Parking Facilities Repairs.pdf
PDF 2 MB Posted
- Attached to
- Repairs to Parking Facilities
- Solicitation number
- 27-1125
- Issued by
- Durham County, North Carolina
About this file
This is a Project Manual for a competitive bidding process issued by the City of Durham, North Carolina General Services Department for Parking Facilities Repairs - Package 3. The project consists of various structural, waterproofing, operational, architectural, mechanical, electrical, plumbing, and fire protection repairs to existing parking decks owned and operated by the City of Durham. Work includes concrete maintenance and repairs, traffic coatings, joint sealants, door hardware, resinous flooring, painting, fire suppression systems, plumbing piping, HVAC equipment, and electrical systems. A non-mandatory pre-bid conference is scheduled for November 10, 2026 at 10:00 AM at Morgan Rigsbee Deck with a site walk-through to follow. Bids are due December 1, 2026 at 2:00 PM. The contract requires a General Contractor's license under North Carolina General Statutes Chapter 87. Single-prime bids are required on a lump sum basis, and bidders must identify subcontractors for Plumbing, Mechanical (HVAC), and Electrical work. Contract completion time is 365 calendar days, with Substantial Completion required within 334 days of the Notice to Proceed.
The bid must include a 5% deposit (cash, cashier's check, certified check, or bid bond). Upon award, the contractor must provide performance and payment bonds for 100% of the contract amount, executed by a North Carolina-licensed surety. Insurance requirements include Commercial General Liability of $1,000,000 per occurrence/$2,000,000 aggregate, Automobile Liability of $1,000,000 Combined Single Limit, and Workers' Compensation with Employer Liability of $1,000,000. Retainage of 5% applies until the project reaches 50% completion, with potential cessation if performance is satisfactory and surety consent is obtained; however, the City may reinstate retainage to maintain 2.5% through project completion. Liquidated damages are assessed at $400.00 per day for delays beyond the contract completion date. The contractor is responsible for all necessary permits and must submit a site-specific safety plan prior to contract approval. Sales tax is excluded from bids and will be reimbursed separately. All bidders must submit a Non-Collusion Affidavit, Bidder Safety Evaluation Questionnaire with contractor safety records, and Contractor Qualifications documentation demonstrating a minimum of five years of experience in similar commercial or industrial work and three project references completed within the past ten years.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manual
City of Durham Parking Facilities Repairs – Package 3
Durham, North Carolina
Bid Advertised October 30, 2026
Owner: City of Durham
101 City Hall Plaza Durham, North Carolina 27701
General Services Department 2011 Fay Street
Durham, North Carolina 27704
(919) 560-4197
Parking Facilities Repairs – Package 3 Durham, North Carolina
CITY OF DURHAM, NORTH CAROLINA
MAYOR: Leonardo Williams
COUNCIL MEMBERS:
Javiera Caballero, Mayor Pro-Tempore Nate Baker Shanetta Burris Matt Kopac Chelsea Cook Carl Rist
CITY MANAGER: W. BOWMAN FERGUSON
CITY ATTORNEY: KIMBERLY REHBERG CITY
CLERK: DIANA SCHREIBER
City of Durham General Services Department
Bidding and Contract Requirements Table of Contents Page i
Table of Contents
Division 00: Bidding and Contract Requirements Page Invitation to Bidders 00 01-1
Instructions to Bidders 00 02-1
Bid Proposal Form 00 03-1
Contractor Qualifications Requirements 00 04-1
Non-Collusion Affidavit 00 05-1
Bidder Safety Evaluation Questionnaire 00 06-1
Insurance Requirements 00 07-1
Payment & Performance Bond 00 08-1
Bid Bond 00 09-1
Request for Approval of Substitution 00 10-1
Example Documents for use During Construction
Standard Form of Agreement between Owner and Contractor Subcontractor Monthly Record of Payment Report
00 11-1 00 12-1
Reimburable Sales Tax Forms 00 13-1
Contract Change Order Form 00 14-1
Claim for Additional Time on the Basis of Adverse Weather Conditions 00 15-1
Division 01: General Requirements Attached
00 01 07 Seals Page
01 10 00 Summary of Work
01 21 00 Allowances
01 22 00 Unit Prices
01 23 00 Alternates
01 25 00 Substitution Procedures
01 29 00 Payment Procedures
01 31 00 Project Management and Coordination
01 32 00 Construction Progress Documentation
01 33 00 Submittal Procedures
01 40 00 Quality Requirements
01 50 00 Temporary Facilities and Controls
01 60 00 Product Requirements
01 73 00 Execution
01 77 00 Closeout Procedures
01 78 39 Project Record Documents
Technical Specifications Attached Division 02: Existing Conditions
Table of Contents Page ii
02 41 19 Selective Structure Demolition
Division 03: Concrete
03 01 30 Maintenance of Cast-In-Place Concrete
Division 05: Metals
05 50 00 Metal Fabrications
Division 07: Thermal and Moisture Protection
07 18 00 Traffic Coatings
07 92 10 Structural and Traffic Grade Joint Sealants
07 95 00 Parking Deck Expansion Joint Cover Assemblies
Division 08: Openings
08 11 13 Hollow Metal Doors and Frames
08 71 00 Door Hardware
Division 09: Finishes
09 65 13 Resilient Base and Accessories
09 67 23 Resinous Flooring
09 91 13 Exterior Painting
09 91 50 Traffic Striping Paint
Division 21: Fire Suppression
21 05 29 Hangers and Supports for Fire-Suppression Piping and Equipment
21 12 00 Fire-Suppression Standpipes
Division 22: Plumbing
22 05 29 Hangers and Supports for Plumbing Piping and Equipment
22 07 19 Plumbing Piping Insulation
22 14 13 Storm Drainage Piping
22 14 23 Storm Drainage Piping Specialties
Table of Contents Page iii
Division 23: Heating, Ventilating and Air Conditioning (HVAC)
23 05 13 Common Motor Requirements for HVAC Equipment
23 05 17 Sleeves and Sleeve Seals for HVAC Piping
23 05 29 Hangers and Supports for HVAC Piping and Equipment
23 05 53 Identification for HVAC Piping and Equipment
23 05 93 Testing, Adjusting and Balancing for HVAC
23 07 19 HVAC Piping Insulation
23 23 00 Refrigerant Piping
23 31 13 Metal Ducts
23 33 00 Air Duct Accessories
23 34 23 HVAC Power Ventilators and Fans
23 81 13 Packaged Terminal Air-Conditioners
23 81 27 Mini Split System Air-Conditioners
23 82 39 Wall and Ceiling Unit Heaters
Division 26: Electrical
26 05 00 Common Work Results for Electrical
26 05 19 Low-Voltage Electrical Power Conductors
26 05 26 Grounding and Bonding for Electrical Systems
26 05 29 Hangers and Supports for Electrical Systems
26 05 33 Raceways and Boxes for Electrical Systems
26 05 44 Sleeves and Sleeve Seals for Electrical Raceways and Cabling
26 05 53 Identification for Electrical Systems
26 05 73.15 Arc Flash Hazard Analysis and Short-Circuit Coordination Study
26 22 00 Low-Voltage Transformers
26 24 16 Panelboards
26 27 26 Wiring Devices
26 28 13 Fuses
26 28 16 Enclosed Switches
26 51 00 Interior-Exterior Lighting
Contract Drawings Separate
Table of Contents Page iv
This page intentionally left blank.
Invitation to Bidders Page 00 01-1
INVITATION TO BIDDERS
The City of Durham will receive bids for the Parking Facilities Repairs – Package 3 by:
December 1, 2026, at 2:00 pm
The City of Durham General Services Department, 2011 Fay Street, Durham, NC 27704
Attention: Chris Liszka
Summary of Work:
This project consists of various structural, waterproofing, operational, architectural, mechanical, electrical, plumbing, and fire protection repairs to the existing parking decks owned and operated by the City of Durham.
Bidders are encouraged to attend a non-mandatory pre-bid conference to go over the project on Tuesday, November 10th @ 10:00 am at Morgan Rigsbee Deck 105 W. Morgan Street
Conference Room located in Durham. A site visit walk through will immediately follow for all parking decks within project scope.
Plans and specifications are available for download or viewing at:
The City of Durham Finance Department Website under Purchasing:
http://durhamnc.gov/bids.aspx
All inquiries, questions, requests for substitution, and/or clarifications must be submitted in writing via the email below according to the directions given in the Request for Approval of Substitution and in the Instructions to Bidders prior to November 11, 2026 @ 5:00pm.
Chris Liszka, GSD PM
Consultant Turner Townsend Heery
984-303-8937 chris.liszka@durhamnc.gov
Matt Sumpter, P.E.
Kimley-Horn and Associates, Inc.
980-785-0732
Matt.sumpter@kimley-horn.com
Each bidder must show evidence that they are licensed under Chapter 87 of the N.C. General Statutes. A General Contractors License is required.
Invitation to Bidders Page 00 01-2
The Following Forms MUST be filled out and included with the bid proposal:
1. Bid Forms
2. Non-Collusion Affidavit
3. Bidder Safety Evaluation Questionnaire / Contractor Safety Record Information
4. Contractor Qualifications
Any bid submitted without these forms may be deemed non-responsive.
The City of Durham reserves the right to reject any or all bids, waive informalities, and/or accept such bid as appears in its judgement to be in the best interest of the City.
END OF ADVERTISEMENT TO BIDDERS
Invitation to Bidders Page 00 01-3
Instructions to Bidders Page 00 02-1
INSTRUCTIONS TO BIDDERS
1. Bids will be received for Single Prime Contract. All proposals shall be for lump sum.
2. The submission of a bid will assume that the Contractor has fully examined the site and knows existing conditions and has made every provision for operating under the existing conditions, and has included all necessary items, and has read and understands the Bidding Documents. No consideration shall be given to any claim for extra compensation or extension of contract time because of failure to comply with this provision.
3. Bids must be made in strict accordance on the “Bid Form” provided hereto and all blank spaces for the Bid Alternates and Unit Prices, shall be properly filled in. When requested Alternates or Unit Prices are not bid, the bid may be considered incomplete. All bids submitted must be on the blank proposal forms herein provided and prices given shall be both in writing and figures and the complete form shall be without any lineation, alterations, or erasures. Any modification to the Bid Form (including Alternates and Unit Prices) may disqualify the Bid and/or cause the Bid to be rejected. In case of conflicting prices, the written prices shall govern.
One (1) original shall be submitted to City of Durham General Services.
The Contractor shall fill in the Form of Bid as follows:
a. All bids must be signed by an authorized official of the firm.
b. Each proposal shall include the full name and address, phone number, and e-mail contact of the bidder.
c. It shall be the specific responsibility of the Bidder to deliver this Bid to address specified in Invitation to Bidders prior to the date and time specified in the invitation to bidders for opening of the Bids. Later delivery of a Bid for any reason, including delivery by the United States Mail, shall disqualify the Bid.
d. Modifications of previously deposited Bids will be acceptable only if delivered to the place of the bid by the specified time.
Bids shall be received in strict accordance with requirements of the General Statutes of North
Carolina. All copies of the Bid, and any other documents required to be submitted with the Bid shall be enclosed in a double envelope. Bid Bonds, if required, are to be submitted in a separate envelope from the Bid form and other required documents, but within the main Bid envelope, and labeled "Bid Bond". The envelope can be hand delivered or mailed and shall be addressed to the
City of Durham, General Services Department, 2011 Fay Street, Durham, North Carolina 27704, and should be identified with the project name, time and date of Bid Opening, the Bidder’s name and address, and Bidder’s General Contracting license number. For Informal Bidding-Projects Under
$500,000, emailed bids are also acceptable.
4. Bidders are encouraged to attend a pre-bid conference at the date and time specified in the invitation to bidders.
5. The bidder is hereby directed NOT to include the N.C. Sales Tax in the bid total. The successful bidder to whom the award is made will be required to submit a sworn statement each month itemizing the purchases and taxes paid thereon and certifying that the articles purchased were used in work
Instructions to Bidders Page 00 02-2 performed for the City of Durham. The N.C. Sales and Use Tax so itemized will be made a part of the monthly estimate. A sample form which must be followed to qualify for these payments to Sales and Use Tax is shown in the Project Manual.
It is the intent of the City to award this bid to the lowest responsive and responsible bidder. The City reserves the right to reject any and all Bids, including without limitation, nonconforming, non-responsive, unbalanced, or conditional Bids. The City of Durham further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible.
The City of Durham may also reject the Bid of any Bidder if the City believes that it would not be in the best interest of the Project to make an award to that Bidder. The City of Durham also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate terms with the Successful Bidder.
6. No bid shall be considered or accepted by the City unless at the time of its filing, it is accompanied by a deposit of cash, or a cashier's check, or a certified check on some bank or trust company insured by the Federal Deposit Insurance Corporation in an amount equal to not less than five percent (5%) of the bid. In lieu of making that deposit, the bidder may file a bid bond executed by a corporate surety licensed under the laws of North Carolina to execute such bonds, conditioned that the surety will upon demand forthwith make payment to the City of Durham upon the bond if the bidder fails to execute the contract in accordance with the bid bond. This deposit shall be retained by the City if the successful bidder fails to execute the contract within 10 days after the award or fails to give satisfactory bonds or deposit as required herein. The bidder to whom the award of contract is made shall either (a) furnish bonds as required by Article 3 of Chapter 44A of the N.C. General Statutes, using the form supplied by the City; or (b) deposit with the City money, certified check or government securities. The bonds or deposit shall be for the full amount of the contract to secure the faithful performance of the terms of the contract and the payment of all sums due for labor and materials in a manner consistent with Article 3 of Chapter 44 A.
7. Except to the extent allowed by statute, bids shall not be withdrawn and bids shall remain subject to acceptance by the City for a period of 90 days.
8. If performance and payment bonds are required, the City requires the use of its performance bond and payment bond form unless, after consulting the City Attorney’s office, the project manager finds that different bond forms satisfactorily protect the City. Before bidding, each bidder should show the City bond form to its bonding company to be sure it can promptly issue the bond on that form in the event the contract is awarded to it. Each bond must be for 100% of the contract amount and must be executed by a NC-licensed surety.
9. Upon request, bidders must present satisfactory evidence that they have been regularly engaged in the business of constructing such work, such as company work history and references from similar construction projects. And upon request, bidders must show that they are fully prepared with the necessary capital, equipment, etc., to begin the work promptly, and complete the same in accordance with specifications.
10. The Contractor must provide the City of Durham a site – specific safety plan of their organization, prior to approval of the contract.
11. The bidder to whom the award is made shall be required to furnish work crews of adequate number, size, and experience to properly perform the work. The interpretation of the number of crews, size, and experience will be determined by the City of Durham as to their adequacy.
Instructions to Bidders Page 00 02-3
12. The contractor will furnish all materials, labor, equipment, supervision, tools, machinery, etc. for complete construction of projects in accordance with plans and specifications of the City of Durham.
13. The Contractor will perform, or have performed, all the necessary site layout (both lines and grades) for this construction.
14. The City reserves the right to extend the work in this Contract upon the same terms, provided that such extensions shall not exceed in cost fifty per cent (50%) of the original Contract price of the Contract being extended.
15. It shall be the contractors’ responsibility to obtain all necessary and required permits. These permits shall be maintained on site and available upon demand.
16. The contractor(s) to whom the award is made must carry insurance in the amounts and types outlined in the Insurance Requirements document in the Project Manual.
17. Indemnification – See section 6.20 of the EJCDC C-700 Standard General Conditions of the Construction Contract included in the Project Manual.
18. The successful bidder is required to commence work within ten (10) days after written notice from the Project Manager. Termination of work shall also be controlled by the City of Durham.
19. Contract completion time for all work on this project is 365 calendar days.
20. Bidders are required by the City of Durham to be licensed. General Contractors are notified that Chapter 87, Article 1, General Statutes of North Carolina will be observed in receiving and awarding general contracts. Contractors submitting bids on this project must have license classification for general contractor.
21. GS143-128(d) requires all single prime bidders to identify their subcontractors for the Plumbing, Mechanical, and Electrical subdivisions of work. A contractor whose bid is accepted shall not substitute any person as a subcontractor in the place of the subcontractor listed in the original bid, except (i) if the listed subcontractor’s bid is later determined by the contractor to be non-responsible or the listed subcontractor refuses to enter into a contract for the complete performance of the bid work, or (ii) with the approval of the awarding authority for good cause shown by the contractor. The PME subcontractors MUST be listed or this will be cause for rejection. See the Proposal Form.
22. Substitutions: Any Bidder proposing a substitution shall bear the entire cost of incorporating the substitution into the finished work, including costs of administration, re-detailing, redesigning and changing the work of other contractors and sub-contractors. For proposed material substitutions submit the Request for Approval of Substitution form in the Project Manual to the Designer. If a material substitution is accepted by the Project Manager and Owner, Contractors will be notified by an addendum. The deadline for any request for substitution is as listed in the Invitation to Bidders in order allow time to issue responses in an addendum.
23. Any addenda issued during the time of bidding are to be considered covered in the Bid and the Contract they will become part thereof. It shall be the Contractor’s responsibility to ascertain prior to Bid time the addenda issues and to see that his/her Bid includes any changes thereby required. All Addenda shall be acknowledged by the bidder(s) on the Bid Form. Failure to do so may disqualify the Bid and may cause the Bid to be rejected.
Instructions to Bidders Page 00 02-4
24. Should the Bidder find discrepancies in, or omissions from, the drawings or documents or should he/she be in doubt as to their meaning, he/she shall at once notify the Designer in writing. Any interpretation of the document will be made only by Addendum duly issued. The Designer will not be responsible for any explanation or interpretation of the proposed documents. Neither the Owner nor the Designer will be responsible for any oral instructions. Any questions regarding the Bid
Documents or Contract Conditions must be in writing via email and received by the date and time specified in the Invitation to Bidders.
25. Plans and specifications and all bid addenda are available electronically on The City of Durham Finance Department Website under Purchasing: NEW WEBSITE: http://durhamnc.gov/bids.aspx
26. Plans and specifications are also on file and available for viewing at: The City of Durham General Services Department – 2011 Fay Street, Durham, NC 27704; 919-560-4197, and City of Durham Equal Opportunity/Equity Assurance Department – 101 City Hall Plaza, Durham, NC 27701; (919) 560-4180.
27. The bidder to whom the award is made shall be required to enter into proposed Contract with the City of Durham, North Carolina, E-Verify Requirements. (A) If this contract is awarded pursuant to North Carolina General Statutes
(NCGS) 143-129 – (i) the contractor represents and covenants that the contractor and its subcontractors comply with the requirements of Article 2 of Chapter 64 of the NCGS; (ii) the words
"contractor," "contractor’s subcontractors," and "comply" as used in this subsection (A) shall have the meanings intended by NCGS 143-129(j); and (iii) the City is relying on this subsection (A) in entering into this contract. (B) If this contract is subject to NCGS 143-133.3, the contractor and its subcontractors shall comply with the requirements of Article 2 of Chapter 64 of the NCGS.
State Treasurer's lists regarding Iran and Boycott of Israel. If the successful bidder or the City signs the contract on October 1, 2017 or afterwards, and the value of the contract is $1,000 or more, the following applies unless the bidder otherwise states in its bid: the bidder affirms (by submitting a bid) that (1) its name does not appear on the list of companies that are engaged in a boycott of Israel developed by the N. C. State Treasurer under N.C.G.S. 147 86.81(a)(1) or on a list created by the
Treasurer pursuant to N.C.G.S. 147 86.58 as a company engaging in investment activities in Iran, and
(2) it has no reason to expect that its name will appear on either of those lists. Take notice that a contract between a company named on either list and the City may be void.
28. Examination of Bidding Documents, Other related Data, and Site Subsurface and Physical Conditions
a. The General Conditions identify those reports of explorations and tests of subsurface conditions at or contiguous to the Site that the Engineer has used in preparing the Bidding
Documents. Those drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the Site (except Underground Facilities) that the
Engineer has used in preparing the Bidding Documents.
b. Copies of reports and drawings referenced in Paragraph 1.5.A.1 are available by the City of Durham to any Bidder in accordance with Appendix. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which the Bidder is entitled to rely and have been identified and established as provided in Paragraph 4.02 of the General Conditions. Bidder is responsible for any interpretation
Instructions to Bidders Page 00 02-5 or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings
29. Values of City of Durham regarding Treatment of Employees of Contractors
a. Statement of City EEO Policy. The City of Durham opposes discrimination in employment because of race, color, religion, sex, national origin, political affiliation or belief, age, or handicap. Therefore, it desires that firms doing business with the City:
1. not discriminate against any employee or applicant for employment because of race, color, religion, sex, national origin, political affiliation or belief, age, or handicap.
2. take affirmative action to insure that applicants are employed and that employees are treated equally during employment, without regard to race, color, religion, sex, national origin, political affiliation or belief, age, or handicap. This action includes employment, upgrading, demotion, transfer, recruitment or advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship.
3. state, in solicitations or advertisement for employees, that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, political affiliation or belief, age, or handicap.
4. include this Statement of City EEO Policy in every purchase order for goods to be used in performing City contracts and in every subcontract related to City contracts.
30. Livable Wage - The City of Durham desires that firms doing business with the City pay their workers a livable wage rate while working on City contracts. The livable wage rate effective 7/1/26 is $25.09.
END OF INSTRUCTIONS TO BIDDERS
Instructions to Bidders Page 00 02-6
Bid Proposal Page 00 03-1
BID PROPOSAL FORM
(USE THIS FORM ONLY)
SUBMIT PROPOSALS IN CARE OF:
General Services Department City of Durham 2011 Fay Street Durham, NC 27704
(919) 560-4197
BIDDER’S FIRM NAME_______________________________________________________
DATE:____________________________
PROPOSAL: Parking Facilities Repairs – Package 3
The Undersigned, as Bidder, hereby declares that only person or persons interested in this proposal as principal or principals is or are named herein and that no other persons than herein mentioned has any interest in this proposal or in the contract to be entered, that this proposal is made without connection with any other person, company or parties making a bid or proposal; and that it is in all respect fair and in good faith without collusion or fraud.
The bidder further declares that they have examined the site of the work and informed themself fully in regard to all conditions pertaining to the place where the work is to be done; that they have examined the specifications for the work and the contract documents relative thereto, and has read all special provisions furnished prior to the opening of bids, that they have satisfied themself relative to the work to be performed.
Materials to be furnished shall be in compliance with standard specifications and special provisions.
CONTRACTOR’S responsibility shall continue uninterrupted until expiration of the warranty period as stated in the specifications after completion of the work. The owner (City of Durham) reserves the right to select any or all of the alternatives and to increase or decrease the total contract amount utilizing the unit prices supplied by the CONTRACTOR in the bid form.
The Base Bid and Alternates shall not include any state or local sales tax. Such tax shall be accounted for separately and will be reimbursed from a separate source.
The Bidder agrees, if their proposal is accepted, to contract with the City of Durham, 101 City Hall Plaza, Durham, NC 27701, in the form of contract specified, to furnish all necessary materials, equipment, machinery, tools, apparatus, means of transportation, and labor necessary to complete within the time allotted as specified, the General Construction work on the Owner’s property, in complete accordance with the Plans, Specifications, and Contract Documents bearing the title Parking Facilities Repairs –
Package 3 with a definite understanding that no money will be allowed for extra work except as set forth in the Contract Documents for the sums as follows:
TOTAL BASE BID:
($____________________)_________________________________________________dollars
Bid Proposal Page 00 03-2
PROPOSED SUBCONTRACTORS
HVAC Subcontractor: License:
Mechanical Subcontractor: License:
Electrical Subcontractor: License:
General Subcontractor: License:
GS 143-128(d) requires all single prime bidders to identify their subcontractors for the above subdivisions of work. A contractor whose bid is accepted shall not substitute any person as a subcontractor in the place of the subcontractor listed in the original bid, except (i) if the listed subcontractor’s bid is later determined by the contractor to be non-responsible or the listed subcontractor refuses to enter into a contract for the complete performance of the bid work, or (ii) with the approval of the awarding authority for good cause shown by the contractor.
ADDENDA
The following addenda are acknowledged as having been received and noted, the provisions for which are included in the proposal(s). Failure to acknowledge receipt of any addenda will subject the bidder to disqualification. CONTRACTOR to sign.
Addendum No. 1:__________________________________________________________
Addendum No. 2:__________________________________________________________
Addendum No. 3:__________________________________________________________
Addendum No. 4:_______________________________________________________
The undersigned proposes to perform alternatives for stated resulting additions from the Base Bid.
Additions shall include any modifications of work or additional work that the undersigned may be required to perform by reason of acceptance of any alternative.
Bid Proposal Page 00 03-3
ALTERNATES
Should any of the alternates as described in the contract documents be accepted, the amount written below shall be the amount to be “added to” the base bid.
Alternate #1: X.10 Repaint Interior Concrete Surfaces – Chapel Hill Street (54,039 SF)
($____________________)________________________________________________dollars
Alternate #2: X.11 Repaint Exterior Concrete Surfaces – Chapel Hill Street (14,450 SF)
($____________________)________________________________________________dollars
Alternate #3: X.13 Repaint Interior Concrete Surfaces – Corcoran Street (93,069 SF)
($____________________)________________________________________________dollars
Alternate #4: X.14 Repaint Exterior Concrete Surfaces – Corcoran Street (11,858 SF)
($____________________)________________________________________________dollars
Alternate #5: X.92 Doors and Hardware Repairs Alternate – Durham Centre (31 EA)
($____________________)________________________________________________dollars
Alternate #6: X.93 Doors and Hardware Repairs Alternate (14 EA)
($____________________)________________________________________________dollars
ALLOWANCES (Shall be included in the Total Base Bid Amount)
Allowances #1: Fire Protection Repairs Allowance
($_10,000_________________)____Ten thousand_____________________________________dollars
UNIT PRICES
Item
No.
Description Quantity Unit Unit Price Subtotal Price
A Mobilization / Demobilization 1 LS $ $
B Traffic Control 1 LS $ $
ST.01 SHAVE DOWN CONCRETE 20 SF $ $
ST.02 INSTALL CONCRETE WASHPOUR 213 SF $ $
Bid Proposal Page 00 03-3
ST.04
VERTICAL / OVERHEAD SPALL
REPAIR
3 SF $ $
ST.20 CMU WALL ROUT AND SEAL 50 LF $ $
ST.40 BEAM LEDGE REPAIRS 1 LS $ $
ST.50 CMU WALL REPAIR 1 LS $ $
ST.60 REMOVE BASE PLATES 4 EA $ $
W.02
REPLACE FAÇADE SEALANT /
VERTICAL SEALANT
144 LF $ $
W.10
REPLACE EXPANSION JOINT
(EPOXY BONDED)
186 LF $ $
W.20
INSTALL NEW TRAFFIC COATING
(URETHANE BASED)
25,500 SF $ $
W.21
REPAIR / REPLACE EXISTING
TRAFFIC COATING (URETHANE
BASED)
500 SF $ $
W.40
INSTALL FLASHING TO DIVERT
WATER
1 LS $ $
X.01
RESTRIPE STALLS AND PAVEMENT
MARKINGS
1 LS $ $
X.02 REPAINT CURBS 254 LF $ $
X.12 REPAINT INTERIOR CMU WALLS 2,225 SF $ $
X.15
REPAINT INTERIOR CONCRETE
SURFACES - ANNEX
10,685 SF $ $
X.20 POWER WASH INTERIOR SURFACE 461,620 SF $ $
X.30
REPAIR / REPLACE DAMAGED
FLOOR TILES
2,613 SF $ $
X.32
REPLACE DAMAGED STAIR
TREADS
28 EA $ $
X.51
INSTALL FIRE EXTINGUISHER
SIGNAGE
59 EA $ $
X.52 INSTALL NEW STAIR SIGNS 31 EA $ $
X.53
INSTALL NEW WAYFINDING
SIGNAGE AT CHURCH STREET
1 EA $ $
X.54
INSTALL NEW LOW CLEARANCE
SIGNAGE
1 LS $ $
X.55
INSTALL NEW WAYFINDING
SIGNAGE AT CHAPEL HILL STREET
2 EA $ $
X.56
INSTALL NEW LEVEL SIGNAGE AT
CHAPEL HILL STREET
27 EA $ $
X.57
REPLACE OVERHEAD HEADACHE
BAR ATTACHMENT METHOD
5 EA $ $
Bid Proposal Page 00 03-3
X.90 INSTALL PEDESTRIAN CANE RAIL 38 LF $ $
X.91 DOOR AND HARDWARE REPAIRS 47 EA $ $
M.1 MECHANICAL REPAIRS – ANNEX 1 LS $ $
M.2
MECHANICAL REPAIRS – CHAPEL
HILL STREET
1 LS $ $
M.3
MECHANICAL REPAIRS – CHURCH
STREET
1 LS $ $
M.4
MECHANICAL REPAIRS –
CORCORAN STREET
1 LS $ $
M.5
MECHANICAL REPAIRS – DURHAM
CENTRE
1 LS $ $
M.6
MECHANICAL REPAIRS – MORGAN
RIGSBEE
1 LS $ $
F.1
FIRE PROTECTION REPAIRS –
CHURCH STREET 1 LS $ $
F.2
FIRE PROTECTION REPAIRS –
DURHAM CENTRE 1 LS $ $
F.3
FIRE PROTECTION REPAIRS –
MORGAN RIGSBEE 1 LS $ $
P.1
PLUMBING REPAIRS - ANNEX
1 LS $ $
P.2
PLUMBING REPAIRS – CHAPEL
HILL STREET 1 LS $ $
P.3
PLUMBING REPAIRS – CHURCH
STREET 1 LS $ $
P.4
PLUMBING REPAIRS – CORCORAN
STREET 1 LS $ $
P.5
PLUMBING REPAIRS – DURHAM
CENTRE 1 LS $ $
P.6
PLUMBING REPAIRS – MORGAN
RIGSBEE 1 LS $ $
E.1
ELECTRICAL REPAIRS – CHAPEL
HILL STREET 1 LS $ $
E.2
ELECTRICAL REPAIRS – CHURCH
STREET 1 LS $ $
E.3
ELECTRICAL REPAIRS –
CORCORAN STREET 1 LS $ $
E.4
ELECTRICAL REPAIRS – DURHAM
CENTRE 1 LS $ $
E.5
ELECTRICAL REPAIRS – MORGAN
RIGSBEE 1 LS $ $
SUM TOTAL UNIT PRICE
(include with the Total Base Bid Amount)
Bid Proposal Page 00 03-4
REQUIRED FORMS
The following forms have been completed by the CONTRACTOR and are attached hereto.
CONTRACTOR to sign.
Bid Bond: _________________________________________________ ___________
Performance and Payment Bond: _______*To be provided upon award_________________________
Non-Collusion Affidavit: _________________________________________________
Bidder Safety Evaluation Questionnaire / Contractor Safety Record Information: ____________________
Contractor Qualifications: _________________________________
Respectfully submitted this _________________ day of ___ _ _
Signature: ________________________________________________________________
Title: ____________________________________________________________________
Firm: ____________________________________________________________________
Address: _________________________________________________________________
License No._________________ Expiration Date : _____________________
Bid Proposal Page 00 03-5
Contractor Qualifications Page 00 04-1
CONTRACTOR QUALIFICATION REQUIREMENTS
A firm or individual experienced in installing, erecting, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance. Provide evidence of the following:
1. Appropriately licensed General Contractor, in compliance with NCGS 87.
2. Bidder with a minimum of five (5) years of recent experience in commercial or industrial structural concrete, waterproofing, painting, electrical, mechanical, and plumbing work of magnitude similar to the scope of this Project.
3. Provide a minimum of three (3) references for work completed in accordance with requirement above. Include the project name, address, and phone number for each reference along with a current contact person. All work cited as references must have been performed within the last ten (10) years.
4. Provide resumes of the Project Manager and Site Superintendent demonstrating experience within the last five (5) years in services of similar scope and magnitude. Include two (2) references on each resume.
5. Provide a concise description of work experiences as related to the scope of work outlined herein.
The description should include, but not be limited to, the number of years the Bidder has been providing these types of services, types of services provided, references, and other documentation to verify the Bidder’s experience.
6. See additional requirements noted in the technical specification sections.
Contractor Qualifications Page 00 04-2
Non-Collusion Affidavit Page 00 05-1
NON-COLLUSION AFFIDAVIT
By executing this proposal, I certify that this proposal is submitted to the City of Durham competitively and without collusion. I am authorized to represent the candidate r bidder named below both in submitting this proposal and in making this non-collusion Affidavit. To the best of my knowledge and belief, (1) the candidate or bidder has not violated N. C. General Statute section 133-24 in connection with the proposal,
(2) the candidate or bidder has not entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with its proposal, and (3) the candidate or bidder intends to do the work with its own Bonafide employees or subcontractors and is no bidding or making a proposal for the benefit of another contractor. The neuter includes the masculine and the feminine. The candidate or bidder to which this Non-Collusion Affidavit refers is:
(insert name of candidate or bidder)
(signature of individual)
ACKNOWLEDGEMENT
Type or print name of the individual who signed the affidavit:
Type or print the name of Notary Public signing this acknowledgement:
Place where acknowledgment occurred: County of ______________________, State of
Notary’s residence: County of ___________, State of ________
I, the Notary Public named above, certify (1) the individual named above personally appeared before me this day, (2) I have personal knowledge, or satisfactory evidence, of the individual’s identity; and (3) the individual acknowledged signing the foregoing affidavit.
This the ____ day of _______________, 20__. _____________________ Notary Public
My commission expires:
Non-Collusion Affidavit Page 00 05-2
Bidder Safety Evaluation Questionnaire Page 00 06-1
BIDDER SAFETY EVALUATION QUESTIONNAIRE
CONTRACTOR SAFETY RECORD INFORMATION
The Contractor’s safety record shall be reviewed and evaluated in addition to other quality and performance criteria as part of bid evaluation process. Failure to provide the requested information and documentation may result in rejection of your bid as non-responsive. Accordingly, all bidders must submit the following information regarding their safety record.
The following definitions shall apply to this section:
“DART incident rate” - Acronym for “Days Away, Restrictions and Transfers”. The DART incident rate may be used to show the relative level of injuries and illnesses within a firm compared to the industry. It is based only on those injuries and illnesses severe enough to warrant “Days Away, Restrictions and Transfers”. The DART incident rate is calculated using OSHA’s Form 300 and the following formula:
((Number of entries in column H (days away from work) + column I (job transfer or restriction) x 200,000) / (Number of hours worked by all employees) = DART Incident rate.
“EMR” – Acronym for “Experience Modification Rate,” is an indicator of a contractor’s past safety performance, widely used by the insurance industry as an equitable means of determining premiums for workers' compensation insurance. The rating system considers the average workers' compensation losses for a given firm's type of work and amount of payroll and predicts the dollar amount of expected losses to be paid by that employer in a designated rating period, usually three years. The rating is based on comparison of firms doing similar types of work, and the employer is rated against the average expected performance in each work classification. Losses incurred by the employer for the rating period are then compared to the expected losses to develop an experience rating.
“OSHA” – Acronym for the Federal Occupational Health and Safety Administration. The term “OSHA” as used in this Policy also refers to any state or local agency having jurisdictional authorization to enforce worker safety requirements and assess fines or warnings for violation of worker safety standards.
Bidder Safety Evaluation Questionnaire Page 00 06-2
1. OSHA DART Incident Rate. Provide the bidder’s DART Incident Rate calculated from OSHA’s Form 300 for the previous three years and the other required information shown in the example table below. The bidder must attach all supporting documentation and calculations including certified OSHA forms.
YEAR CONTRACTOR
DART
INCIDENT RATE
INDUSTRY
DART
INCIDENT
RATE
INDUSTRY FIELD AND
CODE
Bidder must provide OSHA 300 Forms for each year listed above.
2. Experience Modification Rate (EMR). Provide the bidder’s most recent Experience Modification Rate (EMR) based on insurance claims history. The bidder must provide the source of the EMR information and contact information of insurer entity providing the EMR.
YEAR CONTRACTOR
EMR
INDUSTRY FIELD
AND CODE
NAME AND CONTACT
INFO FOR EMR
INFORMATION
3. Answer the following OSHA Specific Questions:
(a) Within the last 2 years, has the bidder received any citations classified by OSHA as being (1) serious, (2) willful and/or (3) repeat violations where your company operates?
Yes _____ No ________
If yes, attach a copy of each such citation and violation.
(b) Has the bidder experienced any work-related fatalities within the last five years?
Yes ______ No ______
Bidder Safety Evaluation Questionnaire Page 00 06-3
(c) Has the bidder had any citations issued by OSHA as a result of work related fatalities within the past 5 years?
Yes ______ No ______
(d) Is the bidder under investigation for any work-related fatalities?
Yes ______ No ______
(e) If your answer is “yes” to 3(b), (c) or (d), provide a copy of the citation(s), list of number(s) of fatalities and documented explanation of the fatality.
4. Safety Plan:
(a) Does the company have a written safety program that includes responsibility for all aspects of safety management?
Yes_________ No _______
(b) Does the company have a written plan for safety training of new employees and ongoing training of existing employees?
Yes_________ No _______
(c) Does the company have documented evidence of safety training that they have conducted?
Yes_________ No _______
(d) If the company has employees with limited English ability, does the company have a written plan for ensuring that their employees understand the training they are being given?
Yes_________ No _______
(e) Do all supervisors have an appropriate documented level of OSHA training (e.g., a minimum of 30 hour OSHA construction safety training)?
Yes_________ No _______
(f) Do employees have documented basic OSHA 10 hour construction safety training?
Yes_________ No _______
(g) Does the company have a documented Hazard Communication Program?
Yes_________ No _______
Bidder Safety Evaluation Questionnaire Page 00 06-4
5. Required Written Explanation of Safety Record. If the bidder has any of the following: (a) DART incident rate greater than its industry average, (b) an EMR greater than 1.0, (c) answered “yes” to any of the OSHA Specific Question above, or (d) answered “no” to any of the Safety Plan questions, the bidder shall provide the City, in its bid, a detailed written explanation of its safety record and the reasons why such safety history is NOT representative of its future performance and what specific actions it has taken to improve its overall safety record. Failure to provide a written explanation of its safety record pursuant to this paragraph may be deemed as non-responsive by the City.
Bidder Safety Evaluation Questionnaire Page 00 06-5
Insurance Requirements Page 00 07-1
Insurance Requirements
Attach Insurance Requirements
Insurance Requirements
The Contractor agrees to maintain on a primary basis, at its sole expense, and at all times during the life of this contract the following applicable coverages and limits. The requirements contained herein, as well as the City’s review or acceptance of insurance maintained by the Contractor, is not intended to, and shall not in any manner, limit or qualify the liabilities or obligations assumed by the Contractor under this contract.
Commercial General Liability – Combined single limit of no less than $1,000,000 each occurrence and $2,000,000 aggregate. Coverage shall not contain any endorsement excluding or limiting Product/Completed Operations, Contractual Liability, Cross Liability, or Personal and Advertising Injury Liability.
Automobile Liability – Limits of no less than $1,000,000 Combined Single Limit. Coverage shall include liability for Owned, Non-Owned, and Hired automobiles. In the event the Contractor does not own automobiles, the Contractor agrees to maintain coverage for Hired and Non-Owned Auto Liability, which may be satisfied by way of endorsement to the Commercial General Liability policy or by separate Auto Liability policy. Automobile coverage is necessary only if vehicles are used in the provision of services under this contract or are brought on a City site.
Umbrella or Excess Liability – The Contractor may satisfy the minimum liability limits required above under an Umbrella or Excess Liability policy. There is no minimum Per Occurrence limit of liability under the Umbrella or Excess Liability. However, the Annual Aggregate limits shall not be less than the highest “Each Occurrence” limit for required policies. The Contractor agrees to endorse the City as an “Additional Insured” on the Umbrella or Excess Liability unless the certificate of insurance states the Umbrella or Excess Liability provides coverage on a “Follow-Form” basis.
Workers’ Compensation & Employers Liability – The Contractor agrees to maintain Worker’s Compensation Insurance in accordance with Chapter 97 of the North Carolina General Statutes and with Employer Liability limits of no less than $1,000,000 for each accident, each employee, and policy limit.
This policy must include a waiver of subrogation.
Additional Insured – The Contractor agrees to endorse the City as an Additional Insured on the Commercial General Liability. The Additional Insured shall read “City of Durham as its interest may appear”.
Certificate of Insurance – The Contractor agrees to provide the City a certificate of insurance evidencing that all coverage, limits, and endorsements required herein are maintained and in full force and effect, and certificates of insurance shall provide a minimum thirty (30) day endeavor to notify, when available, by the Contractor’s insurer. If the Contractor receives a non-renewal or cancellation notice from an insurance carrier affording coverage required herein or receives notice that coverage no longer complies with the insurance requirements herein, the Contractor agrees to notify the City within five (5) Business Days with a copy of the non-renewal or the cancellation notice or with written specifics as to which coverage is no longer in compliance. The Certificate Holder address should appear as follows:
City of Durham
Attn: General Services Department 101 City Hall Plaza Durham, NC 27701
All primary insurance carriers must be authorized to do business in North Carolina. As used in this contract, “Business Day” is deĮned as any day other than Saturdays, Sundays, and any legal holiday recognized by the City pursuant to City Code SecƟon 42-16, as amended.
Insurance Requirements Page 00 07-2
Performance & Payment Bond Page 00 08-1
PAYMENT & PERFORMANCE BOND
Date of Contract:
Contract Name and Number:
Name of Principal (Name of Contractor):
The Principal is organized and existing under the laws of the following State:
Name of Surety:
Name, address, and telephone number of Surety’s N. C. Resident Agent:
Amount of Performance Bond (in words and figures):
dollars
Bond number:
Date of Execution of these Bonds:
Contracting Body: CITY OF DURHAM, a North Carolina municipal corporation.
Amount of Payment Bond: same dollar amount as the dollar amount of the Performance Bond.
KNOW ALL PERSONS BY THESE PRESENTS, That we, the PRINCIPAL AND SURETY above named, are held and firmly bound unto the above named Contracting Body, hereinafter called the Contracting Body, in the penal sum of the amount stated above for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal entered into a certain contract with the Contracting Body, numbered as shown above and hereto attached:
NOW THEREFORE, if the Principal shall well and truly perform and fulfill all the undertakings, covenants, terms, conditions, and agreements of said contract during the original term of said contract and any extensions thereof that may be granted by the Contracting Body, with or without notice to the Surety, and during the life of any guaranty required under the contract, and shall also well and truly perform and fulfill all the undertakings, covenants, terms, conditions, and agreements of any and all duly authorized modifications of said contract that may hereafter be made, notice of which modifications to the Surety being hereby waived, then this obligation to be void; otherwise to remain in full force and virtue. As used hereinabove, “modifications” shall include, without limitation, changes (including, without limitation, changes granting extensions of time) and additions to or with respect to the work, scope of work, and specifications. The undertakings, covenants, terms, conditions, and agreements of said contract shall include, without limitation, the Principal’s obligations, if any, with respect to damages for delay, to indemnify, and to provide warranties.
Performance & Payment Bond Page 00 08-2
KNOW ALL PERSONS BY THESE PRESENTS, That we, the PRINCIPAL AND SURETY above named, are held and firmly bound unto the above named Contracting Body, hereinafter called the Contracting Body, in the penal sum of the amount stated above for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal entered into a certain contract with the Contracting Body, numbered as shown above and hereto attached:
NOW THEREFORE, if the Principal shall promptly make payment to all persons supplying labor and material in the prosecution of the work provided for in said contract, and any and all duly authorized modifications of said contract that may hereafter be made, notice of which modifications to the Surety being hereby waived, then this obligation to be void; otherwise to remain in full force and virtue. As used hereinabove, “modifications” shall include, without limitation, changes (including, without limitation, changes granting extensions of time) and additions to or with respect to the work, scope of work, and specifications.
The Performance Bond and the Payment Bond are being combined here only for purposes of convenience in signing and acknowledging, and the obligations of the Principal and of the Surety are the same as if the bonds were on separate documents. Each bond is in the dollar amount stated above, and the amounts of these bonds are not combined. The Surety agrees that both of these bonds are fully binding on it whether or not the Principal executes these bonds. These bonds are given pursuant to Article 3 of Chapter 44A of the N. C. General Statutes.
IN WITNESS WHEREOF, the above-bounden parties have executed this instrument (for both the Performance Bond and the Payment Bond) under their several seals on the date of execution indicated above, the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.
(name of Principal)
[Execution by Principal when the Principal is a corporation]
By:______________________________________
Title of officer: ___________________________
(Affix Principal’s corporate seal.)
[Execution by Principal when the Principal is a limited liability company]
By: __________________________________________ Manager of Principal
[Surety’s execution]
Performance & Payment Bond Page 00 08-3
(name of Surety)
(signature of attorney in fact)
(Affix Surety’s corporate seal.)
(Instructions to Surety and Principal: If the signature or acknowledgment form is inappropriate for the
Principal, please consult the City to obtain more suitable forms. If you use an embossing corporate seal, press enough to make it legible.)
ACKNOWLEDGMENT OF CONTRACTOR’S EXECUTION OF CONTRACT AND PERFORMANCE
BOND AND PAYMENT BOND
[Acknowledgment when the Contractor (the Principal) is a corporation]
(Type or print the corporation's name)
By: _________________________________ (SEAL)
Name: ______________________________
Title: _______________________________
State of ____________________________ Acknowledgment by Corporation County of ________________________ (Type or print state and county where notarial act was performed)
I, ____________________________________________ (Type or print name of notary public), a notary public, certify that _______________________________________________________ (Type or print name of individual who signed) personally…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .