Specifications

Global Peace Operations Initiative (GPOI)

Vibratory Soil Compactor- Uruguay

1. Contractor shall provide the following vibratory soil compactor in accordance with or equal to the item specified below:

a) Weight

Operating Weight - With Cab, at least 23265.0 lb Operating Weight - With ROPS/FOPS, at least 22822.0 lb Weight - Drum with Cab, at least 12959.0 lb Weight - Drum with ROPS/FOPS, at least 12754.0 lb

b) Operating Specifications Compaction Width- at least 84.0 in Ground Clearance- at least 17.4 in Static Linear Load - With Cab- at least 154.3 lb/in Static Linear Load - With ROPS/FOPS- at least 151.8 lb/in Travel Speed - Maximum 6.8 mile/h Turning Radius - Inside Drum Edge- at least 12.08 ft

c) Engine Gross Power at least 131.0 HP

d) Dimensions Drum Diameter at least 60.4 in Drum Width at least 84.0 in Height - With ROPS/FOPS or Cab at least 10.25 ft Overall Length at least 19.17 ft Overall Width at least 7.58 ft Wheel Base at least 9.58 ft

e) Vibratory System Centrifugal Force - Maximum 52600.0 lb/ Minimum 29900.0 lb Nominal Amplitude - High 0.075 in/ Low 0.037 in Variable Frequency Option Range - 23.3 - 30.5 Hz (1400-1830 vpm) Vibratory Frequency – Standard- 30.5 Hz (1830 vpm)

f) Tires- at least 23.1 x 26

g) Fuel Tank Capacity at least 64.0 gal (US)

2. Customs Clearance: The contractor is responsible for complying with Department of

Commerce export rules and regulations.

3. Preparation for Delivery: The contractor shall include marking for shipment in accordance with the best commercial practices for the type of transportation and shipping that equipment will arrive undamaged to Uruguay.

4. Shipping and Transportation: The contractor shall include shipping and transportation in the total contract cost.

5. Place of Delivery: The contractor shall prepare and arrange final delivery of equipment to the following Point of Contact person and delivery address. Contractor MUST ensure that the equipment is delivered to the address as shown below:

DELIVERY: HEADQUARTERS OF THE ENGINEER BRIGADE #1

CAMINO CARRASCO KM 17

500 BTWN AVENIDA A LA PLAYA & RACINE

CANELONES, Uruguay

CONSIGNEE: LTC ROBERT GOMEZ

NOTIFY PARTY (FOR ACCEPTANCE): Lt Col Richard Balladares US Embassy Montevideo, Uruguay 1776 Lauro Muller Montevide, Uruguay