IA02 PWS DRAFT - 5BDE SAT Drill Competition.pdf
PDF 838 KB Posted
- Attached to
- 5BDE San Antonio Drill Competition
- Solicitation number
- PANMCC-27-P-0000060237
About this file
This is a Performance Work Statement (PWS) for facility rental and event support services for the 2027 5th Brigade JROTC Drill Team Championship scheduled for February 19-20, 2027, in San Antonio, Texas.
The contractor must provide a facility of at least 100,000 square feet of unobstructed space within a 25-mile radius of San Antonio (ZIP 78205) to host approximately 1,000 JROTC student-cadets, spectators, educators, and media for a one-day drill competition. The contractor shall furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, and supervision necessary for the event, including permanent-structured facilities with electrical power and consistent internet connectivity. Specific deliverables include: three separate rooms totaling approximately 10,000 square feet each for drill competition, judge/scoring (with interior and exterior locking capability), and drill team inspection; one elevated 16' x 16' x 24" centrally located stage with two 8-foot tables and six chairs; 741 chairs and 23 8-foot tables distributed across performance venues and inspection areas; 14 tables and 50 chairs for judges and scorers; 30 tables with 60 chairs for team displays; sufficient restroom facilities; ample trash receptacles; janitorial/custodial crews; loading dock and equipment/personnel ramp access; and five VIP parking slots. The contractor shall provide facility access from 6:00 a.m. to 11:59 p.m. on February 19 for setup and February 20 for the event, maintain the facility in clean and orderly condition, and shall not charge admission. Performance thresholds require 95% compliance across all deliverables. The contractor is responsible for all utility conservation and must comply with applicable Army regulations and Federal Acquisition Regulations. No specific contract value, response deadline, or award date is stated in this draft PWS.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IA02 SSN - 5BDE SAT Drill Competition.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
IN SUPPORT OF
2027 5TH BRIGADE JROTC DRILL TEAM CHAMPIONSHIP
FOR 5TH BRIGADE JROTC PROGRAMS
19-20 February 2027
PART 1
GENERAL INFORMATION
1. GENERAL: This is a non-personal service contract under which the personnel rendering the service are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
1.1 Description of Services/Introduction: This is a non-personal service contract to provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to facilitate the rental of the contractor facility in support of the 2027 5th Brigade
JROTC Drill Team Championship as defined in this Performance Work Statement except for those items specified as government furnished property and services.
The contractor shall meet the standards in this contract.
1.2 Background: The 5th Brigade JROTC Drill Team Championships are in their
11th year of existence and encompass teams from throughout a seven-state area of operation. The competition not only determines our top 10 teams, but it also qualifies the teams representing the 5th Brigade at the National level. These top
10 drill teams will represent 5th Brigade at the U.S. Army Cadet Command, JROTC National Drill Team Championships in San Antonio, Texas. Each year, we host approximately 1000 JROTC student-cadets, spectators, local educators, stakeholders, and local media at our competition. The facility required to host a drill competition of this size are rather unique, in that an inordinate amount of unobstructed space (approx. 100,000 square feet or more) for drill teams to perform, and to be able to complete the competition in one day. Also, the Drill
Team Championship Competition is required to be held entirely in one location to maintain the integrity of the competition, and an appropriate level of oversight by management personnel.
1.3 Scope: The Contractor shall provide non-personal service(s). Provide training facilities, furniture, equipment, supplies, management, supervision, and parking.
1.4 Objectives: The objective of this contract is to provide:
• The 5th Brigade JROTC Drill Team Champion
• Top 10 qualifiers to attend the Army Cadet Command JROTC National Drill
Team Championship in San Antonio, Texas.
DRAFT
1.5 General Information
1.5.1 Quality Control Plan (QCP), the contractor’s existing quality assurance system shall be utilized in accordance with FAR 12.208.
1.5.1.1 The Contractor shall inform the COR of issues or potential issues that might affect the performance within 2 hours of identifying those issues. Verbal reports shall be followed by written reports within 2 days
1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance
Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
1.5.3 Recognized Holidays: Reserved.
1.5.3.1 U.S. Holidays Reserved
1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide; however, they may differ. Please refer to the following.
1.5.4.1 Contractor Support Hours: The Contractor shall provide support between the
Hours of 0600 to 1159 hrs or until event is complete each day from the 19 -20 February
2027. The Contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined with this PWS for the period stated. Contractors shall keep in mind that stability and continuity of the workforce are essential.
1.5.5 Place of Performance: The work to be performed under this contract will be performed at a contract facility within a 25-mile radius of San Antonio TX 78205.
1.6 Security Requirements: The following information is provided on security related matters. Contractor personnel performing work under this contract are not required to have a security clearance.
1.6.1 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use.
1.7 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting
Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will appraise the Contractor of how the
Government views the Contractor's performance and the Contractor shall appraise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.7.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the
Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.
1.8 Contracting Officer’s Representative (COR): As determined by the Contracting
Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially regarding changes in cost or price, estimates, or changes in delivery dates. The
COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the
Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including
Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of
Contractor personnel.
1.9 Key Personnel: Reserved
1.9.1 Special Qualifications: Reserved
1.10 Identification of Contractor Employees: All Contractor personnel attending meetings and working in other situations where their contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.11 Protection of Government and Contract Information: Per Public Use Notice of
Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/ the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.
1.12 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the
Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s
OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting
Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1 Definitions: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
Contracting Officer. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
http://www.dimoc.mil/resources/limitations/
Contracting Officer Representative (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
Day – means, unless otherwise specified, a calendar day.
Defective Service. A service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
Government-furnished Property – As reflected in FAR 52.245-1, Government furnished Property “means property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification.
Government Property - means all property owned or leased by the Government.
Government property includes Government-furnished. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
Physical Security. Actions that prevent the loss or damage of Government property. Quality Assurance. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
Quality Assurance Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Statement – means the specific results-based activities required to satisfy HLOs.
A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however, they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective.
Statements are similar to Level 3 in a Work Breakdown Structure.
Subcontractor. One that enters into a contract with a prime contractor. The
Government does not have privacy of contract with the subcontractor.
Workday. The number of hours per day the Contractor provides services in accordance with the contract.
Work Week. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative
AFARS Army Federal Acquisition Regulation Supplement
AR Army Regulation
CFR Code of Federal Regulations
CONUS Continental United States (excludes Alaska and Hawaii)
COR Contracting Officer Representative
DA Department of the Army
DFARS Defense Federal Acquisition Regulation Supplement
DOD Department of Defense
FAR Federal Acquisition Regulation
KO Contracting Officer
OCI Organizational Conflict of Interest
PIPO Phase In/Phase Out
POC Point of Contact
PRS Performance Requirements Summary
PWS Performance Work Statement
QA Quality Assurance
QAP Quality Assurance Program
QASP Quality Assurance Surveillance Plan
QC Quality Control
QCP Quality Control Program
TE Technical Exhibit.
PART 3
GOVERNMENT PROPERTY (GP) AND SERVICES
3. Government Property and Services:
3.1 Services: Reserved.
3.2 Materials: Reserved.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. Contractor Furnished Property and Service:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed in this
PWS.
4.2 Materials: The Contractor shall provide facilities, equipment, supplies, management, supervision, and labor as specified herein. The contractor shall provide permanent-structured facilities with electrical power for consistent internet connectivity. The Contractor shall provide services in accordance with the terms, conditions and specifications put forth in this PWS.
4.3 Vehicles and Equipment: The contractor shall provide folding long table for internet set-up. The contractor shall provide 741 chairs and 23 8-foot tables.
4.4 Clothing: The contractor’s personnel shall wear clean clothing and present themselves with clothing that does not contain statements that may be offensive to the military or others using a portion of the uniform.
4.5 Utility Conservation: The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves.
PART 5
SPECIFIC TASKS
5.1. Basic Services: The contractor shall provide services to support 5th BDE Drill
Championship Competition during the period of 19-20 February 2027. The contractor shall provide equipment, supplies, tools, and adequate floor space to support the drill competition. Provide sufficient restrooms for the setup and event.
The contractor shall provide services in accordance with the terms, conditions and specifications set forth in this Performance Work Statement (PWS). The contractor shall perform to the standards in this contract.
5.2 Tasks: Tasks consist of the following:
5.1.2. The contractor shall provide access to the facility and be made available to
5th Brigade JROTC/SROTC Personnel the day before the competition, Friday, 19
February 2027, at 6:00 a.m. to 11:59 p.m., to facilitate the setup of the performance venues, competition Headquarters, the Judge’s Chambers and the
Competition Scoring Room.
5.1.3 The contractor shall provide total access to the facility on event day from
6:00 a.m. to 11:59 p.m., Saturday, 20 February 2027.
5.1.4 The contractor shall provide clean-up of the facility and ample trash receptacles for the deposit of trash and debris by spectators, participants and event staff.
5.1.5 The contractor shall provide sufficient restroom space to accommodate some 1,000 JROTC Cadets, Chaperones, Judges, Instructors and Parents.
5.1.6 The contractor shall provide three (3) separate rooms totaling approximately
10,000 square feet of unobstructed space, each collocated or adjacent to the Drill
Pads. One (1) room for a Judge/Scoring area, another room for JROTC Drill
Team Inspection Phase and another room for rehearsal activities.
5.1.7 The contractor shall provide one (1) elevated centrally located stage, 16 feet x 16 feet x 24 inches, for an event control center/awards stand with two (2) 8-foot tables and six (6) chairs.
5.1.8 The contractor shall provide one Hundred (100) chairs adjacent to each of the six (6) performance venues in the 100,000 square foot area and thirty (30) chairs each in each of the two (2) spaces designated for Drill Team inspections.
5.1.9 The contractor shall provide fourteen (14) tables and fifty (50) chairs in the area designated for use by Judges and Scorers.
5.1.10 The contractor shall provide thirty (30) tables with two (2) chairs per table (total of sixty (60) chairs) placed against the outside walls of Exhibit Hall on event day for teams and event displays.
5.1.11 The contractor shall provide access to loading docks and equipment/personnel ramps immediately in the 100,000 square foot facility.
5.1.12 The contractor shall provide and make available enough
Janitorial/Custodial crews to maintain the facility in a clean and orderly manner.
5.1.13 The contractor shall not charge admission to access the facility or view the competition.
5.1.14 The contractor shall provide 5 slots for VIP personnel during the day of the
PART 6
APPLICABLE PUBLICATIONS
6. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
6.1: CCR 145-2- Organization, Administration, Operations Training and Support
6.2 Federal Acquisition Regulations
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7. Attachment/Technical Exhibit List:
7.1 Attachment 1/Technical Exhibit A – Performance Requirements Summary.
7.2 Attachment 2/Technical Exhibit B – Deliverables Schedule.
TECHNICAL EXHIBIT A
Performance Requirements Summary (PRS)
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
PERFORMANCE
OBJECTIVE
STANDARD PERFORMANCE
THRESHOLD DRAFT
PWS Para. 5.1. Contractor shall provide access to facility for setup of performance venues.
Make available total access to the facility on event day.
Facility of over 100,000 square feet shall be made available on the day before the event for set up.
95% Compliance
PWS para 5.1.4 –
Contractor shall provide cleanup of Facility
Cleanup. Provide cleanup of facility and provide trash receptacles and janitorial crews.
Provide cleanup of facility and provide trash receptacles and janitorial crews.
95% Compliance
PWS para 5.1.5 The contractor shall provide sufficient restroom space
Facility shall have sufficient restroom space to accommodate JROTC
Cadets, Chaperones, Judges, Instructors and
Parents.
PWS 5.1.6-5.1.11 The contractor shall provide three separate rooms, one elevated stage, chairs, tables and loading dock.
PWS para 5.1.6-5.1.11 cont.’
One room for drill competition, one separate room for Judge/Scoring that’s able to be secured from the inside during occupancy and from the outside while room is empty of personnel to secure valuables. One room for drill team inspection phase.
Each room shall be approximately 10,000 square feet. One hundred
(100) chairs for each of the six (6) performance venues and thirty (30) chairs for each of the two (2) Drill
Team inspection spaces.
PWS para 5.1.6-5.1.11 cont.’
The contractor shall provide fourteen (14) tables and fifty
(50) chairs in the designated area for Judges and Scorers.
The contractor shall provide thirty (30) tables with two (2) chairs each (60 chairs total) placed against the outside walls of the Exhibit Hall.
PWS para 5.1.12 The contractor shall provide and make available enough
Janitorial/Custodial crews to maintain the facility in a clean and orderly manner
The facility is maintained in a clean and orderly condition throughout the event, with staff visibly present
PWS para 5.1.14 VIP
Parking.
The contractor shall provide five (5) parking slots for VIP personnel on the day of the
TECHNICAL EXHIBIT B
DELIVERABLES SCHEDULE
Deliverable Frequency # of copies Medium/Format Submit To
JCLC Camp
Commander
Para 5.1.2
Setup
1 1 In person
Para 5.1.3
Event
Day
20 February
In person
Same as above
Para 5.1
Restrooms
As needed.
Contractor venue
Para 5.1.4
Cleanup
As needed
Multiple locations
Para 4.3 Chairs, tables and stage
Multiple locations
Para 5.1 Drill area
As needed 1
Same as above
Para 5.1 Drill team inspection phase
Per room
Para 5.1.6
Judge/Scoring room
Per room
Same as above
Para 5.1.6 One room
19-20 February
Unlimited
Para 5.1.11
Access to loading dock
Each
File details come from the government source that posted it. Updated .