ATTACHMENT 0001 Aviation MATOC PWS Final _3SEP2026_Redacted.pdf

PDF 1 MB Posted

Attached to
SATMO Aviation Multiple Award Task Order Contract (MATOC)
Solicitation number
PANORL25P0000-000408
Issued by

About this file

This is a Performance Work Statement (PWS) for the United States Army Security Assistance Training Management Organization (USASATMO) Aviation Multiple Award Task Order (AV MATOC) contract, located at Fort Bragg, North Carolina. The document outlines requirements for providing Security Assistance Training (SAT) through Technical Assistance Field Teams (TAFTs) to foreign military nations.

The contract is a five-year indefinite-delivery/indefinite-quantity (IDIQ) MATOC with an optional five-year extension, not to exceed ten years total. The base contract period is five years with optional ordering periods executable at the Contracting Officer's discretion. The primary scope involves deploying contractor personnel to provide aviation training, maintenance operations, instructor pilot progression, and technical assistance outside the continental United States (OCONUS) within Geographic Combatant Commands. TAFT missions must be classified as training rather than operational in nature. The contractor is responsible for all personnel, equipment, supplies, transportation, tools, materials, and supervision, except items specified as Government Furnished Property (GFP). Pre-deployment activities include a 45-day Phase-In period, mandatory Foreign Affairs Counter Threat (FACT) training completion, medical screening with current physical and HIV testing, security clearance requirements at Secret level minimum, and anti-terrorism/OPSEC training. All personnel must maintain Current Defense Contract Management Administration (DCMA) INST 8210-1 qualifications for flight operations. Deliverables include monthly status reports (CDRL A001) with training details, contractor assessment reports, deployment information, and personnel rosters; a Quality Control Plan (CDRL A002); monthly billing invoices with supporting documentation (CDRL A003); and monthly property reports tracking Government Furnished Equipment and Contractor Acquired Property (CDRL A004). The contractor must establish a Property Management Plan, maintain a retention plan to minimize personnel turnover, obtain Common Access Cards (CAC) if required, and comply with all applicable Army Regulations, security protocols, and local country regulations. Medical evacuation, non-medical evacuation, health care, and related insurance are contractor responsibilities. The Government will conduct surveillance according to a Performance Requirement Summary (PRS) with four performance objectives: status reporting (100% inspection monthly), quality control plan execution (100% inspection monthly), billing invoice submission (100% inspection monthly), and property management (100% inspection monthly).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

TABLE OF CONTENTS

PART 1 –SPECIFIC REQUIREMENTS

1. GENERAL:

2. DESCRIPTION OF SERVICES/INTRODUCTION:

3. BACKGROUND:

4. SCOPE:

7. HOURS OF OPERATION:

10. TRAINING DEPLOYMENT SCHEDULE:

11. STAFFING/STAFFING REQUIREMENTS:

12. STAFFING RESTRICTIONS:

13. TRAINING DESCRIPTIONS: Will be indicated at the TO Level

14. DESIRED TRAINING RESULTS:

16. SPECIFIC GOVERNMENT FURNISHED EQUIPMENT, ITEMS AND SERVICES:

PART 2 – GENERAL REQUIREMENTS

1. PHASE-IN:

2. FACT Training:

3. PHASE-OUT:

4. SECURITY:

5. DATA RIGHTS

6. COMMON ACCESS CARD (CAC) AND BADGING REQUIREMENTS:

7. PRE-DEPLOYMENT REQUIREMENTS:

8. MEDICAL REQUIREMENTS:

9. TRAINING PERSONNEL:

10. QUALITY ASSURANCE:

11. CONTRACTOR RESPONSIBILITIES:

12. DELIVERABLES:

PART 3 –AVIATION SPECIFIC REQUIREMENTS:

1. GOVERNMENT FLIGHT REPRESENTATIVE (GFR)

2. GROUND AND FLIGHT RISK CLAUSE

PART 4 – PERFORMANCE REQUIREMENTSSUMMARY/ SURVEILLANCE SCHEDULE

PART 5 – DEFINITIONS AND ACRONYMS

1. DEFINITIONS ...................................................................... Error! Bookmark not defined.

2. ACRONYMS (see Base Contract for standard acronyms): ............ Error! Bookmark not defined.

PART 1 –SPECIFIC REQUIREMENTS

1. GENERAL:

1.1 This is a non-personal services contract to provide Security Assistance Training (SAT) in support of U.S. Army Security Assistance Training Management Organization (SATMO). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. The Contractor service providers are accountable solely for their own personnel and those of their Subcontractors who, in turn, are responsible to the Government.

2. DESCRIPTION OF SERVICES/INTRODUCTION:

The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision and other items and non-personal services necessary to perform the Aviation Technical Assistance Field Team (TAFT) requirements as defined in this Performance Work Statement (PWS), except for those items specified as Government Furnished Property (GFP) and services. The Contractor shall perform in accordance with (IAW) the terms and conditions of the contract and consistently IAW the established standards in this PWS and contract. This contract will include flight instruction. Therefore, all provisions under the latest DCMA Instruction 8210-1D* (Contractor’s Flight and Ground Operations) and Defense Federal Acquisition Regulation Supplement (DFARS) 252.228-7001 (Ground and Flight Risk Clause (GFRC) are applicable.

[*The DCMA Instruction is interchangeably known as DCMA-INST 8210-1, AFI 10- 220_IP, AR 95-20, NAVAIRINST 3710.1, and COMDINST M13020.3A).]

2.1. Program Goals. To provide agile, specialized and cost effective Security Assistance Teams (SATs) in order to facilitate security assistance programs that; build partnership capacity as well as defense and security relationships; promote specific U.S. security interests, including all security assistance activities; develop allied and friendly military capabilities for self-defense and multinational operations; and provide U.S. forces with peacetime and contingency access to host nations in support of United States Army Campaign Plan and U.S. national security objectives.

3. BACKGROUND:

3.1 SATMO is a subordinate command under the U. S. Army Security Assistance Command (USASAC), a Major Subordinate Command (MSC) of Army Material Command (AMC). SATMO executes the overseas portion of the U.S. Army’s Security Assistance Enterprise Outside Continental United States (OCONUS) training and technical assistance mission. SATMO plans, forms, prepares, deploys, sustains and re-deploys Continental United States (CONUS)-based (from the continental U.S.) SATs to execute OCONUS Security Cooperation missions in support of Geographic Combatant Command Theater Security Cooperation Programs and U.S. foreign policy. (For the purposes herein, the terms “Security Assistance” and “Security Cooperation” mean “Foreign Military Aid.”)

3.2. SATMO staffs teams with active component Army, active component members of other services, reserve component Army, reserve component members of other services and DoD civilians. SATMO may use Contractor services if none of these are available for the given Aviation SAT mission. Because of long lead-times for non-contract personnel, and current operations tempo, SATMO anticipates an increasing requirement for Contractor support, especially for Aviation skills including flying, maintenance and operational planning. Additional requirements will include the same aviation skills as previously listed but for Non-Standard Aircraft. In this case non-standard aircraft are all types not currently employed by the active component, including legacy air frames. In accordance with the Assistant Secretary of the Army for Acquisition, Logistics, and Technology (ASA ALT) memorandum dated 6 January 2010, all Non-Standard Aircraft training not procured through the United States Army Aviation and Missile Command (AMCOM) Acquisition Center shall be referred to the Deputy Assistant Secretary of the Army Procurement (DASA P), the Deputy Assistant Secretary of the Army Acquisition Policy and Logistic) (DASA APL), and the Deputy Assistant Secretary of the Army Defense Exports and Cooperation (DASA DEC) for review and evaluation and ASA ALT for approval prior to any commitment and execution by any other acquisition office.

Specific skill requirements will be identified at the Task Order (TO) level. When it is known that uniformed personnel will not be available, Contractor support will become the first option considered. In other cases, the more rapid reaction time of Contractors may be a governing factor in using Contractor teams. Aviation SATs deployed because of this contract may be a single Contractor employee, a combination of Department of Defense personnel and Contractor employee(s), or entirely Contractor employees.

3.3. SATMO requires a variety of expertise while preparing to deploy an Aviation SAT, during the Aviation SAT execution phase and during the post deployment stage of an Aviation SAT mission cycle. The aviation services required are divided into two (2) categories: (1) training-related services and (2) technical assistance-related services.

The example subtasks and explanations listed below are representative of Aviation SAT missions that SATMO may accomplish during performance of a TO.

Potential technical assistance related mission sets are Special Patrol Insertion Extraction System (SPIES)/Fast Rope Insertion/Extraction System (FRIES), Hoist, External Loads, Over Water, Helicopter Aerial Refueling (HAR), High Altitude Aviation Army National Guard Training Site (HAATS), High Altitude Mountain Environmental Training Strategy (HAMETS), Aerial Gunnery, Aviation Special Operations, and Air Assault/Air Movement.

Potential qualified trainers and advisors of USAACE rotary wing pilots (SP/IP, ME/MTP, FCP, AMSO, ASO), 15 series Military Occupational Specialty codes (MOS), MOS maintainers (15B,15D,15F,15G, 15H, 15N,15R, 15Y), and 15 MOS crew members (15T, 15U) with additional qualifications of SI/FI and FE, and personnel capable of establishing base operations training capabilities.

3.4 Objectives:

3.4.1. Provide Aviation training to increase the military capability and capacity of the purchasing nation or agency.

3.4.2. Provide Aviation technical advice to improve the military readiness of the host nation.

3.4.3. Provide and develop and build-on long term relationships between the U.S.

Government and the host-nation.

4. SCOPE:

4.1 The TAFT missions under this IDIQ MATOC will be focused on providing appropriate training to the host country on the proper operation and/or maintenance of the aircraft.

TAFT personnel will conduct progression, maintenance operations and all maintenance functions, gunnery operations, Instructor Pilot (IP) and Maintenance Test Pilot (MTP) progression, Pilot in Command development, Standard Operating Procedures (SOP) and Standardization Program development while supporting these missions.

All events that Task Order (TO) TAFTs participate in must be classified as training opportunities to the host country and not operational in nature.

5. PLACE OF PERFORMANCE:

5.1 Place of Performance: The work to be performed under this contract will primarily be performed OCONUS within the Geographic Combatant Commands (GCCs).

Temporary work may be required at other OCONUS locations to support training activities. Pre-deployment and post-deployment performance shall be accomplished at Continental United States (CONUS) locations. Long-duration deployments to the duty location are anticipated and will be indicated under the Task Orders.

5.2 The TAFT may occasionally be required to operate at other host country locations (receiving seaport, gunnery, exercises, etc.) on a temporary basis to support collective training activities. A force protection and operational risk assessment will be completed for applicability and scope. Trips to alternate locations (outside 50-mile radius of the place of performance) must be preapproved by the Contracting Officer’s Representative (COR).

The Contractor should be prepared to conduct trips to support training. Each off-site outside the 50-mile radius will be considered TDY, for which costs should be captured under the appropriate Travel Contract Line-Item Number (CLIN) on the TO.

6. PERIOD OF PERFORMANCE:

6.1 Contract Period. The base contract will be a five (5) year ordering period with an optional ordering period for up to five (5) years. Optional ordering periods will be executed at Contracting Officer discretion (one year, two years, etc.) but shall not exceed a total ordering period of 10 years. (5) -year option

7. HOURS OF OPERATION:

7.1 Hours of Operation: The hours of operation will be determined under each TO.

However, the Contractor should be able to accommodate night-time flights and may establish shift work hours to accommodate local schedule requirements. No overtime or compensatory time off or exceeding a 40-hour work week without COR notification is authorized.

7.2 Holidays: The Contractor is normally not required to perform services on recognized U.S. holidays. However, that requirement is subject to execution requirements. The Contractor must coordinate the holidays’ schedule (applicable U.S. and local holidays) with the host country’s Government and the COR. The Contractor shall work on the days the host country’s Government is scheduled to work except country’s national holidays, or when the host country Government facility is closed due to local or national emergencies, administrative closings or similar Government directed facility closings.

8. PERFORMANCE OBJECTIVES:

8.1 The overall objective of the TAFT is to assist the host country in building a mission-ready aviation operations capability with appropriately trained instructor pilots and maintenance support personnel capable of supporting its primary mission. The TAFT is authorized to train best practices, Techniques Tactics and Procedures, Training Support Packages and lessons learned that are not sensitive or classified to the USG. Specific support objectives are listed in the individual TOs.

8.2 TAFT personnel are prohibited from participating in any operational missions.

8.3 TAFT personnel are authorized to perform the following roles and duties: Instructor Pilot and MTP, Maintenance Test Flights, Maintenance Supervisor and TI duties as required in the individual TOs.

8.4 The Contractor will not be performing independent CLS services and shall not be the primary host country maintenance provider. However, the TAFT will provide training maintenance support while HOST COUNTRY builds capability and experience.

9. LEVEL OF EFFORT:

9.1 Level of Effort: All flying TAFT members shall meet the qualification requirements of the latest Defense Contract Management Administration (DCMA) INST 8210-1 to include the level of effort. The Contractor shall propose a level of effort for the Project Manager to ensure success. The Contractor will schedule employee absences to minimize impact on the requirement. The Contractor shall always maintain a workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential to successful performance under this contract.

9.1.1 Country Regulations: In addition to compliance with policies and procedures for aviation and maintenance, TAFT members shall also comply with local policies governing smart phone use, on-base vehicle use and parking and warehouse safety.

10. TRAINING DEPLOYMENT SCHEDULE:

10.1 This contract will provide a 45-day Phase-In period. In consideration of the aircraft equipment/device delivery and aircraft delivery timeline, the TAFT is required to be in place ready to start services before the arrival of the aircraft to ensure unit preparation of Program of Instruction development, training device utilization, and logistical support/setup prior to aircraft arrival. Aircraft delivery may fluctuate, and the Contractor will not be held accountable for early aircraft arrival or other potential Government caused delays.

11. STAFFING/STAFFING REQUIREMENTS:

11.1 The minimum acceptable staffing for the Host Country Aviation TAFT is established in an international agreement and cannot be modified without approval from the Host Country and SATMO. Specific staffing requirements will be identified in the Performance Work Statement (PWS) at the Task Order level.

11.2 The TAFT Composition will be determined at the TO level.

11.3 The Contractor shall comply with staffing key personnel IAW this PWS and as incorporated in their proposal. The Contractor is responsible for maintaining staffing for the uninterrupted performance of all tasks defined within this PWS. When staffing this requirement, the Contractor shall prioritize the stability and continuity of the workforce as essential to the successful performance of this contract.

11.4 Contractor Key Personnel

11.4.1 Key personnel shall not be added to or removed from performance without express acknowledgement by the Contracting Officer Representative (COR). Any changes to the working status of these key personnel shall be transmitted in writing to the Contracting Officer (KO)/COR within ten (10) business days of the proposed change. If, for any reason, any of the key personnel becomes, or is expected to become, unavailable for work under this contract for a continuous period exceeding 10 business days, the

Contractor shall promptly replace personnel with personnel who possess qualifications equal to or better than that of the original employee. The Contractor shall ensure all personnel terminated or released from employment are replaced expeditiously. The Contractor shall identify replacements within five (5) business days. All replacements for outgoing Contractor personnel should be in place and ready to perform their duties Not Later Than (NLT) twenty (20) business days from the time of Contractor vacancy, however the timeline may vary depending on Foreign Affairs Counter Threat (FACT) course availability. The Contractor shall rapidly provide qualified replacements to fill any vacancies caused by the loss of personnel from the program.

11.4.2 Resumes: The Contractor shall provide SATMO with resumes and letters of intent for all Contractor personnel performing TAFT services as part of the Contractors’ enrollment packet prior to reporting to FACT and deployment.

11.4.3 Key Personnel shall include a Project Manager. Other key personnel will be indicated at the TO level.

11.4.4. Other Recommended TAFT Positions will be indicated at the TO level.

11.5 Special Qualifications

11.5.1 All flying TAFT members shall meet the qualification requirements of the latest

DCMA INST 8210-1 (AR 95-20).

11.5.2 TAFT member qualifications, training certifications, and experience must be documented on the appropriate, official forms. Military flight experience, training, qualifications must be documented on an official DA Form 759, DD 1821, or other Service equivalent form. Military service and duty positions must be evidenced using a DD Form 214, Officer/Enlisted Record Brief, course diploma, or other similar official document. The Contractor shall be responsible for ensuring all personnel performing work IAW this PWS possess and maintain all current certifications as required to successfully perform the mission.

11.5.3 TAFT IPs must have skills or experience required to conduct training on Aviation Mission Planning System planning and on Aircraft Survivability Equipment procedures.

12. STAFFING RESTRICTIONS:

12.1 TAFT personnel are prohibited from participating in any combat or combat-related mission. TAFT personnel are also PROHIBITED from participating in any operational missions of any kind except as may be required in the conduct of on-the-job training in the operation and maintenance of equipment or supporting systems. All requests and/or participation in operational missions will be discussed with the COR prior to performing them and the mission details shall be included in the Contractor’s monthly reports to the COR. (CDRL A001)

12.2 TAFT personnel are PROHIBITED from participating in any flying exhibition on aircraft unless providing instruction or training to a pilot during such events. All requests and/or participation in flying exhibitions will be discussed with the COR prior to performing and the details of the exhibition shall be included in the Contractor’s monthly reports to the COR. (CDRL A001)

12.3 Contractor employees are PROHIBITED from flight until required documentation of aviation qualifications for each Contractor employee with flight duties is provided and approved by the GFR. The results of this action shall be included in the Status Report.

(CDRL A001)

12.4 Contractor employees are PROHIBITED from flight until the Contractor specific Flight Operations Procedures are approved by the latest GFR instruction IAW DCMA 8210-1. The results of this action shall be included in the Status Report. (CDRL A001)

13. TRAINING DESCRIPTIONS: Will be indicated at the TO Level.

13.1 Advising. TAFT members advise HOST COUNTRY personnel on all aspects of various Rotary Wing systems, developing curriculum and executing training to include tactical operations in a training environment. TAFT members lend their experience and expertise to the HOST COUNTRY to help develop effective ATP, instructor pilot training, MPT training and other collective training programs to include SOPs.

13.2 Assisting and Supporting: Assist and advise the HOST COUNTRY on the creation of a sustainable Rotary Wing system pilot and maintainer training plan with the purpose of identifying new pilots and maintainers and teaching them how to safely operate and maintain the Rotary Wing system.

13.3 Mentoring LAF maintainers through scheduled Programmed Maintenance Inspection requirements and maintaining historical training records.

13.4 Assisting HOST COUNTRY on establishing an Aviation Life Support Equipment (ALSE) and an Aviation Ground Support Equipment (AGSE) Maintenance program.

14. DESIRED TRAINING RESULTS:

14.1 TAFT Standardization Pilot should focus on training the trainer to provide Pilot Readiness Level progression, currency, tactical employment and proficiency supporting HOST COUNTRY Mission/Tactical Operations. Qualification of HOST COUNTRY pilots through Gunnery Table IX and employment of various Rotary Wing weapons systems. The goal is 100% of the available pilots to achieve Readiness Level 1, certify HOST COUNTRY Instructor pilots, and develop HOST COUNTRY Pilots-in Command. (Reference Objective 2/3)

14.1 TAFT MTP/ME should leverage already qualified HOST COUNTRY MTPs in instructing new MTP candidates and perform the duties of an MTP/ME such as providing MTP support of test flights and maintenance ground runs. The goal is for 100% of available MTPs to perform maintenance tasks up to the 4000 series level. If there are no HOST COUNTRY qualified MTPs, the TAFT MTP/ME will train and develop MTP candidates for the MTP Course. (Reference Objective 1)

14.2 Provide mentorship to HOST COUNTRY aviation maintenance personnel to assist in acquiring experience and achieving competency in performing unit and intermediate Rotary Wing system maintenance tasks. Desired results are:

• 50% of available HOST COUNTRY Maintainers to achieve 30 Level standards.

• Remaining HOST COUNTRY Aviation Maintainers to achieve a minimum of 20

Level Standards.

• Establish an efficient ALSE, AGSE, logistics, and maintenance SOP that will meet the standards in DCMA 8210-1.D Chapter 4

• 30% of 30 Level HOST COUNTRY maintainers to achieve 100% TI training.

Fully developed HOST COUNTRY Ground operating Procedures (GOP) and Flight Operating Procedures (FOP). (Reference Objective 1/4/6)

14.4 Desired End State: The HOST COUNTRY aviation program is capable of independently training, maintaining and operationally employing various Rotary Wing systems.

15. SPECIFIC SECURITY REQUIREMENTS:

15.1 Security Requirements: In the performance of this contract all TAFT contractors under this IDIQ MATOC shall possess and maintain a Facility Security Clearance (FCL) at a minimum level of Secret. Consequently, all contractors must have administrative capability, personnel security infrastructure, and authorized security systems required to sponsor, manage, and issue Personnel Security Clearances (PCL) at a minimum level of Secret for all contract-assigned staffing that will be required to have a SECRET security clearance prior to deploying. The security requirements will be IAW a DD254.

Contractor personnel shall comply with all applicable security and safety regulations, guidance and procedures including those local procedures referenced in this PWS and in effect at the work sites.

16. SPECIFIC GOVERNMENT FURNISHED EQUIPMENT, ITEMS AND SERVICES:

16.1 Facilities, Equipment, and Information for HOST COUNTRY: The HOST COUNTRY will provide all required facilities, equipment, and information, and utilities needed to support the execution of the requirements of the PWS. This includes furnished office space and classrooms, desks, computer workstations, telephones, and other equipment necessary to perform the tasks in this PWS.

PART 2 – GENERAL REQUIREMENTS

The requirements, procedures, and standards set forth in this Part 2 of the Performance Work Statement (PWS) shall apply universally to all Task Orders issued under this contract, except to the extent that superseding procedures or requirements are explicitly specified in Part 1. In the event of an inconsistency or conflict between the procedures outlined in Part 1 and this Part 2, the provisions of Part 1 shall govern.

1. PHASE-IN:

1.1 Phase-In Period: Phase-In is not required for an in-place follow-on team member.

Phase-In is applicable to new or replacement personnel. The Phase-In period shall be as stated in Part 1 of this PWS but shall not exceed 45 days in duration. If a Phase-In period is not listed in Part 1 of this PWS, the Phase-In period defaults to 45 days.

1.1.1 The Phase-In period will include:

a. Hiring of all SAT personnel.

b. The Pre-deployment Site Survey (PDSS – five (5) business days).

c. Development of training package

d. Completion of administrative actions.

e. Completion of all pre-deployment training prior to deployment.

f. The Contractor shall process passports, and visas, and initiate other pre-deployment actions upon notification of tentative course dates.

g. Travel to place of performance.

h. Coordination for Outside Continental United States (OCONUS) life support set-up.

1.1.2 To minimize any decreases in productivity and to prevent possible negative impact on additional services, the Contractor should have key personnel on board, during the entire Phase-In period. If key personnel are not available during any portion of the Phase-In period, the Contractor shall promptly notify the COR.

The Contractor shall use the Phase-In period to prepare all SAT members for full performance.

2. FACT Training:

2.1 Completion of the five (5) business day Foreign Affairs Counter Threat (FACT) Course is a mandatory pre-deployment requirement for all TAFT personnel. The Contractor shall report to SATMO (Fort Bragg) to attend the FACT course after acquiring the training package and immediately prior to deploying. TAFT members may be required to participate in evasive driving and handgun familiarization training while attending the course. If the scheduled FACT training dates do not correspond with the required deployment start date, another location or equivalent course may be selected at the discretion of the COR/GFR. This training is mandatory for any personnel who have not completed the training within the previous six (6) years.

3 PHASE-OUT:

3.1 Phase-Out Period: The Phase-Out period shall be as stated in Part 1 of this PWS but shall not exceed 10 business days in duration. If a Phase-Out period is not listed in Part 1 of this PWS, the Phase-Out period defaults to 10 business days. It is planned to occur in the last month of the base period in parallel with the current period of performance (PoP) or less if indicated in Part 1 of this PWS. It is not intended to extend the period of performance. The base period remains as stated in Part 1 of this PWS. However, in the event an option-PoP is exercised, the Phase-Out CLIN PoP will be adjusted to the option- PoP date exercised, accordingly.

3.2 This Phase-Out should be developed to affect a smooth and orderly transfer of contract responsibility to a successor (if applicable) or shut down if FMS case is ending.

The incumbent Contractor shall submit a final Phase-Out plan within 20 business days after award. The Government will review and provide comments to the Contractor within 40 business days after receiving receipt from Contractor. The plan may be requested to be adjusted or updated upon an option exercise. The plan shall fully describe the Contractor’s approach to the following issues, at a minimum: inventories and turn- over of government property and Contractor acquired property; removal of Contractor property;

reconciliation of all property accounts; turn-in of excess property; data and information transfer; clean- up of Contractor work areas; any security debriefings that may be required; and any other actions required to ensure smooth transition and/or closeout. The plan shall specify the actions needed and the dates for transferring responsibilities to the incoming Contractor, if there is to be an incoming Contractor, to ensure continuity is maintained at the required level of proficiency.

3.3 In accordance with Federal Acquisition Regulation (FAR) 52.237-3 Continuity of Services, the Contractor recognizes that the services under this contract are vital to the Government. When necessary, the Contractor agrees to allow an observation period to occur, at which time team management personnel of the successor Contractor may observe operations. This will allow for orderly turnover of facilities, equipment, and records and will help to ensure continuity of services. The outgoing Contractor shall fully cooperate with the succeeding Contractor and the Government, so as not to interfere with their work or duties.

3.4 The outgoing Contractor, regardless of successor contract or ending of Foreign Military Sale (FMS) case, is ultimately responsible for performing full services IAW the contract during the Phase-Out period, IAW its approved Phase-Out plan, and shall not defer performance of any requirements for the purpose of avoiding responsibility to its contractual requirements or avoid transferring such responsibility to the succeeding Contractor.

3.5 When applicable, to minimize any decreases in productivity and to prevent possible negative impacts on additional services, the incumbent/outgoing Contractor shall have at a minimum, key personnel on board during the Phase-Out period. The incumbent/outgoing Contractor shall be prepared to transition the workload to the newly selected Contractor, if there is a successor Contractor, on the last day of performance of the Phase-Out period to avoid a gap in training/services.

3.6 When applicable, as a part of the Phase-Out plan and within two (2) weeks for Phase-Out, the Contractor must account for 5 business days in-country to close out SAT operations by completing training, closing out leases/ life support arrangements, transferring equipment to the country and preparing after action comments; and three (3) business days for personnel to re-deploy to CONUS and present the After-Action Review report to SATMO. All work is to be completed by the end of the period of performance.

3.7 If, for unforeseeable circumstances, the requirement ceases and one or more options are not exercised, then the Government will provide the Contractor with as much notice as possible that the Government intends for the Contractor to execute Phase-Out IAW the approved Phase-Out plan.

4 SECURITY:

4.1 Security Requirements. The security requirements will be in accordance with Section 1 of this PWS and a DD254, when applicable. Contractor personnel shall comply with all applicable security and safety regulations, guidance, and procedures, including local, referenced in this PWS and in effect at the work sites.

4.2 All team members shall be responsible for safeguarding all USG and Country government equipment, information and property provided for team members use. At the close of each work period, USG and Country government facilities, equipment, and materials shall be secured.

4.3 Nondisclosure. Contractor personnel supporting this effort are required to sign a Classified Information Nondisclosure Agreement Standard Form (SF) 312 agreeing not to copy, use, share, disclose, or publish any training information or other information on country Armed Forces organization, status, procedures, or capabilities for a period not less than 20 years.

4.4 All reports/products completed by Contractor will be marked with applicable Controlled Unclassified Information (CUI) or derivative classified markings depending on the highest level of information contained in the reports, products, and briefings. All events and participant data will be in an unclassified but appropriate non- attribution, academic mode to facilitate educational freedom and open, uninhibited interaction by all involved.

4.5 Safeguarding CUI: During normal duty hours, the Contractor shall place information determined to be CUI in an out-of-sight location, if visitors, casual traffic, and other non- Government/Non-Contractor personnel have access to the work area. During non-duty hours and at the close of business, the Contractor shall store CUI records, to preclude unauthorized access. The transfer of, termination of, and disposal of, CUI documents will be consistent with Army Regulation (AR) 380-5, Army Information Security Program.

4.6 Safeguarding of Classified Information. The Contractor must abide by all safeguarding requirements outlined in Part 117 of Title 32, Code of Federal Regulations.

4.7 Handling and Disposal: All actions regarding sensitive, classified, or CUI document handling or disposal shall be discussed in the monthly reports submitted to the COR. Sensitive information includes Foreign Government Information (FGI) on unit capabilities and status that may be provided to the team members. This sensitive information should be safeguarded to at least the same degree as CUI and in accordance with host-nation guidance.

4.8 The Contractor shall demonstrate and maintain compliance with Cybersecurity Maturity Model Certification (CMMC) requirements commensurate with the level of information handled under this contract. At a minimum, a current CMMC Level 1 self-assessment shall be maintained and verifiable in the Supplier Performance Risk System (SPRS). Where contract performance involves the receipt, processing, storage, transmission, or generation of Controlled Unclassified Information (CUI) in any form, the Contractor shall demonstrate a current CMMC Level 2 assessment prior to award and throughout the period of performance. This requirement flows down to all subcontractors performing work involving CUI.

4.9 Security and Academic Informational Requirements: The Contractor shall also establish appropriate administrative, technical, and physical safeguards to protect all Government data to ensure the confidentiality, integrity, and availability of government data. The Contractor will refer to Department of Defense (DoD) Instruction 5200.02, Personnel Security Program for details.

4.10 Access and General Protection/Security Policy and Procedures: All Contractor personnel performing work under this requirement shall comply with applicable installation, facility and area commander installation/facility access, local security policies and security procedures provided by the Security Manager Government representative.

Contractor personnel shall provide all information required for background checks to meet installation access requirements.

4.11 Information Assurance (IA) Plan and Certification: The Contractor shall provide an Information Security Plan to certify any employees supporting IA/IT functions as per

DoDM 5200.01 Volume 1, DoDM 8140.03, and AR 25-2. If any TAFT members are expected to perform duties that fall under these regulations, the baseline certification is stipulated in DoDM 5200.01 Volume 1, DoDM 8140.03, and the plan to ensure compliance must be submitted to the KO/COR.

4.12 Counterintelligence Awareness and Reporting Program (CIARARC): For all contractors with security clearances. Per AR 381-12 contractor employees must receive annual CIARC training by a CI agent or other trainer as specified in 2-4b of AR 381-12.

5 DATA RIGHTS

5.1 The Government shall have unlimited rights in all deliverables under this requirement to the extent permitted by law. All training-related materials delivered under this requirement will be considered special works for purposes of DFARS 252.227-7020.

The Contractor shall deliver any training material generated to the United States Government (USG) twenty (20) business days after contract award and within five (5) business days of any proposed change and the USG will maintain responsibility for any necessary exportability of material.

5.2 DFARS 252.227-7020(c) states the following:

“License rights. (1) The Government shall have unlimited rights in works first produced, created, or generated and required to be delivered under this contract. (2) When a work is first produced, created, or generated under this contract, and such work is required to be delivered under this contract, the Contractor shall assign copyright in those works to the Government. The Contractor, unless directed to the contrary by the Contracting officer, shall place the following notice on such works: “© (Year of delivery) United States Government, as represented by the Secretary of (department). All rights reserved.” (3) The Contractor grants to the Government a royalty-free, world-wide, nonexclusive, irrevocable license to reproduce, prepare derivative works from, distribute, perform, or display, and to have or authorize others to do so, the Contractor's copyrighted works not first produced, created, or generated under this contract that have been incorporated into the works deliverable under this contract.”

5.3 To the extent permitted by law, the Government shall own and/or have unlimited rights in all deliverables. An “unlimited rights” license means that the Government can use, modify, reproduce, release, or disclose technical data or computer software in whole or in part, in any manner, and for any purpose and to authorize others to do so. The Contractor shall deliver all and any training material generated during performance to the U.S. Government and the U.S Government will maintain responsibility for any necessary exportability of material. The Contractor will not be authorized to re-use any training material generated until the U.S Government provides approval.

5.4 The Contractor will inventory, identify, and track all intellectual property (training materials, training related data, photos, creations of the mind, inventions, literary and artistic works, designs, symbols, names, and images) to include all documents, training materials, data, or other (classified or unclassified) obtained and/or created for this requirement. The Contractor shall immediately (within thirty days of creation) notify the KO of any intellectual property or data that it believes to have Copyright or Limited Rights.

Otherwise, all intellectual property used or created shall be considered Government Unlimited Rights Data.

5.5 The Contractor will safeguard the Government’s data rights to prevent intellectual property (as described above) from “spillage” or unauthorized use by company or personnel.

5.6 The Contractor will ensure that all intellectual property (as described above) will be submitted in their entirety to the COR at the conclusion of the requirement and notify the Government of how residual data remaining on laptops will be controlled.

6 COMMON ACCESS CARD (CAC) AND BADGING REQUIREMENTS:

6.1 All Contractor personnel performing work under this requirement shall have the ability to obtain and be able to maintain a DoD Common Access Card (CAC) if required.

All Contractors will be required to possess a company e-mail address and will be required to obtain a .mil e-mail address in order to access the US Government Systems. Any country required badging shall be always worn when performing work IAW this contract, to include attending government meetings and conferences. Unless otherwise specified in the contract, Contractor personnel shall wear the country required badging in a conspicuous place on the front of exterior clothing and above the waist, except when safety or health reasons prohibit such placement or when being used for computer access.

6.2 Any CAC in the possession of a Contractor will be maintained by the Contractor and returned to the Government upon individual employment termination or end of the PoP.

6.3 A CAC will not be issued (or maintained) by a person if there is a reasonable basis to believe, based on the individual’s criminal or dishonest conduct, that issuance of a CAC poses an unacceptable risk.

6.4 Considerations of issuing a CAC should be taken towards an individual’s conduct involving questionable judgment, lack of candor, dishonesty, or unwillingness to comply with rules and regulations that can raise questions about his or her reliability or trustworthiness and may put people, property, or information systems at risk.

6.5 Conditions that may be disqualifying include: a single serious crime or multiple lesser offenses that put the safety of people at risk or threaten the protection of property or information. A person’s convictions for burglary may indicate that granting a CAC poses an unacceptable risk to the U.S. Government’s physical assets and to employees’ personal property on a U.S. Government facility. Army Directive 2014-05, which establishes Homeland Security Presidential Directive (HSPD)-12 investigative and adjudicative policies and procedures to support credentialing determinations for the issuance of CACs to eligible Army Contractor personnel. HSPD-12 mandates a government-wide standard for secure and reliable forms of identification issued by the Federal Government for physical access to federally controlled facilities and/or logical access to federally controlled information systems. The CAC is the DoD federal personal identity verification credential. The purpose of security screening is to identify those people who may pose a threat to good order and discipline on Fort Bragg by either denying them access or placing restrictions on their movement.

6.6 The following criteria will be used as a guideline for determining denial of a CAC by the Government Authority IAW HSPD-12: Any record of a felony conviction for a crime (includes murder, rape, sale of illegal drugs, grand theft, arson, and kidnapping) and/or three or more misdemeanor convictions within the past five years (includes assault, theft of $500 or less, but excludes minor traffic violations).

6.7 The Contractor shall immediately report any lost CAC or government issued identification cards to the COR and Military and/or DoD police agencies. The Contractor shall immediately collect the CAC and other government issued forms of identification upon termination of employee, or at the end of the contract performance period. The CAC and other government issued forms of identification shall be returned to the COR within ten (10) days of employee termination, or at the end of contract performance period, whichever comes first, IAW PARC Policy Alert 14- 33, HSPD-12 issued 31 Dec 2013.

Final payment may be delayed if Contractor fails to comply with these requirements.

7 PRE-DEPLOYMENT REQUIREMENTS:

7.1 Pre-deployment activities shall take place at U.S. Army SATMO Headquarters, Fort Bragg, NC (or alternate FACT locations) and Contractor facilities in CONUS.

7.2 The Contractor shall hire, assemble, and prepare the members for deployment as follows:

7.2.1.1 Recruit and hire personnel with the qualifications, training, and experience listed in this PWS. Provide documentation of qualifications to the COR and SATMO prior to the individual’s deployment.

7.2.1.2 The Contractor shall schedule and arrange for personnel to deploy/travel to country to establish the support requirement. The Contractor shall be responsible for preparing their employees for deployment to include passport, visa, country clearance requirements, and international driver’s Permit.

7.2.1.3 The Contractor shall ensure all deploying personnel arrive in country within five

(5) business days of their designated report dates.

7.2.2 As required, the Contractor shall provide each deploying team member a means to conduct official communication on a Non-classified Internet Protocol Router system.

7.2.3 Network Access: Contractor personnel requiring access to Government- owned computer networks must meet all access requirements prior to being issued a user identification and password IAW AR 380-67 and NIST Special Publication (SP) 800-88, Revision 1.

7.3 Theater Clearance: Theater entry requirements are determined by the Combatant Commander (COCOM) and listed in the Foreign Clearance Guide, which can be found at https://www.fcg.pentagon.mil/fcg.cfm. Theater entry requirements for OCONUS commands pertain to all DoD military, civilian, and Contractor personnel traveling in any capacity into and within the command’s area of responsibility. Travel Tracker/Individual Antiterrorism Plan (TT/IAP) is not required for U.S. Army Personnel or U.S. Army Contractors.

7.3.1.1 The Contactor shall meet all Theater Clearance Requirements for travel to country listed in the Electronic Foreign Clearance Guide. Aircraft and Personnel Automated Clearance System requests will be submitted NLT 20 business days prior to travel.

7.3.1.2 The Contractor shall schedule and ensure all Contractor members complete any theater-specific geographic training and pre-deployment actions as required by the United States unified combatant command of the U.S. Armed Forces responsible for that region, country, and SATMO.

7.3.1.3 The Contractor shall complete required online training classes per the electronic foreign clearance guide. Complete Anti-terrorism (AT) Level 1 and Counter Threat Awareness Training (CTAT) (for any travelers that will be in country less than 90 cumulative days in a 12-month period). Note that TT/IAP is not required for U.S. Army and U.S. Army Contractors.

7.3.1.4 AT Program for Contractor Personnel Traveling Overseas. U.S. based Contractor employees shall complete JS-US007-14 - Level I Antiterrorism Awareness Training Course prior to travelling to country. The training is available at:

http://jko.jten.mil/courses/atl1/launch.html IAW PARC Policy Alert 14-33, HSPD-12.

7.3.1.5 OPSEC Training. Per AR 530-1, Operations Security, new contract employees shall complete Level I OPSEC training within 20 business days of their reporting for duty and annually thereafter.

7.3.1.6 Information Assurance Training: Contractor and associated Sub- Contractor personnel must complete the DoD IA, Information Awareness training, before issuance of network access, and annually thereafter. This required training must be completed within

10 business days of contract award or 10 business days of employment. Certificates of completion will be provided to the COR.

7.3.1.7 Attend FACT Course. FACT Training is five (5) business days. The Contractor shall report to SATMO to attend the FACT course after training development and immediately prior to deploying. SAT members may be required to participate in evasive driving training and handgun firing range training while attending the FACT course. If the FACT training dates do not correspond with the requirement required start date, another location may be selected at the discretion of the COR. It is the Contractor’s responsibility to coordinate and ensure that this training is accomplished in its entirety. This training is mandatory for all new hires and any Contractor personnel who have not had the training within six years. It also applies to personnel that have returned into the United States from a prior or current contract.

7.4 Contractor Travel: The Contractor shall be authorized travel and temporary duty expenses consistent with the provisions of Federal Acquisition Regulation (FAR) 31.205- 46 Travel Costs, Federal Travel Regulations, and the limitation of funds specified in the resulting contract for Contractor personnel pre-deployment preparation, deployment, redeployment, and in-country temporary duty away from the primary duty location. Travel costs shall cover Contractor personnel pre-deployment preparation, deployment OCONUS and redeployment CONUS.

7.4.1.1 Any official travel requires Government approval/authorization and notification to the COR before it is incurred. The Contractor shall be responsible for all travel expenses related to replacement personnel. The Contractor shall provide a deployment schedule/roster to the USG within 20 business days of Contractor travel and within 10 business days of any changes.

7.5 Establish and maintain a Contractor Company Synchronized Pre-deployment Operational Tracker (SPOT) account, if required.

7.6 Obtain U.S. Government CAC, if required.

7.7 Complete medical screening and preparations to include receiving any required immunizations.

7.8 Reportable Activities Training Acknowledgement. Contractors are required to read and understand the Army Incident Reporting and Response Requirement Memorandum and if applicable the Army Implementation of Security Executive Agent Directive (SEAD) 3. The Reportable Activities Training Acknowledgement needs to be signed and submitted to the COR prior to deployment. These documents will be provided by SATMO.

8 MEDICAL REQUIREMENTS:

8.1 The Contractor shall maintain for each team member a doctor’s certification letter stating that the individual is medically and emotionally fit for deployment and performance of the requirement under potentially austere, physically demanding, and stressful working conditions. This certification must state that the medical doctor has found no reasonably disqualifying factor during his/her interview, exam, and review of the member’s medical history that would prevent the team member’s deployment. All team members shall meet the following conditions prior to deployment. Pilots shall meet and maintain medical requirements and certification for flights as per DCMA Instruction 8210- 1D Contractor’s Flight and Ground Operations.

8.1.1.1 Current Physical (within 12 months of deployment).

8.1.1.2 HIV testing: Personnel shall be tested, and present proof of a negative HIV test result performed within six months of deployment. Positive HIV test result is a non-deployable condition.

8.1.1.3 The Contractor will ensure all personnel have the necessary immunizations required by the Country. All immunizations required for U.S. personnel deploying to host nation must be complete and current. Contractor is responsible for cost. A list of mandatory and recommended vaccines can be found on the Center for Disease Control website at https://wwwnc.cdc.gov/travel/. The Contractor will ensure all personnel have the necessary immunizations outlined in the Foreign Clearance Guide (https://www.fcg.pentagon.mil) for all countries the Contractor will visit in support of these requirements. Additionally, the Contractor will ensure its personnel meet immunization requirements policy guidance with the United States unified combatant command of the U.S. Armed Forces responsible for that region. Immunizations must be complete prior to arrival at the deployment center/ platform. Costs associated with immunizations are the responsibility of the Contractor.

8.1.1.4 Contractor must verify that each team member has all prescription medications and any required over-the-counter medications that may have limited in country or online availability in adequate supply to cover the planned duration of the requirement.

8.1.1.5 Each team member will report any changes in his/her medical condition or any developing medical concerns that could impact on the requirement of the team leader, who will notify the appropriate company personnel. The Contractor shall determine, after providing prior notification to the COR, whether to replace the team member based on potential requirement impact. The Contractor recognizes that the services under this contract are vital to the Government and must be continued without interruption. If contract personnel need to be replaced, then the Contractor shall replace them expeditiously so that the performance is not affected.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .