This document is a Statement of Work (SOW) for furniture assembly and installation at the 3rd MCDS Building 900 facility. The SOW requires the contractor to unpack, assemble, and install various office furniture items, including desks with hutches, in specific room configurations. The contractor must furnish all labor, equipment, and incidentals necessary to complete the work. The contractor is responsible for providing an installation schedule and travel costs. Access to the facility is limited to 0730-1630 hours, and all contractor personnel must be cleared by the 3rd MCDS G2 before starting work.

The related federal contract opportunity is a pre-solicitation for furniture assembly services, with the Mission and Installation Contracting Command (MICC) at Fort Liberty as the procuring agency. This requirement will be a 100% small business set-aside.

View the file

Other files

File Type Posted
Classroom 83.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

3RD MCDS BLDG 900 Furniture Assembly

3rd MCDS PROJECT DESCRIPTION:

1. Unpacked, assemble, and install furniture and dispose of all boxes and debris upon completion.

2. Location and place of work to be done 3rd MCDS Bldg. 900 5015 N 34th Street, Gillem Enclave, GA 30297-5122

SCOPE: 3rd MCDS Bldg. 900 facility requires installation of updated Audio Video controls for classrooms. This will support all elements from USARC staff to local area units for training.

3. Requirements.

a. Room 83 (1st floor) unpack, assemble, and install (4) Left Pedestal Desks with Hutches on the backwall of the room, unpack assemble and install (2) Left Pedestal Desk with Hutches facing back to back in the center of the room and (I) Left Pedestal Desks with Hutches center left wall of the room, and unpack, assemble, and install (3) Left Pedestal Desk with Hutches left front wall centered and equally spaced of the room, then remove all boxes and debris.

(See attached documents for Pictures of room) for identification of installed equipment).

4. Contractor shall furnish all labor, equipment, and incidentals necessary to accomplish the work as specified above in section 3. Requirements.

DELIVERABLES.

5. Contractor shall provide the install schedule once awarded the contract for this project to the 3rd MCDS for final approval.

TRAVEL.

6. Contractor shall be responsible for any travel costs incurred to complete this requirement.