I-2
2012 NFPA 1010 LIFE SAFETY CHAPTER 19 - EXISTING HEALTHCARE
2. CONSTRUCTION TYPE
IBC 2018 2018 NFPA 101 LIFE SAFETY
SECTION 601 TABLE A.7.2.1 (7.2.1)
TYPE: I-A I(332)
3. FIRE SPRINKLERS (S1)
IBC 2018 2018 NFPA LIFE SAFETY
EXISTING BUILDING IS SPRINKLERED
5. OCCUPANCY LOAD
NOTES:
1. CALCULATIONS ARE
PER NFPA TBL. 7.3.1.2
BUSINESS OCCUPANCY
(PRINCIPAL INTENDED USE)
AREA / FACTOR = OCCUPANTS
TOTAL
OCCUPANCY
VA MRI
TOTAL
2,785 SF 240/SF
6. EGRESS REQUIREMENTS
PER NFPA 101 TABLE 7.3.3.1
LEVEL COMPONENT .2" PER
OCCUPANT
STAIR COMPONENT .3" PER
OCCUPANT
MIN ACTUAL MIN ACTUAL
VA MRI
2.4" / CH. 19 36"
NUMBER OF EXITS
MIN ACTUAL
VA MRI
1 1
7. TRAVEL DISTANCE
NOTES:
1. PER NFPA 101 TABLE A7.6.1.
2. PER NFPA 101 TABLE A7.6.1. NO DEAD END CORRIDORS CAN EXCEED 50'
TRAVEL DISTANCE LIMIT
NFPA 101 TABLE A7.6.1
200 FT.
ACTUAL
> <92'-7" FT.
4. HEIGHT / AREA LIMITATIONS - EXISTING PER IBC 2018 TABLE 503
MAX ALLOWABLE AREA
(TABLE 503)
ACTUAL AREAAREA:
VA MRI
UL
ULHEIGTH IN FEET
HEIGHT IN STORIES
MAX ALLOWABEL AREA
(TABLE 503)
ACTUAL BUILDING
HEIGHT
LIFE SAFETY CODE
INTERNATIONAL BUILDING CODE
AMERICAN DISABILITIES ACT
INTERNATIONAL MECHANICAL CODE
INTERNATIONAL GAS CODE
NATIONAL ELECTRIC CODE; NFPA 70
INTERNATIONAL FIRE PROTECTION CODE
INTERNATIONAL FUEL GAS CODE
INTERNATIONAL ENERGY CONSERVATION CODE
INTERNATIONAL PLUMBING CODE
VA FIRE PROTECTION DESIGN MANUAL
NFPA 101, 2018 EDITION
2018 EDITION, WITH STATE AMENDMENTS
2010 WITH REVISED STANDARDS
2015 EDITION, WITH STATE AMENDMENTS
2012 EDITION, WITH STATE AMENDMENTS
2020 EDITION, WITH NO STATE AMENDMENTS
2012 EDITION, WITH NO STATE AMENDMENTS
2012 EDITION, WITH STATE AMENDMENTS
2015 EDITION, WITH STATE AMENDMENTS
2012 EDITION, WITH STATE AMENDMENTS
2015, 7TH EDITION, DECEMBER
2,785 SF
18'-8"
2,785 SF
44" N/A
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/7 /2
:5
:0
A
M
GI002
FIRST FLOOR LIFE SAFETY
2 4RER
NEW 4TH MRI ADDITION
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD.
RICHMOND, VA 23249 OCTOBER 7, 2020
BID DOCUMENTS
652-CSI-20419-088
LCW
PROPOSED USE:
OWNED BY: FEDERAL
CODE ENFORCEMENT JURISDICTION: CITY
COUNTY
APPLICABLE CODES:
GENERAL CODE INFORMATION:
NEW CONSTRUCTION
RENOVATION (EXISTING BUILDING)
CONSTRUCTION TYPE:
MIXED CONSTRUCTION
SPRINKLERED
MEZZANINE
MIXED OCCUPANCY
PRIMARY OCCUPANCY:
SECONDARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
Relevant Code Goes Here
Relevant Code Goes Here
Relevant Code Goes Here
Relevant Code Goes Here
20XX International Building Code 20XX Energy Code 20XX Mechanical Code 20XX Fire Code 20XX Electrical Code
20XX ADA Code Relevant Code Goes Here
Relevant Code Goes Here
NEW 4TH MRI ADDITION
HUNTER HOLMES MCGUIRE
VAMC
1201 BROAD ROCK BLVD.
RICHMOND, VA 23249CLIENT NAME HERE
CODE INFORMATION
0 4 8 16
NORTH
PLAN
LIFE SAFETY LEGEND
Scale: 1/8" = 1'-0"
FIRST FLOOR LIFE SAFETY PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
WALL LEGEND
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V .I
.F
V .I
.F
V.I.F.
V .I .F
E X
IS
T
IN
G
W A
L L
V .I .F
E X
IS
T
IN
G
W A
L L
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
IG
H
T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
3 5/8" INSULATED WALL
WITH 16 GAUGE METAL
STUDS @ 16" O.C. WALL
TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT
GYPSUM BOARD
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S
F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
5"
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
5"
3 5/8" 16 GAUGE METAL
STUDS @ 16" O.C. WALL TO
EXTEND TO UNDERSIDE OF
CEILING
A B
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. (2) LAYERS 5/8"
GYPSUM BOARD EACH SIDE.
WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
6"
C
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
SMOKE RATED 2-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
RENOVATION EXISTING
5/8" EXTERIOR
GYPSUM
SHEATHING
INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE
MRI ADDITION PROJECT
• THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA
• PLEASE USE ALTERNATE EXITS AS MARKED
1'-5"
ICRA, ILSM, FIRE WATCH AND
MISC. FORMS
PAPER
CADDY
A P
P R
O X
A .F
.F
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
SUPPLY DUCTS
EITHER KEEP
RUNNING OR COVER
WHEN RUNNING TO
KEEP DUST OUT
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
F L E
X D
U C
T
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL
STATION WITH
AUDIO / VISUAL
NEW ICRA WALL, TYPE "A"
STAFF RM
1Y-110
CORRIDOR
C1Y-1
ICRA PARTITION
TYPE "A"
A
A 1'-2"
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7 /2
:5
:0
A
M
GI003
INFECTION CONTROL RISK
ASSESSMENT - (ICRA)
3 4RER
NEW 4TH MRI ADDITION
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD.
RICHMOND, VA 23249 OCTOBER 7, 2020
BID DOCUMENTS
652-CSI-20419-088
LCW
Scale: 1/2" = 1'-0"
CROSS SECTION 'A'
Scale: 1/2" = 1'-0"
MOBILE CONTAINMENT CART
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPES
Scale: 6" = 1'-0"
ILSM SIGNAGE
Scale: 1/2" = 1'-0"
ROOM ELEVATION
Scale: 1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
GENERAL
A. ALL APPLICABLE PERMITS AND COR APPROVALS
SHALL BE COMPLETED PRIOR TO BEGINNING ANY
WORK FOR EACH PHASE. PERMITS INCLUDE: ICRA,
ILSM, ABOVE CEILING FIRE/SMOKE WALL, UTILITY,
FIRE ALARM SYSTEM, MEDICAL GASES, AND
CONFINED SPACES.
B. WORK REQUIRED BY INFECTION CONTROL SHALL
BE PERFORMED FOR EACH PHASE OF THE
PROJECT.
C. CONTRACTOR SHALL EXHAUST ALL AIR FROM
SPACES WHERE WORK IS BEING PREFORMED
DIRECTLY TO THE EXTERIOR OF THE BUILDING.
ENSURE EXHAUST POINTS ARE LOCATED AWAY
FROM INTAKE POINTS FOR THE BUILDING. EXHAUST
LOCATIONS TO BE APPROVED BY COR.
0 2 4 8
NORTH
PLAN
1 AREA OF WORK
2 PROVIDE TEMPORARY PROTECTIVE PLASTIC
BARRIER WITH ZIPPER ENTRY CONSTRUCTION
ACCESS TO UNDERSIDE OF FINISH CEILING.
3 FOR WALL REPAIR OR EXTENSION WORK ABOVE
CEILING, EXTEND BARRIER TO THE UNDERSIDE
OF FLOOR DECK ABOVE WITHIN THE AREA OF
WORK .
4 PROVIDE STICKY MAT AT ZIPPER ENTRY
CONSTRUCTION ACCESS POINT.
5 USE PORTABLE DUST EXTRACTOR AND AIR
SCRUBBER WITH HEPA FILTRATION SYSTEM, IN
ADDITION TO MAINTAINING NEGATIVE PRESSURE
IN CONSTRUCTION AREA.
6 PERFORM WORK REQUIRED BY VA CONTROL
PERSONNEL REGARDING ICRA FORM. SEE PCRA
FORM FOR REQUIREMENTS. ALL PCRA AND ILSM
WORK ITEMS MUST BE COMPLETED PRIOR TO
BEGINNING ANY NEW CONSTRUCTION WORK OR
DEMOLITION.
7 ALL APPLICABLE PERMITS BE COMPLETED AND
APPROVED PRIOR TO BEGINNING WORK ON
STATION.
8 PROVIDE TEMPORARY BALL-IN-TUBE OR
ELECTRICAL MONITORS WITH GAUGES AND
ALARMS TO MONITOR NEGATIVE PRESSURE
WITHIN CONSTRUCTION AREA. COORDINATE
WITH VA COR ON LOCATION PRIOR TO
INSTALLATION.
ICRA KEY NOTES#
Scale: 1/4" = 1'-0"
FIRST FLOOR ICRA PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
FC
76. 0000
DN
C'
2 3
B'
A'
2.11.4
DRESS
1Y-152
DRESS
1Y-153
TLT
1Y-154
CORRIDOR
C1Y-4
MRI 2
1Y-156
MRI 1
1Y-158
EQUIPMENT
1Y-159
EQUIPMENT
1Y-155
CHANGING RM
1Y-114
IMAGING RM
1Y-115
OFFICE
1Y-126
BREAK RM
1Y-111
IV PREP
1Y-110
FEMALE TOILET
1Y-109
MALE TOILET
1Y-108
OFFICE
1Y-106
CORRIDOR
C1Y-1
MECH/ELEC
1Y-113
CHANGING RM
1Y-112
STATION
1Y-114A
CONTROL RM
1Y-131
MAGNET RM
1Y-129
TEACHING LAB-1
1Y-128
RADIOLOGIST
1Y-127
DRESSING RM
1Y-123MAMMOGRAPHY
1Y-122
STAFF
1Y-118
SECRETARY CATH
LAB
1Y-117
HOUSEKEEPING
1Y-116
OFFICE
1Y-120
CORRIDOR
C1Y-3
SECRETARY
1Y-124
CORRIDOR
C1Y-3SINK
1Y-121
CORRIDOR
C1G-19
CARDIOLOGY
STORAGE RM
1Y-125
MECHANICAL
1Y-133
MRI READING RM
1Y-103
RECEPTION
1Y-101
OFFICE
1Y-102
WAITING
1Y-100
FILM VIEWING
1G-231
EQUIPMENT RM
1Y-132
MRI READING RM
1Y-103
RECEPTION
1Y-101
OFFICE
1Y-102
WAITING
1Y-100
FILM VIEWING
1G-231
CATH LAB
1G-230
CORRIDOR
C1G-229
CONTROL RM
1G-232
EQUIPMENT RM
1G-233
E X
IT
D
IS
T
A N
C E
E X
IT
D
IS
T
A N
C E
(277 S.F.)
(503 S.F.)
(460 S.F.)
(160 S.F.)
(185 S.F.)
(168 S.F.)
CONTROL
ROOM
1Y-151D
(51 S.F.)
(55 S.F.)
(53 S.F.)
PREP
1Y-151
BAY 1
1Y-151A
BAY 2
1Y-151B
BAY 3
1Y-151C
STORAGE
1Y-150 (40 S.F.)
(120 S.F.)
(95 S.F.)
(46 S.F.)
(44 S.F.)
RECLINER
IT ROOM
1Y-107
TEMPORARY CONSTRUCTION
WALL @ WINDOW
/2
5'-0" 6'-5"
5'-6"
5'-0"±
EXISTING SIDEWALK
EXISTING SIDEWALK
GI003
ICRA PARTITION WALL
DURING CONSTRUCTION
NEW SIDEWALK AND
CONSTRUCTION
FENCE - COORDINATE
WITH CIVIL SHEETS
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/7 /2
:5
:0
A
M
GI004
INTERIM LIFE SAFETY PLAN
4 4RER
NEW 4TH MRI ADDITION
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD.
RICHMOND, VA 23249 OCTOBER 7, 2020
BID DOCUMENTS
652-CSI-20419-088
LCW
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
INTERIM LIFE SAFETY PLAN 0 4 8 16
NORTH
PLAN
& PLANNERS
W E
S
N
TEPHENSON,S P.C.
LAND SURVEYORS
J
ENNING
& PLANNERS
W E
S
N
TEPHENSON,S P.C.
LAND SURVEYORS
J
ENNING
E
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
NEW 4TH MRI ADDITION
652-GSI-204
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
19-088
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.fg-inc.net
BID DOCUMENTS
#500
OCTOBER 7, 2020
A
M
V-101
NRSNSY
SITE SURVEY - AREA A
1 2
NOT TO SCALE
KEY PLAN
AREA A
AREA B
DocuSign Envelope ID: D8F2CD59-3E32-4621-AF1A-6C893039CB12
10/7/2020
& PLANNERS
W E
S
N
TEPHENSON,S P.C.
LAND SURVEYORS
J
ENNING
E
& PLANNERS
W E
S
N
TEPHENSON,S P.C.
LAND SURVEYORS
J
ENNING
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
NEW 4TH MRI ADDITION
652-GSI-204
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
19-088
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.fg-inc.net
BID DOCUMENTS
#500
OCTOBER 7, 2020
A
M
V-102
NRSNSY
SITE SURVEY - AREA B
2 2
NOT TO SCALE
KEY PLAN
AREA A
AREA B
SS
SS
UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
SS
SS
SS
SS
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC
WWWW
W
W
W
W
W
W
W
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
I
N
V
R
C
P
24" OR 27" RCP
TOP= 197.29'
F/L= 179.65'
SIZE N/A
DRAIN MH
TOP = 196.61'
INV. 180.64'
(DIR. ONLY)
INV. 189.67'
(DIR. ONLY)
STACKED PIPE
INV. = 182.44'
INV. = 179.6'
DIRECTION
ONLY
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLODLODLODLODLODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLODLODLODLODLODLODLODLODLO
D
LO
D
LODLODLODLODLODLOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD LOD
LO
D
LOD LOD
LO
D LOD LOD LOD
LOD
LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
SS
SS
SS
SS
SS
EXISTING MRI TRAILER
(TO BE RELOCATED)
FOUNDATIONS TO BE
REMOVED
EXISTING FENCE
(TO BE REMOVED)
PORTION OF EXISTING CONCRETE SIDEWALK
(TO BE REMOVED)
PORTION OF EXISTING
CONCRETE SIDEWALK
(TO BE REMOVED)
EXISTING UNDERGROUND
POWER LINE
(TO BE REMOVED)
EXISTING CONCRETE SIDEWALK
(TO REMAIN)
EXISTING SIGN AND POLE
(TO REMAIN, TYP.)
EXISTING FUEL TANKS
(TO REMAIN, TYP.)
EXISTING GENERATOR AND CONCRETE PAD
(TO REMAIN, TYP.)
EXISTING ASPHALT
(TO REMAIN, TYP.)
APPROXIMATE LOCATION OF
EXISTING 3/4" WATER MAIN
(TO BE REMOVED)
APPROXIMATE LOCATION OF
EXISTING 3" SEWER SERVICE LINE.
(TO BE REMOVED AND REPLACED)
SANITARY SEWER
CLEANOUT
(TO BE REMOVED)
EXISTING WATER VALVE
(TO BE REMOVED)
APPROXIMATE LOCATION OF EXISTING
8" SEWER LINE. SEWER LINE TO
REMAIN. CONTRACTOR TO POTHOLE
AND DETERMINE EXACT LOCATION AND
DEPTH PRIOR TO DEMOLITION OR NEW
CONSTRUCTION. EXISTING SEWER LINE
TO REMAIN IN SERVICE AT ALL TIMES
THROUGHOUT CONSTRUCTION.
EXISTING ELECTRICAL EQUIPMENT
(TO BE REMOVED, SEE ELECTRICAL PLANS FOR DETAILS)
APPROXIMATE LOCATION OF STORM
DRAINAGE PIPE (TO REMAIN).
CONTRACTOR TO POTHOLE AND DETERMINE
EXACT LOCATION AND DEPTH PRIOR TO
CONNECTING PROPOSED STORM SYSTEM
AND INSTALLING BUILDING FOUNDATIONS
APPROXIMATE LOCATION OF EXISTING
SANITARY SEWER MANHOLE
(TO REMAIN)
APPROXIMATE LOCATION OF EXISTING 8"
SANITARY SEWER MAIN (TO REMAIN).
CONTRACTOR TO POTHOLE AND VERIFY
EXACT LOCATION AND DEPTH PRIOR TO
DEMOLITION OR NEW CONSTRUCTION.
EXISTING FIRE HYDRANT
(TO REMAIN)
EXISTING WOOD DECK,
RAMP AND STAIRS
(TO BE REMOVED)
EXISTING CONCRETE
(TO REMAIN)
APPROXIMATE LOCATION OF EXISTING 8" SANITARY
SEWER MAIN (TO REMAIN). SEWER MAIN APPEARS
TO RUN UNDERNEATH EXISTING BUILDING.
CONTRACTOR TO POTHOLE AND VERIFY EXACT
LOCATION AND DEPTH PRIOR TO DEMOLITION OR
NEW CONSTRUCTION.
APPROXIMATE LOCATION OF
EXISTING STORM STRUCTURE.
STRUCTURE NOT FOUND IN FIELD
AND IS LIKELY PAVED OVER
EXISTING SANITARY
SEWER MANHOLE
(TO REMAIN, TYP.)
CONTRACTOR TO PROVIDE PERMANENT
PROTECTION FOR EXISTING WINDOWS
FOR DURATION OF CONSTRUCTION (TYP.)
EXISTING STORM STRUCTURE
(TO REMAIN, TYP.)
CONSTRUCTION LAYDOWN
AREA
SS
SS
SS
SS
SS
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
SS
SS
SS
SS
SS
SSSSSSSSSSSSSS
SS
SS SS
SS
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LODLOD
LO
D
LO
D
LO
D
LO
DLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
EXISTING UNDERGROUND
POWER LINE
(TO REMAIN)
EXISTING SANITARY SEWER
LINE AND MANHOLE
(TO REMAIN, TYP.)
EXISTING 12" WATER MAIN
(TO BE RELOCATED AND
ABANDONED BY OTHERS, AS
PART OF SCI ADDITION PROJECT)
EXISTING MEDICAL TRAILER
(TO BE REMOVED)
EXISTING CONCRETE PAD
(TO REMAIN)
EXISTING ASPHALT
(TO REMAIN)
EXISTING OVERHANG
(TO BE REMOVED)
EXISTING UNDERGROUND
POWER LINE
(TO REMAIN, TYP.)
EXISTING STORM LINE
(TO BE RELOCATED
AND ABANDONED BY
OTHERS, AS PART OF
SCI ADDITION
PROJECT)
EXISTING TREE
(TO REMAIN, TYP.)
EXISTING STORM
STRUCTURE
(TO REMAIN, TYP.)
EXISTING TREE
(TO BE REMOVED)
EXISTING CONCRETE
(TO BE SAWCUT AND
REMOVED FOR UTILITY
INSTALLATION)
EXISTING SANITARY SEWER MAIN
(TO BE RELOCATED AND
ABANDONED BY OTHERS, AS
PART OF SCI ADDITION PROJECT)
PORTION OF
EXISTING CONCRETE
(TO BE SAWCUT AND
REMOVED)
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
NEW 4TH MRI ADDITION
652-GSI-204
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
19-088
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.fg-inc.net
BID DOCUMENTS
#500
OCTOBER 7, 2020
1" = 10'
SCALE IN FEET
10 5 10 20
A
M
CD101
NRSNSY
CIVIL DEMOLITION PLAN
1 10
LEGEND
FENCE AND WOOD DECK DEMOLITION
CONCRETE DEMOLITION
TRAILER RELOCATION
UTILITY DEMOLITION / ABANDON IN PLACE
EXISTING CONTOURS
EXISTING SANITARY SEWER LINE TO
REMAIN
EXISTING WATER LINE
EXISTING STORM LINE
LIMITS OF DISTURBANCE
EXISTING TREE TO BE REMOVED
XXXX
1) UNLESS OTHERWISE NOTED, ALL EXISTING BUILDINGS,
PAVEMENTS, UTILITIES, AND ELEVATIONS SHOWN ON THESE
PLANS ARE FROM THE PARTIAL TOPOGRAPHIC AND UTILITY
SURVEY PERFORMED BY JENNING STEPHENSON P.C.S, DATED
NOVEMBER 4, 2019.
2) ALL NEW WORK SHOWN IN THESE SHEETS SHALL COMPLY
WITH APPLICABLE STATE, FEDERAL, AND LOCAL BUILDING AND
UTILITY INSTALLATION CODES.
3) ALL WORK ON-SITE SHALL BE CONSTRUCTED IN STRICT
ACCORDANCE WITH, AND CONFORM TO, THE PROJECT
SPECIFICATIONS.
4) THERE MAY BE ADDITIONAL UTILITIES NOT SHOWN ON THESE
PLANS. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR
LOCATIONS SHOWN, AND IT SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR TO FIELD VERIFY THE LOCATIONS OF ALL
UTILITIES WITHIN THE LIMITS OF CONSTRUCTION AND TO NOTIFY
THE OWNER IN CASE OF DISCREPANCIES THAT AFFECT THE
CONSTRUCTION PROJECT.
5) CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE THAT MAY
OCCUR TO ANY ADJACENT STRUCTURES OR PROPERTY, OR ANY
EXISTING STRUCTURES WITHIN LIMITS OF CONSTRUCTION THAT
ARE DESIGNATED ON THE PLANS TO REMAIN, AND SHALL REPAIR
OR REPLACE SUCH DAMAGED PROPERTY TO THE VA'S
SATISFACTION AT NO COST TO THE VA.
6) THE CONTRACTOR SHALL NOT DEVIATE FROM THESE PLANS
AND SPECIFICATIONS WITHOUT THE PRIOR WRITTEN CONSENT OF
THE ENGINEER.
7) CONTRACTOR IS RESPONSIBLE FOR CONTACTING VETERANS
AFFAIRS AND ALL EXISTING UTILITY PROVIDERS BEFORE
REMOVING ANY/ALL UTILITIES FROM THEIR EXISTING LOCATION
ON THE SITE. THE CONTRACTOR SHALL PERFORM ALL UTILITY
DEMOLITION OR RELOCATION ACTIVITIES IN ACCORDANCE WITH
THE EXISTING UTILITIES SPECIFICATIONS, MATERIALS, AND
REQUIREMENTS.
8) THE CONTRACTOR SHALL SEQUENCE THE WORK AND
PROVIDE TEMPORARY MEASURES AS NECESSARY TO MAINTAIN
ACCESS TO THE SITE THROUGH ALL ENTRANCES AT ALL TIMES
DURING CONSTRUCTION. TEMPORARY PROVISIONS MAY INCLUDE,
BUT ARE NOT LIMITED TO: BARRICADES, FLASHING LIGHTS,
FLAGMAN, TEMPORARY PAVEMENT, AND DIRECTIONAL SIGNAGE
AS NECESSARY TO ACCOMPLISH THE WORK.
9) CONTRACTOR SHALL CONSIDER COORDINATION ASPECTS OF
CRANES AND CONSTRUCTION EQUIPMENT OPERATIONS DURING
DEMOLITION ACTIVITY.
10) ALL BUFFERS AND TREE SAVE AREAS SHALL BE CLEARLY
IDENTIFIED BY FLAGGING AND/OR FENCING PRIOR TO
COMMENCEMENT OF ANY LAND DISTURBANCE.
11) THE CONTRACTOR SHALL DISPOSE OF ANY HAZARDOUS
MATERIALS IN STRICT ACCORDANCE WITH ALL APPLICABLE
LOCAL, STATE, AND FEDERAL LAWS.
12) ALL ITEMS DESIGNATED FOR REMOVAL SHALL BE LEGALLY
DISPOSED OF, OFF SITE.
DEMOLITION PLAN - TRAILER RELOCATION - AREA B
SCALE: 1"=10'
DEMOLITION PLAN - BUILDING EXPANSION - AREA A
SCALE: 1"=10'
1" = 10'
SCALE IN FEET
10 5 10 20
LOD LOD
SHEET NOTES:
W W
SS SS
DRAWING REFERENCE:
1) H.H. MCGUIRE VAMC - CONSTRUCT SPINAL CORD
ENHANCEMENT CENTER CIVIL CONSTRUCTION DRAWINGS, DATED
09/11/2017 (VA PROJECT NUMBER 652-314)
NOT TO SCALE
KEY PLAN
AREA A
AREA B
NEW MRI ADDITION
FFE= 199.01
5'5.47'
7.02'
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLODLODLODLODLODLODLODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLODLODLODLODLODLODLOD
LOD
LOD
LODLODLODLODLODLODLOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD LOD
LOD
LOD LOD
LOD LOD LOD LOD
LOD
LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
5'
5'
EXISTING BUILDING
FFE = 199.01
PROPOSED CONCRETE
SIDEWALK TO TIE INTO
EXISTING (TYP.)
PROPOSED 5' WIDE CONCRETE SIDEWALK
(SEE DETAIL ON SHEET CS501)
EXISTING GENERATOR
AND CONCRETE PAD
EXISTING BUILDING
FFE = 199.01
PROPOSED CONCRETE PAD FOR CHILLER
(SEE MECHANICAL AND STRUCTURAL
PLANS FOR DETAILS)
PROPOSED CONCRETE PAD FOR CHILLER
(SEE MECHANICAL AND STRUCTURAL
PLANS FOR DETAILS)
PROPOSED CONCRETE PAD FOR
CONDENSATE UNIT
(SEE MECHANICAL AND
STRUCTURAL PLANS FOR DETAILS)
PROPOSED CONCRETE
SIDEWALK TO TIE INTO EXISTING
CONTRACTOR TO INSTALL
PROPOSED SIDEWALK AROUND
WEST AND NORTH SIDES OF
PROPOSED EXPANSION PRIOR TO
INSTALLING CONSTRUCTION
FENCING AND BEGINNING ANY
OTHER CONSTRUCTION WORK
PROPOSED TEMPORARY
CONSTRUCTION FENCING
(TYP.)
EGRESS PATH FROM EXISTING DOOR
TO BE MAINTAINED AT ALL TIMES
THROUGHOUT CONSTRUCTION
CONSTRUCTION LAYDOWN
AREA
PROPOSED CANOPY
(SEE ARCHITECTURAL FOR DETAILS)
RELOCATED MRI TRAILER
FFE= 202.61
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
PROPOSED LOCATION FOR
RELOCATED MRI TRAILER
EXISTING
CONCRETE PAD
PROPOSED TEMPORARY
CONSTRUCTION FENCING
(TYP.)
PROPOSED CONCRETE PAD TO BE
EXPANDED FOR RELOCATED MRI TRAILER
PROPOSED PRE-FABRICATED
METAL HANDICAP RAMP
(SEE CS501 FOR DETAILS)
CONTRACTOR TO INSTALL PROPOSED
CONCRETE PAD PRIOR TO INSTALLING
CONSTRUCTION FENCING AND
BEGINNING ANY DEMOLITION OR
OTHER CONSTRUCTION WORK
PROPOSED CONCRETE
TO TIE INTO EXISTING
(TYP.)
EGRESS PATH FROM EXISTING DOOR
TO BE MAINTAINED AT ALL TIMES
THROUGHOUT CONSTRUCTION
PROPOSED CONCRETE
(TYP.)
PROPOSED PRE-FABRICATED METAL STAIRS
PROPOSED CONCRETE PATCH FOR
UTILITY INSTALLATION
(SEE DETAIL ON SHEET CS501, TYP.)
PROPOSED CONCRETE SIDEWALK
(BY OTHERS, AS PART OF SCI
ADDITION PROJECT)
PROPOSED CONCRETE PATCH FOR UTILITY INSTALLATION
(SEE DETAIL ON SHEET CS501, TYP.)
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
NEW 4TH MRI ADDITION
652-GSI-204
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
19-088
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.fg-inc.net
BID DOCUMENTS
#500
OCTOBER 7, 2020
A
M
CS101
NRSNSY
CIVIL SITE PLAN
2 10
SITE PLAN - TRAILER RELOCATION - AREA B
SCALE: 1"=10'
SITE PLAN - BUILDING EXPANSION - AREA A
SCALE: 1"=10'
1) ALL PROPOSED DIMENSIONS USED TO SHOW THE
GEOMETRIC LAYOUT OF THE PROPOSED STRUCTURE LOCATION
ARE GIVEN AT THE OUTSIDE FACE OF THE STRUCTURE CORNERS.
2) CONTRACTOR SHALL NOTIFY ENGINEER OF ANY
DISCREPANCIES BETWEEN THE EXISTING CONDITIONS IN THE
FIELD AND THE SURVEY SHOWN ON THE PLANS BEFORE
PROCEEDING WITH ANY NEW CONSTRUCTION.
3) CONTRACTOR IS RESPONSIBLE FOR CORRECT HORIZONTAL
AND VERTICAL ALIGNMENT OF ALL TIES BETWEEN PROPOSED
AND EXISTING PAVEMENTS, CURB AND GUTTER, SIDEWALKS,
WALLS, AND UTILITIES.
4) SEE MEP PLANS FOR MECHANICAL DIMENSIONS, DOOR
LOCATIONS, SITE LIGHTING PLAN, AND OTHER ARCHITECTURAL
DETAILS.
5) MAXIMUM CUT OR FILL SLOPE=4H:IV
6) IN ALL AREAS OF FILL OR OTHERWISE DISTURBANCE OF
EXISTING CONDITIONS, UNLESS OTHERWISE NOTED, THE
CONTRACTOR SHALL FULLY AND COMPLETELY REMOVE AND
LEGALLY DISPOSE OFF-SITE, ALL PLANT MATERIALS INCLUDING
BUT NOT LIMITED TO ROOT SYSTEMS, CONCRETE, REINFORCED
CONCRETE, ASPHALT DEBRIS, UNDERBRUSH, TOPSOIL, AND
OTHER DELETERIOUS MATERIAL. THE SUBGRADE TO REMAIN
SHALL BE COMPACTED TO 98% STANDARD PROCTOR MAXIMUM
DRY DENSITY FOLLOWING FULL REMOVAL OF THESE MATERIALS.
7) CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION
AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROLS
DURING CONSTRUCTION FOR PROTECTION OF ADJACENT
ROADWAYS.
8) PROPOSED PHASING FOR MAINTAINING EGRESS:
A. CONSTRUCTION NEW SIDEWALK ON WEST AND NORTH SIDES
OF PROPOSED BUILDING EXPANSION.
B. INSTALL TEMPORARY CONSTRUCTION FENCING.
C. BEGIN REST OF CONSTRUCTION ACTIVITIES.
1" = 10'
SCALE IN FEET
10 5 10 20
NOT TO SCALE
KEY PLAN
AREA A
AREA B
1" = 10'
SCALE IN FEET
10 5 10 20
SHEET NOTES:
LEGEND
CONCRETE SIDEWALK PAVING
TEMPORARY CONSTRUCTION FENCE
PROPOSED LIMITS OF DISTURBANCE
LOD LOD
DRAWING REFERENCE:
1) H.H. MCGUIRE VAMC - CONSTRUCT SPINAL CORD
ENHANCEMENT CENTER CIVIL CONSTRUCTION DRAWINGS, DATED
09/11/2017 (VA PROJECT NUMBER 652-314)
RELOCATED MRI TRAILER
FFE= 202.61
M
A X
S
L O
P E
M
O
P E
M
O
P E
27' RAMP
21.68'
35' RAMP
6' LANDING
1:67 MAX SLOPE
35' RAMP
6' LANDING
1:67 MAX SLOPE
6'
199.79
199.79
199.79
199.79
199.79
201.35
201.35
201.35
201.35
201.35
202.56
202.56
202.56
202.56
198.17
198.14
198.24
198.22
NOTE:
SEE SECTION 32 31 14 METAL
LANDINGS AND RAMPS FOR
SPECIFICATI0NS.
RAMP
1:20 MAX
SLOPE
RAMP
1:20 MAX
SLOPE
RAMP
1:20 MAX
SLOPE
HANDRAILS ON BOTH
SIDES OF STEPS
(TYP.)
HANDRAILS ON BOTH
SIDES OF RAMP
(TYP.)
198.18
198.13
6'X6' FLAT LANDING
(5'X5' MIN. UNOBSTRUCTED)
1:67 (1.5%) MAX SLOPE IN
ALL DIRECTIONS
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
NEW 4TH MRI ADDITION
652-GSI-204
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
19-088
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.fg-inc.net
BID DOCUMENTS
#500
OCTOBER 7, 2020
A
M
CS501
NRSNSY
CIVIL SITE DETAILS
3 10
CS501
CS501
CS501
*NOTE: IMAGE ABOVE IS PROVIDED AS A VISUAL EXAMPLE OF THE INTENDED RAMP ONLY. IT IS NOT SPECIFIC TO THE SITE AND SHALL BE CONSIDERED A GENERAL
REFERENCE ONLY. REFER TO THE DESIGN PLANS AND DETAILS FOR DESIGN SPECIFICS.
SS
SS
SS
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
NEW MRI ADDITION
FFE= 199.01
SS
SS
SS
SS
SS
SS
SS
SS
SS
I
N
V
R
C
P
24" OR 27" RCP
DRAIN MH
TOP = 196.61'
INV. 180.64'
(DIR. ONLY)
INV. 189.67'
(DIR. ONLY)
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLODLODLODLODLODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLODLODLODLODLODLODLODLODLO
D
LO
D
LODLODLODLODLODLOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD LOD
LO
D
LOD LOD
LO
D LOD LOD LOD
LOD
LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
197.14
197.17
197.35
197.28
197.33
197.24
197.87
197.65
198.30
198.29
198.44
198.35
198.42
198.46
198.36
198.68
198.51
198.68
198.94
199.01
199.01
198.84
198.80
198.75
198.51
198.51
198.51
198.51
APPROXIMATE LOCATION OF
EXISTING STORM STRUCTURE
APPROXIMATE LOCATION OF EXISTING STORM PIPE.
CONTRACTOR TO POTHOLE AND VERIFY EXACT
LOCATION AND DEPTH PRIOR TO CONSTRUCTION.
198.83
198.85
198.76
198.49
198.53
198.36
198.41
197.38
198.31
198.17
198.39
198.46
198.40
STR. 104
(NYOPLAST GRATE DRAIN)
P-103
STR. 102
(NYOPLAST GRATE DRAIN)
P
STR. 100
(VDOT STD DOGHOUSE MH
WITH GRATE TOP)
STR. EX2 (MH)
JUNCTION BOX
EX2
STR. EX1 (GRATE)
DROP INLET (GRATE)
EX1
PR 6" PVC STORM LINE
(SLOPE 1% MINIMUM)
NYOPLAST GRATE DRAIN
FOR CONDENSATE DRIP LINE
198.78
CONSTRUCTION LAYDOWN
AREA
198.74
198.76
198.64
198.61
198.11
198.13
198.01
197.98
197.84
198.35
198.35
198.40
198.40
SS
SS
SS
SS
SS
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
SS
SS
SS
SS
SS
SSSSSSSSSSSSSS
SS
SS SS
SS
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
RELOCATED MRI TRAILER
FFE= 202.61
W W
W W
W W
SS
SS
SS
SS
SS
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LODLOD
LO
D
LO
D
LO
D
LO
DLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
W W
W W
W W
SS
SS
SS
SS
SS
SS
SS
SS
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
198.04
198.42
198.57
198.67 198.68
198.58
198.26
198.62
198.57
198.27
198.24
198.37
198.38
198.29
198.14
198.17
198.24
198.19
PROPOSED STORM LINE
RELOCATION
(BY OTHERS, AS PART OF
SCI ADDITION PROJECT)
PROPOSED STORM STRUCTURE
(BY OTHERS, AS PART OF SCI
ADDITION PROJECT)
198.10
EXISTING STORM LINE
(TO BE RELOCATED
AND ABANDONED BY
OTHERS, AS PART OF
SCI ADDITION
PROJECT)
198.22
198.21
198.22198.13
198.18
198.23
198.31
198.29 198.28
SEE SHEET CS501 FOR PROPOSED
ELEVATIONS FOR RAMP
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
NEW 4TH MRI ADDITION
652-GSI-204
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
19-088
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.fg-inc.net
BID DOCUMENTS
#500
OCTOBER 7, 2020
1) ALL SPOT ELEVATIONS SHOWN ARE AT THE EDGE OF PAVEMENT
UNLESS OTHERWISE NOTED.
2) ALL PROPOSED SIDEWALKS SHALL BE BUILT WITH A 1.5%
CROSS-SLOPE AWAY FROM THE BUILDING.
3) THE CONTRACTOR SHALL CLEAN OUT ACCUMULATED SILT IN
STORM WATER CONVEYANCE CHANNELS AND PIPES AT END OF
CONSTRUCTION WHEN DISTURBED AREAS HAVE BEEN STABILIZED.
4) COORDINATE WITH VA INSPECTIONS DURING CONSTRUCTION.
5) CONSTRUCT EROSION CONTROL BARRIERS PER VA STANDARDS
INSPECTOR AND MAINTAIN UNTIL PERMANENT VEGETATION IS
ESTABLISHED.
6) THE CONTRACTOR SHALL RE-ESTABLISH ALL AREA WHICH IS
DAMAGED OR DISTURBED TO ORIGINAL CONDITIONS OR BETTER
DURING AUTHORIZED WORK.
7) MAXIMUM CUT OR FILL SLOPES IS 4H:1V
8) IN ALL AREAS OF FILL OR OTHERWISE DISTURBANCE OF
EXISTING CONDITIONS, UNLESS OTHERWISE NOTED, THE
CONTRACTOR SHALL FULLY AND COMPLETELY REMOVE AND
LEGALLY DISPOSE OFF-SITE, ALL PLANT MATERIALS INCLUDING BUT
NOT LIMITED TO ROOT SYSTEMS, CONCRETE, REINFORCED
CONCRETE, ASPHALT DEBRIS, UNDERBRUSH, TOPSOIL, AND OTHER
DELETERIOUS MATERIAL. THE SUBGRADE TO REMAIN SHALL BE
COMPACTED TO 98% STANDARD PROCTOR MAXIMUM DRY DENSITY
FOLLOWING FULL REMOVAL OF THESE MATERIALS.
9) IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN
QUALIFIED PROFESSIONAL ADVICE WHEN QUESTIONS ARISE
CONCERNING DESIGN AND EFFECTIVENESS OF EROSION CONTROL
DEVICES. 24 HR. CONTACT: NATHAN SPENCE, P.E. (205) 397-0370
10) NO PORTION OF THIS PROPERTY LIES WITHIN A SPECIAL FLOOD
HAZARD AREA PER PANEL 5101290077D DATED 04/02/2009
11) EROSION CONTROL MEASURES ARE TO BE ACCOMPLISHED
PRIOR TO ANY OTHER CONSTRUCTION ON THE SITE AND
MAINTAINED UNTIL PERMANENT GROUND COVER IS ESTABLISHED.
LEGEND
EXISTING CONTOURS
PROPOSED CONTOURS
EXISTING STORM PIPE
EXISTING SPOT ELEVATION
PROPOSED SPOT ELEVATION
XXXX.XX
XXXX.XX
XXXX
XXXX
1" = 10'
SCALE IN FEET
10 5 10 20
A
M
CG101
NRSNSY
CIVIL GRADING & DRAINAGE PLAN
4 10
GRADING PLAN - TRAILER RELOCATION - AREA B
SCALE: 1"=10'
GRADING PLAN - BUILDING EXPANSION - AREA A
SCALE: 1"=10'
1" = 10'
SCALE IN FEET
10 5 10 20
SHEET NOTES:
DRAWING REFERENCE:
1) H.H. MCGUIRE VAMC - CONSTRUCT SPINAL CORD
ENHANCEMENT CENTER CIVIL CONSTRUCTION DRAWINGS, DATED
09/11/2017 (VA PROJECT NUMBER 652-314)
NOT TO SCALE
KEY PLAN
AREA A
AREA B
| 01-Gen BD |
| GI002 - FIRST FLOOR LIFE SAFETY |
| GI003 - INFECTION CONTROL RISK ASSESSMENT - (ICRA) |
| GI004 - INTERIM LIFE SAFETY PLAN |
| 02A-Civil BD |
| 02-Civil BD |
| Sheets and Views |
| V-101 SITE SURVEY - AREA A |
| V-102 SITE SURVEY - AREA B |
| 02B-Civil BD |
| CG102 EROSION AND SEDIMENTATION CONTROL PLAN |
| CG201 STORM DRAINAGE PROFILES |
| CG501 STORM DRAINAGE DETAILS (1 OF 2) |
| CG502 STORM DRAINAGE DETAILS (2 OF 2) |
| CG503 EROSION CONTROL DETAILS |
| CU101 CIVIL UTILITY PLAN |
| 04A-Arch BD |
| AD101 - FIRST FLOOR DEMOLITION PLAN |
| A001 - ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES |
| A002 - PARTITION TYPES AND DETAILS |
| A-101 - FIRST FLOOR PLAN |
| A-102 - ROOF PLAN |
| A-201 - EXTERIOR ELEVATIONS AND BUILDING SECTIONS |
| A-202 - BUILDING SECTIONS |
| A-203 - MRI MAGNETIC SHIELDS |
| A-301 - WALL SECTIONS |
| A-302 - WALL SECTIONS |
| A-401 - ENLARGED FLOOR PLAN LAYOUTS |
| A-501 - EXTERIOR WALL AND COLUMN DETAILS |
| A-601 - DOOR SCHEDULE, TYPES, DETAILS |
| A-701 - WINDOW ELEVATIONS AND DETAILS |
| 05-Interior BD |
| I-001 - FINISH SCHEDULE |
| I-101 - FIRST FLOOR FINISH PLAN |
| I-120 - FIRST FLOOR FLOOR PATTERN PLAN |
| I-130 - FIRST FLOOR WALL PROTECTION PLAN |
| I-131 - WALL PROTECTION DETAILS |
| I-201 - CASEWORK ELEVATIONS |
| I-202 - CASEWORK DETAILS |
| I-203 - INTERIOR ELEVATIONS |
| I-204 - INTERIOR ELEVATIONS |
| I-401 - FIRST FLOOR EQUIPMENT PLAN |
| I-402 - ENLARGED TOILET PLAN |
| I-601 - EQUIPMENT SCHEDULE |
| 06-FP BD |
| FX001 - FIRE PROTECTION GENERAL INFORMATION |
| FX101 - FIRST FLOOR FIRE PROTECTION PLAN - MRI SUTIE |
| 09-Elec BD |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| E-601 - ONE-LINE DIAGRAM |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| E-501 - ELECTRICAL DETAILS |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| E-502 - ELECTRICAL DETAILS |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| E-503 - ELECTRICAL DETAILS |
| E-001 - ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS |
| E-002 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-401 - ELECTRICAL RACEWAY PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| ED101 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| EL101 - FIRST FLOOR LIGHTING PLAN - MRI SUITE |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
| EP102 - ROOF POWER PLAN |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| EP104 - PARTIAL BASEMENT ELECTRICAL PLAN |
| ES101 - FIRST FLOOR ELECTRICAL PLAN - OVERALL |
| E-601 - ONE-LINE DIAGRAM |
| E-601 - ONE-LINE DIAGRAM |
| EP103 - FIRST FLOOR ELECTRICAL PLAN - MOBILE MRI |
| E-602 - ELECTRICAL SCHEDULES |
| E-601 - ONE-LINE DIAGRAM |
| E-602 - ELECTRICAL SCHEDULES |
| EP101 - FIRST FLOOR ELECTRICAL PLAN - MRI SUITE |
File details come from the government source that posted it. Updated .