Solicitation Amendment W9115126QA0570001 SF30.pdf

PDF 178 KB Posted

Attached to
13 ACSC 3D Metal Printer
Solicitation number
PANMCC-26-P-047957
Issued by

About this file

This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the U.S. Army's Contracting Office at Fort Hood, Texas. Amendment 0001, effective 08 July 2026, formally revises the technical specifications of Solicitation W9115126QA057 (originally dated 29 June 2026) to establish a minimum performance threshold of 50 Microns for the optical/laser spot size of the required equipment.

The amendment modifies the procurement specification for a Xact Metal 200G Metal 3D Printer System to include the addition of a laser spot size specification of 50 Microns in the technical requirements. The system must be a complete metal powder bed fusion 3D printing system with physical delivery, onsite installation at Fort Hood, Texas, OEM-led operator training, and operational verification. The system configuration includes a single 400-Watt laser, extended build height of 11.5 inches, reactive metal processing capability, integrated powder handling glove box, OEM powder sieving station, specialized metal powder vacuum equipment, and onsite unboxing, setup, and system calibration by certified OEM technicians. OEM-led training must consist of 2-3 days of intensive, hands-on operational and safety training scheduled only after full installation, calibration, and operational verification. Invoicing is required following delivery, installation, and conclusion of OEM-led onsite training. The contracting officer is Donelle White, Fort Hood Military Installation Management Command Facility Directorate Office.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

J

PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

08 JUL 2026

4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE W91151 7. ADMINISTERED BY (If other than Item 6) CODE

W6QM MICC-FDO FT HOOD

36000 DARNALL LOOP, FORT HOOD TX 76544

FORT HOOD, TX 76544

UNITED STATES

DONELLE WHITE, EMAIL: DONELLE.H.WHITE.MIL@AR

MY.MIL TELEPHONE: 843-726-

SCD: PAS:

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X ) 9A. AMENDMENT OF SOLICITATION NUMBER

W9115126QA057

9B. DATED (SEE ITEM 11)

29 JUN 2026

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE

11. THIS IT

FACILITY CODE

EM ONLY APPLIES TO A

MENDMENTS OF

S

OLIC

ITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

SEE CONTINUATION

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of Amendment 0001 is to formally revise the technical specifications of SolicitationW9115126QA057 to establish a minimum performance threshold of 50 Microns for the optical/laser spot size.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

W9115126QA0570001

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Continuation of Supplies or Services and Prices/Costs

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO

Description Xact Metal 200G Metal 3D Printer

System (With Installation and OEM

OnSite Training)

Complete metal powder bed fusion

3D printing system, including physical delivery, onsite installation, OEM-led operator training, and operational verification.

System shall be configured and supplied with:

Laser Configuration: Single (1) 400-

Watt Laser

Build Height: Extended Build Height

(11.5")

Reactive Enabled: Supports safe processing of aluminum and other reactive metals

Glove Box: Integrated powderhandling glove box.

Sieving Station: OEM powder sieving station for material reclamation.

Safety Equipment: Specialized metal powder vacuum for safe cleaning and mitigation of inhalation

/combustion hazards.

Installation Services: Onsite unboxing, physical setup, utility connection, and system calibration

Xact Metal 200G Metal 3D Printer

System (With Installation and OEM

OnSite Training)

Complete metal powder bed fusion

3D printing system, including physical delivery, onsite installation, OEM-led operator training, and operational verification.

System shall be configured and supplied with:

-Laser Configuration: Single (1) 400-

Watt Laser

-Spot Size: 50 Microns

-Build Height: Extended Build Height

(11.5")

-Reactive Enabled: Supports safe processing of aluminum and other reactive metals

-Glove Box: Integrated powder handling glove box.

-Sieving Station: OEM powder sieving station for material reclamation.

-Safety Equipment: Specialized metal powder vacuum for safe cleaning and mitigation of inhalation

/combustion hazards.

-Installation Services: Onsite unboxing, physical setup, utility

W9115126QA0570001

/verification by certified OEM technicians at Fort Hood, TX.

OEM-Led Training (Bundled): 2-3 days of intensive, onsite, hands-on operational and safety training at

Fort Hood, TX. Training shall be scheduled and conducted only after the printer has been fully installed, calibrated, and verified as operational. Training includes system operation, powder handling, reactive metal safety, job setup, maintenance, and troubleshooting.

Invoicing Requirement:

Invoicing shall be submitted following delivery, installation, and the conclusion of the OEM-led onsite training.

connection, and system calibration

/verification by certified OEM technicians at Fort Hood, TX.

-OEM-Led Training (Bundled): 2-3 days of intensive, onsite, hands-on operational and safety training at

Fort Hood, TX. Training shall be scheduled and conducted only after the printer has been fully installed, calibrated, and verified as operational. Training includes system operation, powder handling, reactive metal safety, job setup, maintenance, and troubleshooting.

Invoicing Requirement:

Invoicing shall be submitted following delivery, installation, and the conclusion of the OEM-led onsite training.

File details come from the government source that posted it. Updated .