STATEMENT OF WORK
PROJECT NO.
Fire Extinguisher Annual Inspection and Maintenance
FORT BRAGG, NORTH CAROLINA
Special Provisions and General Project Information:
1. The contractor shall prepare a technical and price proposals for Fire Extinguisher Annual Inspection and Maintenance at Fort Bragg, NC.
2. Project Title: Fire Extinguisher Annual Inspection and Maintenance at 82nd CAB, Fort Bragg, North Carolina.
3. Project Number:
4. 82nd CAB needs the inspection of a total of 848 fire extinguishers.82nd CAB needs the contractor to conduct all annual maintenance on site. Extinguishers that are six or twelve years past manufacturer date are due for breakdown or hydro test. Extinguishers that are due for breakdown or hydro test will be picked up and brought to the shop for maintenance. Once the proper maintenance has been completed the contractor will return all extinguishers to the 82nd CAB. Any extinguishers that the contractor is unable to perform maintenance on due to damage or recall will be replaced with new fire extinguishers.
5. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform operations necessary for providing Fire Extinguisher Annual Inspection and Maintenance at 82nd CAB, Fort Bragg, NC
6. The Contractor shall conduct Fire Extinguisher Annual Inspection and Maintenance at Fort Bragg, NC.
7. Contractor shall perform all annual maintenance on site.
8. Contractor shall ensure that all extinguishers that are six or twelve years past manufacture date are due for breakdown or hydro test.
9. Contractor shall ensure that extinguishers that are due for breakdown or hydro test will be picked up and brought in for maintenance. Once the proper maintenance has been completed the contractor shall return all extinguishers to the 82nd CAB.
10. Contractor shall replace all extinguishers with new extinguishers if the contractor deems any extinguishers are damaged, recalled, or unable to perform maintenance on.
11. Clean up after Servicing: The Contractor shall remove all trash, debris, or surplus materials from the work site at during and at the end of each workday and shall leave the work site clean of all debris when work is completed.
12. Work hours for this project shall be the normal working hours of 12 Hours.
13. Project completion for the Project estimated to be 10 workdays from receipt of the Notice to Proceed.
14. The Davis-Bacon Wage rate for the Seed Project is as follows: General Decision Number: NC25 07/13/2018 and can be found at the following website: http://www.wdol.gov/dba.aspx.
15. Government Materials – All required Fire Extinguishers for the inspections
16. Inspection: Inspection will be by the Directorate of Public Works, Service Contract Branch, Fort Bragg, North Carolina. The contractor shall notify the COR no later than two days prior to starting work.
17. Warranties: A warranty on workmanship for one year must be provided.