This is a Performance Work Statement (PWS) for Industrial Equipment Maintenance & Repair services at Fort Bragg, North Carolina, issued by the Contract Management Branch, Service Contract Section, dated 13 November 2026, Version 1.0.

The Contractor shall provide comprehensive maintenance and repair services for cranes, hoists, scales, dock levelers, and vehicle lifts across Fort Bragg, Pope Army Airfield, Camp Mackall, Simmons Army Airfield, and Range Operations. Services include preventive maintenance, corrective action, emergency repairs, load testing, and certification of all equipment to maintain 24/7 operational status in accordance with Army TB 43-0142, OSHA 29 CFR 1910.179, ASME B30.2, B30.11, B30.16, B30.17, and manufacturer specifications. The contract is Firm Fixed Price (FFP) with "As Required" Contract Line Items (CLINs), covering a base period of 12 months with four optional one-year extensions and an optional six-month extension. The normal hours of operation are 8:00 AM to 4:30 PM EST, Monday through Friday, excluding federal holidays. The Contractor must maintain 100% compliance with all regulatory codes and manufacturer recommendations, with performance ratings based on monthly inspection results. Key personnel requirements include a Project Manager with OSHA 40-Hour Hazardous Waste Operations certification, OSHA 30-Hour Construction Safety certification, respiratory protection qualification, and a valid driver's license; an Alternate Project Manager/Quality Control Manager with at least two years of documented experience; and maintenance/repair technicians with five years of experience with similar equipment. The Contractor is responsible for all materials, equipment, supplies, tools, and labor, with no government-furnished items except police and fire protection services. Maintenance technicians must be certified or licensed in North Carolina and EPA areas as required. Demand Maintenance Orders are categorized by priority: Priority 1 (emergency) requires acknowledgment within one hour and completion within 24 hours; Priority 2 (urgent) requires acknowledgment within two hours and completion within three days; Priority 3 (routine) requires acknowledgment within three hours and completion within 15 days. Load testing of cranes must be performed at 125% rated capacity with a minimum of 25% of all cranes tested annually on a four-year cycle; scales require calibration testing every six months per National Institute of Standards and Technology Handbook 44; vehicle lifts require annual certification per ANSI/ALI ALOIMR2020 standards; and dock levelers and trailer restraints require annual certification per MH30.1 2015 Edition standards. The Contractor must submit extensive documentation including monthly maintenance schedules, weekly inspection checklists, security program plans, safety plans, spill plans, and quality control plans within specified timeframes. All contractor personnel must complete AT Level I training, iWATCH training, OPSEC training, and obtain installation access badges. Historical workload data indicates approximately 14-181 cranes/hoists Demand Maintenance Orders annually, 2-12 scales orders, and 3-51 dock leveler/lift orders.

View the file

Other files

File Type Posted
SSN - USAG Industrial Equipment - 20261116.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(Cranes, Hoists, Scales, Dock Levelers & Vehicle Lifts)

Performance Work Statement Page 1 of 34

PERFORMANCE WORK STATEMENT

(PWS)

Industrial Equipment Maintenance & Repair

Contract Management Branch

Service Contract Section

Fort Bragg, North Carolina.

13 November 2026

Version 1.0

Performance Work Statement Page 2 of 34

TABLE OF CONTENTS

Part 1: General Information

• 1.1. Description of Services/Introduction

• 1.2. Background

• 1.3. Objectives

• 1.4. Scope

• 1.5. Traffic Flow & Operational Coordination

• 1.6. Restoration of Real Property Damage

• 1.7. General Information

• 1.8. Period of Performance o 1.8.1. Place of Performance o 1.8.2. Recognized Holidays o 1.8.3. Hours of Operation o 1.8.4. Installation Closures o 1.8.5. Inclement Weather

• 1.9. Emergency Delays

• 1.10. Fraud, Waste, and Abuse

• 1.11. Type of Contract

• 1.12. Security o 1.12.1. Security Requirements o 1.12.2. Security Program o 1.12.3. AT Level I Training o 1.12.4. Access and General Protection/Security Policy and Procedures o 1.12.5. iWATCH Training o 1.12.6 Contractor employees who require access to government information systems o 1.12.7. Contracts that require an OPSEC standing operating procedure/plan o 1.12.8. Contracts that require Opsec training o 1.12.9. Information Assurance (IA) Information Technology Training o 1.12.10 Information Assurance (IA) Information Technology Certification o 1.12.11. Contracts that require handing classified information o 1.12.12. Secured Areas / Restricted Areas o 1.12.13. Eligibility Verification for employment o 1.12.14. 3Rs (Recognize, Retreat, Report) Explosives Safety Education Program Training.

• 1.13. Security Training

• 1.13.1. Training

• 1.13.2. Anti-Terrorism (AT) Level I Training

• 1.13.3. iWATCH Training

• 1.13.4. Threat Awareness and Reporting Program (TARP) Training

• 1.14. Local Health Protection Conditions o 1.14.1. Key Control

• 1.15. General o 1.15.1. Personnel Certifications o 1.15.2. Access and General Protection/Security Policy and Procedures

• 1.16. Post Award Conference/Periodic Progress Meetings

• 1.17. Government Roles and Responsibilities o 1.17.1. Contracting Officer (KO) o 1.17.2. Contracting Officer’s Representative (COR/ACOR) o 1.17.3. COR/ACOR Authority o 1.17.4. COR or Designated Government Representative Functions

• 1.18. Specific Contractor Requirements, Roles, and Responsibilities o 1.18.1. U.S. Residency o 1.18.2. Contractor Hiring Restrictions o 1.18.3. Contractor Identification o 1.18.4. Standards of Conduct o 1.18.5. Contractor Key Personnel o 1.18.6. Project Manager (PM)

Performance Work Statement Page 3 of 34 o 1.18.7. Quality Control Manager/Inspector (QCM) o 1.18.8. Quality Control Program (QCP) o 1.18.9. Special Qualifications

• 1.19. Phase In / Phase Out Period

• 1.20. Emergency Services o 1.20.1. Emergency Medical Treatment o 1.20.2. Accident Reporting

• 1.21. Environment and OSHA

• 1.22. Safety o 1.22.1. Safety Plan o 1.22.2. Spill Plan o 1.22.3. Safety Data Sheets

• 1.23. Environmental Compliance

Part 2: Definitions & Acronyms

• 2.1. Definitions

• 2.2. Acronyms

Part 3: Government Furnished Property, Equipment, and Services

• 3.1. Equipment

• 3.2. Utilities

• 3.3. Materials

• 3.4. Property

• 3.5. Services

Part 4: Contractor Furnished Items and Services

• 4.1. General

• 4.2. Materials

• 4.3. Equipment

• 4.4. Unserviceable Contractor Equipment

Part 5: Specific Tasks / Common Levels of Service

• 5.0. Specific Tasks for Cranes, Hoists, and Rigging Equipment

• 5.1. Annual and Periodic Comprehensive Inspections

• 5.2. Preventive Maintenance (PM) and Servicing

• 5.3. Proof Load Testing, Weight Testing, and Certification

• 5.4. Corrective Maintenance, Service Calls, and Emergency Repairs

• 5.5. Deficiency Tracking, Tag-Out/Lockout, and Out-of-Service Systems

• 5.6. Hours of Operation and Service Coordination

• 5.7. Monthly Maintenance Schedule Reports (MSR)

• 5.8. Certification Documentation, Labeling, and Inspection Decals

Part 6: Applicable Publications

Part 7: Attachment(s) & Technical Exhibit Listing.

• 7.1. Attachments

• 7.2. Technical Exhibits

• 7.3. Historical Data

Part 8: Performance Requirements Summary & Deliverables Schedule.

• 8.0. Performance Requirements Summary (PRS) Table.

• 8.1. Deliverables Schedule Table.

Performance Work Statement Page 4 of 34

Part 1

General Information

1.0. GENERAL

This is a non-personal services contract to provide maintenance and repair of cranes, hoists, scales, dock levelers, and vehicle lifts. The Government will not exercise any supervision or control over the contract service providers.

• The Contractor shall perform to the standards specified in this Performance Work Statement (PWS).

• Contract service providers shall be accountable solely to The Contractor who, in turn is responsible to the

Government.

• The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to complete the requirements as outlined and defined in this PWS.

1.1. Description of Services/Introduction

The Contractor shall provide comprehensive management, supervision, personnel, labor, equipment, supplies, facilities, transportation, tools, materials, and other items and non-personal services necessary to perform all maintenance and repair of cranes, hoists, scales, dock levelers, and vehicle lifts. These tasks and standards are detailed and defined in this PWS, Part 5 Specific Tasks, this shall be done In Accordance With (IAW) all the terms, conditions, specifications, attachments, general special provisions and exhibits contained herein or incorporated by reference.

• The Contractor shall ensure that all work meets or exceeds the specifications for the listed Common Levels of

Service (CLS).

• The Contractor shall perform to the standards in this contract.

1.2. Background

The Directorate of Public Works (DPW) at Fort Bragg, North Carolina, oversees Cranes, Hoists, Dock levelers scales and Vehicle lifts across multiple geographically dispersed locations. These supported sites include Fort Bragg, Pope Army Airfield (PAAF), Camp Mackall (MAAF), Simmons Army Airfield (SAAF), and Range

Operations. These systems are critical to the smooth operation of material handling, equipment maintenance, and logistical operations.

1.3. Objectives

The Contractor shall ensure all work accomplished as fulfillment of this PWS meets all applicable Federal, State, and local laws, regulations, directives, and other requirements Legal and Other Requirements (LOR) (See Definitions &

Acronyms), 2.2 Acronyms --- and Applicable Publications.

1.4. Scope

This contract encompasses comprehensive maintenance and repair services for Fort Bragg. The Contractor assumes responsibility for all costs associated with maintaining and repairing the equipment listed in Technical Exhibit (TE). As defined in this contract, and in accordance with all other terms, conditions and provisions contained herein. Work performed under this contract includes servicing, replacement of defective or worn parts, adherence to manufacturer instructions and specifications and Army TB 43-0142. The Contractor’s expertise extends to overhauling, modernizing, installing, and maintaining equipment systems listed in TE. Additionally, The Contractor is expected to propose innovative solutions for equipment improvement. The Contractor shall comply with Federal, State, and local regulations, codes, and manufacturer guidelines.

1.5. Traffic Flow

The Contractor shall maintain the free flow of vehicle and pedestrian traffic while conducting maintenance service tasks.

Any street (or road) closures more than 30 minutes shall be coordinated with the Contracting Officer Representative

Performance Work Statement Page 5 of 34

(COR) or Alternate Contracting Officer Representative (ACOR). (See Deliverables Schedule, paragraph 8.1, Deliverables

A001).

1.6. Restoration of Real Property Damage

The Contractor shall be responsible for all damages to Government property occurring because of contractor employees’ work. The Contractor shall notify the COR no later than 2 two hours of occurrence of any damages caused by The

Contractor employee’s or equipment. The Contractor shall make all necessary repairs, at no cost to the Government, and to the satisfaction of the Government. The Government may perform necessary repairs that are required because of

Contractor damage. The Contractor shall reimburse the Government for all costs the Government incurs due to the cost of repairing, cost of removal of damaged item or loss of assessed/appraised value due to Contractor caused damage to

Government Property within thirty (30) calendar days of completion of repairs. (See Deliverables Schedule, paragraph

8.1, Deliverables A002).

1.7. General Information

1.8. Period of Performance

Base period of 12 months with four (4) option years of 12 months each, with optional (-8) six (6) months extension.

1.8.1. Place of Performance

The Contractor shall perform work on Fort Bragg, Pope AAF, Camp Mackall AAF, Simmons AAF, Range Operations, North Carolina. Authorized access is required to enter the government-owned property.

1.8.2. Recognized Holidays

The Contractor shall not be required to perform services on recognized federal holidays nor on days observed in lieu thereof. The recognized federal holidays include:

New Year’s Day Labor Day

Martin Luther King Jr.’s Birthday Columbus Day

President’s Day Veteran’s Day

Memorial Day Thanksgiving Day

Independence Day Christmas Day

Juneteenth

1.8.3. Hours of Operation

The normal hours of operation are between the hours (8:00 am – 4:30 pm EST), Monday through Friday, excluding

Federal holidays or when the Government facilities are closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

• The Contractor shall coordinate with Contracting Officer (KO) or Contracting Officer Representative (COR) to establish a schedule for conduct business if services are required outside of normal hours of operation.

• The Contractor shall maintain an adequate workforce to ensure the uninterrupted performance of all tasks defined within this PWS when installations are not closed for the aforementioned reasons.

• The Contractor shall work on the days the Government is scheduled to work.

1.8.4. Installation Closures

When an unforeseen installation closure occurs on a regularly scheduled day of work, (i.e., severe weather, training holiday, day of mourning, etc.).

• The Contractor shall reschedule the work to be performed the following day, unless the following day falls on a weekend, or a recognized Federal holiday, or reschedule the work on any day that is mutually satisfactory.

Performance Work Statement Page 6 of 34

1.8.5. Inclement Weather

If The Contractor determines unsafe weather conditions for continued operations, then The Contractor shall notify the

KO/COR if inclement weather suspends operations within two (2) hours. The Contractor shall resume operations with

KO/COR approval.

1.9. Emergency Delays

If The Contractor determines unsafe weather conditions or work environment is cause for an interruption of services, The

Contractor shall notify the KO or his/her designated representative COR/ACOR; two (2) hours prior to curtailing operations. The Contractor shall obtain KO approval to resume operations.

• The Contractor shall obtain KO approval to resume operations.

• The Contractor shall coordinate with the DPW designated representative(s) in preparation for and during emergency operations situations such as inclement weather, flood, active shooter, fire or other emergency situations.

1.10. Fraud, Waste, and Abuse

In accordance with AR 11-2, Internal Management Controls, The Contractor shall be responsible for maintaining proper conduct and good discipline within Contractor-occupied work areas. Contractor personnel shall be encouraged to be alert to and report to designated representatives suspected of fraud, waste, and abuse or other intentionally dishonest conduct observed during or in the performance of contract.

1.11. Type of Contract

The Government will award a FIRM FIXED (FFP) type of contract, with some “As Required” CLIN’s.

1.12. Security.

AT/OPSEC Requirement.

Yes / No Concern

Yes AT Level I Training

Yes Access, General Protection, and Security Policy and Procedures

Yes iWATCH Training

No Contractor Employees Who Require Access to Government Information

Systems

No Contracts That Require an OPSEC Standing Operating Procedure / Plan

Yes Contracts That Require OPSEC Training

No Information Assurance (IA)/Information Technology (IT) Training

No Information Assurance (IA) and/or Information Technology (IT)

Certification

No Contracts That Require Handling or Access to Classified Information

Yes Will Be Escorted in Area Where They May Be Exposed to Classified and/or Sensitive Materials and/or Restricted Areas

Yes For Eligibility Verification for Employment

No 3Rs Explosive Safety Education Training Certificate

No Project-specific Photographs

Performance Work Statement Page 7 of 34

1) (Yes) means this is a requirement of job, (No) means this is not a requirement of job.

1.12.1. Security Requirements:

Contractor personnel performing work under this contract shall obtain and maintain an installation access credential /

Homeland Security Installation Access Control Badge at the time of contract start date and for the life of the contract. The

PM, QCM, and lead technicians shall understand, speak, read, and write the English language fluently.

1.12.2. Security Program:

The Contractor’s Physical Security Plan, Information Security Plan, and compliance with the National Industrial Security

Program (NISP) shall form the basis of The Contractor’s security program. The security program plan is required within thirty (30) calendar days after contract award and within five (5) working days of any subsequent revisions (See

Deliverables Schedule, paragraph 8.1, Deliverables A003.

1.12.3. AT Level I Training:

All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas, shall complete AT Level I awareness training 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, The Contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the KO/COR within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: https://jko.jten.mil/courses/AT-level1/launch.html.

a) If access to a computer is not available, the Government will provide AT Level I training to Contractor employees within 30 business days after the contract starts and maintain a copy of the attendance roster for one (1) year. Any

Contractor hired after contract start will be required to receive AT Level I training within 30 calendar days either online or as provided by the Government.

b) The Contractor must present the training certificate to the (KO) or designated Government representative/COR within

30 calendar days (See Deliverables Schedule, paragraph 8.1, Deliverables A004).

1.12.4. Access and General Protection/Security Policy and Procedures.

The Contractor and all associated subcontractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal, Director of Emergency

Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or individual facility change, the

Government may require changes in contractor security matters or processes. For contractors that do not require CAC but require access to a DoD facility or installation. Contractors and all associated sub-contractors employees must be screened using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening

Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at

OCONUS locations, in accordance with status of forces agreements and other theater regulations. Contractors or Contract

Leads will coordinate with the COR to receive an entry badge (AIE). All issued badges will not exceed the issuance of three years or the length of the contract.

Contractors requiring access to the installation will go to the visitor center to obtain a badge of access. Contractors will turn in the badge to the COR upon expiration of the contract or separation from the contract. Lost, damaged, or stolen badges will be reported immediately to the COR. IAW AR 190-51, at no point will a contractor use a retiree, or other

DoD ID to access the installation unless it is a CAC ID, issued by the US Government and sponsored locally.

1.12.5. iWATCH Training.

iWATCH Training: The Contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to

Performance Work Statement Page 8 of 34 inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR.

This training shall be completed within 30 calendar days of contract award and within 10 calendar days of new employees commencing performance with the results reported to the COR NLT 15 calendar days after contract award. This information is available at the following website: https://www.youtube.com/embed/vlzYhQp7fPw. (No certificate.

Provide email documents to COR stating when video was watched.) (See Deliverables Schedule, paragraph 8.1, Deliverables A005).

1.12.6. Contractor Employees Who Require Access to Government Information Systems:

All contractor employees with access to a government information system must be registered in the Army Validation

System (AVS) at the commencement of services and must successfully complete the DOD Information Assurance

Awareness training prior to access to the information systems and then annually thereafter. AVS website is located at https://iga.army.mil/identityiq/home.jsf. It is used to submit automated DD For 2875 System Authorization Access

Request (Saar) for account creation.

1.12.7. Contracts That Require an OPSEC Standing Operating Procedure / Plan:

The Contractor shall develop an OPSEC SOP/Plan within 30 calendar days of contract award. The OPSEC SOP/Plan must be reviewed and approved by the Responsible Government OPSEC Officer, and a copy shall be furnished to the

COR/ACOR. This SOP/Plan will include the government’s critical information, why it needs to be protected, where it is located, who is responsible for it and how to protect it. In addition, The Contractor shall identify an individual who will be an OPSEC Coordinator. The Contractor will ensure this individual becomes OPSEC Level II certified per AR 530-1.

1.12.8. Contracts That Require OPSEC Training:

All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty.

Additionally, all contractor employees must complete annual OPSEC awareness training. The Contractor shall submit certificates of completion for each affected contractor and subcontractor employee to KO/COR within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites:

https://securityawareness.dcsa.mil/opsec/index.htm or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum. (See Deliverables Schedule, paragraph 8.1 Deliverables A006).

1.12.9. Information Assurance (IA)/Information Technology (IT) Training:

For Information Assurance (IA)/Information Technology (IT) Training: All contractor employees and associated subcontractor employees must complete the DOD IA Cybersecurity Awareness Training in the Army Training Information

System (ATIS) located at https://learn.atis.army.mil/moodle/ before issuance of network access and annually thereafter.

All contractor employees working in IA/IT functions must comply with DOD and Army training requirements in DOD

8570.01, DOD 8570.01-M and AR 25-2 within six months of employment. Cyber Awareness Training is now required initial and once every five (5) years.

1.12.10. Information Assurance (IA) and/or Information Technology (IT) Certification:

Per DoD 8140.01-M, DFARS 252.239.7001 and AR 25-2, The Contractor employees supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8140 must be completed upon award of contract.

1.12.11. Contracts That Require Handling or Access to Classified Information:

For Contracts That Require Handling or Access to Classified Information: Contractor shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified “(Confidential),” “(Secret),” or “Top

(Secret)” and requires contractors to comply with— (1) The Security Agreement (DD Form 441), including the National

Industrial Security Program Operating Manual (DoD 5220.22-M); any revisions to DOD 5220.22-M, notice of which has been furnished to The Contractor.

1.12.12. Secured Areas / Restricted Areas:

Performance Work Statement Page 9 of 34

Contractor will Be Escorted in Area Where They May Be Exposed to Classified and/or Sensitive Materials and/or

Restricted Areas: All contractor employees, including subcontractor’s employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in area where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.

1.12.13. Eligibility Verification for Employment: E-Verify:

For Eligibility Verification for Employment: E-Verify is an Internet-based system that compares information from an employee's Form I-9, Employment Eligibility Verification, to data from U.S. Department of Homeland Security and

Social Security Administration records to confirm employment eligibility. The U.S. Department of Homeland Security is working to stop unauthorized employment. By using E-Verify to determine the employment eligibility of their employees, companies become part of the solution in addressing this problem. All U.S. employers must complete and retain a Form I-

9 for everyone they hire for employment in the United States. This includes citizens and noncitizens. On the form, the employer must examine the employment eligibility and identity document(s) an employee presents to determine whether the document(s) reasonably appears to be genuine and relates to the individual and record the document information on

Form I-9. The list of acceptable documents can be found on the last page of the form. E-Verify is mandatory for employers with federal contracts or subcontracts that contain the Federal Acquisition Regulation E-Verify clause.

1.12.14. 3Rs (Recognize, Retreat, Report) Explosives Safety Education Program Training:

All Contractor and subcontractor employees requiring access to Army or Army National Guard installations, facilities, and areas for the performance of a contract or subcontract must complete the 3Rs (Recognize, Retreat, Report) Explosives

Safety Education Program training. Complete the training within 30 calendar days after the date of receipt of a written notice of the award. The Contractor is responsible for ensuring that all subcontractor employees complete the training before access to the installation is required for performance of the subcontract. The Contractor is also responsible for ensuring that all contractor and subcontractor employees renew the training annually for the duration of the performance period of the contract or subcontract. The Contractor must submit certificates of completion for each Contractor and subcontractor employee subject to this requirement to the (COR) within 5 calendar days after completion of training. 3Rs

Explosives Safety Education Program training is available at the following website: https://www.denix.osd.mil/uxo/3rs-training/.

1.13 Security Training

1.13.1. Training:

The Contractor shall effectively educate its employees, through formal training, company policy, information directives and procedures, so that each employee will know and understand the absolute necessity of safeguarding information from anyone other than The Contractor's employees who have a need to know, and the U.S. Government.

1.13.2. Counterintelligence Awareness and Reporting Program Training:

For all DA contractors. Training will be completed within 30 days of assignment or employment to an organization and will undergo live environment CIAR training will be completed annually IAW AR 381-12 Counterintelligence Awareness and Reporting Program. The Contractor must provide either certificates of completion or dates of attendance, the training is available at the following site: http://jko.jten.mil, for each affected contractor employee and subcontractor employee to the COR/KO within 15 calendar days after completion of training by all employees and subcontractor personnel.

1.13.3. Threat Awareness and Reporting Program Training:

For all DA contractors. Training will be completed within 30 days of assignment or employment to an organization and will undergo live environment TARP training will be completed annually IAW AR 381-12 Threat Awareness and

Reporting Program. The Contractor shall provide either certificates of completion or dates of attendance, the training is available at the following site: http://jko.jten.mil, for each affected contractor employee and subcontractor employee to the KO/COR, within15 calendar days after completion of training by all employees and subcontractor personnel (See

Deliverables Schedule, paragraph 8.1, Deliverables A007).

1.14. Local Health Protection Conditions:

https://www.denix.osd.mil/uxo/3rs-training/ https://www.denix.osd.mil/uxo/3rs-training/

Performance Work Statement Page 10 of 34

The Contractor will comply with all national and DoD policies regarding health protection issues including pandemic outbreaks. Local Health Protection Conditions (HPCON) change based on risk levels in the surrounding area Fort Bragg, North Carolina, and in cooperation with local, state, and national guidance. The Contractor shall comply with installation and higher headquarters policies aimed at mitigating the spread of dangerous communicable diseases.

1.14.1. Key Control:

The Government will issue no keys, key cards nor combinations to The Contractor.

1.15. General:

1.15.1. The Contractor shall be responsible for ensuring that all personnel performing work under this contract possess and maintain current certifications as indicated in the Performance Work Statement (PWS) security requirements throughout the execution of this contract.

1.16. Post Award Conference/Periodic Progress Meetings:

The Contractor shall attend the post award conference convened by the Contracting Activity or Contract Administration

Office as agreed upon and stated in the contract award document and shall be at no additional cost to the Government.

When the KO/COR and DPW management meet with The Contractor to review The Contractor's performance, written minutes of meetings will be recorded by the Government and signed by the Requirements Authority (RA) and the KO.

The written minutes will be distributed within five (5) business days after the meeting.

If any party does not concur with any portion of the minutes, the non-concurrence shall be provided in writing to the

KO/COR within two (2) workdays following receipt of the minutes.

Notwithstanding The Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and The

Contractor.

1.17. Government Roles and Responsibilities

1.17.1. Contracting Officer (KO):

The KO is the only person authorized to make any changes to the requirements listed on this PWS. This authority remains solely with the KO, regardless of any provisions stated elsewhere in this contract, If The Contractor makes any change under the direction of someone other than the KO, the change will be deemed unauthorized and will be made solely at

The Contractor's risk and expense.

All contract administration will be handled by the KO. Communications regarding contractual administrative matters should be directed to the KO. No changes or deviations from the terms and conditions will be effective without a written modification to the contract, executed by the KO.

The KO will approve all deliverables and plans required in this PWS.

1.17.2. Contracting Officer’s Representative (COR/ACOR):

The KO will appoint a COR during the performance of this requirement.

Additional Government personnel may be designated to assist in contract oversight IAW AR 70-13 Management and

Oversight of Service Acquisitions. Other surveillance personnel may be designated as COR and shall be trained and appointed IAW DoDI 5000.72, Department of Defense (DoD) Standard for Contracting Officer’s Representative (COR)

Certification.

The COR will aid in identification and resolution of problems within ten (10) days of identification of problem conflicts in priority, subtask requirement definitions, and other operations type problems.

The COR will perform IAW the responsibilities and duties identified in the appointment letter.

1.17.3. COR/ACOR Authority:

A letter of designation will be issued to the COR/ACOR by the KO.

A copy of the letter will be sent to The Contractor.

The letter of designation states the responsibilities and limitations of the COR, especially regarding changes in cost, price estimates, or changes in delivery dates.

Performance Work Statement Page 11 of 34

The COR is not authorized to change any of the terms and conditions regarding cost, quantity, or schedule of the resulting order.

1.17.4. COR or Designated Government Representative Functions:

The COR or designated Government representative shall monitor all technical aspects of the contract and assist in contract administration.

The COR or designated Government representative is authorized to perform the following functions:

assure The Contractor performs the technical requirements of the contract.

perform inspections necessary in connection with contract performance.

maintain written and oral communications with The Contractor concerning technical aspects of the contract. issue written interpretations of technical requirements. to monitor, document, and report

Contractor's performance and notify both the KO and Contractor of any deficiencies.

coordinate availability of Government-Furnished Facilities and Incidental Property and provide direction or assistance for site entry requests of Contractor personnel.

1.18. Specific Contractor Requirements, Roles, and Responsibilities:

See below for Contractors Roles, and Requirements, Responsibilities

1.18.1. U.S. Residency:

All CONUS Contractor employees shall be legal U.S. residents.

The Contractor shall immediately remove any employee that is not a legal U.S. resident.

The Contractor personnel shall be able to communicate clearly in the English language.

1.18.2. Contractor Hiring Restrictions:

The Contractor shall not hire or subcontract with off-duty or former Government employees whose employment would result in a conflict of interest as defined in DOD 5500.7-R Joint Ethics Regulation 30 August 1993, to include change dated 17 November 2011.

1.18.3. Contractor Identification:

The Contractor shall ensure that personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, and/or uniform) from Government employees.

• The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that

Contractor participation is disclosed.

• Contractor-owned/leased vehicles and trailers shall be clearly identified.

1.18.4. Standards of Conduct:

Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure all personnel present a professional appearance while working on the Government installation. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance.

• The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner.

• The Contractor shall remove, from the job site, any employee for reasons of misconduct or security.

• The Contractor shall ensure employee conduct complies with 41 USC §423, Procurement

Integrity.

• The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation.

• The removal of such a person shall not relieve The Contractor of the requirement to provide personnel to perform adequate and timely service.

Performance Work Statement Page 12 of 34

1.18.5. Contractor Key Personnel:

The Contractor shall provide a resume of key personnel, who will be designated in writing, to the KO within one week of the contract award. (See Deliverables Schedule, paragraph 8.1, Deliverables A008).

• These key personnel shall be available during normal duty hours.

• These individuals designated as key personnel shall be able to understand, speak, read, and write the English language.

• The Government considers the Project Manager and Quality Control Manager as Key Personnel.

1.18.6. Project Manager (PM):

The Contractor shall provide a Project Manager (PM) who shall be responsible for the performance of the work under this contract. The name of this person shall be designated in writing to the KO. The PM shall have full authority to act for The

Contractor on all contract matters relating to daily operation of this contract. When available the PM shall be available between the hours of 8:00 AM to 4:30 PM, Est Monday through Friday, except federal holidays or when the Government facility is closed for administrative reasons.

PM shall:

• Have Occupation Safety and Health Association, 40 Hour Hazardous Waste Operations and

• Emergency Response OSHA Standard CFR 1910.120.(e)(8).

• Be on a Medical Surveillance Program.

• Have OSHA 30 Hour Construction Safety and Health 29 CFR Part 1926.

• Be qualified to wear Respiratory Protection per 29 CFR 1910.134.

• Have a valid Driver’s License.

1.18.7. Alternate Project Manager/Quality Control Manager (APM/QCM):

The Contractor shall designate a part-time APM/QCM on site during normal duty hours.

• As a minimum, the APM/QCM shall have at least two (2) years of documented relative maintenance and repair of cranes, hoists, scales, dock levelers, and vehicle lifts.

experience and shall be responsible for the overall management and implementation of The Contractor's Quality

Control Plan.

1.18.8. Quality Control Program (QCP):

Quality Control is the responsibility of The Contractor. This contract requires a primary Quality Control (QC). The

Contractor shall provide a Quality Control Plan (QCP) thirty (30) business days after contract start. The Contractor shall provide and maintain a (QCP) that is acceptable to the KO. Changes to The Contractor’s (QCP) shall be submitted to the

KO for review and approval within five (5) business days prior to implementation. (See Deliverables Schedule, paragraph

8.1, Deliverables A009).

a) The Contractor shall ensure all Contractor’s employees and associated subcontractors are certified or licensed in the specific areas required by the State of (NC).

b) The Contractor shall ensure employees are certified or licensed in the appropriate Environmental Protection Agency

(EPA) areas required.

c) The Contractor shall ensure all required documentation of certification or licensure for Contractor personnel are filed with the COR/ACOR within twenty-four (24) hours prior to employees commencing performance. (See Deliverables

Schedule, paragraph 8.1, Deliverables A011).

Performance Work Statement Page 13 of 34

1.18.9. Maintenance and Repair Technicians Qualifications and Experience:

Maintenance and Repairs Technicians’ qualifications shall consist of five (5) years of experience as maintenance and repair mechanics on equipment that is of similar type and or like contract type equipment. The work experience shall be with an established company that has repaired and installed equipment of similar types to those covered under this contract (cranes, hoist, scales, dock levelers and vehicle lifts). Only documented experienced technicians’ mechanics shall be authorized to perform under the terms of this contract, to include the installation, inspection, tests, preventive maintenance and/or for the performance of all required repairs on equipment identified on TE’s.

1.19. Phase Out Period:

The Contractor shall prepare and submit within ten (10) business days after contract award or during contract completion/ termination a Phase In/Phase Out Plan to be implemented by The Contractor to the KO. (See Deliverables Schedule, paragraph 8.0, Deliverables A011).

• Successor Familiarization: The Contractor is required to permit the successor contractor and its designated employees to observe all ongoing operations under the contract. This is to ensure the incoming team can become familiar with the full scope of work and procedures.

• Cooperation and Non-Interference: The Contractor must fully cooperate with both the successor contractor and Government personnel. All phase-out activities shall be conducted in a manner that does not interfere with the successor's ability to assume their duties or disrupt any future work.

• Maintain Service Levels: Throughout the phase-out period, The Contractor shall provide sufficient experienced personnel to guarantee that all services are maintained at the required level of proficiency without degradation.

• The Contractor shall return any unused materials that have been purchased under the ODC CLIN and identify the work orders associated with the unused materials to the Government when the contract has been fulfilled or terminated.

1.20. Emergency Services

1.20.1. Emergency Medical Treatment:

The Contractor or their employees shall immediately notify their supervisor of any incident requiring immediate emergency medical treatment.

a) The Government may provide 911 emergency support ambulance service and/or DoD medical facility, if available. injuries are incurred while an employee is performing work under this contract

b) The Contractor shall verbally notify the KO/COR immediately, but no later than (NLT) two (2) hours after an emergency medical event, followed by a documented summary of events (See

Deliverables Schedule, paragraph 8.1, Deliverables A012).

c) The Contractor shall be responsible for reimbursement of any cost of provided emergency medical treatment services provided to Contractor personnel. reimbursement shall be paid to the

U.S. Treasury.

1.20.2. Accident Reporting:

The Contractor shall comply with Operational Safety and Health Administration (OSHA) for record keeping and reporting of all accidents resulting in death, injury, occupational disease, or adverse environmental impact.

a) The Contractor shall provide a verbal report to the KO/COR within two (2) hours of each such occurrence followed up by an email documenting each such occurrence (See Deliverables

Schedule, paragraph 8.1, Deliverables A013).

b) The Contractor shall adhere to reporting of mishaps IAW AR 385-10, The Army

Safety Program (Chapter 3 Accident Investigation and Reporting, Chapter 4 Contracting Safety) and DA Pam 385-40, Army Accident Investigations and Reporting.

1.21. Environment and OSHA:

Performance Work Statement Page 14 of 34

IAW para. 1.4 Scope, any apparent conflict between compliance (with such local, State, and Federal environmental and occupational safety laws, rules, and regulations) and the requirements of the contract shall be immediately brought to the attention of the KO and authorized representative(s) (i.e., Environmental Officer, Safety Officer, and COR) verbally.

a) The Contractor shall notify the KO and authorized representative(s) via email outlining the details for each said conflict such that a final resolution is derived (See Deliverables Schedule, paragraph 8.1, Deliverables A014).

b) The Contractor shall be liable for all fines, penalties, and costs that result from violations of, or failure to comply with para. 1.4 Scope.

c) The Contractor shall implement the following environmental objectives in accordance with FAR 23.4; FAR 52.223-1 through 52.223-5; and based on EPA-issued guidance).

d) Maximize the utilization of environmentally preferable products.

e) Maximize the utilization of bio-based products. See USDA-designated items at http://www.biopreferred.gov or 7 CFR part 3201.

f) Maximize the reutilization of nonhazardous and recovered materials.

g) Eliminate or reduce the generation of hazardous waste and the need for special material processing (including special handling, storage, treatment, and disposal).

1.22. Safety:

The Contractor shall safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract.

a) The Contractor shall comply with AR 385-10, The Army Safety Program.

b) All unsafe acts or conditions fostered by The Contractor or Contractor personnel may be grounds for the KO to halt all Contractor performance until such unsafe conditions are corrected.

c) The Contractor shall take due caution not to endanger personnel during performance of this contract.

d) Upon discovery of a serious hazard such as, but not limited to, fire, or fuel spill, The Contractor shall immediately notify the KO and designated authorized representatives verbally followed up with an email notification within three

(3) business days (See Deliverables Schedule, paragraph 8.1, Deliverables A015).

1.22.1. Safety Plan:

The Contractor shall develop and implement a safety plan for its employees. The Contractor shall submit the safety plan to the KO/COR for review and acceptance within 30 business days after contract award. revisions shall be submitted to the KO/COR five (5) business days prior to the effective date of change (See Deliverables Schedule, paragraph 8.1, Deliverables A018).

1.22.2. Spill Plan:

The Contractor shall immediately clean up hydraulic oil spills and other liquids leaking from their vehicles, within (2) hours. Disposal of hazardous waste shall be coordinated with the Environmental Division for manifest signature. Any spills of fuel, solvents, oxidizers, acids, or highly flammable material that enters a storm drain or waterway (including ditches) and any spill over (5) gallons at any location must be reported to the Fire Department immediately (911, (910)

907-4813 or (910) 309-9506. The Fire Department will notify DPW, who will determine whether it’s required to report the spill to NCDEQ.

a) The Contractor shall immediately notify the KO/COR of all spills within (2) hours of spillage.

Additionally, The Contractor is required to submit all paperwork showing compliance and disposing of the hazardous spillage. (See Deliverables Schedule, paragraph 8.1, Deliverables

A017).

b) The Contractor is responsible for all costs associated with the clean-up of a hazardous spill.

c) The Contractor shall submit a Spill Plan to the KO/COR for approval within 30 calendar days of contract award (See Deliverables Schedule, paragraph 8.1, Deliverables A018).

d) The Contractor shall verbally notify the KO and COR, followed by written notification as required in the (Fort Bragg) Spill Plan, if The Contractor spills or releases any hazardous substances, (i.e., substances listed in 40 CFR 302, Designation, Reportable Quantities.

Performance Work Statement Page 15 of 34

1.22.3. Safety Data Sheets:

For materials that have Safety Data Sheets (SDS) associated with them, The Contractor shall submit the SDS to the

KO/COR for approval five (5) business days after contract award (See Deliverables Schedule, paragraph 8.1, Deliverables

A019).

• The Contractor shall adhere to all applicable requirements of the Installation Hazardous Waste Management Plan.

• The Contractor shall provide all materials, labor, training, transportation, and equipment for the handling and storage of hazardous materials or toxic materials.

1.23. Corrective Action Request (CAR):

Nonconformance occurs when a Contractor fails to meet contract terms, conditions, or specifications; for example, if The

Contractor’s quality control system is found to be inadequate, The Contractor’s noncompliance leads to substandard performance requiring corrective action, the acts are considered nonconformities. All instances of nonconformance will be documented via a CAR. The Contractor shall reply to the KO within the due date established in the issued CAR, giving the reasons for the unsatisfactory performance, corrective action taken, and procedures to preclude recurrence. A

CAR will not normally be issued if The Contractor has self-identified a nonconforming condition and has implemented effective corrective actions. However, a nonconformance does not apply in cases where a Contractor has issued an internal corrective action based on a nonconformance previously identified by the Government.

Performance Work Statement Page 16 of 34

PART 2

DEFINITIONS & ACRONYMS

2.0 DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the

Government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER (KO). A person with authority to enter, administer, and/or terminate contracts, and to make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to The Contractor, so long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. CONTRACTOR PERSONNEL. Contractor and subcontractor employees performing working under this contract.

2.1.5. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the

Performance Work Statement (PWS).

2.1.6. DELIVERABLE. Anything that can be physically delivered, but may include non-physical things, such as meeting minutes or reports.

2.1.7. FACILITY CLEARANCE. Not Applicable.

2.1.8. GOVERNMENT-FURNISHED PROPERTY (GFP) OR GOVERNMENT PROPERTY (GP). Not Applicable

2.1.9. KEY PERSONNEL. Contractor employees who are critical for achieving PWS objectives. Key personnel shall meet position qualification and experience requirements indicated in the PWS. When key personnel qualifications are used as an evaluation factor in “Best Value” procurement, the Contracting Officer is the only one authorized to concur with key personnel replacement after award of the contract. When proposed key personnel resumes are used as an evaluation factor in best value procurement, a letter of commitment may be required from the individual whose resume is provided.

2.1.10. PERFORMANCE REQUIREMENT SUMMARY (PRS). A listing of the service outputs under the contract that are to be evaluated by the COR on a regular basis, the surveillance methods to be used for these outputs, and the performance requirement of the listed outputs.

2.1.11. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.12. PROPERTY ADMINISTRATOR (PA). Not Applicable

2.1.13. PROPERTY MANAGEMENT SYSTEM. Not Applicable

2.1.14. QUALITY ASSURANCE. A planned and systematic pattern of all actions necessary to provide confidence that adequate technical requirements are established; products and services conform to established technical requirements; and satisfactory performance is achieved. For the purposes of this document, quality assurance refers to actions by the

Government.

2.1.15. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). The Government’s organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.

Performance Work Statement Page 17 of 34

2.1.16. QUALITY CONTROL. All necessary measures taken by The Contractor to assure that the quality of a product or service shall meet contract requirements.

2.1.17. SUBCONTRACTOR. One that enters a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.

2.1.18. WORKDAY. The length of time during a day in which The Contractor provides services, in accordance with the contract.

2.1.19. WORK WEEK. Monday through Friday, unless otherwise specified.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative

AFARS Army Federal Acquisition Regulation Supplement

APP Accident Prevention Plan

AR Army Regulation

CFR Code of Federal Regulations

CONUS Continental United States (excludes Alaska and Hawaii)

COR Contracting Officer Representative

DA Department of the Army

DD250 Department of Defense Form 250 (Receiving Report)

DD254 Department of Defense Form 254

DFARS Defense Federal Acquisition Regulation Supplement

DMDC Defense…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .