BOAST RFOP - Distribution Box (Revision 2).xlsx
XLSX spreadsheet 63 KB Posted
- Solicitation number
- PANDTA-25-P-0000_025474
- Issued by
-
Department of the Army
About this file
This is a Request for Order Proposal (RFOP) issued by the U.S. Army Contracting Command - Detroit Arsenal under the Basic Ordering Agreement Sustainment Track (BOAST) program for a Distribution Box, Turret (NSN: 6110-01-176-8802, Part Number: 12328964). The solicitation, PANDTA-25-P-0000_025474, is a Total Small Business Set-Aside action with a response deadline of 31 July 2026 at 4:00 PM Eastern Time. The requirement calls for 32 units of production quantity (CLIN 0001AA), one First Article Test Report (CLIN 0001AB), and an unexercised option for 32 additional units (CLIN 0002AA). The item is non-commercial and classified under NAICS 336320. The award will be a firm-fixed-price contract placed to the responsible BOA holder submitting the lowest-priced proposal; mandatory eligibility requires a fully executed BOAST Basic Ordering Agreement in place by the closing date.
Delivery of the First Article Test unit must occur within 120 calendar days after receipt of order (ARO), with the Government requiring up to 30 days for evaluation and approval/disapproval. All remaining production units must be delivered within 270 calendar days from the date of written First Article Test approval. The contract incorporates extensive quality and technical requirements including ISO 9001:2015 certification, first article testing per contractor testing procedures, Chemical Agent Resistant Coating (CARC) requirements, and military preservation, packing, and marking per MIL-STD-2073-1. The item is export-controlled, requiring vendors to possess a current DD Form 2345 certification from the Joint Certification Program. Inspection and acceptance occurs at origin for production units, and at destination for the First Article Test Report. Payment terms are Net 30 days from receipt of invoice and acceptance of goods. The solicitation is set aside for small business concerns and includes multiple DFARS clauses addressing cybersecurity, technical data rights, subcontracting restrictions, and compliance with federal procurement regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BOAST RFOP - Distribution Box (Revision 5).xlsx | XLSX spreadsheet | |
| BOAST RFOP - Distribution Box (Revision 4).xlsx | XLSX spreadsheet | |
| QandA PANDTA_25_P_0000_025474_Distribution Box.docx | DOCX document | |
| QandA PANDTA_25_P_0000_025474_Distribution Box.docx | DOCX document | |
| QandA PANDTA_25_P_0000_025474_Distribution Box.docx | DOCX document | |
| BOAST RFOP - Distribution Box (Revision 3).xlsx | XLSX spreadsheet | |
| BOAST RFOP - Distribution Box (Revision 1).xlsx | XLSX spreadsheet | |
| BOAST RFOP - Distribution Box 1 (1).xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFOP
BASIC ORDERING AGREEMENT SUSTAINMENT TRACK (BOAST): Request for Order Proposal (RFOP)
NOTICE ID: PANDTA-25-P-0000 025474 DATE ISSUED: 18-JUN-2026 / REVISION 1: 01-JUL-2026 / Revision 2: 08-JUL-2026 RESPONSE DUE: 31-JUL-2026, 4:00 PM Eastern
| ISSUE BY: | U.S. Army Contracting Command - Detroit Arsenal (ACC-DTA) | CONTRACTOR: |
| ATTN: | BOAST@army.mil | UIE / CAGE: |
| Zachary K Wiegand, Contract Specialist, zachary.k.wiegand.civ@army.mil | ADDRESS: | |
| Dan Gibson, Contracting Officer, daniel.j.gibson43.civ@army.mil | POC NAME: | |
| POC EMAIL: | ||
| POC PHONE: | ||
| BOA NUMBER: |
GENERAL INFORMATION I. This Request for Order Proposal (RFOP) is a competitive action to solicit proposals for the supplies/services detailed below. While all responsible sources may submit a proposal, award is contingent upon the mandatory eligibility requirements detailed below. The resulting order will be a firm-fixed-price contract placed under the BOAST program.
II. Information regarding the program's continuous on-ramp process can be found in the standing BOAST program notice on SAM.gov under ID W912CH-26-R-0001. Vendors are encouraged to proactively establish a BOA to ensure eligibility for future requirements.
III. All questions regarding this RFOP must be submitted in writing to the Point of Contact no later than 06 JUL 2026.
| REQUIREMENT DETAILS | Supply / Service: | Distribution Box, Turret |
| NSN / Description: | 6110-01-176-8802 | |
| TDP / DWG No . | 12328964 | |
| Commerciality: | Non-Commercial | |
| NAICS: | 336320 | |
| Size Standard: | 1,000 | |
| Set-Aside Status: | Small Business Set-Aside | |
| Small Business Subcontracting Plan: | Not Required | |
| Order Rating: | DO | |
| Packaging Level: | Military: B SPI Number: 12328964 | |
| Ship-To Location: | SR W0MC ARMY GENERAL SUPPLY |
DLA DISTRIBUTION RED RIVER
HIGHWAY 82 WEST
TEXARKANA, TX, 75507-5000
| Inspect / Accept: | Origin |
| FOB: | Destination |
| Delivery Schedule: | The First Article Test (FAT) unit(s) specified in CLIN 0001AB shall be delivered within 120 (per Revision 2) calendar days ARO. Alternative schedules for the FAT unit(s) will not be considered. The Government requires up to 30 days for FAT evaluation and written approval/disapproval. |
All remaining production units shall be delivered within 270 calendar days from the date of written FAT approval.
Any acceleration in First Article Test Approval will be subtracted from the delivery schedule of the production units.
| PRICING SHEET | |||||||||||
| Line Item | Description | Noun | NSN | Part No. | PRON / 1095 | Quantity | Unit of Measure | Del Sch / Rate | Unit Price | Total Price | Notes |
| 0001AA | PRODUCTION QUANTITY | Distribution Box | 6110-01-176-8802 | 12328964 | EH5C0696EH | 32 | EA | 0 | |||
| 0001AB | FIRST ARTICLE TEST REPORT | FATR | N/A | N/A | 1 | LO | 0 | ||||
| 0002AA | UNEXERCISED OPTION QUANTITY | Distribution Box | 6110-01-176-8802 | 12328964 | 32 | EA | 0 | ||||
| 9000 | CONTRACT DATA REQUIREMENTS LIST (NSP) | CONTRACT DATA REQUIREMENTS LIST | 0 | ||||||||
| A001 | DATA ITEM NOT PRICED -- DD 250 NOT REQUIRED | Engineering Change Proposal (ECP) | 1 | LO | $ - 0 | 0 | |||||
| A002 | DATA ITEM NOT PRICED -- DD 250 NOT REQUIRED | Request For Variance (RFV) | 1 | LO | $ - 0 | 0 | |||||
| A003 | DATA ITEM NOT PRICED -- DD 250 NOT REQUIRED | Notice Of Revision (NOR) | 1 | LO | $ - 0 | 0 | |||||
| A004 | First Article Test Report (FATR) | First Article Test Report (FATR) | 1 | LO | $ - 0 | 0 | |||||
| A005 | Service Data Item - Not Priced | TEST PROCEDURE – PRETREATMENTS AND CHEMICAL AGENT RESISTANT COATINGS LOCAL WARREN - PAINTED MATERIEL | 1 | LO | $ - 0 | 0 | |||||
| A006 | Service Data Item - Not Priced | TEST REPORT– PRETREATMENTS AND CHEMICAL AGENT RESISTANT COATINGS LOCAL WARREN - PAINTED MATERIEL | 1 | LO | $ - 0 | 0 | |||||
| Order Total | $ - 0 |
PROPOSAL SUBMISSION INSTRUCTIONS Proposal Content: Submission shall consist of a completed and signed Pricing Sheet contained in this RFOP. No separate technical proposal is required. The Government intends to evaluate proposals and award an order without discussions.
| Submission Method: | Proposals must be submitted electronically via email to the Point of Contact by the Response Due Date. The subject line must read: "Proposal for RFOP-[PANDTA-25-P-0000 025474] - [Your Company Name]". Late proposals will not be evaluated. |
| Period of Acceptance | Proposals shall remain firm for at least 60 calendar days from the closing date of this RFOP. |
| Mandatory Eligibility Requirement For Award: | To be considered eligible for award, a vendor must have a fully executed BOAST Basic Ordering Agreement in place prior to the closing date and time specified in this RFOP. Proposals received from vendors who do not have an executed BOA by the closing time will be considered ineligible and will not be evaluated. |
(A)EVALUATION FOR AWARD Price Only The Government intends to award a Firm-Fixed-Price Order to the responsible BOA holder who submits the lowest-priced proposal. Price will be evaluated for reasonableness. Award will be made to the offeror with the lowest evaluated price.
Evaluation: Price will be evaluated for reasonableness. Award will be made to the offeror with the lowest evaluated price.
In accordance with FAR Subpart 9.1, the Government will make a determination of contractor responsibility for the apparent successful awardee prior to placing the order.
| REGULATORY COMPLIANCE | BOA Attachment Reference: | FAR Part 15_Contracting by Negotiation | |||||
| Applicable Clauses: | See 'Applicable Clauses-Provisions' sheet. | ||||||
| Payment Terms: | Net 30 days from receipt of invoice and acceptance of goods. | ||||||
| Buy American / Trade Agreements: | |||||||
| (Select One) | Buy American and Balance of Payments Program | ||||||
| (DFARS 252.225-7001) | N/A | Buy American --Free Trade Agreements--Balance of Payments Program (DFARS 252.225-7036) | N/A | Trade Agreements (DFARS 252.225-7021) | N/A |
NAME: DATE:
mailto:BOAST@army.mil Applicable Clauses-Provisions
| Applicable Clauses/Provisions | ||||
| Reference | Date | Title | BOA Reference | Remarks |
| 52.246-2 | 8/1/96 | INSPECTION OF SUPPLIES--FIXED-PRICE | ||
| 52.246-16 | 4/1/84 | RESPONSIBILITY FOR SUPPLIES | ||
| 252.211-7008 | 9/1/10 | USE OF GOVERNMENT-ASSIGNED SERIAL NUMBERS | ||
| 252.211-7003 | 1/1/23 | ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) | ||
| 52.242-15 | 8/1/89 | STOP-WORK ORDER | ||
| 52.242-17 | 4/1/84 | GOVERNMENT DELAY OF WORK | ||
| 52.247-34 | 2/1/06 | F.O.B. DESTINATION (JAN 1991) | ||
| 52.247-48 | 2/1/99 | F.O.B. DESTINATION--EVIDENCE OF SHIPMENT | ||
| 252.232-7006 | 1/1/23 | WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) | ||
| 252.209-7004 | 5/1/19 | SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY E GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (MAY 2019) | ||
| 252.225-7001 | 2/1/24 | BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM--BASIC (FEB 2024) | ||
| 252.225-7012 | 4/1/22 | PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES | ||
| 252.225-7016 | 1/1/23 | RESTRICTION ON ACQUISITION OF BALL AND ROLLER BEARINGS (JAN 2023) | ||
| 252.226-7001 | 1/1/23 | UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS (JAN 2023) | ||
| 252.227-7013 | 8/1/25 | RIGHTS IN TECHNICAL DATA--OTHER THAN COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (AUG 2025) | ||
| 252.227-7015 | 1/1/25 | TECHNICAL DATA--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025) | ||
| 252.227-7016 | 1/1/23 | RIGHTS IN BID OR PROPOSAL INFORMATION (JAN 2023) | ||
| 252.227-7025 | 1/1/25 | LIMITATIONS ON THE USE OR DISCLOSURE OF GOVERNMENT-FURNISHED INFORMATION MARKED WITH RESTRICTIVE LEGENDS (JAN 2025) | ||
| 252.227-7027 | 4/1/88 | DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE | ||
| 252.227-7030 | 3/1/00 | TECHNICAL DATA--WITHHOLDING OF PAYMENT | ||
| 252.227-7037 | 1/1/25 | VALIDATION OF ASSERTED RESTRICTIONS ON TECHNICAL DATA (JAN 2025) | ||
| 252.232-7003 | 12/1/18 | ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS | ||
| 252.243-7001 | 12/1/91 | PRICING OF CONTRACT MODIFICATIONS | ||
| 252.243-7002 | 12/1/22 | REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2022) | ||
| 252.244-7000 | 11/1/23 | SUBCONTRACTS FOR COMMERCIAL PRODUCTS OR COMMERCIAL SERVICES (NOV 2023) | ||
| 252.247-7023 | 10/1/24 | TRANSPORTATION OF SUPPLIES BY SEA--BASIC (OCT 2024) | ||
| 252.203-7001 | 1/1/23 | PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-CONTRACT-RELATED FELONIES (JAN 2023) | ||
| 252.204-7000 | 10/1/16 | DISCLOSURE OF INFORMATION | ||
| 252.204-7003 | 4/1/92 | CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT | ||
| 252.231-7000 | 12/1/91 | SUPPLEMENTAL COST PRINCIPLES | ||
| 252.232-7010 | 12/1/06 | LEVIES ON CONTRACT PAYMENTS | ||
| 252.203-7000 | 9/1/11 | REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS | ||
| 252.203-7002 | 12/1/22 | REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (DEC 2022) | ||
| 252.225-7048 | 6/1/13 | EXPORT-CONTROLLED ITEMS | ||
| 252.204-7015 | 1/1/23 | NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT (JAN 2023) | ||
| 252.204-7012 | 5/1/24 | SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (MAY 2024) (DEVIATION 2024-O0013, REVISION 1) | ||
| 252.222-7006 | 1/1/23 | RESTRICTIONS ON THE USE OF MANDATORY ARBITRATION AGREEMENTS (JAN 2023) | ||
| 252.204-7018 | 1/1/23 | PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023) | ||
| 252.204-7020 | 11/1/23 | NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023) | ||
| 252.225-7056 | 1/1/23 | PROHIBITION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME (JAN 2023) | ||
| 252.240-7997 | 2/1/26 | NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (DEVIATION 2026-O0025)(FEB 2026) | ||
| 252.227-7989 | 2/1/26 | RIGHTS IN TECHNICAL DATA, COMPUTER SOFTWARE, AND COMPUTER SOFTWARE DOCUMENTATION?OTHER THAN COMMERCIAL PRODUCTS ORCOMMERCIAL SERVICES (DEVIATION 2026-O0036) (FEB 2026) | ||
| 252.227-7991 | 2/1/26 | RIGHTS IN BID OR PROPOSAL INFORMATION ((DEVIATION 2026-O0036) | ||
| (FEB 2026) | ||||
| 252.227-7995 | 2/1/26 | DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE (DEVIATION 2026-O0036) (FEB 2026) | ||
| 252.227-7996 | 2/1/26 | TECHNICAL DATA-WITHHOLDING OF PAYMENT (DEVIATION 2026-O0036) (FEB 2026) | ||
| 252.240-7997 CD | 2/1/26 | NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (DEVIATION 2026-O0025)(FEB 2026) | ||
| (DEVIATION 2026-O0025)(FEB 2026) | ||||
| 52.203-3 | 4/1/84 | GRATUITIES | ||
| 52.203-5 | 5/1/14 | COVENANT AGAINST CONTINGENT FEES | ||
| 52.203-6 | 11/1/21 | RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020) | ||
| 52.203-7 | 6/1/20 | ANTI-KICKBACK PROCEDURES | ||
| 52.203-8 | 5/1/14 | CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY | ||
| 52.203-10 | 5/1/14 | PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY | ||
| 52.203-12 | 6/1/20 | LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS | ||
| 52.209-6 | 2/1/26 | PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, OR VOLUNTARILY EXCLUDED (FEB 2026) | ||
| 52.211-5 | 2/1/26 | MATERIAL REQUIREMENTS (FEB 2026) | ||
| 52.211-15 | 4/1/08 | DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS | ||
| 52.215-2 | 2/1/26 | AUDIT AND RECORDS--NEGOTIATION (FEB 2026) | ||
| 52.215-14 | 11/1/21 | INTEGRITY OF UNIT PRICES | ||
| 52.222-1 | 2/1/97 | NOTICE TO THE GOVERNMENT OF LABOR DISPUTES | ||
| 52.222-20 | 2/1/26 | CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND EQUIPMENT (FEB 2026) | ||
| 52.222-37 | 2/1/26 | EMPLOYMENT REPORTS ON VETERANS (FEB 2026) | ||
| 52.222-50 | 2/1/26 | COMBATING TRAFFICKING IN PERSONS ((FEB 2026) | ||
| 52.227-1 | 6/1/20 | AUTHORIZATION AND CONSENT | ||
| 52.227-2 | 6/1/20 | NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT | ||
| 52.229-3 | 2/1/13 | FEDERAL, STATE, AND LOCAL TAXES | ||
| 52.232-1 | 4/1/84 | PAYMENTS | ||
| 52.232-8 | 2/1/02 | DISCOUNTS FOR PROMPT PAYMENT | ||
| 52.232-11 | 4/1/84 | EXTRAS | ||
| 52.232-17 | 5/1/14 | INTEREST | ||
| 52.232-23 ALT 1 | 4/1/84 | ASSIGNMENT OF CLAIMS (MAY 2014) -- ALTERNATE I (APR 1984) | ||
| 52.232-25 | 1/1/17 | PROMPT PAYMENT | ||
| 52.232-33 | 10/1/18 | PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT | ||
| 52.233-1 | 2/1/26 | DISPUTES (FEB 2026) | ||
| 52.233-3 | 2/1/26 | PROTEST AFTER AWARD (FEB 2026) | ||
| 52.233-4 | 2/1/26 | APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (FEB 2026) | ||
| 52.242-13 | 7/1/95 | BANKRUPTCY | ||
| 52.243-1 | 2/1/26 | CHANGES--FIXED PRICE | ||
| 52.244-6 | 2/1/26 | SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2025) (DEVIATION 2025-O0003) | ||
| 52.247-63 | 1/1/25 | PREFERENCE FOR U.S.-FLAG AIR CARRIERS (JAN 2025) | ||
| 52.247-68 | 2/1/06 | REPORT OF SHIPMENT (REPSHIP) | ||
| 52.248-1 | 6/1/20 | VALUE ENGINEERING | ||
| 52.249-2 | 4/1/12 | TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) | ||
| 52.249-8 | 4/1/84 | DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) | ||
| 52.202-1 | 6/1/20 | DEFINITIONS | ||
| 52.204-10 | 2/1/26 | REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (FEB 2026) | ||
| 52.222-54 | 2/1/26 | EMPLOYMENT ELIGIBILITY VERIFICATION (FEB 2026) | ||
| 52.226-8 | 5/1/24 | ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (MAY 2024) | ||
| 52.222-40 | 12/1/10 | NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT | ||
| 52.219-8 | 2/1/26 | UTILIZATION OF SMALL BUSINESS CONCERNS (FEB 2026) | ||
| 52.209-9 | 2/1/26 | UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (FEB 2026) | ||
| 52.204-13 | 2/1/26 | SYSTEM FOR AWARD MANAGEMENT-MAINTENANCE (FEB 2026) | ||
| 52.232-39 | 6/1/13 | UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS | ||
| 52.232-40 | 3/1/23 | PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS(MAR 2023) | ||
| 52.203-19 | 1/1/17 | PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS | ||
| 52.219-6 | 2/1/26 | NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (FEB 2026) | ||
| 52.240-91 | 2/1/26 | SECURITY PROHIBITIONS AND EXCLUSIONS (FEB 2026) | ||
| 52.204-91 | 2/1/26 | CONTRACTOR IDENTIFICATION (FEB 2026) | ||
| 52.222-90 | 4/1/26 | ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS | ||
| 52.219-14 | 2/1/26 | LIMITATIONS ON SUBCONTRACTING (FEB 2026) | ||
| 52.252-2 | 2/1/98 | CLAUSES INCORPORATED BY REFERENCE (Feb 1998) | ||
| 52.252-6 | 11/1/20 | AUTHORIZED DEVIATIONS IN CLAUSES (Nov 2020) | ||
| 52.219-28 | 2/1/26 | POSTAWARD SMALL BUSINESS PROGRAM REPRESENTATION (FEB 2026) | ||
| 52.222-35 | 2/1/26 | EQUAL OPPORTUNITY FOR VETERANS (FEB 2026) | ||
| 52.222-36 | 2/1/26 | EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (FEB 2026) | ||
| 52.204-19 | 12/1/14 | INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS | ||
| 52.222-19 | 2/1/26 | CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES (FEB 2026) | ||
| 52.203-17 | 11/1/23 | CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV2023) | ||
| 52.240-93 | 2/1/26 | BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEM (FEB 2026) | ||
| 252.227-7028 | 6/1/95 | TECHNICAL DATA OR COMPUTER SOFTWARE PREVIOUSLY DELIVERED TO THE GOVERNMENT | ||
| 252.203-7005 | 9/1/22 | REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (Sep 2022) | ||
| 252.204-7008 | 10/1/16 | COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS | ||
| 252.225-7053 | 8/1/21 | REPRESENTATION REGARDING PROHIBITION ON USE OF CERTAIN ENERGY SOURCED FROM INSIDE THE RUSSIAN FEDERATION | ||
| 252.204-7007 | 10/1/25 | ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025) | ||
| 252.204-7017 | 5/1/21 | PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION | ||
| 252.225-7973 | 8/1/24 | PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED AIRCRAFT SYSTEMS--REPRESENTATION (DEVIATION 2024-O0014) | ||
| 252.239-7098 | 4/1/21 | PROHIBITION ON CONTRACTING TO MAINTAIN OR ESTABLISH A COMPUTER NETWORK UNLESS SUCH NETWORK IS DESIGNED TO BLOCK ACCESS TO CERTAIN WEBSITES--REPRESENTATION (DEVIATION 2021-O0003) | ||
| 52.240-90 | 2/1/26 | SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS | ||
| 52.225-18 | 8/1/18 | PLACE OF MANUFACTURE | ||
| 52.209-13 | 2/1/26 | VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS--CERTIFICATION | ||
| 252.215-7008 | 12/1/22 | ONLY ONE OFFER (DEC 2022) | ||
| 252.215-7013 | 1/1/23 | SUPPLIES AND SERVICES PROVIDED BY NONTRADITIONAL DEFENSE CONTRACTORS (JAN 2023) | ||
| 252.204-7019 | 11/1/23 | NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS | ||
| 252.270-7000 | 11/1/24 | Pilot Program To Incentivize Contracting With Employee-Owned Businesses?Representation (Nov 2024) | ||
| 252.270-7001 | 11/1/24 | Pilot Program To Incentivize Contracting With Employee-Owned Businesses?Subcontracting Certification (Nov 2024) | ||
| 252.215-7992 | 3/1/26 | ONLY ONE OFFER (DEVIATION 2026-O0048) (MAR 2026) | ||
| 52.214-34 | 4/1/91 | SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE | ||
| 52.214-35 | 4/1/91 | SUBMISSIONS OF OFFERS IN U.S. CURRENCY | ||
| 52.215-1 | 2/1/26 | INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (FEB 2026) | ||
| 52.215-16 | 6/1/03 | FACILITIES CAPITAL COST OF MONEY | ||
| 52.204-7 | 2/1/26 | SYSTEM FOR AWARD MANAGEMENT-REGISTRATION (FEB2026) | ||
| 52.233-2 | 2/1/26 | SERVICE OF PROTEST (FEB2026) | ||
| 52.211-14 | 4/1/08 | NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE | ||
| 52.252-1 | 2/1/98 | SOLICITATION PROVISIONS INCORPORATED BY REFERENCE | ||
| 52.252-5 | 11/1/20 | AUTHORIZED DEVIATIONS IN PROVISIONS | ||
| 252.217-7000 ALT 1 | 11/1/14 | EXERCISE OF OPTION TO FULFILL FOREIGN MILITARY SALES COMMITMENTS (Nov 2014) -- ALTERNATE I (NOV 2014) | ||
| 252.217-7000 | 11/1/14 | EXERCISE OF OPTION TO FULFILL FOREIGN MILITARY SALES COMMITMENTS--BASIC | ||
| 252.217-7001 | 12/1/18 | SURGE OPTION | ||
| 52.217-9 | 3/1/00 | OPTION TO EXTEND THE TERM OF THE CONTRACT | ||
| 52.217-7 | 3/1/89 | OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM | ||
| 52.217-6 | 3/1/89 | OPTION FOR INCREASED QUANTITY | ||
| 52.217-4 | 2/1/26 | EVALUATION OF OPTIONS EXERCISED AT TIME OF CONTRACT AWARD (FEB 2026) | ||
| 52.217-5 | 2/1/26 | EVALUATION OF OPTIONS (FEB 2026) | ||
| 52.207-4 | Economic Purchase Quantity-Supplies (AUG 1987) | |||
| 52.246-25 | Limitation of Liability--Services (FEB 1997) | |||
| 52.246-26 | Reporting Nonconforming Items (Aug 2024) | |||
| 52.246-11 | Higher-Level Contract Quality Requirement (DEC 2014) | (a) The Contractor shall comply with the higher-level quality standard(s) listed below. |
QMS Requirements: ISO 9001:2015 (21 Oct 2015) or equivalent Tailored by excluding paragraph(s) 8.3
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require-
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
52.209-3 First Article Approval-Contractor Testing (a) The Contractor shall test 3 unit(s) of Lot/Item PN: 12328964 as specified in this contract. At least 15 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report within TBD calendar days from the date of this contract to Contract Specialist Zachary.k.wiegand.civ@army.mil and PCO Daniel.j.gibson43.civ@army.mil marked "First Article Test Report: Contract No. TBD, Lot/Item No. PN: 12328964 ." Within 30 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) of this subsection. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) of this subsection, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
(End of clause) Alternate I (Jan 1997). As prescribed in 9.308-1(a)(2) and (b)(2), add the following paragraph (i) to the basic clause:
(i) The Contractor shall produce both the first article and the production quantity at the same facility.
Alternate II (Sept1989). As prescribed in 9.308-1(a)(3) and (b)(3), substitute the following paragraph (g) for paragraph (g) of the basic clause:
(g) Before first article approval, the Contracting Officer may, by written authorization, authorize the Contractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules. Until first article approval is granted, only costs for the first article and costs incurred under this authorization are allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government. If first article tests reveal deviations from contract requirements, the Contractor shall, at the location designated by the Government, make the required changes or replace all items produced under this contract at no change in the contract price.
52.211-14 Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use (APR 2008) Any contract awarded as a result of this solicitation will be [ ] DX rated order; [x] DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR700), and the Contractor will be required to follow all of the requirements of this regulation.
Technical & Quality Requirement
| TECHNICAL & QUALITY REQUIREMENTS | |
| Title | Instructions/Narrative |
| ELECTRONIC CONTRACTING | (a) All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website (https://www. SAM.gov). When available electronically, Technical Data Packages (TDPs) will be provided to the contractor either as separate attachments that will be made available within SAM.gov or as links within the PIEE Solicitation Module. |
(b) This solicitation requires any proposal, modification or revision/amendment submission via the Procurement Integrated Enterprise Environment (PIEE) - Solicitation Module. (See Section L for further information.)
PIEE Log in Page: https://piee.eb.mil/xhtml/unauth/home/login.xhtml
This will require offerors to be registered in PIEE and have the appropriate access/user role for the Solicitation module within PIEE. This may also require action on the part of offerors to request and obtain the appropriate access/user role for the Solicitation module in order to upload and submit any proposal, modification or revision/amendment. Offerors are required to review their PIEE module access immediately and initiate any necessary request(s) for the Solicitation module, which should be done as soon as possible, and well in advance of the solicitation closing date/time.
See the below for information regarding PIEE and the Solicitation Module:
Getting Started with PIEE:
https://piee.eb.mil/xhtml/unauth/web/homepage/vendorGettingStartedHelp.xhtml https://pieetraining.eb.mil/wbt/xhtml/wbt/portal/overview/vendorRegister.xhtml https://pieetraining.eb.mil/wbt/portal/portal/Vendor_Registration.pdf
PIEE Solicitation Module Information and Web Training:
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml https://pieetraining.eb.mil/wbt/sol/Solicitation_Registration.pdf https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml
Other helpful Info:
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf
(c) Please pay close attention to the Issued By block location on the cover page of the solicitation closing date/time. The solicitation closing date/time is based on the local time of the location of the Issued By office. Offerors are responsible for submitting any proposal, modification or revision/amendment, so as to be received by the Government office designated in the solicitation by the date/time specified.
(d) It is the responsibility of the offeror to ensure any proposal, modification, or revision/amendment is received by the date and time specified on the cover page of this solicitation. If any proposal, modification, or revision/amendment was not received at the initial point of entry to the Government infrastructure by the exact date and time specified on the cover page of this solicitation, it will be determined late and will be handled in accordance with FAR 52.215-1 or FAR 52.212-1 (whichever is applicable to this solicitation). Proposal, modification, or revision/amendment is defined to mean ALL volumes or parts required in the solicitation and included in the electronic submission.
Note: Any proposal, modification, or revision/amendment size and content may impact the time it takes for submission. Therefore, offerors are strongly cautioned that adequate time should be allowed when submitting any proposal, modification, or revision/amendment.
(e) Solicitations may remain posted on www.SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, offerors will no longer be able to submit electronic responses.
(f) Any award issued as a result of this solicitation will be distributed electronically. In the event of a Freedom of Information Act (FOIA) (5 USC § 552) request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released. In addition, in accordance with Executive Order 12600 (June 23, 1987), please be advised it is the Government’s intention to also release the unit price(s) in response to any request under FOIA. Unit price is defined as the contract price per unit, or item purchased as it appears in Section B of the contract. Unit price does NOT refer to, nor does it include Cost or Pricing data or information. If an offeror objects to the release of the unit price(s) in the contract or contract modifications in the event of a FOIA request, the offeror must notify the Contracting Officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection, consistent with the provisions of FOIA. A release determination will be made in accordance with FOIA based on the rationale provided.
(g) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the APEX (formerly Procurement Technical Assistance Center (PTAC)) website at http://www.miapex.org/ to locate a regional center.
| ARMY CONTRACTING COMMAND – DETROIT ARSENAL (DTA) OMBUDSPERSON | Information regarding the Ombudsperson for this contract is located at the following website: https://tacom.army.mil/ombudsman (Best viewed using Google Chrome or Microsoft Edge). |
| DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE | (a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801–4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provision of DoD Directive 5230.25 and DoD Instruction 2040.02. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level. |
(b) To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, “Militarily Critical Technical Data Agreement” certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at: http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's Section C “Technical Data Package” instructions.
(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
TECHNICAL DATA PACKAGE INFORMATION The following “X”d item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[X] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov) associated with this solicitation number:
PANDTA-25-P-0000 025474
To access the data through SAM:
a. Log on to the SAM web site: https://SAM.gov.
b. Search for the solicitation number.
c. Click on the attachment you would like to view.
d. If the attachment is restricted, request access to the document.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801–4852 of Title 50, United States Code).
(2) Further dissemination of the TDP must be in accordance with provisions of DoD Directive 5230.25, DoDI 5230.24, its Distribution Statement markings, and U.S. export control laws. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). To obtain certification, go to DD FORM 2345 Instructions and DD 2345.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select “Request Explicit Access.” This will generate an email to the Contract Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.
f. If multiple individuals in the contractor’s organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP. Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.
g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed “Use and Non-Disclosure Agreement” at the same time if the solicitation requires both to gain access to view the TDP.
STATEMENT OF WORK – STABLE BASE MYLARS Stable Base Mylars Master(s) are required as follows:
CLIN(s): 0001AA / 0002AA
DRAWING NO(s):
12308888 12313208 12328848 12933544 12933545 12933716 12933717
PRON NO(s): EHC0696EH
NSN(s): 6110-01-176-8802
Stable Base drawings should be requested from the Contracting Officer not later than thirty days after award of contract.
CONFIGURATION MANAGEMENT DOCUMENTATION The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).
a. The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).
b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.
d. All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
e. For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.
(i) for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.
(ii) for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.
(iii) for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.
f. The Government’s acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government’s sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.
REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN (a) The contractor is subject to, at a minimum, the provisions of the current TACOM OPSEC Plan, or other approved U.S. Government OPSEC plan, per AR 530-1, Operations Security. This Plan specifies the government’s critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.
(b) The contractor will receive a copy of the Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by TACOM G3/G2 or individual organizations supporting AT/OPSEC Officers.
(c) The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is OPSEC Level I.
g. The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the Administrative Contracting Officer (ACO).
h. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.
| OPSEC TRAINING REQUIREMENT | Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at: https://securityawareness.dcsa.mil/opsec/index.htm. Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officer’s Representative (COR), if assigned to the contract, or the Procuring Contracting Officer (PCO). |
| Counterintelligence Awareness and Reporting (CIAR); formerly known as Threat Awareness Reporting Program (TARP): | Per AR 381-12, all Department of the Army (DA) personnel (Military/Civilian/Contractor) must complete CIAR training within 30 days of assignment or employment to an organization/contract, and then once every 12 months thereafter pursuant to DoDD 5240.06. DA personnel will complete “Counterintelligence Awareness and Reporting for DoD Employees” – CI116.16, located at https://www.cdse.edu/, to satisfy most Army annual training requirements. |
In addition, per AR 381-12 Chapter 5, the following individual(s) must receive an in-person CIAR briefing directly from an ACI Special Agent or a CI-experienced person in addition to the annual training requirement:
• DA personnel scheduled to travel (official, unofficial, permanent change of station) to or through countries with a high foreign intelligence or terrorist threat level as identified by Defense Intelligence Agency or the Department of State, will receive a special CIAR briefing prior to the travel and will be debriefed upon return. AR 381–12 • 13 June 2025 11
• DA personnel who have security clearances travelling to foreign locations in any duty status must fulfill pre-and-post travel security briefing and debriefing requirements in accordance with the DoD Foreign Clearance Guide and DoDD 4500.54E.
• DA personnel deploying in support of military exercises or contingency operations will receive a special CIAR briefing prior to departure.
• DA personnel taking part in bilateral or multilateral engagements with foreign governments or international organizations will receive a CIAR briefing prior to the event.
• Foreign visitors, personnel, and personal connections. Commanders will coordinate with unit security managers to identify personnel potentially vulnerable to FIE exploitation and ensure they are referred to ACI to receive specialized CIAR briefing.
• Such personnel will receive foreign intelligence threat briefings prior to foreign travel or event.
• Personnel with access to Sensitive Compartmented Information and Special Access Programs.
• Personnel assigned to or supporting defense critical infrastructure or associated assets, pursuant to DoDD 3020.40 and DoDI 5240.19, will receive an in-person special CIAR briefing on an annual basis. Such personnel will notify their local ACI office of all projected foreign travel or foreign visits.
• Foreign government employment. Current and retired DA personnel seeking employment with foreign government entities will have CIAR training and support made available.
• Information technology professionals System administrators, privileged users, and those with privileged access that provides an individual capability to alter the properties, behavior, or control of a DoD information system will receive in-person special CIAR briefings on an annual basis.
• Professional and educational exchange programs with foreign governments.
These briefings will be tailored to the particular risk or threat involved, including methods the person may use to minimize the risk, and will place special emphasis on reporting responsibilities. Debriefings will be conducted as soon as feasible following completion of travel, duty, or visit to a foreign country, or attendance at a conference with foreign personnel by an ACI Special Agent. Failure to receive training does not relieve individuals from their reporting responsibilities in chapter 4 of this regulation.
PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS) (a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: B
(3) QUANTITY PER UNIT PACKAGE: 001
(4) SPECIAL PACKAGING INSTRUCTION NUMBER: 12328964
(a) REVISION: C
(b) DATE OF REVISION: 06 JUNE 02
(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL: See Attachment SPECIAL PACKAGING INSTRUCTIONS (SPI) 12328964
(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobe’s website (http://get.adobe.com/reader/) for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the "Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")
(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
(c) Marking:
(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and as applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.
(2) When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at: https://www.acq.osd.mil/dpap/pdi/uid/guides.html) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), “Regulation of Wood Packaging Material in International Trade,” current edition, (hereinafter “ISPM 15”), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organization’s compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The ALS approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Foreign manufacturers shall comply with ISPM -15 and shall have the marking of WPM verified in accordance with their National Plant Protection Organization’s compliance program.
(e) Hazardous Materials (As applicable):
(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
(g) SUPPLEMENTAL INSTRUCTIONS: SEE SPI FOR PACKAGING REQUIREMENTS.
INSPECTION AND ACCEPTANCE POINTS: ORIGIN The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN. Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: __________________________________________
(Name) (CAGE)
| __________________________________________ | |
| (Address) (City) | (State) (Zip) |
ACCEPTANCE POINT: __________________________________________
(Name) (CAGE)
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .