This document is a Sources Sought Synopsis for an interior paint and flooring repair project at Building 622 in the Presidio of Monterey. The Department of Public Works seeks a contractor to remove existing carpets, baseboards, and VCT tiles from the 1st, 2nd, and 3rd floors, and install new rubber flooring and baseboards. The project also requires interior painting of walls on the basement, 1st, 2nd, and 3rd floors, with mandatory hazmat and lead paint testing.
The project is classified under NAICS code 236220 with a size standard of $45 million, and is estimated to cost between $250,000 and $500,000. The contract duration is projected at 180 calendar days. Interested contractors must submit a response by 1:00 PM PST on May 7, 2023, to usarmy.leavenworth.acc-micc.mbx.construction@mail.mil. Submissions must include company information, bonding capacity, and experience with three relevant government or commercial contracts completed in the last three years. The project will be conducted while the building remains occupied, requiring careful coordination with U.S. Army personnel and the Directorate of Public Works.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Draft_SOW Bldg 622 Paint Interior Walls and Repair Flooring.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair Flooring on the 1st floor, 2nd floor, and 3rd floor. Contractor shall remove existing carpets, baseboards and VCTs in the bedrooms, hallways, dayrooms and administration rooms. Contractor shall install new rubber flooring and baseboards in the bedrooms, hallways, dayrooms and administration rooms on the 1st, 2nd, 3rd floors. Contractor shall conduct hazmat test two sections on each floor. Contractor shall field verify dimensions.
Interior Painting on the basement, 1st floor, 2nd floor, and 3rd floor. Contractor shall conduct interior paint on the walls of 1st, 2nd and 3rd floors. Contractor shall conduct lead paint test two sections on each floor. Contractor shall field verify dimensions.