Panther Park Add_ 1.docx
DOCX document 12 KB Posted
- Attached to
- Panther Park Thread
- Solicitation number
- PE-74150-NONST-2024-000000005
- Issued by
- Thomas County, Georgia
About this file
This document is an Addendum to the Panther Park project, which is a state and local contract opportunity. The addendum provides responses to questions posed by potential bidders. It confirms that flagging costs will be covered by the City of LaGrange, provides information on the existing asphalt depth, and states that an additional construction exit has been added to the Scope of Work. The addendum also clarifies the curb detail around the ramp and confirms that the pre-bid sign-in sheet has been uploaded.
The document does not provide any additional details on pricing terms, set asides, incumbents, funding requirements, or other salient information related to the contract opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CSXT Panter Park Contract.pdf | ||
| LaGrange_Logo_Final_Centered_Red_BIG WHITE.png | PNG image | |
| Copy of LaGrangeThread Panther Park Connector.xlsx | XLSX spreadsheet | |
| Statement of Qualifications.pdf | ||
| Panther Park Thread Specs.pdf | ||
| Panther Park Thread Bid Doc.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 1 Q&A – Panther Park Thread Please confirm that flagging costs will be covered by the city of LaGrange – Flagging costs will be covered by the City as part of the payment the City made to CSX What is the depth of the existing asphalt? – Based on the core samples taken asphalt depth is between 5” to 5”50 with a soil base There is only 1 construction exit but I think the project would benefit from another on the other side. Would the city add that to the SOV? – Yes, an additional exit has been added and the SOV has been updated.
On CP-01 in the “Enlargement A” detail it looks like the curbing wraps around the ramp. Do you have a detail or can you confirm this is a standard 6” curb? – Yes the curb wraps around the landing on either side. The top of the curb would stay level at the 2 ramps so it is 6” tall at the toe of the ramps and then flush with the trail and sidewalk at the top of the ramps.
Will LaGrange release the pre-bid sign-in sheet? – It has been uploaded.