This document is a Pump Performance Test Worksheet for fire emergency vehicles in accordance with NFPA 1910 standards. The worksheet is used to record details about the fire pump, engine, and performance tests conducted on the vehicles. It includes information such as the vehicle designation, manufacturer, serial number, pump make and model, and rated capacity. The worksheet documents the tests performed, including the 20-minute capacity test, 5-minute overload test, and 10-minute 200 psi test. Key data recorded includes atmospheric conditions, vacuum levels, priming time, pressure control device performance, and flow rates. The worksheet is to be used for the annual mobile fire emergency vehicle inspection and pump performance testing required by the U.S. Army Fort Leonard Wood, Missouri for their fleet of fire trucks from various manufacturers.

View the file

Other files

File Type Posted
ANN INSPECTION BUMPER-TO-BUMPER (B2B) WORKSHEET.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PUMP PERFORMANCE TEST

IAW NFPA1910

© 2024 National Fire Protection Association

Emergency vehicle number or designation ___________

Manufacturer __________________________________

Serial no. _____________________________________

Engine make __________________________________

Pump make ___________________________________

Year manufactured _____________________________

Model _______________________________________

Vehicle identification no. _________________________

Model _______________________________________

Model _______________________________________

Pump rated capacity __________________ (gpm) (L/min) at _______________(psi) (kPa)

Speed check taken from _________________________ Ratio to engine ________________________________

Test site location ___________________________________________________________________________________

Tests performed from __ Draft __ Hydrant

Suction hose size _____________________ (in.) (mm) Length _________________________(ft) (m)

At start of tests At end of tests

Atmospheric pressure

Air Temperature

Water temperature

Elevation of test site

Lift

Governed engine speed ___________________________ Actual maximum engine speed ____________________

Verify operation of pump shift indicator __________________________________________________________________

Verify operation of pump engine control interlock at pump operator’s panel _____________________________________

Maximum vacuum attained _________________________ Vacuum drop in 5 minutes ________________________

Time to prime pump ________________________________________________________________________________

Pressure control device test:

Rise while pumping capacity at 150psi ________________________________________________________________

Rise while pumping capacity at 90 psi ________________________________________________________________

Rise while pumping at 50 percent capacity at 250 psi ____________________________________________________

Intake relief valve test results _________________________________________________________________________

Tank to pump water flow test ___________________ (gpm) (L/min)

Gauge accuracy _____________________________ Flowmeter accuracy ___________________________________

Pump Test Results Capacity test Overload test 200 psi test 250 psi test Duration Average nozzle pressure Corrected pressure Gallons per minute Average pump pressure rpm-engine Rpm-pump

Comments

PUMP PERFORMANCE TEST

IAW NFPA1910

© 2024 National Fire Protection Association

20-Minute Capacity Test Layout _____________________________ Nozzle size _______ Position of transfer valve _______________

Pump Intake Pump Discharge

Time

Counter (if used) rpm

Tach

Engine temperature

Oil pressure

Voltage

Automatic Transmission

Temp (if equipped)

Apparatus gauge

Test

Apparatus

Test

Pilot/ flow

5-Minute Overload Test

10-Minute 200 psi Test

10-Minute 200 psi Test

Person conducting the test ___________________________________________________________________________

Representing _____________________________________________________________________________________

Signature _____________________________________________________ Date ___________________________

AHJ representative _____________________________________________ Date ___________________________

File details come from the government source that posted it. Updated .