IGE - B2C MCOI ECS Upgrade_1.pdf

PDF 258 KB Posted

Attached to
PIF V22 B2C MCOI Project
Solicitation number
PANRSA_013079
Issued by

About this file

This document is an Independent Government Estimate (IGE) that details the estimated labor, shipping, and materials costs for purchasing Environmental Control Units, Flow Control Valves, and Environmental Control System (ECS) Controllers in support of the PIF V22 B2C MCOI Project. The total estimated cost is $4,000,000.00. The pricing was determined through independent government research.

The related federal contract opportunity is a sources sought notice issued by the Prototype Integration Facility (PIF), Combat Capabilities Development Command (CCDC) Aviation and Missile Center, Redstone Arsenal, Alabama. The notice is for market research to identify parties interested in supplying the required Environmental Control Units, Flow Control Valves, and ECS Controllers. The requirement may be set aside for small businesses or procured through full and open competition, with the possibility of multiple awards. All small business set-aside categories will be considered. This sources sought notice is for informational purposes only and does not constitute a solicitation or commitment by the government.

View the file

Other files

File Type Posted
Product Description - B2C MCOI ECS Upgrade (With_PN).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Independent Government Estimate (IGE) For

FCDD-AMS-PI

This IGE details the total amount of hours, labor, shipping and materials / ODC for the purchase of Environmental Control Units, Flow Control Valves, and Environmental Control System (ECS) Controllers in support of the PIF V22 B2C MCOI Project.

Description Qty Price

Flow Control Valve (398928-4-1) 20 $425,000.00

Environmental Control System (ECS) Controller (p/n: 51090054-1-1) 10 $255,500.00

Environmental Control Unit (p/n: 67000022-1-1), 10 $3,319,500.00

TOTAL $4,000,000.00

The total amount of Hours, Labor, Travel and Material /ODC for the above PIF V22 B2C MCOI Project is as follows:

Hours: N/A

Labor: N/A

Travel: N/A

Material/ODC: $4,000,000.00

TOTAL: $4,000,000.00

The pricing of the twenty (20) Flow Control Valves, ten (10) Environmental Control Units, and ten (10) ECS controllers were determined by independent government research utilizing NAVSUP One Touch Support. The undersigned certify that this estimate was developed independently prior to seeing any formal proposals from contractors and is reasonable and realistic based on the requirements presented.

Jessica Schock Government Project Lead Prototype Integration Facility (PIF)

2024-07-23T15:01:03-0500
SCHOCK.JESSICA.MAEGEN.1267437064

File details come from the government source that posted it. Updated .