BOAST RFOP_Final - 25R0081.xlsx
XLSX spreadsheet 60 KB Posted
- Solicitation number
- PANDTA-24-P-0000_010274
- Issued by
-
Department of the Army
About this file
This is a Request for Order Proposal (RFOP) issued by the U.S. Army Contracting Command - Detroit Arsenal (ACC-DTA) under the Basic Ordering Agreement Sustainment Track (BOAST) program. The solicitation seeks proposals for Cable Assembly, Spec (NSN 6150-01-578-0469, Part Number 12992565) with a production quantity of 20 units and an unexercised option quantity of 20 units. This is a Full and Open competitive action conducted under FAR Part 15, with award contingent on vendors maintaining a fully executed BOAST BOA prior to the closing date of July 13, 2026 at 4:00 PM. The resulting order will be a firm-fixed-price contract using Lowest Price, Technically Acceptable (LPTA) evaluation criteria. Proposals must be submitted electronically in two volumes: Volume I (Technical) demonstrating compliance with the Statement of Work and Technical Data Package requirements, and Volume II (Price) with a completed pricing sheet. Questions must be submitted by June 26, 2026 at 4:00 PM.
The cable assembly is classified as non-commercial under NAICS 335999 with a small business size standard of 600 employees and no set-aside restrictions. The specification requires acquisition of qualified products from DRS Technologies (Drawing 12992632 for Release Flange Connector and Drawing 12992633 for Tool Release Flange) and compliance with SPEC 01417-SC-SA15110 and drawing specifications for testing standards. The contract includes a First Article Test (FAT) requirement with 1 separately priced unit to be delivered within 390 calendar days from award, with up to 30 days allowed for Government FAT evaluation. Production units must be delivered within 360 calendar days from written FAT approval. The item is export-controlled and requires vendors to obtain DD Form 2345 certification from the Joint Certification Program. Delivery is FOB Destination to DLA Distribution Anniston, Alabama, with inspection and acceptance at origin and FATR acceptance at destination. Payment terms are Net 30 days from receipt of invoice and acceptance of goods. The contract is subject to Buy American and Balance of Payments Program requirements (DFARS 252.225-7001) and includes extensive compliance requirements related to OPSEC training, counterintelligence awareness, configuration management, and technical data protection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BOAST RFOP_Final - 25R0081.xlsx | XLSX spreadsheet | |
| BOAST RFOP_Final - 25R0081.xlsx | XLSX spreadsheet | |
| Q and A Cable Assembly.docx | DOCX document | |
| BOAST RFOP_Final - 25R0081.xlsx | XLSX spreadsheet | |
| BOAST RFOP_Final - 25R0081.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFOP
BASIC ORDERING AGREEMENT SUSTAINMENT TRACK (BOAST): Request for Order Proposal (RFOP)
NOTICE ID: PANDTA-24-P-0000 010274 DATE ISSUED: 11-Jun-2026 RESPONSE DUE: 13 JULY 2026 - 4:00 pm
| ISSUE BY: | U.S. Army Contracting Command - Detroit Arsenal (ACC-DTA) | CONTRACTOR: |
| ATTN: | BOAST@army.mil | UIE / CAGE: |
| Christina Herbig, Contract Specialist, christina.a.herbig.civ@army.mil | ADDRESS: | |
| Dan Gibson, Contracting Officer, daniel.j.gibson43.civ@army.mil | POC NAME: | |
| POC EMAIL: | ||
| POC PHONE: | ||
| BOA NUMBER: |
GENERAL INFORMATION I. This Request for Order Proposal (RFOP) is a competitive action to solicit proposals for the supplies/services detailed below. While all responsible sources may submit a proposal, award is contingent upon the mandatory eligibility requirements detailed below. The resulting order will be a firm-fixed-price contract placed under the BOAST program.
II. Information regarding the program's continuous on-ramp process can be found in the standing BOAST program notice on SAM.gov under ID W912CH-26-R-0001. Vendors are encouraged to proactively establish a BOA to ensure eligibility for future requirements.
III. All questions regarding this RFOP must be submitted in writing to the Point of Contact no later than 26 June 2026 4:00 pm..
| REQUIREMENT DETAILS | Supply / Service: | CABLE ASSEMBLY, SPEC |
| NSN / Description: | 6150-01-578-0469 | |
| TDP / DWG No . | 12992565 / 19200 | |
| Commerciality: | Non-Commercial | |
| NAICS: | 335999 (All Other Miscellaneous Electrical Equipment and Component Manufacturing). | |
| Size Standard: | 600 employees | |
| Set-Aside Status: | Full and Open | |
| Small Business Subcontracting Plan: | Not Required unless awarded to a Large Business | |
| Order Rating: | DO | |
| Packaging Level: | Military B | |
| Ship-To Location: | SR W0LX ARMY GENERAL SUPPLY DLA DISTRIBUTION ANNISTON |
7 FRANKFORD AVE 362
ANNISTON,AL,36201-4199
| Inspect / Accept: | Origin |
| FOB: | Destination |
| Delivery Schedule: | Schedule with First Article Test (FAT) Requirement: |
The First Article Test (FAT) unit(s) specified in Line Item 0003 shall be delivered within 390 calendar days ARO. Alternative schedules for the FAT unit(s) will not be considered. The Government requires up to 30 days for FAT evaluation and written approval/disapproval.
All remaining production units shall be delivered within 360 calendar days from the date of written FAT approval. Alternate delivery schedules for the production units will be considered for this order. See Evaluation for Award Below.
Any acceleration in First Article Test Approval will be subtracted from the delivery schedule of the production units.
| PRICING SHEET | |||||||||||
| Line Item | Description | Noun | NSN | Part No. | PRON / 1095 | Quantity | Unit of Measure | Del Sch / Rate | Unit Price | Total Price | Notes |
| 0001 | Production Quanity | CABLE ASSEMBLY, SPEC | 6150-01-578-0469 | 12992565 | EH4L0361EH | 20 | EA | 0 | |||
| 0002 | Unexercised Option Quantity | CABLE ASSEMBLY, SPEC | 6150-01-578-0469 | 12992565 | TBD | 20 | EA | 0 | |||
| 0003 | FIRST ARTICLE TEST REPORT (FATR)-SEPERATLY PRICED | CABLE ASSEMBLY, SPEC | 6150-01-578-0469 | 12992565 | TBD | 1 | LO | 0 | |||
| A001 | Data Requirement | Engineering Change Proposal (ECP) | See Technical & Quality Requirement - Configuration Management | $ - 0 | 0 | Not separately priced | |||||
| A002 | Data Requirement | Requests For Variance (RFV) | See Technical & Quality Requirement - Configuration Management | $ - 0 | 0 | Not separately priced | |||||
| A003 | Data Requirement | Notice Of Revision (NOR) | See Technical & Quality Requirement - Configuration Management | $ - 0 | 0 | Not separately priced | |||||
| Order Total | $ - 0 |
PROPOSAL SUBMISSION INSTRUCTIONS Proposal Content: Proposals shall be submitted in two separate volumes:
Volume I - Technical: The Technical Proposal shall provide a clear and concise statement of compliance, affirmatively stating that the offeror understands and will comply with all requirements of the Statement of Work (SOW) and/or Technical Data Package (TDP). See 'LPTA Factors & Ratings' .
Volume II - Price: The Price Proposal shall consist of a completed and signed Price Schedule from this RFOP. See Pricing Sheet section above and 'LPTA Factors & Ratings'.
The Government intends to evaluate proposals and award an order without negotiations.
| Submission Method: | Proposals must be submitted electronically via email to the Point of Contact by the Response Due Date. The subject line must read: "Proposal for RFOP-PANDTA-24-P-0000 010274 - [Your Company Name]". Late proposals will not be evaluated. |
| Period of Acceptance | Proposals shall remain firm for at least 90 calendar days from the closing date of this RFOP. |
| Mandatory Eligibility Requirement For Award: | To be considered eligible for award, a vendor must have a fully executed BOAST Basic Ordering Agreement in place prior to the closing date and time specified in this RFOP. Proposals received from vendors who do not have an executed BOA by the closing time will be considered ineligible and will not be evaluated. |
| EVALUATION FOR AWARD | Lowest Price, Technically Acceptable (LPTA) | This is a competitive action conducted under the procedures of FAR Part 15. The Contracting Office is using a streamlined Request for Proposal format for this acquisition. The Government intends to award a Firm-Fixed-Price Order to the responsible BOA holder whose proposal is determined to be the Lowest-Priced, Technically Acceptable (LPTA). | |
| Technical Acceptability (Pass/Fail): | All proposals will first be evaluated for technical acceptability. To be rated "Acceptable," a proposal must clearly demonstrate compliance with all minimum requirements of the SOW/TDP. Proposals that do not meet the minimum requirements will be rated "Unacceptable" and will not be considered for award. See Pricing Sheet section above and 'LPTA Factors & Ratings'. | ||
| Price: | The price for all technically acceptable proposals will be evaluated for reasonableness. Award will be made to the offeror with the lowest evaluated price among the technically acceptable proposals. See Pricing Sheet section above and 'LPTA Factors & Ratings'. | ||
| In accordance with FAR Subpart 9.1, the Government will make a determination of contractor responsibility for the apparent successful awardee prior to placing the order. |
| REGULATORY COMPLIANCE | BOA Attachment Reference: | FAR Part 15_Contracting by Negotiation | ||
| Applicable Clauses: | See 'Applicable Clauses-Provisions' sheet. | |||
| Payment Terms: | Net 30 days from receipt of invoice and acceptance of goods. | |||
| Buy American / Trade Agreements: | ||||
| (Select One) | Buy American and Balance of Payments Program | |||
| (DFARS 252.225-7001) | X |
NAME: DATE:
mailto:BOAST@army.mil LPTA Factors & Ratings
| Lowest Price, Technically Acceptable (LPTA) - EVALUATION CRITERIA |
| SECTION 1: ADJECTIVAL RATING AND RISK DEFINITIONS |
(This section provides the standard definitions that will be used by the evaluation team.)
| Rating | Description | Risk |
| Outstanding | Proposal indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. | Very Low |
| Good | Proposal indicates a thorough approach and understanding of the requirements. Strengths outweigh any weaknesses. | Low |
| Acceptable | Proposal indicates an adequate approach and understanding of the requirements. It meets requirements, and strengths and weaknesses are offsetting or do not significantly impact contract performance. | Moderate |
| Marginal | Proposal has not demonstrated an adequate approach and understanding of the requirements. Weaknesses outweigh any strengths, which increases the risk of unsuccessful performance. | High |
| Unacceptable | Proposal fails to meet requirements and contains one or more deficiencies. It is unawardable. | Unacceptable |
| SECTION 2: DETAILED EVALUATION FACTORS |
Relative Importance of Factors All non-price factors, when combined, are significantly more important than price. Among the non-price factors, Factor 1 is more important than Factor 2.
Volume I Factor 1: Technical - Complete Technical Information Questionnaire (TIQ) 1. Technical Factor Criteria
1.1. The offeror shall submit a completed Technical Information Questionnaire (TIQ) below.
1.2. Substantiating Documentation. The offeror shall provide product information that substantiates every response to all questions in the TIQ with documents containing the respective required evidence outlined in the TIQ (e.g. commercial literature, manufacturer specification sheets, quotes, invoices, letters of commitment). The offeror shall clearly identify to which TIQ question the substantiating documentation provided pertains. The substantiating documentation submitted by the offeror shall be sufficient for the Government to conclude that each proposal meets all of the requirements in accordance with the TIQ listed below. Unsubstantiated claims may make the offeror ineligible for award.
1.3. Exceeding Technical Requirements. The offeror will not be awarded extra credit for exceeding the technical requirements outlined in the technical specification of this RFOP.
| CRITERIA | REQUIRED EVIDENCE | REQUIREMENT MET? YES / NO | |||
| 1. Are you able to acquire the Qualified Product Release Flange, Connector on Drawing 12992632 from DRS Technologies (24290) to be used as part of fabrication of the final assembly? | Documentation confirming use of Qualified Product (e.g. current quote/ previous invoice from qualified supplier, letter of commitment) | ||||
| 2. Are you able to acquire the Qualified Product Tool, Release Flange on Drawing 12992633 from DRS Technologies (24290) to be used as part of fabrication of the final assembly? | Documentation confirming use of Qualified Product (e.g. current quote/ previous invoice from qualified supplier, letter of commitment) | ||||
| 3. Is your facility able to meet the testing standards noted on Drawing DR_12992565_19200_B_001_001 in reference to points 10 and 11? | Documentation confirming use of Qualified Product (e.g. current quote/ previous invoice from qualified supplier, letter of commitment) | ||||
| 4. Are you able to meet all specifications of SPEC 01417-SC-SA15110? | Documentation confirming use of Qualified Product (e.g. current quote/ previous invoice from qualified supplier, letter of commitment) | ||||
| 5. Have you successfully produced any similar part? Please provide evidence? | Documentation confirming use of Qualified Product (e.g. current quote/ previous invoice from qualified supplier, letter of commitment) | ||||
| Volume II | Factor 2 : | Price - Complete Pricing Sheet | 2. Pricing Factor Criteria |
2.1. The offeror shall provide its completed 'Pricing Sheet' contained within this RFOP excel file in accordance with the instructions included within this RFOP.
2.2. Total Evaluated Price: The Price Factor evaluation will result in a determination of the Total Evaluated Price. The Total Evaluated Price equals the sum of (a) the proposed prices for all CLINs, as calculated in the Pricing Sheet; (b) if applicable, any other price adjustments, for evaluation purposes only, that are required in accordance with the FAR, DFARS, or clauses or provisions contained within this solicitation.
2.3. Price Reasonableness: A price is reasonable if, in its nature and amount, it does not exceed that which would be incurred by a prudent person in the conduct of competitive business. The Government may make a determination of price reasonableness by any means allowable under FAR 15.404-1.
2.4. Unbalanced Pricing: Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items or ranges is significantly over- or understated as indicated by the application of cost and price analysis techniques. Offerors are cautioned that a proposal the Government assesses to be unbalanced as to price, may either be rejected or determined unacceptable for award. See FAR 15.404-1(g) for more information on unbalanced pricing.
3. First Article Test Waiver
3.1. As specified in this RFOP, the Government reserves the right to waive the requirement entitled FIRST ARTICLE APPROVAL (52.209-3 or 52.209-4), and subtract the price of the proposed First Article Test (Line Item 0003) from the proposal of offerors who elect to seek such a waiver. In the event that the offeror requests and receives a waiver of First Article Approval requirements, the price for such testing, as identified by the offeror in Line Item 0003, shall be deducted from the total price otherwise cited for the materiel herein solicited. The offer will then be evaluated for award at the resulting alternate price.
3.2. If the offeror requests a waiver of First Article Approval requirements, but fails to separately identify the cost of First Article Testing in Line Item 0003 of this RFOP, the Government reserves the right to evaluate the offer based upon the price for 0001 and 0002 and to require that offeror perform on the contract at such price whether or not the First Article requirement is waived, at no additional cost to the Government.
3.3. If the offeror requests but is not granted a waiver of First Article Approval, evaluation for award will be based upon the full amount entered for 0001-0003: the amount entered for item 0003 will not be deducted by the Government.
Applicable Clauses-Provisions
| Applicable Clauses/Provisions | ||||
| Reference | Date | Title | BOA Reference | Remarks |
| 52.246-2 | 8/1/96 | INSPECTION OF SUPPLIES--FIXED-PRICE | BOA Attachment 0003 - FAR 15 | |
| 52.246-16 | 4/1/84 | RESPONSIBILITY FOR SUPPLIES | BOA Attachment 0003 - FAR 15 | |
| 252.211-7008 | 9/1/10 | USE OF GOVERNMENT-ASSIGNED SERIAL NUMBERS | ||
| 252.211-7003 | 1/1/23 | ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) | BOA Attachment 0003 - FAR 15 | Not applicable to CLINs 0001 & 0002. |
| 52.242-15 | 8/1/89 | STOP-WORK ORDER | BOA Attachment 0003 - FAR 15 | |
| 52.242-17 | 4/1/84 | GOVERNMENT DELAY OF WORK | BOA Attachment 0003 - FAR 15 | |
| 52.247-34 | 2/1/06 | F.O.B. DESTINATION (JAN 1991) | ||
| 52.247-48 | 2/1/99 | F.O.B. DESTINATION--EVIDENCE OF SHIPMENT | ||
| 252.232-7006 | 1/1/23 | WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.209-7004 | 5/1/19 | SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY E GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (MAY 2019) | BOA Attachment 0003 - FAR 15 | |
| 252.225-7001 | 2/1/24 | BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM--BASIC (FEB 2024) | BOA Attachment 0003 - FAR 15 | |
| 252.225-7012 | 4/1/22 | PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES | BOA Attachment 0003 - FAR 15 | |
| 252.225-7016 | 1/1/23 | RESTRICTION ON ACQUISITION OF BALL AND ROLLER BEARINGS (JAN 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.226-7001 | 1/1/23 | UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS (JAN 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.227-7013 | 8/1/25 | RIGHTS IN TECHNICAL DATA--OTHER THAN COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (AUG 2025) | ||
| 252.227-7015 | 1/1/25 | TECHNICAL DATA--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025) | ||
| 252.227-7016 | 1/1/23 | RIGHTS IN BID OR PROPOSAL INFORMATION (JAN 2023) | ||
| 252.227-7025 | 1/1/25 | LIMITATIONS ON THE USE OR DISCLOSURE OF GOVERNMENT-FURNISHED INFORMATION MARKED WITH RESTRICTIVE LEGENDS (JAN 2025) | ||
| 252.227-7027 | 4/1/88 | DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE | ||
| 252.227-7030 | 3/1/00 | TECHNICAL DATA--WITHHOLDING OF PAYMENT | ||
| 252.227-7037 | 1/1/25 | VALIDATION OF ASSERTED RESTRICTIONS ON TECHNICAL DATA (JAN 2025) | ||
| 252.232-7003 | 12/1/18 | ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS | BOA Attachment 0003 - FAR 15 | |
| 252.243-7001 | 12/1/91 | PRICING OF CONTRACT MODIFICATIONS | BOA Attachment 0003 - FAR 15 | |
| 252.243-7002 | 12/1/22 | REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2022) | BOA Attachment 0003 - FAR 15 | |
| 252.244-7000 | 11/1/23 | SUBCONTRACTS FOR COMMERCIAL PRODUCTS OR COMMERCIAL SERVICES (NOV 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.247-7023 | 10/1/24 | TRANSPORTATION OF SUPPLIES BY SEA--BASIC (OCT 2024) | BOA Attachment 0003 - FAR 15 | |
| 252.203-7001 | 1/1/23 | PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-CONTRACT-RELATED FELONIES (JAN 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.204-7000 | 10/1/16 | DISCLOSURE OF INFORMATION | BOA Attachment 0003 - FAR 15 | |
| 252.204-7003 | 4/1/92 | CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT | BOA Attachment 0003 - FAR 15 | |
| 252.231-7000 | 12/1/91 | SUPPLEMENTAL COST PRINCIPLES | BOA Attachment 0003 - FAR 15 | |
| 252.232-7010 | 12/1/06 | LEVIES ON CONTRACT PAYMENTS | BOA Attachment 0003 - FAR 15 | |
| 252.203-7000 | 9/1/11 | REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS | BOA Attachment 0003 - FAR 15 | |
| 252.203-7002 | 12/1/22 | REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (DEC 2022) | BOA Attachment 0003 - FAR 15 | |
| 252.225-7048 | 6/1/13 | EXPORT-CONTROLLED ITEMS | BOA Attachment 0003 - FAR 15 | |
| 252.204-7015 | 1/1/23 | NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT (JAN 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.204-7012 | 5/1/24 | SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (MAY 2024) (DEVIATION 2024-O0013, REVISION 1) | BOA Attachment 0003 - FAR 15 | |
| 252.222-7006 | 1/1/23 | RESTRICTIONS ON THE USE OF MANDATORY ARBITRATION AGREEMENTS (JAN 2023) | ||
| 252.204-7018 | 1/1/23 | PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.204-7020 | 11/1/23 | NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.225-7056 | 1/1/23 | PROHIBITION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME (JAN 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.240-7997 | 2/1/26 | NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (DEVIATION 2026-O0025)(FEB 2026) | ||
| 252.227-7989 | 2/1/26 | RIGHTS IN TECHNICAL DATA, COMPUTER SOFTWARE, AND COMPUTER SOFTWARE DOCUMENTATION?OTHER THAN COMMERCIAL PRODUCTS ORCOMMERCIAL SERVICES (DEVIATION 2026-O0036) (FEB 2026) | ||
| 252.227-7991 | 2/1/26 | RIGHTS IN BID OR PROPOSAL INFORMATION ((DEVIATION 2026-O0036) (FEB 2026) | ||
| 252.227-7995 | 2/1/26 | DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE (DEVIATION 2026-O0036) (FEB 2026) | ||
| 252.227-7996 | 2/1/26 | TECHNICAL DATA-WITHHOLDING OF PAYMENT (DEVIATION 2026-O0036) (FEB 2026) | ||
| 252.219-7996 | 2/1/26 | SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEVIATION 2026-O0037)(FEB 2026) | ||
| 252.240-7997 CD | 2/1/26 | NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (DEVIATION 2026-O0025)(FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.203-3 | 4/1/84 | GRATUITIES | BOA Attachment 0003 - FAR 15 | |
| 52.203-5 | 5/1/14 | COVENANT AGAINST CONTINGENT FEES | BOA Attachment 0003 - FAR 15 | |
| 52.203-6 | 11/1/21 | RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020) | BOA Attachment 0003 - FAR 15 | |
| 52.203-7 | 6/1/20 | ANTI-KICKBACK PROCEDURES | BOA Attachment 0003 - FAR 15 | |
| 52.203-8 | 5/1/14 | CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY | BOA Attachment 0003 - FAR 15 | |
| 52.203-10 | 5/1/14 | PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY | BOA Attachment 0003 - FAR 15 | |
| 52.203-12 | 6/1/20 | LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS | BOA Attachment 0003 - FAR 15 | |
| 52.209-6 | 2/1/26 | PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, OR VOLUNTARILY EXCLUDED (FEB 2026) | ||
| 52.211-5 | 2/1/26 | MATERIAL REQUIREMENTS (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.211-15 | 4/1/08 | DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS | BOA Attachment 0003 - FAR 15 | |
| 52.215-2 | 2/1/26 | AUDIT AND RECORDS--NEGOTIATION (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.215-14 | 11/1/21 | INTEGRITY OF UNIT PRICES | BOA Attachment 0003 - FAR 15 | |
| 52.222-1 | 2/1/97 | NOTICE TO THE GOVERNMENT OF LABOR DISPUTES | BOA Attachment 0003 - FAR 15 | |
| 52.222-20 | 2/1/26 | CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND EQUIPMENT (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.222-37 | 2/1/26 | EMPLOYMENT REPORTS ON VETERANS (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.222-50 | 2/1/26 | COMBATING TRAFFICKING IN PERSONS ((FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.227-1 | 6/1/20 | AUTHORIZATION AND CONSENT | ||
| 52.227-2 | 6/1/20 | NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT | BOA Attachment 0003 - FAR 15 | |
| 52.229-3 | 2/1/13 | FEDERAL, STATE, AND LOCAL TAXES | BOA Attachment 0003 - FAR 15 | |
| 52.232-1 | 4/1/84 | PAYMENTS | BOA Attachment 0003 - FAR 15 | |
| 52.232-8 | 2/1/02 | DISCOUNTS FOR PROMPT PAYMENT | ||
| 52.232-11 | 4/1/84 | EXTRAS | BOA Attachment 0003 - FAR 15 | |
| 52.232-17 | 5/1/14 | INTEREST | BOA Attachment 0003 - FAR 15 | |
| 52.232-23 ALT 1 | 4/1/84 | ASSIGNMENT OF CLAIMS (MAY 2014) -- ALTERNATE I (APR 1984) | BOA Attachment 0003 - FAR 15 | |
| 52.232-25 | 1/1/17 | PROMPT PAYMENT | BOA Attachment 0003 - FAR 15 | |
| 52.232-33 | 10/1/18 | PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT | BOA Attachment 0003 - FAR 15 | |
| 52.233-1 | 2/1/26 | DISPUTES (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.233-3 | 2/1/26 | PROTEST AFTER AWARD (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.233-4 | 2/1/26 | APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.242-13 | 7/1/95 | BANKRUPTCY | BOA Attachment 0003 - FAR 15 | |
| 52.243-1 | 2/1/26 | CHANGES--FIXED PRICE | BOA Attachment 0003 - FAR 15 | |
| 52.244-6 | 2/1/26 | SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2025) (DEVIATION 2025-O0003) | BOA Attachment 0003 - FAR 15 | |
| 52.247-63 | 1/1/25 | PREFERENCE FOR U.S.-FLAG AIR CARRIERS (JAN 2025) | BOA Attachment 0003 - FAR 15 | |
| 52.247-68 | 2/1/06 | REPORT OF SHIPMENT (REPSHIP) | BOA Attachment 0003 - FAR 15 | |
| 52.248-1 | 6/1/20 | VALUE ENGINEERING | BOA Attachment 0003 - FAR 15 | |
| 52.249-2 | 4/1/12 | TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) | BOA Attachment 0003 - FAR 15 | |
| 52.249-8 | 4/1/84 | DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) | BOA Attachment 0003 - FAR 15 | |
| 52.202-1 | 6/1/20 | DEFINITIONS | BOA Attachment 0003 - FAR 15 | |
| 52.204-10 | 2/1/26 | REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.222-54 | 2/1/26 | EMPLOYMENT ELIGIBILITY VERIFICATION (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.226-8 | 5/1/24 | ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (MAY 2024) | BOA Attachment 0003 - FAR 15 | |
| 52.222-40 | 12/1/10 | NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT | BOA Attachment 0003 - FAR 15 | |
| 52.219-8 | 2/1/26 | UTILIZATION OF SMALL BUSINESS CONCERNS (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.209-9 | 2/1/26 | UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.204-13 | 2/1/26 | SYSTEM FOR AWARD MANAGEMENT-MAINTENANCE (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.232-39 | 6/1/13 | UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS | ||
| 52.232-40 | 3/1/23 | PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS(MAR 2023) | BOA Attachment 0003 - FAR 15 | |
| 52.203-19 | 1/1/17 | PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS | BOA Attachment 0003 - FAR 15 | |
| 52.219-9 | 2/1/26 | SMALL BUSINESS SUBCONTRACTING PLAN (FEB 2026) | ||
| 52.240-91 | 2/1/26 | SECURITY PROHIBITIONS AND EXCLUSIONS (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.204-91 | 2/1/26 | CONTRACTOR IDENTIFICATION (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.222-90 | 4/1/26 | ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS | BOA Attachment 0003 - FAR 15 | |
| 52.252-2 | 2/1/98 | CLAUSES INCORPORATED BY REFERENCE (Feb 1998) | BOA Attachment 0003 - FAR 15 | |
| 52.252-6 | 11/1/20 | AUTHORIZED DEVIATIONS IN CLAUSES (Nov 2020) | BOA Attachment 0003 - FAR 15 | |
| 52.219-28 | 2/1/26 | POSTAWARD SMALL BUSINESS PROGRAM REPRESENTATION (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.222-35 | 2/1/26 | EQUAL OPPORTUNITY FOR VETERANS (FEB 2026) | ||
| 52.222-36 | 2/1/26 | EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (FEB 2026) | ||
| 52.204-19 | 12/1/14 | INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS | BOA Attachment 0003 - FAR 15 | |
| 52.222-19 | 2/1/26 | CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES (FEB 2026) | ||
| 52.203-17 | 11/1/23 | CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV2023) | BOA Attachment 0003 - FAR 15 | |
| 52.240-93 | 2/1/26 | BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEM (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 252.227-7028 | 6/1/95 | TECHNICAL DATA OR COMPUTER SOFTWARE PREVIOUSLY DELIVERED TO THE GOVERNMENT | ||
| 252.203-7005 | 9/1/22 | REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (Sep 2022) | BOA Attachment 0003 - FAR 15 | |
| 252.204-7008 | 10/1/16 | COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS | ||
| 252.225-7053 | 8/1/21 | REPRESENTATION REGARDING PROHIBITION ON USE OF CERTAIN ENERGY SOURCED FROM INSIDE THE RUSSIAN FEDERATION | ||
| 252.204-7007 | 10/1/25 | ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025) | ||
| 252.204-7017 | 5/1/21 | PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION | ||
| 252.225-7973 | 8/1/24 | PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED AIRCRAFT SYSTEMS--REPRESENTATION (DEVIATION 2024-O0014) | BOA Attachment 0003 - FAR 15 | |
| 252.239-7098 | 4/1/21 | PROHIBITION ON CONTRACTING TO MAINTAIN OR ESTABLISH A COMPUTER NETWORK UNLESS SUCH NETWORK IS DESIGNED TO BLOCK ACCESS TO CERTAIN WEBSITES--REPRESENTATION (DEVIATION 2021-O0003) | BOA Attachment 0003 - FAR 15 | |
| 52.240-90 | 2/1/26 | SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS | BOA Attachment 0003 - FAR 15 | |
| 52.225-18 | 8/1/18 | PLACE OF MANUFACTURE | BOA Attachment 0003 - FAR 15 | |
| 52.209-13 | 2/1/26 | VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS--CERTIFICATION | BOA Attachment 0003 - FAR 15 | |
| 252.215-7008 | 12/1/22 | ONLY ONE OFFER (DEC 2022) | BOA Attachment 0003 - FAR 15 | |
| 252.215-7013 | 1/1/23 | SUPPLIES AND SERVICES PROVIDED BY NONTRADITIONAL DEFENSE CONTRACTORS (JAN 2023) | BOA Attachment 0003 - FAR 15 | |
| 252.204-7019 | 11/1/23 | NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS | ||
| 252.270-7000 | 11/1/24 | Pilot Program To Incentivize Contracting With Employee-Owned Businesses?Representation (Nov 2024) | BOA Attachment 0003 - FAR 15 | |
| 252.270-7001 | 11/1/24 | Pilot Program To Incentivize Contracting With Employee-Owned Businesses?Subcontracting Certification (Nov 2024) | BOA Attachment 0003 - FAR 15 | |
| 252.215-7992 | 3/1/26 | ONLY ONE OFFER (DEVIATION 2026-O0048) (MAR 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.214-34 | 4/1/91 | SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE | BOA Attachment 0003 - FAR 15 | |
| 52.214-35 | 4/1/91 | SUBMISSIONS OF OFFERS IN U.S. CURRENCY | BOA Attachment 0003 - FAR 15 | |
| 52.215-1 | 2/1/26 | INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (FEB 2026) | BOA Attachment 0003 - FAR 15 | |
| 52.215-16 | 6/1/03 | FACILITIES CAPITAL COST OF MONEY | BOA Attachment 0003 - FAR 15 | |
| 52.204-7 | 2/1/26 | SYSTEM FOR AWARD MANAGEMENT-REGISTRATION (FEB2026) | BOA Attachment 0003 - FAR 15 | |
| 52.233-2 | 2/1/26 | SERVICE OF PROTEST (FEB2026) | BOA Attachment 0003 - FAR 15 | |
| 52.211-14 | 4/1/08 | NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE | ||
| 52.252-1 | 2/1/98 | SOLICITATION PROVISIONS INCORPORATED BY REFERENCE | ||
| 52.252-5 | 11/1/20 | AUTHORIZED DEVIATIONS IN PROVISIONS | ||
| 52.227-3 | 4/1/84 | PATENT INDEMNITY | ||
| 252.227-7017 | 1/1/25 | IDENTIFICATION AND ASSERTION OF USE, RELEASE, OR DISCLOSURE RESTRICTIONS (JAN 2025) | ||
| 52.209-1 | 2/1/26 | QUALIFICATION REQUIREMENTS (FEB 2026) | ||
| 52.209-3 ALT 1 and 2 | 9/1/89 | FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING (SEP 1989) -- ALTERNATE I (JAN 1997) AND ALTERNATE II (SEP 1989) | The Contractor shall test 5 unit(s) of Lot/Item 0001 as specified in this contract. At least 30 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests. The Contractor shall submit the first article test report within 390 calendar days from the date of this contract award to ACO (TBD). | |
| 52.217-7 | 3/1/89 | OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM | ||
| 52.217-5 | 2/1/26 | EVALUATION OF OPTIONS (FEB 2026) | ||
| 52.215-1 | 2/1/26 | INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (FEB 2026) |
Technical & Quality Requirement
| TECHNICAL & QUALITY REQUIREMENTS | |
| Title | Instructions/Narrative |
| DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE | 1. This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provision of DoD Directive 5230.25 and DoD Instruction 2040.02. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level. |
2. To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, Militarily Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at: http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at eight (8) to twelve (12) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's Section C Technical Data Package instructions.
3. Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
4. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
DRAWING LIMITATIONS 1. The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are adequate to permit manufacture, and:
1.1 depict the completed (item(s), and
1.2 serve as the basis for inspection of the completed item(s).
2.2 These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.
2.3 The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.
2.4 The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
2.5 Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the government and no delivery schedule extension.
CONFIGURATION MANAGEMENT DOCUMENTATION
The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).
a. The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).
b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.
d. All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
e. For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.
(i) for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.
(ii) for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.
(iii) for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.
f. The Government’s acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government’s sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.
g. The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the Administrative Contracting Officer (ACO).
h. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.
OPSEC TRAINING REQUIREMENT
| Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at: https://securityawareness.dcsa.mil/opsec/index.htm. Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officer’s Representative (COR), if assigned to the contract, or the Procuring Contracting Officer (PCO). | ||
| ACQUISITION OF MANUFACTURER'S PART NUMBER | This acquisition is restricted to the item description set forth in the Schedule which specifies a manufacturer's part number. Since complete Government data for the item are not available, it is understood and agreed that references to specifications and drawings herein shall be deemed to include all changes or revisions thereto which the contractor has made effective as of the date of delivery of any of the items provided for in this contract; provided, that no such change or revision which affects the interchangeability of the item (ability to be interchanged with previous parts or to connect with all mating parts when assembled) shall be effected without the approval of the Contracting Officer. The contractor agrees that he will furnish to the Administrative Contracting Officer or Government Inspector, for the purpose of making inspection under any resulting contract, copies of the applicable specifications and drawings indicating all changes or revisions. | |
| ACQUISITION OF SOURCE-CONTROLLED PART NUMBER | 1. The manufacturer's part number or numbers set forth in the Schedule or the Technical Data Package; and |
2. Other manufacturer's part numbers that are physically, functionally, and mechanically interchangeable with the manufacturer's part number(s) listed in the Technical Data Package; provided the nonlisted part numbers have been furnished to one of the approved manufacturers listed in the Technical Data Package and that manufacturer has substituted the nonlisted part with one of the approved part numbers, without making any changes in the characteristics or properties of the part.
| ACQUISITION OF MANUFACTURER'S PART NUMBER: COMPONENTS | One or more of the drawings for part of the contract item set forth in the Schedule and in the Technical Data Package specify manufacturer's part numbers. Since complete Government technical data for such part or parts are not available, it is understood that the Contractor, by accepting this contract, agrees to furnish only the listed manufacturer's part number(s) for those components of the contract item. It is further understood and agreed that references to manufacturer's part numbers herein shall be deemed to include all changes or revisions thereto which the approved manufacturer has made effective as of the first date of delivery of any of the items under this contract; provided, that no change or revision that affects the interchangeability (ability to be interchanged with previous parts and to match with all mating parts when assembled) of the listed manufacturer's part shall be incorporated into the contract item without the prior written approval of the Procuring Contracting Officer. |
| REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN | 1. The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan)(Attachment 0003), or other U.S. Government OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan (Attachment 0003) specifies the governments critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. |
2. The contractor will receive a copy of the SOP/Plan (Attachment 0003) at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.
3. The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is OPSEC Level I.
4. The contractor is not required to produce an OPSEC Plan. U.S. contractors with access to CUI (e.g. technical information, information marked with a distribution statement or CUI or classified information) shall be required to follow an OPSEC Plan. Thecontractor may choose to follow the TACOM OPSEC plan (Attachment 0003) in lieu of developing a new OPSEC plan. Personnel who have taken the approved OPSEC training within the last 12 months shall be considered compliant.
Counterintelligence Awareness and Reporting (CIAR); formerly known as Threat Awareness Reporting Program (TARP) Per AR 381-12, all Department of the Army (DA) personnel (Military/Civilian/Contractor) must complete CIAR training within 30 days of assignment or employment to an organization/contract, and then once every 12 months thereafter pursuant to DoDD 5240.06. DA personnel will complete "Counterintelligence Awareness and Reporting for DoD Employees" CI116.16, located at https://www.cdse.edu/, to satisfy most Army annual training requirements. In addition, per AR 381-12 Chapter 5, the following individual(s) must receive an in-person CIAR briefing directly from an ACI Special Agent or a CI-experienced person in addition to the annual training requirement:
1. DA personnel scheduled to travel (official, unofficial, permanent change of station) to or through countries with a high foreign intelligence or terrorist threat level as identified by Defense Intelligence Agency or the Department of State, will receive a special CIAR briefing prior to the travel and will be debriefed upon return. AR 38112 13 June 2025 11
2. DA personnel who have security clearances travelling to foreign locations in any duty status must fulfill pre-and-post travel security briefing and debriefing requirements in accordance with the DoD Foreign Clearance Guide and DoDD 4500.54E.
3. DA personnel deploying in support of military exercises or contingency operations will receive a special CIAR briefing prior to departure.
4. DA personnel taking part in bilateral or multilateral engagements with foreign governments or international organizations will receive a CIAR briefing prior to the event.
5. Foreign visitors, personnel, and personal connections. Commanders will coordinate with unit security managers to identify personnel potentially vulnerable to FIE exploitation and ensure they are referred to ACI to receive specialized CIAR briefing.
6. Such personnel will receive foreign intelligence threat briefings prior to foreign travel or event.
7. Personnel with access to Sensitive Compartmented Information and Special Access Programs.
8. Personnel assigned to or supporting defense critical infrastructure or associated assets, pursuant to DoDD 3020.40 and DoDI 5240.19, will receive an in-person special CIAR briefing on an annual basis. Such personnel will notify their local ACI office of all projected foreign travel or foreign visits.
9. Foreign government employment. Current and retired DA personnel seeking employment with foreign government entities will have CIAR training and support made available.
10. Information technology professionals System administrators, privileged users, and those with privileged access that provides an individual capability to alter the properties, behavior, or control of a DoD information system will receive in-person special CIAR briefings on an annual basis.
11. Professional and educational exchange programs with foreign governments. These briefings will be tailored to the particular risk or threat involved, including methods the person may use to minimize the risk, and will place special emphasis on reporting responsibilities. Debriefings will be conducted as soon as feasible following completion of travel, duty, or visit to a foreign country, or attendance at a conference with foreign personnel by an ACI Special Agent. Failure to receive training does not relieve individuals from their reporting responsibilities in chapter 4 of this regulation.
SPECIAL PACKAGING INSTRUCTIONS NSN: 6150-01-578-0469 ITEM: CABLE ASSEMBLY, SPEC/SIDECAR POWER CABLE, 2W173-E
1. Military preservation, packing, and marking for the item identified above shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1 and the Special Packaging Instruction (SPI) contained in the TDP.
PRESERVATION: MILITARY LEVEL OF PACKING: B QUANTITY PER UNIT PACKAGE: 001 SPI NUMBER 12992565, DATED 06 APR 20, REV A
2. Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The pallet shall be a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
3. Marking: In addition to any special markings called out on the SPI;
3.1 All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, including bar coding and a MSL label. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers' Passive RFID Information Guide and Supplier Implementation Plan. If the item has Unique Item Identifier (UII) markings then the concatenated UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the palletized unit load.
4. Heat Treatment and Marking of Wood Packaging Materials: All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
5. This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
6. Hazardous Materials (as applicable):
6.1 Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
6.2 Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents: __International Air Transport Association (IATA) Dangerous Goods Regulations __International Maritime Dangerous Goods Code (IMDG) __Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49 __Joint Service Regulation AFMAN24-604/ TM38-250/NAVSUPPUB 505/MCO P4030.19/DLAM 4145.3 (for military air shipments).
6.3 If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
6.4 When applicable, a Product Safety Data Sheet (SDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
SUPPLEMENTAL INSTRUCTIONS: N/A
INSPECTION AND ACCEPTANCE POINTS: ORIGIN The Government's inspection of the supplies offered under this contract/purchase order shall take place at ORIGIN. Offeror must specify below the exact name, address, and CAGE of the facility, or subcontractor's facility, where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: ORIGIN
a. NAME: ___________________________________________
b. CAGE: ___________________________________________
c. ADDRESS, CITY, STATE, ZIP: ___________________________________________
ACCEPTANCE POINT: ORIGIN
a. NAME: ___________________________________________
b. CAGE: ___________________________________________
c. ADDRESS, CITY, STATE, ZIP: ___________________________________________
FIRST ARTICLE TEST REPORT (FATR) ACCEPTANCE: DESTINATION
The Government's acceptance of the First Article Test Report (if required) offered under this order shall take place at DESTINATION.
SUPPLEMENTAL REQUIREMENTS TO FIRST ARTICLE APPROVAL (CONTRACTOR TESTING) 1. In accordance with the requirements under FAR clause 52.209-3,the first article approval item(s) shall be examined and tested as required by the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.
2. The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
3. The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
3.1. Inspections…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .