REQUIREMENT
FOR
USPFO-DE CIF SHELVING PROJECT
1 DESCRIPTION OF WORK: The contractor(s) shall conduct a site visit to obtain accurate measurements and establish a cost estimate (Bid) for shelving to be purchased and installed in the clothing issue facility’s general areas.
2 . Description of material needed:
Pallet Rack uprise & frame (8)
Pallet rack wire decking (2)
Pallet rack beam 48” Long
Wire container (33)
Lid for wire containers (33)
Shelving Unit:
84”H x 96” W x 30” D
4 shelves per unit
900 lb. shelf load cap.
(22units)
Shelving Unit:
84” H x 72’W x 24’ D
4 shelves per unit
900 lb. shelf load cap.
(2units)
3 . This project will optimize configuration and maximize available floor space for shelving. This shelving will be utilized to adequately store clothing and OCIE equipment.
4 Contractor shall furnish all management, labor, transportation, pickup, delivery service, housekeeping, and facility operation in accordance with the terms and conditions of this Statement of Work (SOW). This includes assembly and all other tasks and responsibilities deemed necessary and spelled out in this SOW.
4.1 PERIOD OF PERFORMANCE: Performance period for this contract shall be the duration of site visit, delivery wait time, and installation time.
4.2 The contractor shall provide services to DEARNG CIF. Services will be provided in accordance with the terms and conditions of this contract. The contractor shall process and finish all walls and door installations to specs. in accordance with the requirements contained in the contract.
4.3 Workmanship: All work performed shall be done on River Road Training Site premises. Contractor will be responsible for cleanup of area each day and at end of project.
4.4 Re-performance: Any items found to have been unsatisfactorily assembled shall be re-worked by the contractor at no additional cost to the government.
5 GENERAL INFORMATION:
5.1 HOURS OF OPERATION: The contractor shall maintain the operating hours from 0800-1630, M-TH. Concessions will be made for Federal holidays.
5.2 Removing objects from refuse for personal use is unauthorized. Contractor Personnel may request items through unit designee. Violations are grounds for termination.
5.3 SECURITY REQUIREMENTS: Contractor shall adhere to current installation security policies.
6 GOVERNMENT FURNISHED PROPERTY (GFP) AND SERVICES: The US Government will not provide any equipment, fuel, personnel, utilities, or facilities to the contractor for the execution of this contract. Should an emergency arise, only the necessary basic lifesaving and life support measures will be provided during the emergency.