PWS Draft - FVMS.pdf
PDF 274 KB Posted
- Solicitation number
- PANDTA-27-P-0000_041432
- Issued by
-
Department of the Army
About this file
This is a Performance Work Statement (PWS) for the Foreign Vehicle Maintenance (FVM) Contract at the National Ground Intelligence Center (NGIC), Foreign Materiel Operations Branch, Aberdeen Proving Ground, Maryland, effective October 2026.
The contract procures full-time Contractor Manpower Equivalents (CMEs) to provide specialized foreign vehicle fleet maintenance, heavy equipment support, inventory management, and technical logistics services. Core functional areas include fleet maintenance, logistics support, and shop operations. The contractor shall maintain operational readiness and mechanical integrity for a diverse fleet of over 50 foreign tactical and commercial vehicles (including T-72, T-80, and T-90 main battle tanks; self-propelled artillery; armored personnel carriers; and various trucks), associated ground support equipment, and shop assets while adhering to U.S. Army, INSCOM, local environmental, and federal safety standards. Services encompass vehicle diagnostics, scheduled and unscheduled maintenance, preventive maintenance checks and services (PMCS), complete engine overhauls, depot-level interventions, digital maintenance record tracking, spare parts warehousing and inventory management, packaging and shipping, shop equipment sustainment, material handling equipment operation, remote logistics support across CONUS locations (Nevada, Florida, Georgia, Virginia), hazardous materials custodianship, environmental compliance, property accountability, and classified system sanitization assistance.
The contractor must furnish all necessary labor, management, supervision, tools, personal protective equipment (PPE), office supplies, automated data processing equipment, and common shop consumables. The government provides the maintenance facility (Building 4728) with installed equipment including three exhaust systems, welding shop, 20-ton overhead crane, and wash rack; all utilities; telephones, computers, and office furniture; engine fuels for government vehicles; calibration and service for government equipment; repair parts and materials; mandatory training; and Common Access Cards via TASS. Contract performance hours are 0700–1600 hours Monday through Friday (excluding federal holidays). Key personnel include a Contract Manager with minimum ten years automotive maintenance experience and five years management experience, Motor Vehicle Mechanics with ASE certifications and five years experience, and Ground Support Equipment Repair personnel with five years experience and ASE certifications. At least one employee must possess a valid Commercial Driver's License. All contractor personnel require a SECRET security clearance and must maintain compliance with DoD security requirements, NISPOM, installation access control, and multiple mandatory training programs (Anti-Terrorism Level I, OPSEC Level I, DoD IA Cyber Awareness, Information Assurance). The contractor must submit deliverables including Quality Control Plan (within 10 working days of award), Work Plan (within 30 days), CAC information (within 5 working days), Accident Prevention Plan (within 15 calendar days), security certifications, training documentation, and insurance proof (within 10 calendar days). Performance standards are measured against eight objectives: 95% first-time repair completion, 100% PMCS scheduling within ±5 days, 100% work order digitization within 24 hours, 98% inventory accuracy, zero shipping rejections, 90% equipment uptime, timely issue reporting, and zero environmental infractions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought Notice - FVM Recompete (v1).pdf | ||
| Sources Sought Notice - FVMS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUG 22
PERFORMANCE WORK STATEMENT (PWS)
National Ground Intelligence Center (NGIC)
Foreign Materiel Operations Branch Aberdeen Proving Ground, Maryland
Foreign Vehicle Maintenance (FVM) Contract
October 2026
Part 1 General Information
1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide maintenance, repair of ground equipment and associated systems and general maintenance shop management at the National Ground Intelligence Center’s Foreign Materiel Operations Branch, Aberdeen Proving Ground (APG), MD.
1.2 Background: The mission of the Foreign Materiel (FM) Operations Branch is to Conduct worldwide FM operations, including inventory, accountability, logistics, and lifecycle management. With over 50 foreign vehicles in inventory the contractor will be responsible for vehicle lifecycle management by providing technical assistance, repair, and maintenance. This consists of inspecting, servicing, cleaning, adjusting, repairing, overhauling, modifying equipment and/or its associated system components to ensure vehicles are ready for future follow-on requirements. Contractor will also be required to maintain a spare parts stockroom and maintain various shop equipment.
1.3 Scope: The Contractor shall provide non-personal service(s). The Contractor shall furnish all necessary labor, management, supervision, tools, and Personal Protective Equipment (PPE) to satisfy maintenance, logistics, and material-handling requirements across the following core functional areas: fleet maintenance, logistics support and shop operations.
1.4 Objectives: The objective of this contract is to procure full-time Contractor Manpower Equivalents (CMEs) to provide specialized foreign vehicle fleet maintenance, heavy equipment support, inventory management, and technical logistics services. The Contractor shall maintain operational readiness, mechanical integrity, and digital tracking for a diverse fleet of foreign tactical and commercial vehicles, associated ground support equipment (GSE), and shop assets while strictly adhering to U.S. Army, INSCOM, local environmental, and federal safety standards.
1.5 General Information:
1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.
The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within 10 working days after date of contract award.
The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within 10 working days. If the Government has provided comments, the Contractor shall then have 10 working days to submit a Final QCP.
After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than 10 working days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance of proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:
(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team;
(b) How the Contractor will monitor work to ensure performance complies with all deliverables (etc. timelines, deadlines, and goals);
(c) How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses;
(d) How the Contractor will monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance;
(e) How the Contractor will ensure all keys issued will remain controlled items
(Paragraph 1.7 Key Control);
(f) How the Contractor will inventory and track maintenance of all Government Provided
Equipment / Materials;
(g) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future; and
(h) How the Contractor will file and save all Quality Control related documents for the life of the contract plus 5 years.
1.5.1.1 An Analysis of Quality Control and Timeliness of Submittals (i.e. deliverables) shall be provided to the COR within 30 days upon completion of each option period.
1.5.1.2 The Contractor shall inform the COR of issues or potential issues that might affect the performance within 8 working hours of identifying those issues. Verbal reports shall be followed by written reports within two working days.
1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.)
deadlines fall on a holiday, the closest workday prior to the holiday will apply as the deadline for submittal.
1.5.3.1 U.S. Holidays: Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer.
When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.
New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in Jan Presidents’ Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th
1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide; however, they may differ. Please refer to the following.
1.5.4.1 Government Facility Office Hours: The Government facility office hours are 0700- 1600 hours Monday through Friday except U.S. Holidays identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.5.4.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of 0700- 1600 hours Monday through Friday. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor.
1.5.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0700- 1600 hours Monday through Friday when the government facility is not closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.
1.5.4.3.1 Contractor Work Plan: The Contractor shall prepare and maintain a Work Plan. The plan, as a minimum, shall identify regularly scheduled work (to include location, work to be completed, timeline, etc.) The Contractor’s proposed Work Plan shall be submitted to the Contracting Officer via the COR for review within 30 days after date of contract award. The Government will review and either accept or return their comments to the Contractor within 10 working days. The Contractor shall then have 3 working days is used to submit a Final Work Plan. Any proposed change to the accepted Final Work Plan is required to be resubmitted via the COR for review and acceptance by the Contracting Officer at a minimum thirty (30) calendar days prior to implementation. The timeline noted above shall apply for review and acceptance of proposed changes.
1.5.5 Training Holidays: Training holidays will not affect access to military operated facilities.
1.5.6 Place of Performance: The work to be performed under this contract will be performed at the National Ground Intelligence facility on Aberdeen Proving Ground.
1.6 Security Requirements: The following information is provided on security related matters.
1.6.1 Security Program: Contractor personnel performing work under this contract must have a Secret Security Clearance at time of the proposal submission and must maintain the level of security required for the life of the contract. The security requirements are IAW with the DoD Contract Security Classification Specification (DD Form 254), which is currently accessible at the following link: http://www.dtic.mil/whs/directives/forms/eforms/dd0254.pdf
1.6.2 Personnel Security Clearance Requirements: Contractor personnel performing work under this contract must have an active personnel security clearance at the SECRET level in the Defense Information System for Security (DISS) at time of the proposal submission and must maintain the level of security required for the life of the contract. The security requirements are IAW the DoD Contract Security Classification Specification DD Form 254.
The Contractor shall ensure that Contractor employees and subcontractor employees performing services under this contract comply with FAR 52.204-2 Security Requirements when the employee has access to information classified “Confidential,” “Secret,” or “Top Secret.” The Contractor shall ensure the employee complies with the DoD Security Agreement (DD Form 441), and the NISPOM rule at 32 Code of Federal Regulation (CFR) Part 117, effective 24 Feb 2021. The NISPOM is the National Industrial Security Program Operating Manual to which contractors must implement and comply.
http://www.dtic.mil/whs/directives/forms/eforms/dd0254.pdf
1.6.3 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S. installations, buildings and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.
The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.
1.6.3.4 Common Access Cards (CAC) and CAC Log: The Contractor shall provide the following information: Last, First and Middle Names, government issued personal identifier (e.g. Social Security Number, Federal Identification Number, or Tax Identification Number), date of birth, primary email address (this email address will be used to contact the individual) and any other necessary information required to obtain a CAC or installation access card, to the COR with 5 working days after award (Deliverable CDR-07). The Contractor shall ensure safeguarding of Personally Identifiable Information (PII) and comply with requirements in this
PWS.
The Contractor shall provide a CAC log within the 30 days after contract award and within five working (5) days after changes have been made (unless circumstances require otherwise and as directed by the Contracting Officer). The COR will provide format and content for the log during the post award meeting. Note - CACs are Government property and must be accounted for.
1.6.4 Reserved
1.6.5. Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13.”)
1.6.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel. Government issued access badges shall not be worn outside designated facilities where visible to the public.
1.7 Key Control: The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Contractor’s Security Plan, (Deliverable CDR-8) and the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any incidents of lost or duplicate keys to the Contracting Officer. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from payment due to the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the payment due to the Contractor. The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Quality Control Plan.
1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall notify the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter.
Meetings may start or end outside of regular duty hours.
1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially regarding changes in cost or price, estimates, or changes in delivery dates.
The COR is not authorized to change any of the terms and conditions of the resulting order.
The COR monitors all technical aspects of the contract and assists in contract administration.
The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.
1.10 Key Personnel: The Program Manager is considered key personnel by the Government.
The Contractor shall provide a Program Manager who shall be responsible for the performance of the work. The name of this person and an Alternate Program/Contract Manager, who shall act for the Contractor when the Program/Contract Manager is absent, along with a Curriculum Vitae (CV) for each of these individuals, shall be provided in writing to the Contracting Officer during the post-award meeting. (Deliverable CDR-9) Acceptance of the CV by the Contracting Officer is required before these individuals are permitted to perform any task on this contract.
The Contract Manager and Alternate Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contract Manager or Alternate Contract Manager shall be available between 0700- 1600 hours Monday through Friday as identified in paragraph 1.6.4}. Qualifications for all key personnel are listed below:
a. Contract Manager and Alternate Contract Manager: Shall have a high school diploma or equivalent. Shall have a minimum of ten years experience in automotive maintenance, five years of which shall include management experience in military or civilian automotive/heavy equipment maintenance similar to the work to be performed under the contract. Oversees contract execution, safety, quality control, personnel administration and deliverable tracking. Shall be thoroughly familiar with the maintenance, the repair, and the installation/removal of large gasoline/diesel engines (to include turbine or opposing cylinder engines), brake and hydraulic systems, drive train and suspension systems (to include both wheeled and tracked), transmissions and planetary final drives. Shall be knowledgeable with current load test procedures as they relate to forklifts and pallet jacks. Examples of duties are:
perform initial, in-process and final inspections on systems and equipment turned in for maintenance and repair, diagnose complex equipment malfunctions, oversee the load testing procedures for material handling equipment. Train and instruct personnel in troubleshooting and repair of unusual malfunctions in equipment. Utilize office automation as related to the services required under the contract.
b. Motor Vehicle Mechanic: Shall have a high school diploma or equivalent and ASE or other industry standard certifications. Shall have a minimum of five years years experience in general automotive repair and maintenance. Shall have a minimum of five years experience in fuel and electrical systems for automotive maintenance similar to the work to be performed under the contract. Examples of duties are: perform organizational and direct support maintenance gasoline and diesel fueled wheeled and tracked equipment and their associated trailers. Perform organizational and direct support maintenance on fuel and electrical systems of both wheel and tracked equipment, brake system components, and on internal combustion engines associated with power generation or material handling equipment.
c. Ground Support Equipment Repair: Shall have a high school diploma or equivalent and ASE or other industry standard certifications Shall have a minimum of five years experience as a ground support equipment repairer and a minimum of three years in maintenance similar to the work performed under this contract to include heavy equipment.
Examples of duties are: Rebuild or overhaul major assemblies of internal combustion engines (diesel and gasoline) typically found in automobiles, buses, trucks and towed trailers. Diagnose the source of trouble and determine extent of repairs required; overhaul transmissions, lighting and ignition systems. Test overhauled equipment to ensure operating efficiency. Weld broken parts and structural members.
d. Special Qualifications: The contractor shall ensure at least one employee possesses a valid CDL license to assist in moving/ driving commercial style vehicles. All mechanics and ground support equipment repair personnel shall have ASE or similar certifications.
1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.12. Contractor workspace (staging site, on-site office, desk or work area, etc.) shall contain a sign signifying the space is occupied by Contractor employee(s) to ensure that Government employees and the public know that they are not Government employees. The proposed sign shall be submitted to the Contracting Officer via the COR for review and acceptance within 10 calendar days after contract award (Deliverable CDR-10). Workspace sign location shall be coordinated with the COR. Contractor employees shall identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting or attending meetings, and seminars. All Contractor correspondence (written, facsimile, and email display) shall include their company name.
1.12.1 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (AE Reg. 27-715). “The Contractor (to include subcontractors) shall provide each of their employees an easily readable identification badge. The badge must include the employee’s name, the contractor’s company name, the functional area of assignment, and a recent color photograph of the employee.
Companies with U.S. Government contracts will require their employees to wear these badges visibly when performing work at Government workplaces unless this would be impractical because of mission or safety considerations. The Contractor shall collect all ID Badges upon completion of the contract or termination of employee. A listing of issued ID cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor personnel changes. (Deliverable CDR-11)
1.13 Contractor Travel: The Contractor may be required to travel during the performance of this contract to attend meetings, provide vehicle diagnostics and repair, assist with vehicle overhaul in locations other than primary maintenance facility. The Contractor may be required to travel to off-site training locations and to ship training aids to these locations in support of this PWS. The Contractor may be authorized travel expenses at rates no higher than the substantive provisions of the Joint Travel Regulation (JTR), IAW FAR Part 31.205-46, and the limitation of funds specified in this contract. All travel requires Government approval and authorization five working days prior to scheduled travel. For proposal planning purposes, we assume contractors will travel to Reno, NV once per year, Yorktown, VA 4 times per year, and Atlanta, Georgia 2 times per year.
1.14 Other Direct Costs (ODCs): ODCs for this contract include commercially available repair parts when traveling or providing maintenance service away from the normal duty location.
Contractor will maintain a credit card or accounts at major automotive repair chain stores for rapid acquisition of common repair parts when it is not feasible for the government to purchase these items.
1.15 Reserved
1.16 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. The Contractor and Contractor personnel, shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
1.17 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/ , the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.
1.18 Non-Disclosure Statements: The Contractor shall provide signed non-disclosure agreements to the Government no later than 5 working days (Deliverable CDR-12) prior to commencement of work under the contract. Disclosure of information by Contractor personnel may result in removal of Contractor personnel from performance under this contract.
1.19 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, http://www.dimoc.mil/resources/limitations/ budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI (Deliverable CDR- 13). The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.20 Phase In /Phase Out Period: To minimize decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board during the 30-day phase in/ phase out periods. During the phase in period, the Contractor shall become familiar with performance requirements to commence full performance of services on the contract start date.
1.21 Safety: The following provides information pertaining to Safety and Accident Prevention:
1.21.1 Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein (e.g. U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1))
The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:
(a) Before initiation of work at the job site, an Accident Prevention Plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated Government personnel (Deliverable CDR-14) Specific requirements for development of the Accident Prevention Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.
(b) Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, activity hazard analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1);
(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work;
(d) The Contractor shall discuss the plans in conferences convened by the Contracting
Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to http://www.usace.army.mil/ work areas. The plan for accomplishing the initial work phase shall be submitted within fifteen
(15) calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than fifteen (15) calendar days prior to initiation of work on each major phase; and
(e) In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:
(i) Short sleeve shirt;
(ii) Long trousers;
(iii) Steel-toed safety boots; and
(iv) Hard hat.
1.21.1.1 In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes.
The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract.
1.21.1.2 The Contractor shall complete and provide safety notifications required and will provide documented proof to the Contracting Officer via the COR, no later than 10 working days (Deliverable CDR-15) that such notifications were made.
1.22 Required Training: The following provides information on training requirements.
1.22.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within 30 calendar days (Deliverable CDR-16) after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 calendar days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion (Deliverable CDR-16) for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer, if a COR is not assigned) within 10 calendar days after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training (Deliverable CDR-16) every twelve (12) months except AOR specific AT Level I training which shall be completed as required by local AT policies https://jkodirect.jten.mil/
If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training.
Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within 10 working days after completion of the training (Deliverable CDR- 16).
1.22.2 OPSEC Training: All Contractor employees, including subcontractors, shall complete Level I OPSEC training within 30 calendar days of employment under this contract (Deliverable CDR-17). Verification of the training shall be provided to the COR within 10 calendar days after completion of the training (Deliverable CDR-17). OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html. Contractor personnel must complete refresher training every 12 months (Deliverable CDR-17). Verification of the training shall be provided to the COR within 10 calendar days after completion of the training (Deliverable CDR-17).
If training cannot be conducted on the website, the Contractor shall coordinate with the COR, who will contact the local OPSEC Officer at their assigned location for classroom training.
Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be provided to the COR within 10 working days after completion of the training (Deliverable CDR- 17).
1.22.3 Information Assurance (IA) Training
1.22.3.1 All Contractor employees, including subcontractors, requiring access to Government information systems shall complete the DoD IA Cyber Awareness Training within30 calendar days (Deliverable CDR-18) after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 calendar days after employment of new personnel. Verification of the training shall be provided to the COR 10 calendar days after completion of the training (Deliverable CDR-18).
1.22.3.2 All Contractor employees, including subcontractors, working information technology (IT)/IA functions shall comply with DoD and Army training requirements per Information Assurance Training Certification and Workforce Management DoD Directive (DoDD) 8570.01, Information Assurance Workforce Improvement Program DoD 8570.01-M, and Information Assurance AR 25-2 within thirty (30) calendar days of employment. Training is available at https://ia.signal.army.mil/DoDIAA/default.asp .
1.22.3.3 All Contractor employees, including subcontractors, performing services under this contract with access to a Government information system must be registered in the Army Training Certification Tracking System (ATCTS), which requires CAC to access. Verification of registration shall be provided to the COR within 10 calendar days after registration.
(Deliverable CDR-19). Contractor personnel must complete refresher training every twelve http://www.cdse.edu/catalog/elearning/GS130.html https://ia.signal.army.mil/DoDIAA/default.asp
(12) months (Deliverable CDR-19). Verification of the training shall be provided to the COR within 10 calendar days after completion of the training (Deliverable CDR-19).
PART 2
DEFINITIONS & ACRONYMS
2. Definitions and Acronyms
2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.
Contracting Officer – means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. DoD Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, Contracting Officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing other surveillance support personnel to assist the COR when needed, “…These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the Contracting Officer as alternate CORs.”
Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
Contractor-acquired Property - means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.
Day – means, unless otherwise specified, a calendar day.
Defective Service – means a service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable – means anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
Government-furnished Property – As reflected in FAR 52.245-1, Government-furnished Property “means property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is deliverable under a cost contract when accepted by the Government for continued use under the contract
Government Property - means all property owned or leased by the Government. Government property includes both Government-furnished and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
Property Administrator - means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.
High Level Objective (HLO) – means a key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are similar to Level 2 in a Work Breakdown Structure. Each HLO may contain several statements to flesh out the areas necessary to meet the objective.
Physical Security – means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.
Quality Assurance – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.
Quality Assurance Surveillance Plan (QASP) – means the key Government-developed surveillance process document and is applied to Performance-Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.
Quality Control – means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Statement – means the specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however, they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are similar to Level 3 in a Work Breakdown Structure.
Subcontractor – means one that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
Work Day - The number of hours per day the Contractor provides services in accordance with the contract.
Work Week - Monday through Friday, unless otherwise specified.
2.2 Acronyms: Although not inclusive of every term used within this PWS, or that may be included in an acquisition, the following provides a list of acronyms commonly used in the acquisition field.
ACOR Alternate Contracting Officer's Representative AE Army in Europe AFARS Army Federal Acquisition Regulation Supplement AHA Activity Hazard Analysis AOR Area of Responsibility AR Army Regulation AT Anti-terrorism ATCTS Army Training Certification Tracking System CAC Common Access Card CCE Contracting Center of Excellence CFE Conventional Forces Europe CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer’s Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DoD Department of Defense FAR Federal Acquisition Regulation FRG Federal Republic of Germany GFP Government Furnished Property HLO High Level Objective HIPAA Health Insurance Portability and Accountability Act of 1996 IA Information Awareness IAC Installation Access Control IACO Installation Access Control Office ID Identification IGCE Independent Government Cost Estimate
IT Information Technology JTR Joint Travel Regulation JPAS Joint Personnel Adjudication System KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OPSEC Operations Security PA Property Administrator PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RA Requiring Activity RCO Regional Contracting Office SIGE Safety and Health Protection Plan TE Technical Exhibit USAG United States Army Garrison USAREUR United States Army Europe UOM Unit of Measure
PART 3
GOVERNMENT PROPERTY (GP) AND SERVICES
3. Government Property and Services
3.1 Services: The Government will provide manuals, facility and supplies listed as government furnished.
3.2 Facilities: The Government will provide a maintenance facility to be used in support of vehicle and equipment maintenance functions.
3.2.1 Installed Equipment included with Building 4728 is as follows:
3 - exhaust systems 1 - welding shop 1 - overhead crane 1 - wash rack with oil and silt traps (joint access)
3.3 Utilities: The Government will provide all utilities in the facility and will be available for the Contractor’s use in performance of the tasks outlined in the PWS. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves, light switches, etc. after using the required amount to accomplish tasks requiring the use of the utilities.
3.4 Equipment: The Government will provide telephones, computers, scanners, printers, shipping crates, lighting, and office furniture. The Government will provide all engine fuels for all Government furnished vehicles and equipment; this will include the foreign vehicles and organic material handling equipment. The contractor shall conform to requisition, security, safety and accountability procedures as prescribed by AR 385-10, 40 and AR 710-2.
Government furnished fuel shall not be used in contractor furnished vehicles.
3.5 Special Tooling and Test Equipment: The government will provide calibration and service for all government provided equipment. The government will also provide repair parts, sub-assemblies, assemblies and materials that are needed to perform the services.
3.6 Materials: The Government will provide Standard Operating Procedures (SOP), US Army and Government forms and regulations, and maintenance manuals when available.
3.7 Training: The Government will provide all mandatory training as required by INSCOM to include: Anti-Terrorism, Information Security, Threat Awareness & Reporting Program, Cyber Awareness, Cybersecurity Incident Management Training, Derivative Classification, DoD Mandatory CUI Training, Foreign Disclosure, Intelligence Oversight and Compliance, Operations Security, Records Management, and Sexual Harassment/Assault Response and Prevention
3.8 Common Access Cards (CAC): The Government will provide Common Access Cards (CAC) via the Trusted Associate Sponsorship System (TASS) (Web site https://www.dmdc.osd.mil/tass/ ).
https://www.dmdc.osd.mil/tass/
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. Contractor Furnished Property and Services
4.1 General: The Contractor shall furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services.
4.2 Secret Facility Clearance: The Contractor shall possess and maintain a Secret clearance level facility clearance from the Defense Security Service IAW DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM) and AR 380-49, Industrial Security Program. The Contractor’s employees, performing work in support of this contract shall have been granted a Secret clearance level from the Defense Industrial Security Clearance Office.
The Facility Security Clearance must match the highest security clearance required for personnel. The DoD Contract Security Classification Specification (DD 254) is provided as an attachment to the basic contract.
4.3 Materials: The Contractor shall provide Personal Protective Equipment, PPE, Office supplies and materials such as, paper, and all other office supplies and materials needed in the performance of this contract; automated data processing…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .