Track Shoe Set Vehicular BOAST RFOP.xlsx

XLSX spreadsheet 40 KB Posted

Attached to
BOAST RFOP - Track Shoe Set, Vehicular - NSN: 2530-00-150-5895
Solicitation number
PANDTA-25-P-0000_010369
Issued by

About this file

This is a Request for Order Proposal (RFOP) issued by the U.S. Army Contracting Command - Detroit Arsenal under the Basic Ordering Agreement Sustainment Track (BOAST) program. The solicitation seeks proposals for Track Shoe Set, Vehicular (NSN 2530-00-150-5895, Part Number 5704208), a non-commercial item classified under NAICS 336992. The base requirement is 89,216 units with two optional 12-month periods each containing 65,569 units. The Government requires delivery of the base quantity within 270 calendar days after receipt of order (ARO), with the same delivery timeline applicable to option quantities if exercised. This is a Full and Open competitive action with no small business set-aside; however, a small business subcontracting plan is required per FAR 19.074 and 52.219-9. Award will be made on a firm-fixed-price basis to the responsible BOA holder submitting the lowest-priced proposal, with price evaluated for reasonableness. The item is export-controlled and requires vendors to be certified in the Joint Certification Program (JCP) for access to the Technical Data Package (TDP).

Proposals must be submitted electronically to BOAST@army.mil with the subject line "Proposal for RFOP-PANDTA-25-P-0000_010369 - [Your Company Name]" by July 29, 2026, at 12:00 PM Eastern. A mandatory eligibility requirement for award is that vendors must have a fully executed BOAST Basic Ordering Agreement in place prior to the closing date; proposals from vendors without an executed BOA will be deemed ineligible. Submission consists solely of a completed pricing sheet with no separate technical proposal required. The resulting order will be FOB Destination to DLA Distribution Red River in Texarkana, Texas, with inspection and acceptance at origin. Payment terms are Net 30 days from receipt of invoice and acceptance of goods. The Government has indicated that accelerated delivery schedules earlier than the 270-day requirement may be proposed. Offerors must specify their inspection/acceptance point facility name, address, CAGE code, and maintain proposals firm for at least 60 calendar days from the closing date. Questions regarding the RFOP must be submitted in writing by July 29, 2026, at 12:00 PM Eastern to the designated Point of Contact.

View the file

Other files

File Type Posted
Track Shoe Set Vehicular BOAST RFOP Updated.xlsx XLSX spreadsheet
Track Shoe Set Vehicular BOAST RFOP.xlsx XLSX spreadsheet
CDRLs EH5L0225EH.docx DOCX document
Track Shoe Set Vehicular BOAST RFOP.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFOP

BASIC ORDERING AGREEMENT SUSTAINMENT TRACK (BOAST): Request for Order Proposal (RFOP)

NOTICE ID: PANDTA-25-P-0000_010369 DATE ISSUED: 6/15/2026, Revised 15 Jul RESPONSE DUE: 29-Jul-2026, 12:00 PM Eastern

ISSUE BY:U.S. Army Contracting Command - Detroit Arsenal (ACC-DTA)CONTRACTOR:
ATTN:BOAST@army.milUIE / CAGE:
Colin Creagh, Contract Specialist, colin.t.creagh.civ@army.milADDRESS:
Dan Gibson, Contracting Officer, daniel.j.gibson43.civ@army.milPOC NAME:
POC EMAIL:
POC PHONE:
BOA NUMBER:

GENERAL INFORMATION I. This Request for Order Proposal (RFOP) is a competitive action to solicit proposals for the supplies/services detailed below. While all responsible sources may submit a proposal, award is contingent upon the mandatory eligibility requirements detailed below. The resulting order will be a firm-fixed-price contract placed under the BOAST program.

II. Information regarding the program's continuous on-ramp process can be found in the standing BOAST program notice on SAM.gov under ID W912CH-26-R-0001. Vendors are encouraged to proactively establish a BOA to ensure eligibility for future requirements.

III. All questions regarding this RFOP must be submitted in writing to the Point of Contact no later than 29-Jul-2026, 12:00 PM Eastern.

REQUIREMENT DETAILSSupply / Service:Track Shoe Set, Vehicular
NSN / Description:2530-00-150-5895
TDP / DWG No .5704208
Commerciality:Non-Commercial
NAICS:336992
Size Standard:1500
Set-Aside Status:Full and Open
Small Business Subcontracting Plan:Plan required in accordance with FAR 19.074 and 52.219-9
Order Rating:DO
Packaging Level:Military B
Ship-To Location:SR W0MC ARMY GENERAL SUPPLY

DLA DISTRIBUTION RED RIVER

HIGHWAY 82 WEST

TEXARKANA, TX, 75507-5000

Inspect / Accept:Origin
FOB:Destination
Delivery Schedule:Alternate Schedule Allowed:

The Government's objective is to receive a quantity of 89,216ea within 270 calendar days After Receipt of Order (ARO). There are two option periods, each option period represents a 12 month time period with a estimated quantity of 65,569ea. If the options are exercised, the Government's requirement is to receive the option quantity within 270 calendar days After Receipt of Order (ARO). Options may be exercised incrementally. Offerors may propose an accelerated delivery schedule that is earlier than the Government's requirement. The proposed schedule, stated in days ARO, must be clearly identified in your proposal.

PRICING SHEET
Line ItemDescriptionNounNSNPart No.PRON / 1095QuantityUnit of MeasureDel Sch / RateUnit PriceTotal PriceNotes
0001AAPRODUCTION QUANTITYTrack Shoe Set, Vehicular2530-00-150-58955704208EH5L0225EH89,216EA0
0002AAOPTION QUANTITYTrack Shoe Set, Vehicular2530-00-150-58955704208TBD65,569EA0IAW FAR Clause 52.217-7, The Contracting Officer may exercise option 0002AA unilaterally by written notice to the Contractor after 182 Days but before 547 Days from delivery order award. This option may be exercised incrementally.
0003AAOPTION QUANTITYTrack Shoe Set, Vehicular2530-00-150-58955704208TBD65,569EA0IAW FAR Clause 52.217-7, The Contracting Officer may exercise option 0003AA unilaterally by written notice to the Contractor after 548 Days but before 913 Days from delivery order award. This option may be exercised incrementally.
A001Data RequirementEngineering Change Proposal (ECP)See Attachment - Contract Data Requirements List (CDRL)$ - 00NSP
A002Data RequirementRequests For Variance (RFV)See Attachment - Contract Data Requirements List (CDRL)$ - 00NSP
A003Data RequirementNotice Of Revision (NOR)See Attachment - Contract Data Requirements List (CDRL)$ - 00NSP
0
0
Order Total$ - 0

PROPOSAL SUBMISSION INSTRUCTIONS Proposal Content: Submission shall consist of a completed and signed Pricing Sheet contained in this RFOP. No separate technical proposal is required. The Government intends to evaluate proposals and award an order without discussions.

Submission Method:Proposals must be submitted electronically via email to the Point of Contact by the Response Due Date. The subject line must read: "Proposal for RFOP-PANDTA-25-P-0000_010369 - [Your Company Name]". Late proposals will not be evaluated.
Period of AcceptanceProposals shall remain firm for at least 60 calendar days from the closing date of this RFOP.
Mandatory Eligibility Requirement For Award:To be considered eligible for award, a vendor must have a fully executed BOAST Basic Ordering Agreement in place prior to the closing date and time specified in this RFOP. Proposals received from vendors who do not have an executed BOA by the closing time will be considered ineligible and will not be evaluated.

EVALUATION FOR AWARD Price Only The Government intends to award a Firm-Fixed-Price Order to the responsible BOA holder who submits the lowest-priced proposal. Price will be evaluated for reasonableness. Award will be made to the offeror with the lowest evaluated price.

Evaluation: Price will be evaluated for reasonableness. Award will be made to the offeror with the lowest evaluated price.

In accordance with FAR Subpart 9.1, the Government will make a determination of contractor responsibility for the apparent successful awardee prior to placing the order.

REGULATORY COMPLIANCEBOA Attachment Reference:FAR Part 15_Contracting by Negotiation
Applicable Clauses:See 'Applicable Clauses-Provisions' sheet.
Payment Terms:Net 30 days from receipt of invoice and acceptance of goods.
Buy American / Trade Agreements:
(Select One)Buy American and Balance of Payments Program
(DFARS 252.225-7001)N/ABuy American --Free Trade Agreements--Balance of Payments Program (DFARS 252.225-7036)N/ATrade Agreements (DFARS 252.225-7021)X

NAME: DATE:

mailto:BOAST@army.mil Applicable Clauses-Provisions

Applicable Clauses/Provisions
ReferenceDateTitleBOA ReferenceRemarks
52.246-208-01-1996INSPECTION OF SUPPLIES--FIXED-PRICEBOA Attachment 0003 - FAR 15
52.246-1604-01-1984RESPONSIBILITY FOR SUPPLIESBOA Attachment 0003 - FAR 15
252.211-700809-01-2010USE OF GOVERNMENT-ASSIGNED SERIAL NUMBERS
252.211-700301-01-2023ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)BOA Attachment 0003 - FAR 15
52.242-1508-01-1989STOP-WORK ORDERBOA Attachment 0003 - FAR 15
52.242-1704-01-1984GOVERNMENT DELAY OF WORKBOA Attachment 0003 - FAR 15
52.247-3402-01-2006F.O.B. DESTINATION (JAN 1991)
52.247-4802-01-1999F.O.B. DESTINATION--EVIDENCE OF SHIPMENT
252.232-700601-01-2023WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)BOA Attachment 0003 - FAR 15
252.209-700405-01-2019SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY E GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (MAY 2019)BOA Attachment 0003 - FAR 15
252.225-700102-01-2024BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM--BASIC (FEB 2024)BOA Attachment 0003 - FAR 15
252.225-701204-01-2022PREFERENCE FOR CERTAIN DOMESTIC COMMODITIESBOA Attachment 0003 - FAR 15
252.225-701601-01-2023RESTRICTION ON ACQUISITION OF BALL AND ROLLER BEARINGS (JAN 2023)BOA Attachment 0003 - FAR 15
252.226-700101-01-2023UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS (JAN 2023)BOA Attachment 0003 - FAR 15
252.227-701308-01-2025RIGHTS IN TECHNICAL DATA--OTHER THAN COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (AUG 2025)
252.227-701501-01-2025TECHNICAL DATA--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025)
252.227-701601-01-2023RIGHTS IN BID OR PROPOSAL INFORMATION (JAN 2023)
252.227-702501-01-2025LIMITATIONS ON THE USE OR DISCLOSURE OF GOVERNMENT-FURNISHED INFORMATION MARKED WITH RESTRICTIVE LEGENDS (JAN 2025)
252.227-702704-01-1988DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE
252.227-703003-01-2000TECHNICAL DATA--WITHHOLDING OF PAYMENT
252.227-703701-01-2025VALIDATION OF ASSERTED RESTRICTIONS ON TECHNICAL DATA (JAN 2025)
252.232-700312-01-2018ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTSBOA Attachment 0003 - FAR 15
252.243-700112-01-1991PRICING OF CONTRACT MODIFICATIONSBOA Attachment 0003 - FAR 15
252.243-700212-01-2022REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2022)BOA Attachment 0003 - FAR 15
252.244-700011-01-2023SUBCONTRACTS FOR COMMERCIAL PRODUCTS OR COMMERCIAL SERVICES (NOV 2023)BOA Attachment 0003 - FAR 15
252.247-702310-01-2024TRANSPORTATION OF SUPPLIES BY SEA--BASIC (OCT 2024)BOA Attachment 0003 - FAR 15
252.203-700101-01-2023PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-CONTRACT-RELATED FELONIES (JAN 2023)BOA Attachment 0003 - FAR 15
252.204-700010-01-2016DISCLOSURE OF INFORMATIONBOA Attachment 0003 - FAR 15
252.204-700304-01-1992CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCTBOA Attachment 0003 - FAR 15
252.231-700012-01-1991SUPPLEMENTAL COST PRINCIPLESBOA Attachment 0003 - FAR 15
252.232-701012-01-2006LEVIES ON CONTRACT PAYMENTSBOA Attachment 0003 - FAR 15
252.203-700009-01-2011REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALSBOA Attachment 0003 - FAR 15
252.203-700212-01-2022REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (DEC 2022)BOA Attachment 0003 - FAR 15
252.225-704806-01-2013EXPORT-CONTROLLED ITEMSBOA Attachment 0003 - FAR 15
252.204-701501-01-2023NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT (JAN 2023)BOA Attachment 0003 - FAR 15
252.204-701205-01-2024SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (MAY 2024) (DEVIATION 2024-O0013, REVISION 1)BOA Attachment 0003 - FAR 15
252.222-700601-01-2023RESTRICTIONS ON THE USE OF MANDATORY ARBITRATION AGREEMENTS (JAN 2023)
252.204-701801-01-2023PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)BOA Attachment 0003 - FAR 15
252.204-702011-01-2023NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023)BOA Attachment 0003 - FAR 15
252.225-705601-01-2023PROHIBITION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME (JAN 2023)BOA Attachment 0003 - FAR 15
252.240-799702-01-2026NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (DEVIATION 2026-O0025)(FEB 2026)
252.227-798902-01-2026RIGHTS IN TECHNICAL DATA, COMPUTER SOFTWARE, AND COMPUTER SOFTWARE DOCUMENTATION?OTHER THAN COMMERCIAL PRODUCTS ORCOMMERCIAL SERVICES (DEVIATION 2026-O0036) (FEB 2026)
252.227-799102-01-2026RIGHTS IN BID OR PROPOSAL INFORMATION ((DEVIATION 2026-O0036)

(FEB 2026)

252.227-799502-01-2026DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE (DEVIATION 2026-O0036) (FEB 2026)
252.227-799602-01-2026TECHNICAL DATA-WITHHOLDING OF PAYMENT (DEVIATION 2026-O0036) (FEB 2026)
252.219-799602-01-2026SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEVIATION 2026-O0037)(FEB 2026)

(DEVIATION 2026-O0037)(FEB 2026)

252.240-7997 CD 02-01-2026 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (DEVIATION 2026-O0025)(FEB 2026)

(DEVIATION 2026-O0025)(FEB 2026)

52.203-304-01-1984GRATUITIESBOA Attachment 0003 - FAR 15
52.203-505-01-2014COVENANT AGAINST CONTINGENT FEESBOA Attachment 0003 - FAR 15
52.203-611-01-2021RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)BOA Attachment 0003 - FAR 15
52.203-706-01-2020ANTI-KICKBACK PROCEDURESBOA Attachment 0003 - FAR 15
52.203-805-01-2014CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITYBOA Attachment 0003 - FAR 15
52.203-1005-01-2014PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITYBOA Attachment 0003 - FAR 15
52.203-1206-01-2020LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONSBOA Attachment 0003 - FAR 15
52.209-602-01-2026PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, OR VOLUNTARILY EXCLUDED (FEB 2026)BOA Attachment 0003 - FAR 15
52.211-502-01-2026MATERIAL REQUIREMENTS (FEB 2026)BOA Attachment 0003 - FAR 15
52.211-1504-01-2008DEFENSE PRIORITY AND ALLOCATION REQUIREMENTSBOA Attachment 0003 - FAR 15
52.215-202-01-2026AUDIT AND RECORDS--NEGOTIATION (FEB 2026)
52.215-1411-01-2021INTEGRITY OF UNIT PRICESBOA Attachment 0003 - FAR 15
52.222-102-01-1997NOTICE TO THE GOVERNMENT OF LABOR DISPUTESBOA Attachment 0003 - FAR 15
52.222-2002-01-2026CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND EQUIPMENT (FEB 2026)BOA Attachment 0003 - FAR 15
52.222-3702-01-2026EMPLOYMENT REPORTS ON VETERANS (FEB 2026)BOA Attachment 0003 - FAR 15
52.222-5002-01-2026COMBATING TRAFFICKING IN PERSONS ((FEB 2026)BOA Attachment 0003 - FAR 15
52.227-106-01-2020AUTHORIZATION AND CONSENTBOA Attachment 0003 - FAR 15
52.227-206-01-2020NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENTBOA Attachment 0003 - FAR 15
52.229-302-01-2013FEDERAL, STATE, AND LOCAL TAXESBOA Attachment 0003 - FAR 15
52.232-104-01-1984PAYMENTS
52.232-802-01-2002DISCOUNTS FOR PROMPT PAYMENTBOA Attachment 0003 - FAR 15
52.232-1104-01-1984EXTRASBOA Attachment 0003 - FAR 15
52.232-1705-01-2014INTERESTBOA Attachment 0003 - FAR 15
52.232-23 ALT 104-01-1984ASSIGNMENT OF CLAIMS (MAY 2014) -- ALTERNATE I (APR 1984)
52.232-2501-01-2017PROMPT PAYMENTBOA Attachment 0003 - FAR 15
52.232-3310-01-2018PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENTBOA Attachment 0003 - FAR 15
52.233-102-01-2026DISPUTES (FEB 2026)BOA Attachment 0003 - FAR 15
52.233-302-01-2026PROTEST AFTER AWARD (FEB 2026)BOA Attachment 0003 - FAR 15
52.233-402-01-2026APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (FEB 2026)BOA Attachment 0003 - FAR 15
52.242-1307-01-1995BANKRUPTCYBOA Attachment 0003 - FAR 15
52.243-102-01-2026CHANGES--FIXED PRICEBOA Attachment 0003 - FAR 15
52.244-602-01-2026SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2025) (DEVIATION 2025-O0003)BOA Attachment 0003 - FAR 15
52.247-6301-01-2025PREFERENCE FOR U.S.-FLAG AIR CARRIERS (JAN 2025)BOA Attachment 0003 - FAR 15
52.247-6802-01-2006REPORT OF SHIPMENT (REPSHIP)BOA Attachment 0003 - FAR 15
52.248-106-01-2020VALUE ENGINEERINGBOA Attachment 0003 - FAR 15
52.249-204-01-2012TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE)BOA Attachment 0003 - FAR 15
52.249-804-01-1984DEFAULT (FIXED-PRICE SUPPLY AND SERVICE)BOA Attachment 0003 - FAR 15
52.202-106-01-2020DEFINITIONSBOA Attachment 0003 - FAR 15
52.204-1002-01-2026REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (FEB 2026)BOA Attachment 0003 - FAR 15
52.222-5402-01-2026EMPLOYMENT ELIGIBILITY VERIFICATION (FEB 2026)BOA Attachment 0003 - FAR 15
52.226-805-01-2024ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (MAY 2024)BOA Attachment 0003 - FAR 15
52.222-4012-01-2010NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACTBOA Attachment 0003 - FAR 15
52.219-802-01-2026UTILIZATION OF SMALL BUSINESS CONCERNS (FEB 2026)BOA Attachment 0003 - FAR 15
52.209-902-01-2026UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (FEB 2026)BOA Attachment 0003 - FAR 15
52.204-1302-01-2026SYSTEM FOR AWARD MANAGEMENT-MAINTENANCE (FEB 2026)BOA Attachment 0003 - FAR 15
52.232-3906-01-2013UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONSBOA Attachment 0003 - FAR 15
52.232-4003-01-2023PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS(MAR 2023)BOA Attachment 0003 - FAR 15
52.203-1901-01-2017PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTSBOA Attachment 0003 - FAR 15
52.219-902-01-2026SMALL BUSINESS SUBCONTRACTING PLAN (FEB 2026)
52.240-9102-01-2026SECURITY PROHIBITIONS AND EXCLUSIONS (FEB 2026)BOA Attachment 0003 - FAR 15
52.204-9102-01-2026CONTRACTOR IDENTIFICATION (FEB 2026)BOA Attachment 0003 - FAR 15
52.222-9004-01-2026ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS
52.252-202-01-1998CLAUSES INCORPORATED BY REFERENCE (Feb 1998)BOA Attachment 0003 - FAR 15
52.252-611-01-2020AUTHORIZED DEVIATIONS IN CLAUSES (Nov 2020)BOA Attachment 0003 - FAR 15
52.219-2802-01-2026POSTAWARD SMALL BUSINESS PROGRAM REPRESENTATION (FEB 2026)BOA Attachment 0003 - FAR 15
52.222-3502-01-2026EQUAL OPPORTUNITY FOR VETERANS (FEB 2026)BOA Attachment 0003 - FAR 15
52.222-3602-01-2026EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (FEB 2026)BOA Attachment 0003 - FAR 15
52.204-1912-01-2014INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONSBOA Attachment 0003 - FAR 15
52.222-1902-01-2026CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES (FEB 2026)
52.203-1711-01-2023CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV2023)
52.240-9302-01-2026BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEM (FEB 2026)BOA Attachment 0003 - FAR 15
252.227-702806-01-1995TECHNICAL DATA OR COMPUTER SOFTWARE PREVIOUSLY DELIVERED TO THE GOVERNMENT
252.203-700509-01-2022REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (Sep 2022)BOA Attachment 0003 - FAR 15
252.204-700810-01-2016COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLSBOA Attachment 0003 - FAR 15
252.225-705308-01-2021REPRESENTATION REGARDING PROHIBITION ON USE OF CERTAIN ENERGY SOURCED FROM INSIDE THE RUSSIAN FEDERATION
252.204-700710-01-2025ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)BOA Attachment 0003 - FAR 15
252.204-701705-01-2021PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION
252.225-797308-01-2024PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED AIRCRAFT SYSTEMS--REPRESENTATION (DEVIATION 2024-O0014)
252.239-709804-01-2021PROHIBITION ON CONTRACTING TO MAINTAIN OR ESTABLISH A COMPUTER NETWORK UNLESS SUCH NETWORK IS DESIGNED TO BLOCK ACCESS TO CERTAIN WEBSITES--REPRESENTATION (DEVIATION 2021-O0003)
52.240-9002-01-2026SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS
52.225-1808-01-2018PLACE OF MANUFACTUREBOA Attachment 0003 - FAR 15
52.209-1302-01-2026VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS--CERTIFICATIONBOA Attachment 0003 - FAR 15
252.215-700812-01-2022ONLY ONE OFFER (DEC 2022)BOA Attachment 0003 - FAR 15
252.215-701301-01-2023SUPPLIES AND SERVICES PROVIDED BY NONTRADITIONAL DEFENSE CONTRACTORS (JAN 2023)BOA Attachment 0003 - FAR 15
252.204-701911-01-2023NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTSBOA Attachment 0003 - FAR 15
252.270-700011-01-2024Pilot Program To Incentivize Contracting With Employee-Owned Businesses?Representation (Nov 2024)BOA Attachment 0003 - FAR 15
252.270-700111-01-2024Pilot Program To Incentivize Contracting With Employee-Owned Businesses?Subcontracting Certification (Nov 2024)BOA Attachment 0003 - FAR 15
252.215-799203-01-2026ONLY ONE OFFER (DEVIATION 2026-O0048) (MAR 2026)
52.214-3404-01-1991SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGEBOA Attachment 0003 - FAR 15
52.214-3504-01-1991SUBMISSIONS OF OFFERS IN U.S. CURRENCYBOA Attachment 0003 - FAR 15
52.215-102-01-2026INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (FEB 2026)BOA Attachment 0003 - FAR 15
52.215-1606-01-2003FACILITIES CAPITAL COST OF MONEYBOA Attachment 0003 - FAR 15
52.204-702-01-2026SYSTEM FOR AWARD MANAGEMENT-REGISTRATION (FEB2026)BOA Attachment 0003 - FAR 15
52.233-202-01-2026SERVICE OF PROTEST (FEB2026)BOA Attachment 0003 - FAR 15
52.211-1404-01-2008NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USEBOA Attachment 0003 - FAR 15
52.252-102-01-1998SOLICITATION PROVISIONS INCORPORATED BY REFERENCEBOA Attachment 0003 - FAR 15
52.252-511-01-2020AUTHORIZED DEVIATIONS IN PROVISIONSBOA Attachment 0003 - FAR 15
252.225-700803-01-2013RESTRICTION ON ACQUISITION OF SPECIALTY METALS
252.225-700901-01-2023RESTRICTION ON ACQUISITION OF CERTAIN ARTICLES CONTAINING SPECIALTY METALS (JAN 2023)
252.225-701007-01-2009COMMERCIAL DERIVATIVE MILITARY ARTICLE--SPECIALTY METALS COMPLIANCE CERTIFICATE
252.204-700010-01-2016DISCLOSURE OF INFORMATION
52.217-703-01-1989OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM
52.217-502-01-2026EVALUATION OF OPTIONS (FEB 2026)
252.227-701701-01-2025IDENTIFICATION AND ASSERTION OF USE, RELEASE, OR DISCLOSURE RESTRICTIONS (JAN 2025)
52.246-1504-01-1984CERTIFICATE OF CONFORMANCE

Technical & Quality Requirement

TECHNICAL & QUALITY REQUIREMENTS
TitleInstructions/Narrative
CONFIGURATION MANAGEMENT DOCUMENTATION

The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).

a. The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).

b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.

c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.

d. All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.

e. For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.

(i) for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.

(ii) for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.

(iii) for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.

f. The Government’s acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government’s sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.

g. The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the Administrative Contracting Officer (ACO).

h. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.

OPSEC TRAINING REQUIREMENT
Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at: https://securityawareness.dcsa.mil/opsec/index.htm. Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officer’s Representative (COR), if assigned to the contract, or the Procuring Contracting Officer (PCO).
REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN(a) The contractor is subject to, at a minimum, the provisions of the current TACOM OPSEC Plan, or other approved U.S. Government OPSEC plan, per AR 530-1, Operations Security. This Plan specifies the government’s critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.

(b) The contractor will receive a copy of the Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by TACOM G3/G2 or individual organizations supporting AT/OPSEC Officers.

(c) The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is OPSEC Level I.

Counterintelligence Awareness and Reporting (CIAR); formerly known as Threat Awareness Reporting Program (TARP) Per AR 381-12, all Department of the Army (DA) personnel (Military/Civilian/Contractor) must complete CIAR training within 30 days of assignment or employment to an organization/contract, and then once every 12 months thereafter pursuant to DoDD 5240.06. DA personnel will complete “Counterintelligence Awareness and Reporting for DoD Employees” – CI116.16, located at https://www.cdse.edu/, to satisfy most Army annual training requirements.

In addition, per AR 381-12 Chapter 5, the following individual(s) must receive an in-person CIAR briefing directly from an ACI Special Agent or a CI-experienced person in addition to the annual training requirement:

• DA personnel scheduled to travel (official, unofficial, permanent change of station) to or through countries with a high foreign intelligence or terrorist threat level as identified by Defense Intelligence Agency or the Department of State, will receive a special CIAR briefing prior to the travel and will be debriefed upon return. AR 381–12 • 13 June 2025 11

• DA personnel who have security clearances travelling to foreign locations in any duty status must fulfill pre-and-post travel security briefing and debriefing requirements in accordance with the DoD Foreign Clearance Guide and DoDD 4500.54E.

• DA personnel deploying in support of military exercises or contingency operations will receive a special CIAR briefing prior to departure.

• DA personnel taking part in bilateral or multilateral engagements with foreign governments or international organizations will receive a CIAR briefing prior to the event.

• Foreign visitors, personnel, and personal connections. Commanders will coordinate with unit security managers to identify personnel potentially vulnerable to FIE exploitation and ensure they are referred to ACI to receive specialized CIAR briefing.

• Such personnel will receive foreign intelligence threat briefings prior to foreign travel or event.

• Personnel with access to Sensitive Compartmented Information and Special Access Programs.

• Personnel assigned to or supporting defense critical infrastructure or associated assets, pursuant to DoDD 3020.40 and DoDI 5240.19, will receive an in-person special CIAR briefing on an annual basis. Such personnel will notify their local ACI office of all projected foreign travel or foreign visits.

• Foreign government employment. Current and retired DA personnel seeking employment with foreign government entities will have CIAR training and support made available.

• Information technology professionals System administrators, privileged users, and those with privileged access that provides an individual capability to alter the properties, behavior, or control of a DoD information system will receive in-person special CIAR briefings on an annual basis.

• Professional and educational exchange programs with foreign governments.

These briefings will be tailored to the particular risk or threat involved, including methods the person may use to minimize the risk, and will place special emphasis on reporting responsibilities. Debriefings will be conducted as soon as feasible following completion of travel, duty, or visit to a foreign country, or attendance at a conference with foreign personnel by an ACI Special Agent. Failure to receive training does not relieve individuals from their reporting responsibilities in chapter 4 of this regulation.

PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS) (a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.

(1) LEVEL OF PRESERVATION: Military

(2) LEVEL OF PACKING: B

(3) QUANTITY PER UNIT PACKAGE: 1

(4) SPECIAL PACKAGING INSTRUCTION NUMBER. AK01505895

(a) REVISION K

(b) DATE OF REVISION 29 SEP

(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL: WWW.SAM.GOV

(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobe’s website (http://get.adobe.com/reader/) for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the "Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")

(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

(c) Marking:

(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and as applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.

(2) When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at: https://www.acq.osd.mil/dpap/pdi/uid/guides.html) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.

(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):

(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), “Regulation of Wood Packaging Material in International Trade,” current edition, (hereinafter “ISPM 15”), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organization’s compliance program.

(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.

(3) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The ALS approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Foreign manufacturers shall comply with ISPM -15 and shall have the marking of WPM verified in accordance with their National Plant Protection Organization’s compliance program.

(e) Hazardous Materials (As applicable):

(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:

- International Air Transport Association (IATA) Dangerous Goods Regulations

- International Maritime Dangerous Goods Code (IMDG)

- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).

(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.

(g) SUPPLEMENTAL INSTRUCTIONS: -7- USE OF MIL-STD 1916 (a) The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of Product. The Verification Level (VL) shall be VL -1- for major characteristics and VL -2- for minor characteristics.

(b) MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.

INSPECTION AND ACCEPTANCE POINTS: ORIGIN The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN. Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT: __________________________________________

(Name) (CAGE)

(Address) (City) (State) (Zip)

ACCEPTANCE POINT: __________________________________________

(Name) (CAGE)

(Address) (City) (State) (Zip)

File details come from the government source that posted it. Updated .