Part10_S02 Combined Dwgs BD 11-12-20.pdf

PDF 8 MB Posted

Attached to
Y1DB--New 4th MRI Addition Project 652-CSI-204
Solicitation number
36C24621R0021
Issued by

About this file

This federal solicitation requests proposals for Project 652-CSI-204, New 4th MRI Addition at the Hunter Holmes McGuire VA Medical Center in Richmond, Virginia. The project scope includes construction of a new single-story addition of approximately 2,785 square feet to house two new MRIs adjacent to an existing MRI suite. Interior finishes will match standard facility materials. Relocation of an existing MRI trailer and associated services is included. Offerors are to provide all labor, materials, equipment, demolition, and construction services to complete the project in accordance with drawings, specifications and the statement of work. Proposals are due under Solicitation Number 36C24621R0021 issued by the Department of Veterans Affairs Veterans Health Administration VISN 6.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FINISHED WALL

HANDRAIL

T.O. HANDRAIL TO BE 34".

TYPICAL HANDRAIL

BLOCKING

FINISHED FLOOR

4" BASE AS SCHEDULED

FINISHED WALL

WALL

PROTECTION

METAL CAP BY WALL

PROTECTION MFR.

TYPICAL WALL PROTECTION

TYPICAL CRASH RAIL

FINISHED FLOOR

4" BASE AS SCHEDULED

FINISHED WALL

HIGH IMPACT RAIL COVER

T.O. CRASH RAIL TO BE 12".

BLOCKING (BY OTHERS)

FINISHED FLOOR

4" BASE AS SCHEDULED

CRASH RAIL

CONTINUOUS VINYL CUSHION

CONTINUOUS ALUMINUM RETAINER

MOUNTING BRACKET

CONTINUOUS CUSHION

ACCENT REVEAL

CONTINUOUS ALUMINUM

RETAINER

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7 /2

:5

:1

A

M

I-131

WALL PROTECTION DETAILS

5 12JK

NEW 4TH MRI ADDITION

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD.

RICHMOND, VA 23249 OCTOBER 7, 2020

BID DOCUMENTS

652-CSI-20419-088

LW

Scale: No Scale

WALL GUARD DETAIL

Scale: 1" = 1'-0"

WALL PROTECTION SECTION

Scale: No Scale

CORNER GUARD DETAIL

DocuSign Envelope ID: 35F56701-DC70-47B5-A50E-7108A2FACA35

10/8/2020

19522039 FCSOCIALACTIVITIESCLOSET1G-22711'-1111'-1111'-1111'-1111'-1111'-4" 13'-1012'-2"36'-525'-7 7'-915'-4__16 3'-6__1611'-1019'-8"4'-33'-10"

TELEPHONE VAULTSIDEWALKCONCRETERD2785 SFAREA

10'-8"22'-8"14'-4" 23'-4"

THE FOLLOWING NOTES ARE SPECIFIC TO

CASEWORK AND ARE IN ADDITION TO THE GENERAL

FINISH NOTES.

A. FIELD VERIFY ALL CASEWORK AND SHELVING

DIMENSIONS.

B. ALL SHELVING SHOWN WITH DASHED LINES

TO BE ADJUSTABLE

C. COUNTERTOPS TO HAVE 1/2" RADIUS AT

EXPOSED CORNERS.

D. USE BLACK 2 1/2" DIAMETER GROMMETS

WHERE GROMMETS ARE INDICATED.

E. PROVIDE FINISHED END PANEL AT EXPOSED

CASEWORK ENDS AND BACKS AS NEEDED.

PANEL TO MATCH PLASTIC LAMINATE,

STAINLESS STEEL OR MELAMINE FINISH,

BASED ON CABINET TYPE.

F. ADD FILLER PANEL AS NEEDED AT CABINETS,

WARDROBES, DRAWERS, APPLIANCES, ETC.

TO ENSURE FULL DOOR SWING AND DRAWER

OPERATION.

G. ALL UPPER CABINETS TO BE 15"D OUT TO OUT

UNLESS NOTED OTHERWISE.

H. ALL COUNTERTOPS TO EXTEND 1" BEYOND

FRONT OF CABINET DOOR FACE.

I. ALL BASE CABINETS TO BE 23" DEEP UNLESS

NOTED OTHERWISE.

J. ALL COUNTERTOPS TO HAVE POST FORM

PROFILE.

K. ALL COUNTERTOPS ARE 1 1/2" THICK WITH 4"

HIGH BACK/SIDE SPLASHES UNLESS NOTED

OTHERWISE

L. PROVIDE SHEET METAL OR FIRE RETARDANT

WOOD BLOCKING IN WALL CAVITIES FOR

ITEMS THAT ARE REQUIRED TO BE SECURED

TO THE WALLS. REFERENCE MECHANICAL,

PLUMBING, ELECTRICAL AND TECHNOLOGY

DRAWINGS. COORDINATE WITH FURNITURE

SUPPLIER WHERE APPROPRIATE.

M. ALL WALL CABINETS TO HAVE SLOPE TOPS

UNLESS A BULKHEAD IS PRESENT.

N. SEE SHEET A-512 FOR TYPICAL CABINET

SECTIONS

GROMMETS - FINAL LOCATIONS TO BE

COORDINATED WITH END USER

FILLER PANEL

EQUIPMENT - BY OTHERS

METAL SUPPORT

LOCKABLE

G

FP

EQ

S

L

20"D SOLID SURFACE

COUNTERTOP, SSM-1

S

EQ

G

FP

W3

3'-0"1"

3'-1"

3'-1 1/2"

SOLID SURFACE WALL

CAP, SSM-1. OVERHANG

TO BE 1" ON ALL SIDES.

8'-0"

3'-2" 3'-0" 3'-0" 3'-0" 2'-8"

24"D SOLID SURFACE

COUNTERTOP, SSM-1

S S

EQ EQ

G G

12'-0" 3'-0"

15'-0"

S

4'-0"

W5

L

11'-0"

36"D SOLID SURFACE

COUNTERTOP, SSM-1

S S

1'-7 1/2"

2'-0"7'-0"2'-0"

G

2'-6"3'-0"3'-0"2'-6"

1'-1"

3'-0" 3'-0" 3'-0" 3'-2"2'-8"

24"D SOLID SURFACE

COUNTERTOP, SSM-1

S S S

EQ EQ EQ

G G G

3'-0" 12'-0"

15'-0"

FP

4'-2" 4'-0" 4'-0" 4'-0" 5"

16'-7"

T4 T3 T3 T3

L

FP

5" 4'-0" 4'-0" 4'-0" 4'-2"

16'-7"

T3 T3 T3 T4

L

3'-3" 2'-0" 2'-6" 1"

7'-10"

2'-0" 2'-6"

1"4'-7"

7'-10"

B1 SB1

W4 W1 W2

24"D SOLID SURFACE

COUNTERTOP, SSM-1

S

3'-6"

SOLID SURFACE

WALL SPLASH, SSM-1

1'-0"1'-0" 1'-6" 1"

3'-7"

T1 T1

T2

FP

4'-0"2"

4'-2"

T5

FP

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7 /2

:5

:2

A

M

I-201

CASEWORK ELEVATIONS

6 12JK

NEW 4TH MRI ADDITION

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD.

RICHMOND, VA 23249 OCTOBER 7, 2020

BID DOCUMENTS

652-CSI-20419-088

LW

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/4" = 1'-0"

TYPICAL DRESS - SOUTH

Scale: 1/4" = 1'-0"

CORRIDOR C1Y-1

Scale: 1/4" = 1'-0"

CONTROL ROOM 1Y-151D WEST

Scale: 1/4" = 1'-0"

CONTROL ROOM 1Y-151D NORTH

Scale: 1/4" = 1'-0"

CONTROL ROOM 1Y-151D EAST

Scale: 1/4" = 1'-0"

MRI 1Y-156

Scale: 1/4" = 1'-0"

MRI 1Y-158

Scale: 1/4" = 1'-0"

PREP

Scale: 1/4" = 1'-0"

CORRIDOR C1Y-4 - SOUTH

Scale: 1/4" = 1'-0"

TYPICAL DRESS - WEST

CASEWORK SCHEDULE

Type Mark WIDTH Description

B1 2' - 0" 34"H x 24"W x 23"D ONE DOOR ONE DRAWER BASE CABINET

SB1 2' - 6" 34"H x 23"D SINK BASE WITH REMOVABLE PANEL

T1 1' - 0" 84"H x 12"W x 20"D TWO TIER LOCKER

T2 1' - 6" 84"H x 18"W x 20"D TWO TIER STORAGE CABINET

T3 4' - 0" 4"H x 24"D TWO DOOR TALL STORGE UNIT WITH 5 ADJ. SHELVES

T4 4' - 0" 84"H x 48"W x 24"D TWO DOOR TEN DRAWER TALL CABINET

T5 4' - 0" 4"H x 24"D TWO DOOR TALL STORGE UNIT WITH 5 ADJ. SHELVES

W1 2' - 0" 24"H x 12"D ONE DOOR WALL STORAGE UNIT-LH

W2 2' - 6" 18"H x 15"D TWO DOOR WALL STORAGE UNIT

W3 3' - 0" 24"H x 15"D TWO DOOR WALL STORAGE UNIT

W4 3' - 3" 24"H x 15"D TWO DOOR WALL STORAGE UNIT

W5 4' - 0" 24"H x 15"D TWO DOOR WALL STORAGE UNIT

Scale: 3/16" = 1'-0"

MRI 1 1Y-158 NORTH

ADJ.

SHELF

R E

F E

R T

O E

L E

V S

1'-11"

REMOVABLE PANEL, ATTACH TO CLEATS WITH

NICKEL PLATED

SCREWS AND FINISH WASHERS. MATCH

REVEAL AND EDGE TREATMENT OF DOORS

AND DRAWERS.

CLEAT

R E

F E

R T

O E

L E

V S

SINK BASE-REMOVABLE PANEL

R E

F E

R T

O E

L E

V S

WALL CABINET-18"H

1'-11"

E Q

E

Q E

Q

R E

F E

R T

O E

L E

V S

DRAWER BASE

- 3 EQUAL DRAWERS

1'-3"

BASE CABINET

-1/2 DOORS AND 1/2 DRAWERS

6" 4"

1'-11"

R E

F E

R T

O E

L E

V S

1'-3"

WALL CABINET-30"H

1 ADJ.

SHELF

SLOPED TOP

OR GYP. BD.

SOFFIT.

REFER TO

CEILING

PLANS &

ELEVATIONS

SLOPED TOP

OR GYP. BD.

SOFFIT.

REFER TO

CEILING

PLANS &

ELEVATIONS

LIGHT

VALANCE

LIGHT

VALANCE

TALL CABINET-84"H

W/DOORS & SHELVES

SLOPED TOP OR

GYP. BD. SOFFIT.

REFER TO CEILING

PLANS &

ELEVATIONS

2' - 1"

4"

3'

(4) ADJ.

SHELVES

(1) FIXED

SHELF

2' - 0"

3/4" FIXED

DIVIDER,

CENTERED FOR 2-

DOOR CABINETS

TALL OPEN CABINET-84"H

W/DOOR & SHELVES

SLOPED TOP OR

GYP. BD. SOFFIT.

REFER TO CEILING

PLANS &

ELEVATIONS

3' - 1"

4"

(4) ADJ.

SHELVES

(1) FIXED

SHELF

2" 2"

TALL CABINET-84"H

3 SHELVES/2 DRAWERS

SLOPED TOP OR

GYP. BD. SOFFIT.

REFER TO CEILING

PLANS &

ELEVATIONS

2' - 5"

4"

2'

(2) ADJ.

SHELVES

(1) FIXED

SHELF

2" 1'

1'

1'-11"

R E

F E

R T

O E

L E

V S

OPEN BASE STORAGE UNIT

-1 SHELF

FIXED

SHELF

1'-11"

"R

E F

E R

T O

E L E

V S

OPEN BASE STORAGE UNIT - PULL-

OUT SHELF

DEVICE

MOUNTED

THRU BACK OF

CABINET

W/FACEPLATE

F

IX

E D

E Q

S H

E

LF

E Q

4"

1'-5"-B12

1'-11"

R E

F E

R T

O E

L E

V S

OPEN BASE STORAGE UNIT

-MICROWAVE

DEVICE

MOUNTED

THRU BACK OF

CABINET

W/FACEPLATE

CAVITY

4" 8"

3' - 0"2' - 4"

TALL CABINET-84"H

WARDROBE

SLOPED TOP OR

GYP. BD. SOFFIT.

REFER TO CEILING

PLANS &

ELEVATIONS

2' - 1"

4"

(1) FIXED

SHELF

2' - 0"

(3) DOUBLE

CLOTHES

HOOKS:

(1) @ EA.

SIDE PANEL

(1) @ THE

BACK PANEL

5'

4'

PULL-OUT PLAM

SHELF W/HEAVY

DUTY SLIDES

TALL CABINET-84"H

CLEAN/SOILED

LINEN LOCKER W/DOOR &

SHELVES

SLOPED TOP OR

GYP. BD. SOFFIT.

REFER TO CEILING

PLANS &

ELEVATIONS

2' - 1"

4"

(4) ADJ.

SHELVES

(1) FIXED

SHELF

2' - 0"

3/4" FIXED

DIVIDER,

CENTERED FOR 2-

DOOR CABINETS

LINEN BASKET

TALL CABINET-84"H

DOUBLE DOOR LOCKERS

SLOPED TOP OR

GYP. BD. SOFFIT.

REFER TO CEILING

PLANS &

ELEVATIONS

2' - 1"

4"

(1) FIXED

SHELF

1' - 8"

(3) DOUBLE

CLOTHES

HOOKS:

(1) @ EA.

SIDE PANEL

(1) @

THE BACK

PANEL

7'

(3) DOUBLE

CLOTHES

HOOKS:

(1) @ EA.

SIDE PANEL

(1) @

THE BACK

PANEL

3/4" ANGLE

BRACE @ 36" O.C

ANGLE CLIPS

FINISHED

CEILING LINE

COND. @

SLOPED PLAM TOP

EXTEND SOFFIT FIN.

END PANEL PAST CAB.

FIN END 3/8" MIN.

3MM

MATCHING

PVC EDGE

WRAP CONT.-

ALL SIDES

EUROPEAN CONCEALED HINGE

CUT END PIECES

TO BE EASED

EDGE

CAULK-SEE SCRIBE DETAIL

COUNTERTOP-

CAULK TO SPLASH

3/4" SOLID SURFACE

ALL COUNTERTOPS

SHALL BE SCRIBED TO

WALL PRIOR TO

INSTALLATION &

CAULKED

1" R. ALL EXPOSED CORNERS

EXPOSED EDGE-FINISHED

TRIM EDGE OF

SOLID SURFACE

@ THE

INTEGRAL BACK

SPLASH

EASED EDGES

2" DIA. GROMMET

WITH RETRACTABLE,

SELF STORING

SLOT. COLOR TO COORDINATE

WITH COUNTERTOP

PLAM SLOPED TOP

TYP. CABINET DRAWER

PLAN

ELEVATION - COUNTERTOP OPEN

END ELEVATION - SPLASH END

PLAN - SPLASH END PLAN - COUNTERTOP OPEN END

SCRIBE DETAIL

1" 3

1"

1"

R 1"

2"

SOLID SURFACE COUNTERTOP

GROMMET DETAIL

EP-END PANEL

2' - 0"

1/

4"

1"

4"

1/

4"

2' - 0"

1"

1/2"

1/ 2"

3/

4"

4"

1/

4"

1' - 11"

2'

0"

SCHEDULED

BASE

SLOPED TOP OR

GYP. BD. SOFFIT.

REFER TO CEILING

PLANS &

ELEVATIONS

2' - 1" 4"

(1) FIXED

SHELF

3/4" FIXED

DIVIDER,

CENTERED FOR 2-

DOOR CABINETS

/2

2'-0"

TALL CABINET-84"H W/DOORS

& 10 DRAWERS

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7 /2

:5

:2

A

M

I-202

CASEWORK DETAILS

7 12JK

NEW 4TH MRI ADDITION

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD.

RICHMOND, VA 23249 OCTOBER 7, 2020

BID DOCUMENTS

652-CSI-20419-088

LW

Scale: No Scale

I_CASEWORK DETAILS

CR-1

CG-1

CR-1

CG-3

CG-1CG-1

HR-1

CG-1

CR-1

"2

HR-1

HR-1

CR-1

CG-1

HR-1

CR-1

"2

HR-1

CR-1

CR-1

HR-1 HR-1

CR-1

CG-2

CR-1

CG-2

CR-1

WP1

CONTINUE WP-1 UNDER

COUNTERTOP TO TERMINATE

AT AT CABINET.

WP1

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7 /2

:5

:4

A

M

I-203

INTERIOR ELEVATIONS

8 12JK

NEW 4TH MRI ADDITION

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD.

RICHMOND, VA 23249 OCTOBER 7, 2020

BID DOCUMENTS

652-CSI-20419-088

LW

Scale: 1/4" = 1'-0"

CORRIDOR C1Y-4 SOUTH

Scale: 1/4" = 1'-0"

CORRIDOR C1Y-1 WEST

Scale: 1/4" = 1'-0"

CORRIDOR C1Y-1 NORTH

Scale: 1/4" = 1'-0"

CORRIDOR C1Y-1A WEST

Scale: 1/4" = 1'-0"

CORRIDOR C1Y-1A EAST

Scale: 1/4" = 1'-0"

CORRIDOR C1Y-4 NORTH

Scale: 1/4" = 1'-0"

CORRIDOR C1Y-4 WEST

*PERIMETER OF ALL ROOMS

Scale: 1/4" = 1'-0"

PREP - WEST

Scale: 1/4" = 1'-0"

TYPICAL IV, PREP, BAY,

STORAGE AND EQUIPMENT

U0006

M1801

A5077

M1801 U0007 M1808

A5077

A1012

M1801

A5080

A5075

A5107 A5108

M0765

M0755 M0750

U0002

M0750

M0755 M0765

U0002

A1080

A5082

A5075

M0765

M0755

M0750M0765

M0755

M0750

A5077

A5107M

A5108

A5180

M0750 M0765

M0755

M0765 M0755

M0750

A5108

A5107M

X6196

A5107M

A5108

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7 /2

:5

:0

A

M

I-204

INTERIOR ELEVATIONS

9 12JK

NEW 4TH MRI ADDITION

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD.

RICHMOND, VA 23249 OCTOBER 7, 2020

BID DOCUMENTS

652-CSI-20419-088

LW

Scale: 1/4" = 1'-0"

ROOM 1Y-151D WEST

Scale: 1/4" = 1'-0"

ROOM 1Y-151D EAST

Scale: 1/4" = 1'-0"

PREP 1Y-151

Scale: 1/4" = 1'-0"

MRI 1Y-158 NORTH

Scale: 1/4" = 1'-0"

MRI 1Y-156 NORTH

Scale: 1/4" = 1'-0"

TYPICAL DRESS NORTH

Scale: 1/4" = 1'-0"

CORRIDOR C1Y-4

Scale: 1/4" = 1'-0"

BAY 1 1Y-151A & BAY 2 1Y-151B

Scale: 1/4" = 1'-0"

IV 1Y-110 NORTH

Scale: 1/4" = 1'-0"

IV 1Y-110 WEST

Scale: 1/4" = 1'-0"

BAY 3 1Y-151C

Scale: 1/4" = 1'-0"

IV 1Y-110 SOUTH

Scale: 1/4" = 1'-0"

MRI 2 1Y-156 EAST

Scale: 1/4" = 1'-0"

MRI 1 1Y-158 SOUTH

C' C'

B' B'

A' A'

2.1

2.1

1.4

1.4

M1801

M1801

M0750

M0755

M0765

M0750

M0755

M0765

X6196

X6196 F0275

F0275

F0275

F2000

F2000

M1840

MRI 2

1Y-156

MRI 1

1Y-158

CORRIDOR

C1Y-4

EQUIPMENT

1Y-159

EQUIPMENT

1Y-155

I-2043

I-204

I-204

I-2048

F2000 F2000

I-204

A5082 A5075

I-20413

TLT

1Y-154

DRESS

1Y-153

DRESS

1Y-152

CORRIDOR

C1Y-1

IV

1Y-110

I-401

I-402

A5075

A5080

F0275

M1801

A1012

F2000

U0001

U0001

M4655

M4255

M0750

M0755

M0765

M4255

M0750

M0755

M0765

A5180

A5180

A5180

A1200

M4255

M0765 M0755

M0750

U0004 U0005

U0002 U0002

A5077 M1410

U0001

M4255

F2000

A5107M

E0948

F0275

F0275

U0006

U0007

PREP

1Y-151

BAY 3

1Y-151C

BAY 2

1Y-151B

BAY 1

1Y-151A

M1808

U0009 U0008

M7845M

STORAGE

1Y-150

CORRIDOR

C1Y-1B

IT ROOM

1Y-107

M7845M

M7845M

A5108

M0750M0755

M0765

A5108F2000

M3072A5107M

M3072 F2000

A5107M

A5108

A1015

A1015A1015

A1015

A1015

A5107

A5108

A5077

A5077

M3072

F2000

F2000

F2000

F2000

1.4

I-204

DRESS

1Y-153

A1080

A5145

U0003

F0275 M1801

A1015

F2000

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7 /2

:5

:0

A

M

I-401

FIRST FLOOR EQUIPMENT PLAN

10 12JK

NEW 4TH MRI ADDITION

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD.

RICHMOND, VA 23249 OCTOBER 7, 2020

BID DOCUMENTS

652-CSI-20419-088

LW

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/4" = 1'-0"

FIRST FLOOR EQUIPMENT PLAN

Scale: 1/2" = 1'-0"

ENLARGED TYPICAL DRESS

0 1 2 4

NORTH

PLAN

0 2 4 8

NORTH

PLAN

B'

1.4

TLT

1Y-154

A1067

A5075

F2000

A5082

A5109

A5090

A5109

A5200

A5145

I-402

1C

1A

1D 1B

A5082

A5075

A1067

A5109

A5090

A5200

PT-1

PT-2

PT-1

EP-1

PROVIDE TR-1 AT WHERE WALL

AND FLOOR TILE MEET, TYPICAL

TR-2

PT-2

PT-1

PROVIDE TR-1 AT WHERE WALL

AND FLOOR TILE MEET, TYPICAL

EP-1

TR-2

PT-1

PT-2

PT-1

EP-1

A5145

A5109 5

PROVIDE TR-1 AT WHERE WALL

AND FLOOR TILE MEET, TYPICAL

TR-2

PT-1

PT-2

PT-1

EP-1

A5109

A5200

A5090

PROVIDE TR-1 AT WHERE WALL

AND FLOOR TILE MEET, TYPICAL

TR-2

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7 /2

:5

:0

A

M

I-402

ENLARGED TOILET PLAN

11 12JK

NEW 4TH MRI ADDITION

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD.

RICHMOND, VA 23249 OCTOBER 7, 2020

BID DOCUMENTS

652-CSI-20419-088

LW

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/2" = 1'-0"

TYPICAL TOILET

Scale: 1/2" = 1'-0"

1A

TLT 1Y-154- NORTH

Scale: 1/2" = 1'-0" 1B

TLT 1Y-154- EAST

Scale: 1/2" = 1'-0"

1C

TLT 1Y-154- SOUTH

Scale: 1/2" = 1'-0" 1D

TLT 1Y-154- WEST

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7 /2

:5

:1

A

M

I-601

EQUIPMENT SCHEDULE

12 12JK

NEW 4TH MRI ADDITION

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD.

RICHMOND, VA 23249 OCTOBER 7, 2020

BID DOCUMENTS

652-CSI-20419-088

LW

I-EQUIPMENT AND FURNITURE SCHEDULE

JSN

Number JSN Description Quantity Power Data

Pure Water

Cold Water

JSN

Furniture /Install.

Blocking Rqrd Comments

1Y-152

DRESS

A1015 Telephone, Desk, Multiple Line 1 No Yes No No VV No

A1080 Mirror, Posture, Wall Mounted 1 No No No No CC Yes

A5145 Hook, Garment, Double, SS 1 No No No No VC No

F0275 Chair, Swivel, High Back 1 No No No No VV No

F2000 Basket, Wastepaper, Fire Resistant 1 No No No No VV No

M1801 Computer, Microprocessing, w/Flat Panel Monitor 1 Yes Yes No No VV No 120 Volt, Conventional Outlet

U0003 Bench 1 No No No No VV No

1Y-153

DRESS

A1015 Telephone, Desk, Multiple Line 1 No Yes No No VV No

A1080 Mirror, Posture, Wall Mounted 1 No No No No CC Yes

A5145 Hook, Garment, Double, SS 1 No No No No VC No

F0275 Chair, Swivel, High Back 1 No No No No VV No

F2000 Basket, Wastepaper, Fire Resistant 1 No No No No VV No

M1801 Computer, Microprocessing, w/Flat Panel Monitor 1 Yes Yes No No VV No 120 Volt, Conventional Outlet

U0003 Bench 1 No No No No VV No

1Y-154

TLT

A1067 Mirror, Float Glass, ADA Accessible 1 No No No No CC Yes

A5075 Dispenser, Soap, Disposable 1 No No No No VV No

A5082 Dispenser, Paper Towel, Sensor, Hands Free 1 No No No No CC No Battery Operated

A5090 Disposal, Sanitary Napkin, SS, Surface Mounted 1 No No No No CC No

A5109 Grab Bar 1 No No No No CC Yes

A5145 Hook, Garment, Double, SS 1 No No No No VC No

A5200 Dispenser, Toilet Tissue, SS, 2-Roll, Surface Mntd 1 No No No No CC No

F2000 Basket, Wastepaper, Fire Resistant 1 No No No No VV No

1Y-155

EQUIPMENT 2

F2000 Basket, Wastepaper, Fire Resistant 1 No No No No VV No

1Y-156

MRI 2

A5107 Dispenser, Glove, Surgical/Examination, Wall Mounted 1 No No No No VV No

A5108 Disposal, Sharps 1 No No No No VV No

F2000 Basket, Wastepaper, Fire Resistant 1 No No No No VV No

M0750 Flowmeter, Air, Connect w/50 PSI Supply 1 No No No No VV No Vacuum and LP air (30 PSIG) maximum

M0755 Flowmeter, Oxygen, Low Flow 1 No No No No VV No Oxygen

M0765 Regulator, Vacuum 1 No No No No VV No Oxygen and Medical Air (50 PSIG)

M3072 Frame, Infectious Waste Bag With Lid 1 No No No No VV No

U0002 Disposal, Anesthesia Gas 1 No No No No VV No Oxygen

U0004 MRI Unit, Siemens Sola 1 Yes Yes No No VV No

X6196 Injector, CT 1 Yes No No No VC No 120 Volt, Special Outlet

1Y-158

MRI 1

A5107 Dispenser, Glove, Surgical/Examination, Wall Mounted 1 No No No No VV No

A5108 Disposal, Sharps 1 No No No No VV No

F2000 Basket, Wastepaper, Fire Resistant 1 No No No No VV No

M0750 Flowmeter, Air, Connect w/50 PSI Supply 1 No No No No VV No Vacuum and LP air (30 PSIG) maximum

M0755 Flowmeter, Oxygen, Low Flow 1 No No No No VV No Oxygen

M0765 Regulator, Vacuum 1 No No No No VV No Oxygen and Medical Air (50 PSIG)

M3072 Frame, Infectious Waste Bag With Lid 1 No No No No VV No

U0002 Disposal, Anesthesia Gas 1 No No No No VV No Oxygen

U0005 MRI Unit, Siemens Vida 1 Yes Yes No No VV No

X6196 Injector, CT 1 Yes No No No VC No 120 Volt, Special Outlet

1Y-159

EQUIPMENT 1

F2000 Basket, Wastepaper, Fire Resistant 1 No No No No VV No

C1Y-4

CORRIDOR

A5075 Dispenser, Soap, Disposable 1 No No No No VV No

A5077 Dispenser, Hand Sanitizer, Hands Free 2 No No No No VV No

A5082 Dispenser, Paper Towel, Sensor, Hands Free 1 No No No No CC No Battery Operated

F2000 Basket, Wastepaper, Fire Resistant 1 No No No No VV No

I-EQUIPMENT AND FURNITURE SCHEDULE

JSN

Number JSN Description Quantity Power Data

Pure Water

Cold Water

JSN

Furniture /Install.

Blocking Rqrd Comments

1Y-110

IV

A5077 Dispenser, Hand Sanitizer, Hands Free 1 No No No No VV No

A5107 Dispenser, Glove, Surgical/Examination, Wall Mounted 1 No No No No VV No

A5108 Disposal, Sharps 1 No No No No VV No

E0948 Cart, General Storage, Mobile, 42"H x 32"W x 22"D 1 No No No No VV No

F2000 Basket, Wastepaper, Fire Resistant 1 No No No No VV No

M0750 Flowmeter, Air, Connect w/50 PSI Supply 1 No No No No VV No Vacuum and LP air (30 PSIG) maximum

M0755 Flowmeter, Oxygen, Low Flow 1 No No No No VV No Oxygen

M0765 Regulator, Vacuum 1 No No No No VV No Oxygen and Medical Air (50 PSIG)

M1410 Chair, Laboratory, Blood Drawing, w/Storage 1 No No No No VV No

M4255 Stand, IV, Adjustable 1 No No No No VV No

U0001 Recliner 1 No No No No VV No

1Y-151

PREP

A1012 Telephone, Wall Mounted, 1 Line 1 No Yes No No VV No

A5075 Dispenser, Soap, Disposable 1 No No No No VV No

A5080 Dispenser, Paper Towel, SS, Surface Mounted 1 No No No No CC No

A5107 Dispenser, Glove, Surgical-Examination, Wall Mounted 1 No No No No VV No

A5108 Disposal, Sharps 1 No No No No VV No

F0275 Chair, Swivel, High Back 1 No No No No VV No

F2000 Basket, Wastepaper, Fire Resistant 1 No No No No VV No

M1801 Computer, Microprocessing, w/Flat Panel Monitor 1 Yes Yes No No VV No 120 Volt, Conventional Outlet

1Y-151A

BAY 1

A5180 Track, Cubicle, Surface Mounted, Curved, With Curtain 1 No No No No CC No

F2000 Basket, Wastepaper, Fire Resistant 1 No No No No VV No

M0750 Flowmeter, Air, Connect w/50 PSI Supply 1 No No No No VV No Vacuum and LP air (30 PSIG) maximum

M0755 Flowmeter, Oxygen, Low Flow 1 No No No No VV No Oxygen

M0765 Regulator, Vacuum 1 No No No No VV No Oxygen and Medical Air (50 PSIG)

M4255 Stand, IV, Adjustable 1 No No No No VV No

M7845 Monitor, Physiological, Bedside, 4 Channel 1 Yes Yes No No VV Yes

U0001 Recliner 1 No No No No VV No

1Y-151B

BAY 2

A5180 Track, Cubicle, Surface Mounted, Curved, With Curtain 1 No No No No CC No

F2000 Basket, Wastepaper, Fire Resistant 1 No No No No VV No

M0750 Flowmeter, Air, Connect w/50 PSI Supply 1 No No No No VV No Vacuum and LP air (30 PSIG) maximum

M0755 Flowmeter, Oxygen, Low Flow 1 No No No No VV No Oxygen

M0765 Regulator, Vacuum 1 No No No No VV No Oxygen and Medical Air (50 PSIG)

M4255 Stand, IV, Adjustable 1 No No No No VV No

M7845 Monitor, Physiological, Bedside, 4 Channel 1 Yes Yes No No VV Yes

U0001 Recliner 1 No No No No VV No

1Y-151C

BAY 3

A1200 Lift System, Overhead, One Curtain, 1000lb 1 Yes No No No CC No

A5180 Track, Cubicle, Surface Mounted, Curved, With Curtain 1 No No No No CC No

F2000 Basket, Wastepaper, Fire Resistant 1 No No No No VV No

M0750 Flowmeter, Air, Connect w/50 PSI Supply 1 No No No No VV No Vacuum and LP air (30 PSIG) maximum

M0755 Flowmeter, Oxygen, Low Flow 1 No No No No VV No Oxygen

M0765 Regulator, Vacuum 1 No No No No VV No Oxygen and Medical Air (50 PSIG)

M3072 Frame, Infectious Waste Bag With Lid 1 No No No No VV No

M4255 Stand, IV, Adjustable 1 No No No No VV Yes

M4655 Stretcher, Mobile, CRS, 9 Positiondures. 1 No No No No VV No

M7845 Monitor, Physiological, Bedside, 4 Channel 1 Yes Yes No No VV Yes

1Y-151D

CONTROL ROOM

A1015 Telephone, Desk, Multiple Line 5 No Yes No No VV No

F0275 Chair, Swivel, High Back 5 No No No No VV No

F2000 Basket, Wastepaper, Fire Resistant 2 No No No No VV No

M1801 Computer, Microprocessing, w/Flat Panel Monitor 2 Yes Yes No No VV No 120 Volt, Conventional Outlet

M1808 Bio-Med Computer, Dual Monitor 1 Yes Yes No No VV No

M1840 Printer/Copier/Fax Combination 1 Yes Yes No No VV No

U0006 Computer, MRI Control Panel, Siemens Sola 1 Yes Yes No No VV No 120 Volt, Conventional Outlet

U0007 Computer, MRI Control Panel, Siemens Vida 1 Yes Yes No No VV No 120 Volt, Conventional Outlet

U0008 Scanner 1 Yes Yes No No VV No

U0009 Network CPU 1 Yes Yes No No VV No

MECHANICAL TEE

SCREWED END

NEW PIPING

NOTE: SEE FLOOR

PLAN FOR EXISTING

AND NEW PIPE SIZES.

2" NIPPLE 4" LONG

WITH CAP.

TYPICAL TEE WITH

CROSS MAIN PITCH

TOWARDS FEED MAIN.

FEED OR CROSS MAIN.

NOTE: INSTALL FLUSHING

CONNECTION AT END OF

CROSS MAINS.

FLUSHING CONNECTION

MECHANICAL TEE

ADJUSTABLE RING HANGER.

AUTO. SPRINKLER PIPE.

SURGE RESTRAINER.

EXPANSION ANCHOR HILTI QUIK BOLT

TZ OR APPROVED EQUAL. EXPANSION

ANCHOR SHALL BE QUALIFIED FOR

USE IN CRACKED CONCRETE PER ACI

355.2.

EXIST. CONCRETE FLOOR

CONCRETE

STEEL BEAM.

C-CLAMP.

THREADED HANGER ROD.

RETAINING STRAP.

SET SCREW.

STEEL BEAM

NOTE: HANGING DETAILS SHOWN ARE SUBJECT

TO REQUIREMENTS OF SEISMIC DESIGN.

UPRIGHT HEAD.

PROVIDE GUARD.

DUCTWORK OR OTHER

OBSTRUCTION OVER

48" IN WIDTH.

NOTES:

1. SPRINKLER CONTRACTOR SHALL PROVIDE SPRINKLER ABOVE AND BELOW DUCT OR

OTHER OBSTRUCTION OVER 48" IN WIDTH.

2. SPRINKLER CONTRACTOR SHALL COORDINATE WITH THE HVAC AND GENERAL

CONTRACTOR.

3. SPRINKLER CONTRACTOR SHALL INCLUDE COST OF ADDITIONAL SUPPORTS, AS

REQUIRED. ADDITIONAL SUPPORTS SHALL BE IN FULL CONFORMANCE WITH NFPA

REQUIREMENTS. ADDITIONAL SUPPORTS SHALL NOT BE HUNG FROM DUCT WORK.

SPRINKLER BRANCH LINE

UPRIGHT HEAD

ALL EXPOSED

SPRINKLER PIPING

SHALL BE PAINTED RED.

FIRE RATED WALL AND OR SLAB

INSTALL INSULATION AFTER

CAULKING SLEEVE, SEAL AS

REQUIRED.

APPROVED TYPE FIRE SAFE &

SMOKE TIGHT CAULKING SEALER

BETWEEN BARE PIPE & SLEEVE.

FINISHED ESCUTCHEON PLATE

FLUSH AGAINST WALL AND OF

SIZE TO COMPLETELY COVER

OPENING.

STEEL PIPE SLEEVE TERMINATE

SLEEVE FLUSH WITH FINISHED

SURFACE

FIRESTOPPING APPROVED

BY LOCAL CODES)

NOTE: MINIMUM SIZE OF OPENINGS AROUND SPRINKLER PIPE PENTRATIONS OF

CONCRETE OR CMU WALLS SHALL BE IN ACCORDANCE WITH NFPA 13 SEISMIC

REQUIREMENTS.

SUSPENDED CEILING

DROP NIPPLE

PENDENT SPRINKLER

HEAD.

1"x1/2" R.C.

REDUCER

BRANCH LINE

1"x0'-2" NIPPLE

1" 90 EL.

1" X ARMOVER

1" X DROP

HANGERS

SHALL BE

PROVIDED

AS REQUIRED

BY NFPA 13.

TYPICAL

NOTE:

1. ALL SPRINKLERS SHALL BE FM APPROVED

QUICK RESPONSE.

2. ALL EXPOSED PIPING SHALL BE PAINTED RED.

FIRE PROTECTION GENERAL NOTES

A. THE FIRE PROTECTION CONTRACTOR SHOULD USE NFPA-13 (CURRENT EDITION), CHAPTER 8, “PLANS AND

CALCULATIONS” AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW. DISREGARD ONLY THOSE ITEMS NOT APPLICABLE TO THE INDIVIDUAL BUILDING SYSTEM. FIRE PROTECTION MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-13 FOR THE INSTALLATION OF AUTOMATIC SPRINKLER

SYSTEM.

B. THE FIRE PROTECTION CONTRACTOR SHALL COMPLY WITH THE INTERNATIONAL BUILDING CODE (LATEST ADOPTED EDITION). INSTALLATION SHALL MEET THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION.

C. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ROOM FINISH SCHEDULE WHICH INDICATE CEILING HEIGHTS. COORDINATE WITH ARCHITECT'S REFLECTED CEILING PLAN FOR PROPOSED LOCATION OF SPRINKLER HEADS IN AREAS WITH CEILINGS. LOCATE HEADS IN AREAS WITHOUT CEILINGS AS REQUIRED BY IFC, NFPA AND AUTHORITY

HAVING JURISDICTION REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.

D. THIS FACILITY SHALL BE A TOTALLY SPRINKLERED BUILDING. FIRE SUPPRESSION SYSTEM SHALL BE WET/DRY PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. SYSTEM TO BE DESIGNED AS REQUIRED BY IFC, NFPA, AND AUTHORITY HAVING JURISDICTION REQUIREMENTS FOR THE APPROPRIATE HAZARD

CLASSIFICATION.

E. SPRINKLER HEAD LAYOUTS INDICATED ARE BASED ON OCCUPANCY HAZARD CLASSIFICATIONS OUTLINED IN NFPA-13 STANDARDS, GENERALLY, PUBLIC / OFFICE AREAS ARE BASED ON “LIGHT HAZARD”, AND STORAGE / MECHANICAL AREAS ARE BASED ON “ORDINARY HAZARD”. EXTENDED COVERAGE DISTRIBUTION IS NOT INDICATED, BUT MAY BE UTILIZED

WHERE SPACE MEETS REQUIREMENTS SET FORTH IN NFPA-13.

F. IT IS THE CONTRACTOR'S RESPONSIBILITY TO HYDRAULICALLY CALCULATE SPRINKLER REQUIREMENTS PER THE APPROPRIATE HAZARD OCCUPANCY AND PROVIDE ACTUAL NUMBER OF HEADS, REQUIRED SPACING AND PIPE ROUTING AS REQUIRED FOR CLEARANCE WITH STRUCTURAL CONDITIONS AND OTHER TRADES TO PROVIDE A COMPLETE AND OPERABLE SYSTEM IN ACCORDANCE WITH IFC, NFPA AND AUTHORITY HAVING JURISDICTION REQUIREMENTS.

G. FIRE PROTECTION CONTRACTOR SHOULD OBTAIN FLOW TEST DATA INDICATING THE WATER FLOW AND PRESSURE AVAILABLE TO THE FACILITY OR MAKE ARRANGEMENTS TO HAVE A FLOW TEST PERFORMED. FIRE PROTECTION CONTRACTOR TO INCLUDE IN THEIR BID, ALL COSTS ASSOCIATED WITH FLOW TEST. SUBMIT HYDRAULIC CALCULATIONS

AND PLANS RELATED TO A MINIMUM OF 1 REMOTE AREA FOR REVIEW.

H. PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING.

SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER TRADES

TO AVOID CONFLICT.

I. REFER TO SPECIFICATION SECTIONS IN DIVISION 21 FOR ADDITIONAL INFORMATION PERTAINING TO THE FIRE

PROTECTION SYSTEM.

J. SUPPORT ALL NEW PIPING AND EQUIPMENT FROM STRUCTURE ABOVE AS REQUIRED. CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE DESIGN OF SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION LOADS AT

PRIMARY BUILDING STRUCTURAL MEMBERS.

K. PROVIDE SPRINKLER HEADS IN CONCEALED LOCATIONS PER NFPA REQUIREMENTS.

L. DURING CONSTRUCTION PROCEDURES, THE ENTIRE WORK AREA SHALL BE CLEAN OF ALL DUST, DIRT, AND OTHER

DEBRIS BEFORE APPLICATION OF ANY NEW MATERIALS.

M. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF THE WORK AND ARE NOT INTENDED TO SHOW OR DESCRIBE ALL

WORK REQUIRED FOR THE FULL PERFORMANCE AND COMPLETION OF CONTRACT DOCUMENTS.

N. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM AS

SPECIFIED AND INDICATED ON THE DRAWINGS.

O. INCLUDE IN BID, ALL LICENSE, PERMIT, INSPECTION, AND OTHER FEES REQUIRED BY UTILITY COMPANIES OR AUTHORITIES HAVING JURISDICTION REQUIRED FOR COMPLETION OF WORK SO NO ADDITIONAL EXPENSES ARE

INTRODUCED TO OWNER.

P. PROMPTLY INFORM THE ENGINEER, IN WRITING, OF ANY DEVIATIONS IN THE CONTRACT DOCUMENTS FROM REQUIREMENTS OF LOCAL UTILITIES, MUNICIPALITIES, STATE OR FEDERAL LAWS AND REGULATIONS. PERFORM WORK

IN ACCORDANCE WITH SUCH REQUIREMENTS AT NO ADDITIONAL COST TO THE OWNER.

Q. FIRE PROTECTION CONTRACTOR SHALL SUBMIT ONE COMPLETE SET OF AUTOMATIC SPRINKLER SYSTEM DRAWINGS, HYDRAULIC CALCULATIONS, CURRENT WATER FLOW TEST, AND THE EQUIPMENT DATA BROCHURES PREPARED BY OR UNDER THE SUPERVISION OF, AND SEALED BY A PROFESSIONAL ENGINEER. THE SUBMITTAL SHALL BE SENT TO ALL AUTHORITIES HAVING JURISDICTION FOR REVIEW AND APPROVAL. SYSTEM SHALL ALSO BE IN COMPLIANCE WITH ALL

REQUIRED PLUMBING CODES.

R. ALL EXPENSES CARRIED BY THE A/E IN TROUBLESHOOTING SYSTEM(S) PROBLEMS CAUSED BY INADEQUATE WORKMANSHIP, LACK OF TECHNICAL EXPERTISE OR OTHER FORMS OF POOR PERFORMANCE ON THE PART OF A

CONTRACTOR, SHALL BE BORN BY THAT CONTRACTOR.

S. PROVIDE FIRE STOPS / SEALANT AT ALL PIPE PENETRATIONS THROUGHOUT FIRE RATED WALLS. REVIEW ARCHITECTURAL PLANS PRIOR TO BIDDING AND INDICATE PENETRATIONS ON SPRINKLER LAYOUT SUBMITTAL.

T. ELECTRONIC FLOW AND TAMPER SWITCHES ARE TO BE PURCHASED AND INSTALLED BY SPRINKLER CONTRACTOR, WIRED BY ELECTRICAL CONTRACTOR.

U. WATER SERVICE AND DETECTOR TYPE REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER TO BE PROVIDED, INSTALLED AND TESTED BY PLUMBING CONTRACTOR. SPRINKLER CONTRACTOR IS TO INCORPORATE ASSOCIATED

PRESSURE DROP OF SELECTED BACKFLOW PREVENTER DEVICE IN HYDRAULIC CALCULATIONS.

V. FIRE PROTECTION CONTRACTOR SHALL FURNISH AND INSTALL ARMOVER SUPPORTS FOR ALL END OF LINE BRANCH

LINES PER NFPA-13, SECTION: 9.2.3.4. REFER TO A.9.2.3.4.3(B) FOR ACCEPTABLE.

W. ALL DROPS TO SPRINKLER HEADS SHALL TEE / ELBOW OFF TOP OF BRANCH PIPE, EXCEPT WHERE STRUCTURAL, ARCHITECTURAL OR MECHANICAL EQUIPMENT CONDITIONS PRECLUDE CONVENTIONAL INSTALLATION.

X. SPRINKLER HEADS SHALL BE IN A SYMMETRICAL PATTERN, NOT NECESSARILY IN THE CENTER OF ROOMS, CORRIDORS

OR CEILING TILE.

Y. THE FIRE PROTECTION CONTRACTOR SHALL LOCATE THE INSPECTOR'S TEST CONNECTION AND MAIN DRAIN LOCATIONS

IN ACCORDANCE WITH NFPA-13.

Z. FIRE DEPARTMENT CONNECTION SHALL BE LOCATED NOT MORE THAN 100 FEET AWAY FROM THE NEAREST FIRE HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY AND SHALL BE LOCATED NOT LESS THAN 18 INCHES, NOR

MORE THAN 48 INCHES ABOVE ADJACENT SURFACE.

AA. STANDPIPES SHALL BE PROVIDED IN EACH REQUIRED EGRESS STAIRWAY, WITH 4 INCH DIAMETER MINIMUM SIZE.

BB. CLASS 1 SYSTEM SHALL BE PROVIDED WITH 2 1/2 INCH HOSE CONNECTIONS AT EACH INTERMEDIATE LANDING BETWEEN FLOORS IN EACH REQUIRED EGRESS EXIT STAIRWAY. COORDINATE TYPE OF HOSE CONNECTIONS WITH THE

AUTHORITY HAVING JURISDICTION.

FIRE PROTECTION CONTRACTOR

SEMI-RECESSED SPRINKLER HEAD

UPRIGHT SPRINKLER HEAD

FIRE LINE FPCFL

TAMPER SWITCH

FLOW SWITCH

CONCEALED SPRINKLER HEAD

PENDANT SPRINKLER HEAD

CHECK VALVE

GATE VALVE

EXTERIOR ALARM GONG (WATER ACTIVATED)

TEST AND DRAIN ASSEMBLY

ORDINARY HAZARD

GROUP 1 OCCUPANCY

SIDEWALL SPRINKLER HEAD

FIRE DEPARTMENT CONNECTION (FDC)

NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT

FIRE PROTECTION SYMBOLS AND ABBREVIATIONS

KEYNOTE

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER CONNECT TO EXISTING

LIMITS OF DEMOLITION

BACKFLOW PREVENTER

FIRE PROTECTION DEMOLITION GENERAL NOTES

A. LOCATIONS SHOWN FOR EXISTING FIRE PROTECTION PIPE AND EQUIPMENT ARE APPROXIMATE. THE CONTRACTOR IS

TO FIELD VERIFY THE EXACT LOCATIONS OF EXISTING FIRE PROTECTION LINES AND EQUIPMENT INCLUDING RISERS AND

VALVES PRIOR TO THE START OF WORK.

B. COORDINATE WITH OWNER FOR ANY SHUTDOWNS OR PLANNED INTERRUPTIONS OF THE FIRE PROTECTION SERVICE.

THE CONTRACTOR SHALL GIVE THE OWNER THREE (3) DAYS NOTICE PRIOR TO THE PLANNED SHUTDOWN OR

INTERRUPTION.

C. COORDINATE DEMOLITION OF FIRE PROTECTION PIPING WITH OTHER PIPING WHICH IS NOT TO BE REMOVED. PROTECT

OTHER PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT, AND DEBRIS.

D. ALL FIRE PROTECTION RELATED EQUIPMENT AND PIPING WHICH IS REMOVED FROM THE BUILDING IS TO BE TAKEN

OFFSITE AND DISPOSED OF.

BUILDING AND OCCUPANT SAFETY -

INTERRUPTION OF FIRE PROTECTION SERVICE

A. DURING THE TIME THAT THE FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE PROTECTION SYSTEM IS DOWN AND OUT OF COMMISSION, THE FIRE PROTECTION CONTRACTOR SHALL HAVE SUFFICIENT

PERSONNEL ONSITE TO KEEP A “FIRE WATCH” ON THE FACILITY.

B. A FIRE PROTECTION WATCH IS IMPLEMENTED TO ENSURE THE FIRE SAFETY OF A BUILDING IN THE EVENT OF ANY ACT, OR SITUATION INSTIGATING AN INCREASED RISK TO PERSONS OR PROPERTY. THE TERM “FIRE WATCH” IS USED TO DESCRIBE A DEDICATED PERSON OR PERSONS WHO’S SOLE RESPONSIBILITY IS TO LOOK FOR FIRES WITHIN AN

ESTABLISHED AREA.

C. IN THE OPINION OF THE FIRE AND LIFE-SAFETY GROUP (FLS) OF FACTORY MUTUAL (FM), ANY REQUIRED FIRE PROTECTION SYSTEM THAT IS OUT OF SERVICE FOR MORE THAN 4 HOURS AND OCCUPIED IS REQUIRED TO ESTABLISH A FIRE WATCH. FOR THE PERSON OR PERSONS ASSIGNED TO THE FIRE WATCH, THIS MUST BE THEIR ONLY JOB DUTY

DURING THE TIME PERIOD OF THE FIRE PROTECTION RENOVATION WORK.

D. IN ADDITION THE BUILDING OWNER IS REQUIRED TO HAVE AN IMPAIRMENT COORDINATOR. THE OUT OF SERVICE EQUIPMENT MUST BE TAGGED “OUT OF SERVICE”. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION (REFERENCE INTERNATIONAL FIRE CODE- CHAPTER 9, SECTION 901.7).

E. FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF PERFORMANCE, THE PERSONS

PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM ANY OTHER DUTIES.

F. FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TO BE TRAINED IN ITS

USE.

G. THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH FLOOR, LEVEL, AND

ROOM OF THE FIRE AREA IS COVERED.

H. IN GENERAL, A FIRE WATCH IS TO FULFILL THE INTENT OF NFPA-72 AS FOLLOWS: 1. NOTIFY OCCUPANTS TO EVACUATE WHEN THERE IS A FIRE IN THE BUILDING; 2. NOTIFY THE CENTRAL MONITORING STATION TO INITIATE EMERGENCY PERSONNEL RESPONSE; 3. ACITVATE FIRE PROTECTION SYSTEMS IN ORDER TO RELEASE DOOR HOLDERS, CLOSE

SMOKE DAMPERS, AND SHUT DOWN FANS.

I. IF BUILDING OCCUPANTS ASSIST WITH FIRE WATCH DUTIES, THE PROCEDURES FOR CONTACTING EMERGENCY PERSONNEL AND EVACUATING THE BUILDING ARE TO BE DISTRIBUTED TO BUILDING OCCUPANTS. FOR PLANNED

OUTAGES, THE PROCEDURES ARE TO BE SENT TO THE BUILDING OWNER FOR DISTRIBUTION.

FLOW TEST INFORMATION

STATIC PSI RESIDUAL PSI FLOW GPM DATE LOCATION FLOW TEST PERFORMED BY

THE FLOW TEST INFORMATION LISTED ABOVE IS INTENDED AS A REFERENCE FOR THE FIRE PROTECTION

CONTRACTOR. THE FIRE PROTECTION CONTRACTOR SHALL PERFORM A HYDRAULIC FLOW TEST NEAR THE PROJECT SITE TO VERIFY ACTUAL FLOW CONDITIONS ON WHICH TO BASE THE FIRE PROTECTION DESIGN.

T&D

TS

FS

ORDINARY HAZARD

GROUP 2 OCCUPANCY

INFECTION CONTROL MEASURES

A. CONTRACTOR SHALL COMPLY WITH THE OWNER'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND

WRITTEN DUST CONTROL PLAN.

B. EXISTING AIR QUALITY REQUIREMENTS AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS SHALL BE

MAINTAINED.

C. RENOVATION AREAS SHALL BE ISOLATED FROM OCCUPIED AREAS DURING CONSTRUCTION USING AIRTIGHT BARRIERS.

PROVIDE EXHAUST AIRFLOW IN A MANNER THAT SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. COORDINATE TEMPORARY BARRIERS WITH INTERIM LIFE SAFETY MEASURES.

D. FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBOURNE OPPORTUNISTIC

PATHOGENS.

E. DOUBLE-BAGGING IS REQUIRED FOR CONSTRUCTION DEBRIS. COMPLY WITH OWNER'S DESIGNATED ROUTE FOR

REMOVAL.

F. CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE OWNER'S

ACCEPTANCE.

THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA

13. IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE

PROTECTION WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS

DRAWING IS “FOR INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE

PROTECTION CONTRACTOR TO BASE THE DESIGN OF THE FIRE PROTECTION

SYSTEM ON. THE CONTRACTOR SHALL VERIFY THE EXACT CONDITIONS THAT THIS

DRAWING REPRESENTS, INCLUDING ANY PERCEIVED CONCEALED SPACES, AND THE

BUILDING TYPE AND CONSTRUCTION AS OUTLINED IN THE INTERNATIONAL BUILDING

CODE, PRIOR TO THE START OF WORK. REFER TO THE INTERNATIONAL BUILDING

CODE, ESPECIALLY CHAPTERS 6 (TYPES OF CONSTRUCTION) AND CHAPTER 9 (FIRE

PROTECTION SYSTEMS), NFPA 13 (CHAPTER 8), AND THE PROJECT SPECIFICATIONS

FOR OTHER FIRE PROTECTION REQUIREMENTS.

SPRINKLER RISER.

INDICATING BUTTERFLY VALVE

WITH TAMPER SWITCH 7'-0" AFF -

IF GREATER THAN 7'-0" PROVIDE

LADDER.

WATER FLOW SWITCH.

PRESSURE GAUGE.

TO SPRINKLER SYSTEM.

AUXILIARY DRAIN VALVE.

1" INSPECTOR'S TEST VALVE.

SIGHT GLASS.

2" DRAIN CONNECTION. TIE IN TO EXISTING

DRAIN PIPING.

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7 /2

:5

:4

A

M

FX001

FIRE PROTECTION GENERAL

INFORMATION

1 2SMH

NEW 4TH MRI ADDITION

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD.

RICHMOND, VA 23249 OCTOBER 7, 2020

BID DOCUMENTS

652-CSI-20419-088

SPG

SCALE: 12" = 1'-0"

MECHANICAL TEE AND FLUSHING CONNECTION DETAIL

SCALE: 12" = 1'-0"

PIPE HANGER SUPPORT DETAIL

SCALE: 12" = 1'-0"

SPRINKLER ABOVE AND BELOW DUCT DETAIL

SCALE: 12" = 1'-0"

SPRINKLER PIPE SLEEVE THRU FIRE RATED WALL

SCALE: N.T.S.

TYPICAL FLOOR CONTROL VALVE ASSEMBLY DETAIL

SCALE: 12" = 1'-0"

TYPICAL SEMI-RECESSED PENDENT SPRINKLER

F

R P

O

SS

E

OI LNA

GNE

IN

E R

E

N

SILAS PERRY GEORGE

M O

C O

M

OHL

EA T

W

I N

A

V F

I G

I R

Lic. No. 0402056110

DocuSign Envelope ID: 9AC413A8-6793-4109-90C2-2F2A5DEDE49E

10/7/2020

A'

B'

C'

1.4 2 2.1 3

21 3 4

MRI 1

1Y-158

EQUIPMENT 1

1Y-159

MRI 2

1Y-156

EQUIPMENT 2

1Y-155

TLT

1Y-154

DRESS

1Y-153

DRESS

1Y-152

CORRIDOR

C1Y-1

IV

1Y-110

CORRIDOR

C1Y-4

5 TYP.6

CONTROL ROOM

1Y-151D

PREP

1Y-151

BAY 1

1Y-151A

BAY 2

1Y-151B

BAY 3

1Y-151C

IT ROOM

1Y-107

STORAGE

1Y-150

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7 /2

:5

:4

A

M

FX101

FIRST FLOOR FIRE PROTECTION PLAN

- MRI SUTIE

2 2SMH

NEW 4TH MRI ADDITION

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD.

RICHMOND, VA 23249 OCTOBER 7, 2020

BID DOCUMENTS

652-CSI-20419-088

SPG

0 2 4 8

NORTH

SCALE: 1/4" = 1'-0"

FIRST FLOOR FIRE PROTECTION PLAN - MRI SUITE

1 OCCUPANCY CLASSIFICATION ORDINARY HAZARD

GRADE 1.

2 PROVIDE NEW SPRINKLER MAINS AND BRANCH

PIPING SERVING MRI (156 & 158).

3 PROVIDE NEW MRI RATED SPRINKLER HEADS.

4 MRI (156 & 158) SPRINKLER SYSTEM SHALL BE

CONNECTED TO EXISTING MRI SUITE ZONE.

5 PROVIDE NEW SPRINKLER HEADS AS PER LAYOUT.

6 PROVIDE NEW SPRINKLER MAINS AND BRANCH

PIPING AS REQUIRED.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A. ALL PIPING WITHIN THE MRI (156 & 158)

SCANNING ROOM SHALL BE COPPER.

B. RF SHIELDING PENETRATIONS SHALL BE

SEALED PER MRI MANUFACTURER

REQUIREMENTS.

C. PROVIDE RF WAVEGUIDE FOR PIPING

PENETRATIONS THROUGH RF SHIELD.

D. FOLLOW SHUT DOWN PROCEDURES TO

CONNECT MRI (156 & 158) SPRINKLER

SYSTEM TO ZONE SPRINKLER SYSTEM.

PROVIDE FIRE WATCH IF REQUIRED.

E. PROVIDE SEISMIC BRACINGS FOR

SPRINKLER PIPING.

F. SPRINKLER INSTALLATIONS SHALL BE PER

NFPA-13 AND NFPA-75.

G. COVERAGE PER SPRINKLER: 130 SQFT

MINIMUM SPRINKLERS = 6

MAXIMUM SPRINKLERS = 8

F

R P

O

SS

E

OI LNA

GNE

IN

E R

E

N

SILAS PERRY GEORGE

M O

C O

M

OHL

EA T

W

I N

A

V F

I G

I R

Lic. No. 0402056110

ANNOTATION ABBREVIATIONS

PLUMBING ABBREVIATIONS

3-WAY CONTROL VALVE

ANGLE GATE VALVE

ANGLE GLOBE VALVE

BALANCING/SHUTOFF VALVE

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

CALIBRATED BALANCING VALVE

CONTROL VALVE

EXPANSION VALVE

GATE VALVE

GLOBE VALVE

QUICK OPEN VALVE

SAFETY RELIEF VALVE

SOLENOID VALVE

BACKFLOW PREVENTER

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLOW ARROW

HOSE BIBB / SILLCOCK

VACUUM RELIEF VALVE

GAS COCK

PLUG VALVE

PLUMBING SYMBOLS

PRESSURE REDUCING VALVE (WATER)

PRESSURE REGULATOR (GAS)

PIPE ANCHOR

PIPE GUIDES

WALL CLEANOUT

SUSPENDED CLEANOUT

WCO

WYE STRAINER

WYE STRAINER W/DRAIN VALVE

FLOOR DRAIN - ROUND OR SQUARE

FLOOR CLEANOUT - ROUND OR SQUARE

PIPE CAP

PIPE TURNING DOWN

PIPE TURNING UP

TEE UP

TEE DOWN

DROP AND RUN

DROP AND TURN

TEE OFF TOP

TEE OFF BOTTOM

CROSS AND RISER

PLAN 90° ELBOW

PIPE TEE

PIPE UNION

FLEXIBLE PIPE CONNECTOR

WATER METER

PUMP

AUTOMATIC AIR VENT

PRESSURE SWITCH

PRESSURE GAUGE

THERMOMETER

FLOW SWITCH

TEMPERATURE SWITCH

OR

OR

CO

PIPE SLOPE ARROW

F

P

T

M

DCWR

HW

PIPING SYSTEM

NG NATURAL GAS

ST STORM

PD PUMP DISCHARGE

OFD OVERFLOW STORM DRAIN

GW GREASE WASTE

OW OIL WASTE

SAN SANITARY WASTE

CD CONDENSATE DRAIN

CA COMPRESSED AIR

AW ACID WASTE

N2 NITROGEN

N2O NITROUS OXIDE

MA MEDICAL AIR

O2 OXYGEN

WAGD WASTE ANESTHETIC GAS DISPOSAL

VAC VACUUM

V SANITARY VENT

OV OIL VENT

AV ACID VENT

NPCW NONPOTABLE COLD WATER

DI DE-IONIZED WATER

SCW SOFTENED COLD WATER

CW DOMESTIC COLD WATER

RO REVERSE OSMOSIS WATER

DOMESTIC CW RECIRCULATION

DOMESTIC HOT WATER

CO2 CARBON DIOXIDE

HW 140 DOMESTIC HOT WATER (OTHER TEMP)

PG PROPANE GAS

PLUMBING SYMBOLS

ANNOTATION SYMBOLS

(E)EXISTING

NEW KEYNOTE

DEMO KEYNOTE

NEW BOLD TEXT INDICATES NEW ITEM

TEXT INDICATES EXISTING ITEM

PLUMBING EQUIPMENT DESIGNATION

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

CONNECT TO EXISTING

LIMITS OF DEMOLITION

P-###

DHWR DOMESTIC HW RECIRCULATION

PLUMBING GENERAL NOTES

PLUMBING DEMOLITION GENERAL NOTES

1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE

PROCEEDING WITH WORK.

2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF

THIS WORK.

3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.

4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND

ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.

5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.

6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUDTOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND

APPROVAL.

7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES

DAMAGED AT NO ADDITIONAL COST.

8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.

9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW

PLUMBING AND WORK OF OTHER TRADES.

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA

STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE

GRADE FOR THE PURPOSES INTENDED.

5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY

AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.

6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR

EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.

7. AT EACH PLUMBING FIXTURE, PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO

MANUFACTURER'S RECOMMENDATIONS.

8. SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE. SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED

OTHERWISE.

9. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH

SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.

10. FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF

WALLS AND FLOORS.

11. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND

APPLICABLE VA STANDARDS.

12. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.

13. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL

CODES AND APPLICABLE VA STANDARDS.

14. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.

15. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING

OF PIPING WITH EXISTING CONDITIONS.

16. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND

ARRANGEMENT OF PIPING SYSTEMS.

17. CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE OWNER 1

WEEK IN ADVANCE.

18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS

CONTRACT, UNLESS NOTED OTHERWISE.

19. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF

PROJECT.

20. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

21. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.

A/E ARCHITECT/ENGINEER

AC ABOVE CEILING

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

AFG ABOVE FINISHED GRADE

ASD ADJUSTABLE SPEED DRIVE

ASHRAE AMERICAN SOCIETY HEATING,

REGRIGERATING, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY PLUMBING

ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

BAS BUILDING AUTOMATION SYSTEM

BF BELOW FLOOR

BFP BACKFLOW PREVENTER

BG BELOW GRADE

BH BOOSTER HEATER

BHP BREAK HORSEPOWER

BJ BETWEEN JOISTS

BOP BOTTOM OF PIPE

BSP BLACK STEEL PIPE

BT BATHTUB

BTUH BRITISH THERMAL UNITS PER HOUR

C CELSIUS

CF COMBINATION FIXTURE

CGA COMPRESSED GAS ASSOCIATION

CI CAST IRON

CO CLEANOUT

COND CONDENSATE

CP CONDENSATE PUMP

CS CLINICAL SINK

CV CONTROL VALVE

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DF DRINKING FOUNTAIN

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

EC ELECTRICAL CONTRACTOR

EL ELEVATION

EMCS ENERGY MONOSERRAT AND CENTRAL

SYSTEM

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWS EYEWASH STATION

EX EXISTING

F FAHRENHEIT

FA FROM ABOVE

FB FROM BELOW

FBO FURNISHED BY OTHERS

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE)

CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FU FIXTURE UNITS

G GALLON

GC GENERAL CONTRACTOR

GCO GRADE CLEANOUTS

GD GARBAGE DISPOSAL

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

H&CW HOT AND COLD WATER

HB HOSE BIBB (INTERIOR)

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK

(DOMESTIC)

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

ICW INDUSTRIAL COLD WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

KW KILOWATT

KWHR KILOWATT-HOUR

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH THOUSANDS OF BTU PER HOUR

MC MECHANICAL CONTRACTOR

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MOU MEMORANDUM OF UNDERSTANDING

MSB MOP SINK BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N2O NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW

PA PACAL

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAUGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH

ATMOSPHERE

PSIG POUNDS PER SQUARE INCH GAUGE

PTRV PRESSURE TEMPERATURE RELIEF

VALVE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RO REVERSE OSMOSIS

RWL RAIN WATER LEADER

SAN SANITARY SEWER

SCFM STANDARD CUBIC FOOT/MIN

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT SQUARE FOOT

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL VALVE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TDL TEMPERATURE DIFFERENTIAL

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

UPC UNIFORM PLUMBING CODE

V SANITARY VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAUGE

WH WATER HEATER

WHA WATER HAMMER ARRESTOR

WHD WALL HYDRANT

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WS WASTE STACK

YCO YARD CLEANOUT

YH YARD HYDRANT

CIRCUIT SETTER VALVE

NG

ST

PD

OFD

GW

OW

SAN

CD

CA

AW

N2

N2O

MA

O2

WAGD

VAC

CO2

PG

V

OV

AV

HW 140

SCW

NPCW

DI

RO

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .