Parcels 218, 221, 222 & 232 related Plan Sheets 1-115.00_Ballard.pdf
PDF 960 KB Posted
- Attached to
- Demolition SVC Ballard Co
- Solicitation number
- RFB 605 2300000231 1
- Issued by
- Ballard County, Kentucky
About this file
This is a plan sheet document for Ballard County, Kentucky, detailing infrastructure construction along KY 473 (Gage Road) and US 60, involving parcels 218, 221, 222, and 232. The project encompasses roadway improvements and right-of-way acquisition from station 46+85 to 53+20 on KY 473 and from station 190+00 to 205+00 on US 60. The scope of work includes ditch construction with erosion control blanket (ECB) lining in various configurations, entrance construction with asphalt surfaces and 15-inch pipe installations, pavement transitions, and temporary easements for entrance and slope construction. Ditch construction quantities range from 17 to 882 square yards across multiple segments on both US 60 and associated roads, with special "V" ditch configurations specified throughout. The revised plans are dated June 7, 2022, with original plans dated September 7, 2005, indicating a significant time span between initial design and current revisions.
The project involves multiple property owners including Kenneth C. & Nancy Thomas, Ballard County Economic & Industrial Development Board, Inc., and Strickland Farm, Inc., among others. The plan sheets document existing utilities including gas mains, water mains, sewer lines, and various drainage structures such as concrete and metal pipes in sizes ranging from 12 to 48 inches. Right-of-way acquisition, temporary easements for construction, and property access control measures are delineated across the project corridor. The design incorporates specific construction limits, ultimate construction limits, and slope protection measures with detailed specifications for channel lining types, pavement surface materials, and entrance pipe configurations identified by station number and location.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G r a v e l
G r a v e l
A s p h a lt
G r a v e l
A s p h a lt
S h e d
C le a n o u t
KY 473
C M
P
E x
W M W
M
W M
W M
W
MW
M
W M
W M
S A
N M
H
T-POST
I P
C
M
C P
M
C P
G r a v e l
(F o u n d
R e b a r
P O
S T
I P
S I G
N
W O
V E
N
W I R
E
VINYL FENCE
V I N
Y L
F
E N
C E
4' WOVEN WIRE
4' WOVEN
WIRE
W O
V E
N
W I R
E
4' WOVEN WIRE
W
O V
E N
W
IR
E
W O
V
R
E
4' WOVEN WIRE
G r a v e l
G r a v e l
G r a v e l
C o n c r e t e
C o n c r e t e
G r a v e l
G r a v e l
KY 473
I P
I P
I P
W M
I P
I P
I P
W V
I P
W V
W V
W S
T E
L
P
E D
W M
W M
W M
I P
W M
I P
S A
N M
H
T E
L
J
B
S A
N M
H W
M
W M
S A
N M
H W
M W
M
I P
VINYL FENCE
VINYL FENCE
V I N
Y L
F
E N
C E
4' WOVEN WIRE
4' WOVEN WIRE
' W
O V
E N
W
IR
E
4' WOVEN WIRE
4' BOARD
VINYL
4' WOVEN WIRE
W
O V
E N
W
IR
E
W O
V
R
E
4' WOVEN WIRE
W O
V
R
E
S02°44'33"W - 127.17'
N12° 33'5
9"W
- 1
32.
15'
S86°47'14"E-34.89'
S85°37'28"E-37.11'
S17°23'35"W145.41'
N02°36'53"E
141.74'
-19.32'
51+78.27
20.49'
51+92.83
-45.00'
52+57.00
-45.00'
53+00.00
-24.00'
53+00.00
P R O P . R /W
ENT. CONST.
TEMP. ESMT. FOR
55.37'
51+92.29 21.41'
53+20.00
-18.61'
53+20.00
P
P
222X
DEBORAH MAE &
CHARLES GLENN
RICHARDS
P
KATHI
HALYAK
EXCESS
PURCHASE
P
P
TIMOTHY ALLEN &
LESLEY DIANE GOODIN
A
A
P
DEBORAH RILEY &
GREGORY HOLMAN
MICHELE WILKASON
0' 100' 200'50'
US 60 STA. 174+35.85 =
KY 473 SOUTH (GAGE RD.)
STA. 50+20.07
US 60 STA. 174+35.85 =
KY 473 SOUTH (GAGE RD.)
STA. 50+20.07
THE PREWITT
REVOCABLE
LIVING TRUST
RAYMOND J. &
SANDRA J. GILBERT
EXCESS PURCHASE
170+00
175+00
171+61.00
PC
e = NC
12.96'E =
12000.00'R =
1114.74'L =
557.77'T =
LT05°19'21"Δ =
177+18.76PI STA
US 60
47.24'-N12°33'59"W
-35.57' 52+57.00-56.41'
51+79.59
S17°23'35"W -39.99'
B
B
C
C
D
D
P
E. BRUCE &
DEBORAH B. TAFFER
END ACCESS
CONTROL US 60
STA. 173+80, 132'
SPCL. "V" DT.
SPCL. "V" DT.
SPCL. "V" DT.
S P C L.
"V
D T
S P
C L "V
D
T
S P
C L "V
D
T
S P
C L "V
D
T
C O
N S T
L
IM
IT
S
CONST. LIMITS
C O
N S T
L
IM
IT
S
CONST.LIMITS
CONST.LIMITS
2' PVD. SH.
2' PVD. SH.
9'
9'
PLANS
RIGHT OF WAY
10'
10'
18 LF EDGE KEY
18 LF EDGE KEY 9'
9'S02°19'42.8"W S02°19'42.8"W
EL. XXX.XX'
LOW WIRE
42.00' 174+99.43
40.99' 173+79.33
BEG. ACCESS
CONTROL US 60
STA. 175+12, 115'
P
KATHI
HALYAK
218X
P
P
S °2
'5
"E
.0
S03°04'00"W 133.89'
N '2
"W
.8
N08°18'09"E 53.81'
N36°04'25"W -89.32'
N13°00'32"W -6.61'E
E
-200.72' 47+47.20
-37.77' 47+43.63
-95.00' 48+20.00
-39.51' 47+50.00
-133.98' 176+26.10
-133.40' 175+15.00
SPCL. "V"
DT.
RON & ELIZABETH
BLANKENSHIP
GARY & RHONDA QUARLES
P
E. BRUCE &
DEBORAH B. TAFFER
P
P
P
RICKY & DEBRA L
HUDDLESTON RICKY & DEBRA L
HUDDLESTON
JEFFERY LIND &
SUEZEE JENKINS
DANNY & REBECCA J
CAPPS
THE PREWITT
REVOCABLE
LIVING TRUST
RAYMOND J. &
SANDRA J. GILBERT
P
S '0
"E
.2
S03°04'00"W 35.91'
N °3
'2
"W
.0
148.99' 176+41.98113.14'
176+40.01
P 221X
MICHELE WILKASON
EXCESS PURCHASE
P 221X
-39.29' 174+52.91
N02°36'53"E 195.90'
S85°37'28"E-177.68'
S03°04'00"W 159.95'
F
F
-46.56' 176+31.08
G
G
S03°04'00"W 87.56'
Brick 1-Sty.
Garage
Shed
Garage
S h e d
Brick 1-Sty.
G r a v e l
G r a v e l
Frame 1-Sty.
S h e d
Brick 1-Sty.
C o n c r e te
Garage Garage
Brick 1-Sty.
G r a v e l
KY 473
Ex. 15" CMP
(F o u n d
R e b a r
C o n c r e te
Brick 1-Sty.
Garage
Frame 1-Sty.
G r a v e l
Ex. 15" Steel
Frame 1-Sty.
G r a v e l port Car-
Shed
Garage
Gravel
Frame 1-Sty.
G r a v e l
Trailer
Garage
Trailer
KY 473
Frame
1-Sty.
A s p h a lt
Shed
Barn
Barn
G r a v e l
Barn
G r a v e l
A s p h a lt
Brick 1-Sty.
Garage
Shed
S h e d
Barn
RCP
Ex. 15"
Ex. 12" RCP CMP 15" Ex.
Ex. 15" RCP
15" CMP
Ex.
CMP
Ex. 18"
DND
Ex. 18" CMP
CMP
Ex. 15"
C M
P E x
Frame 1-Sty.
Barn
Asphalt Asphalt
46+85.00STA
BEGIN CONST.
53+20.00STA
END CONST.
P R
O P
C /A
R /W F
E N
C E
P R
O P
C /A
R /W F
E N
C E
P R
O P
C /A
R /W F
E N
C E
P R
O P
C /A
R /W F
E N
C E
PROP. R
/W
PROP. R/W
PROP. R
/W45
R
85.12°
IE
426.53 OE
425.96
EX. R/W
EX. R/W
15" 10
R 10'
R 10
R 10'
R
EX. R/W
EX. R/W
50' R
R
' T
A P
E R
:1 T
A P
E R
C O
N S T
L
IM
IT
C O
N S T
L
IM
IT
U L T
C O
N S T
L
IM
IT
U L T
C O
N S T
L
IM
IT
194 SY-1.0'ECBSPCL. "V"50+25 - 52+65
103 SY-1.0'ECBSPCL. "V"48+08 - 49+20
83 SY-1.0'ECBSPCL. "V"46+85 - 47+75
QUANTITYTDTYPE
CHANNEL LINING
SIZE/TYPESTATION TO STATION
DITCH CONSTRUCTION LT - GAGE RD.
243 SY-1.5'ECBSPCL. "V"51+09 - 53+20
86 SY-1.0'ECBSPCL. "V"50+16 - 51+09
216 SY-1.0'ECBSPCL. "V"46+85 - 49+20
QUANTITYTDTYPE
CHANNEL LINING
SIZE/TYPESTATION TO STATION
DITCH CONSTRUCTION RT - GAGE RD.
GAS MAIN
CAUTION:
36ASPH.--RES.14'52+78
85ASPH.15"43'RES.12'47+90
SIZELNG. (SQYD)
AREA
SURFACE
TYPE
SURFACE
PIPE
TYPEWIDTHSTATION
ENTRANCE CONSTRUCTION LT - KY 473 (GAGE ROAD)
R
25'R
41ASPH.15"39'RES.10'47+90
SIZELNG. (SQYD)
AREA
SURFACE
TYPE
SURFACE
PIPE
TYPEWIDTHSTATION
ENTRANCE CONSTRUCTION RT - KY 473 (GAGE ROAD)
O p e n
R o a d s D e s ig n e r v
.1
.4
.4
COUNTY OF ITEM NO. SHEET NO.
BALLARD 01-115.00 R032
SCALE:1"=50' PLAN SHEET
STA 46+85 TO 53+20
KY 473 (GAGE RD)
S e p te m b e r
D A
T E
P L O
T T
E D d re e s
U S
E R
C
P
W W
O R
K
IN
G D
IR
\A
E I-
P W
.B E
N T
L E
Y .C
O M
A
E I-
P W
-0 \D
R E
E S
A
E I.
C
C \D
M S
\0
R
P
L A
N .D
G N
F
IL
E N
A M
E
JUNE 7, 2022REVISED PLANS DATE:
CharlesL.Watkins Highlight
CharlesL.Watkins Highlight
CharlesL.Watkins Highlight
CharlesL.Watkins Highlight
CharlesL.Watkins Highlight
CharlesL.Watkins Highlight
CharlesL.Watkins Highlight
CharlesL.Watkins Highlight
CharlesL.Watkins Highlight
CharlesL.Watkins Highlight
CharlesL.Watkins Highlight
CharlesL.Watkins Highlight
CharlesL.Watkins Polygon
CharlesL.Watkins Polygon
CharlesL.Watkins Polygon
CharlesL.Watkins Polygon
CharlesL.Watkins Polygon
CharlesL.Watkins Polygon
CharlesL.Watkins Polygon
CharlesL.Watkins Polygon
Asphalt
Complex Office
Metal
Building
Metal
M10
CP
Trailer
IP
SIGN
Garage
IP IP
EL JB
EM
GV
FP
EL JB
POSTIP
TV JBEM
TEL P
ED
TEL JB
IP
IP
TEL JB
TEL JB
CONST. LIMITS
ULT. CONST. LIMITS
CONST. LIMITS
ULT. CONST. LIMITS
SPCL. "V" DT. SPCL. "V" DT.
CONST. LIMITS
2' FB. SURF DT.
CONST. LIMITS
O.E
415.98
E Q P
IP
E
I.E
416.59
24" I.E
418.59'
IE
419.62
" P
IP
E
OE
419.10
O.E
418.15'
M A
T C
H L
IN
E
S T
A
M A
T C
H L
IN
E
S T
A
P
BALLARD COUNTY ECONOMIC & INDUSTRIAL
DEVELOPMENT BOARD, INC.
P
KENNETH C. &
NANCY THOMAS
P
PAUL RICHARD OWEN
P
STRICKLAND FARM, INC.
P
STRICKLAND FARM, INC.
-120.00'
193+00.00
40.00'
46+07.00
85.00'
46+07.00
50.00'
47+25.00
85.00'
47+25.00
147.92'
199+85.00
252.00'
199+85.00 252.00'
200+20.00
0' 100' 200'50'
S88°33'52"E
293.33'
S85°53'15"E
327.38'
N87°13'06"W-711.50'
-110.88'
190+06.81
-91.65'
196+76.84 -91.72'
196+86.92
-92.73'
198+18.82
-94.71'
200+79.19
A
C
-31.55'
46+44.22
-43.79'
46+44.14
31.53'
44+75.00 -31.68'
44+75.00
-53.73'
47+82.94
C
-115.78'
200+78.98
-115.79'
201+06.74
150.00'
201+09.38
E X
R
W
E X
R
W
E X
R
W
PROP. C/A, R/W & FENCE
PROP. C/A, R/W & FENCE
PROP. C/A, R/W & FENCE
PROP. C/A, R/W & FENCE
E
N T
P
IP
E
PROP. R/W
TEMP. ESMT. FOR ENT. CONST.
B
B
D
D
29.22'
47+38.57
46.56'
47+77.50
-31.45'
47+41.83
-48.44'
47+78.00
BALLARD COUNTY ECONOMIC & INDUSTRIAL
DEVELOPMENT BOARD, INC.
P
JAMES. O ENLOW, INC.
P
45+00
S '2
W
44+00.00POB
S86°46'57"E
US 60 STA. 196+81.92
VETERANS AVE. (CS 4026) STA. 50+00
11'
11'
6' PVD. SH.
6' PVD. SH.
15"
2' FB. SURF DT.
SPCL. "V" DT.
SPCL. "V" DT.
SPCL. "V" DT. SPCL. "V" DT.
SPCL. "V" DT.
SPCL. "V" DT.
6' PVD. SH.
6' PVD. SH.
11'
11'
E
E
E N
D A
C C E S S
C O
N T R O L U
S
S T A . 1
.3 , -1
.8
148.51'
200+20.00
102.70'
201+45.00
N86°56'34"E-118.37'
N87°13'06"W-10.08'
L= 71.09' R=74.00' Right
S61°21'19"W LC=68.39'
L= 56.01' R=74.00' Right
N61°37'51"W LC=54.68'
145.21'
198+22.36
54.38'
47+85.00
F
F
6' PVD. SH.
11'
11'
6' PVD. SH.
11'
-92.00'
196+10.23
100' TAPER
T A
P E
R
S77°35'26"E 75.98'
S86°48'16"E - 258.98'
N87°13'06"W - 392.28'
-115.69'
198+20.00
DUMPSTER
S T A -1 .8
B E G
A C C E S S
C O
N T R O L
U S
T E
M P
E
S M
T
F O
R
T C
O N
S T
T E
M P
E S
M T
F
S L
O P
E
C
O N
S T
T E
M P
E S
M T
F
S L
O P
E
C
O N
S T
Pond
260.37'
N02°38'49"E-21.08'
S86°48'16"E-27.76' .8
N85°49'36"W
287.06'
N °2
'5
"E
.9
S86°48'16"E
674.71'
S88°15'51 "W
150.56'
N82°30'48"W 241.79'
100.00'
201+08.88
150.00'
201+45.00
FOR ENT. CONST.
TEMP. ESMT. 118.00'
203+50.00 105.00'
205+00.00
A -103.00'
197+41.15
E N
D A
C C
E S
S
C O
N T
R O
L U
S
S T
A
.4
112.02'
196+15.00
142.00'
196+15.00
142.00'
196+30.00
B E
G
A C
C E
S S
C O
N T
R O
L U
S
S T
A
.0
111.77'
196+30.00
1270.21'
N85°49'36"W
192.39'
N03°13'03"E - 30.23'
N87°42'39"W
1078.47'
PLANS
RIGHT OF WAY
170 SY-3.0'ECBSPCL. "V"204+07 - 205+00
265 SY-1.0'ECBSPCL. "V"200+80 - 204+07
426 SY-1.5'ECBSPCL. "V"197+25 - 200+80
882 SY-2.0'ECBSPCL. "V"190+83 - 196+38
94 SY-1.0'ECBSPCL. "V"190+00 - 190+83
QUANTITYTDTYPE
CHANNEL LINING
SIZE/TYPESTATION TO STATION
DITCH CONSTRUCTION LT - US 60
17 SY-1.5'ECB2' FB. SURF204+90 - 205+00
68 SY-1.0'ECB2' FB. SURF204+40 - 204+90
122 SY-1.0'ECB2' FB. SURF203+50 - 204+40
68 SY-1.0'ECB2' FB. SURF203+00 - 203+50
520 SY-1.0'ECBSPCL. "V"198+40 - 203+00
206 SY-1.5'ECBSPCL. "V"197+00 - 198+40
853 SY-1.5'ECBSPCL. "V"190+80 - 196+60
91 SY-1.0'ECB2' FB. SURF190+00 - 190+80
QUANTITYTDTYPE
CHANNEL LINING
SIZE/TYPESTATION TO STATION
DITCH CONSTRUCTION RT - US 60
409 SY-1.0'ECBSPCL. "V"44+75 - 49+20
QUANTITYTDTYPE
CHANNEL LINING
SIZE/TYPESTATION TO STATION
DITCH CONSTRUCTION LT - VETERANS AVE.
110 SY-1.0'ECBSPCL. "V"48+00 - 49+20
74 SY-1.0'ECBSPCL. "V"47+20 - 48+00
133 SY-1.0'ECBSPCL. "V"44+75 - 46+20
QUANTITYTDTYPE
CHANNEL LINING
SIZE/TYPESTATION TO STATION
DITCH CONSTRUCTION RT - VETERANS AVE.
EDGE KEY
20 LF
S86°46'57"E
25'
R
OE 419.79'
IE
419.92'
IE
431.07'
OE
427.26'
EL. 452.16'
LOW WIRE
100100' EOP TAPER198+40 - 199+40
LENGTHTYPESTATION TO STATION
PAVEMENT TRANSITION LT - US 60
100100' EOP TAPER47+25 - 48+25
LENGTHTYPESTATION TO STATION
PAVEMENT TRANSITION RT - VETERANS AVE.
145.42'
198+35.00
169.00'
198+37.00
146.34'
198+90.00
170.00'
198+90.00
TEMP. ESMT. FOR ENT. CONSTRUCTION
R
50'
R
25'
R
R
R
25'R
R
N °3
'4
"E
.8
R
R
N °3
'4
"E
.7
S °3
'4
"W
.0
P
232X
1908ASPH.15"42'RES.24'196+82
SIZELNG. (SQYD)
AREA
SURFACE
TYPE
SURFACE
PIPE
TYPEWIDTHSTATION
ENTRANCE CONSTRUCTION RT - US 60
386ASPH.15"102'COM.40'46+65
SIZELNG. (SQYD)
AREA
SURFACE
TYPE
SURFACE
PIPE
TYPEWIDTHSTATION
ENTRANCE CONSTRUCTION RT - VETERANS AVE
O p e n R o a d s D e s ig n e r v
.1
.4
.4
COUNTY OF ITEM NO. SHEET NO.
BALLARD 01-115.00 R017
SCALE:1"=50' PLAN SHEET
205+00 TO 190+00STA
US 60
S e p te m b e r
D A
T E
P L
O T
T E
D jl it tl e to n U
S E
R
C
P W
W O
R K
IN
G
D
IR
\A E
I- P
W .B
E N
T L
E Y
.C O
M
A E
I- P
W -0
\J
L
IT
T L
E T
O N
A
E I.
C C
\D M
S
\0
R
P L
A N
.D G
N F
IL
E
N A
M E
MARCH 30, 2022REVISED PLANS DATE:
G r a v e l
Gra vel
Complex Office
Metal
Building
Metal
Asphalt
#2105
IPC
Trailer
Garage
Frame
1-Sty.
G r a v e l
G r a v e l
A s p h a lt
KENNETH C. &
NANCY THOMAS
EXCESS PUCHASE
P
232X
44+75.00STA
BEGIN CONST.
CharlesL.Watkins Highlight
CharlesL.Watkins Highlight
CharlesL.Watkins Polygon
File details come from the government source that posted it. Updated .