This Performance Work Statement (PWS) outlines requirements for the installation of aircraft paint booth, mixing room, and personnel air shower equipment at the Delaware Air National Guard (DANG) Base in New Castle County, Delaware.

The contractor must supply all labor, supervision, transportation, tools, equipment, materials, and factory-certified personnel necessary to install, integrate, test, start up, train Government personnel, and commission the Government-furnished VES paint booth system (Part Number PB-100-000, NSN 4940-01-707-5264) with attached mixing room, plus the Government-furnished VES NIOSH Compliant Personnel Air Shower (Part Number 965-100-001, NSN 4460-01-698-7874). The air shower installation is a funding-dependent option line item. The base installation must be completed within 60 calendar days after equipment availability. Installation services must be performed Monday through Thursday, 0700-1700 hours, excluding U.S. federal holidays and facility closures, with no teleworking authorized. The contractor must be VES-certified or use VES factory-trained and certified personnel, and must provide written certification documents, field engineer supervision, and warranty preservation confirmation before work begins. Key contractor responsibilities include equipment assembly and positioning, installation of all components, ventilation and electrical systems, structural supports, waste handling and disposal, alignment and accuracy testing per manufacturer standards, chemical approval documentation (submitted 90 days in advance to DANG's HAZMAT office), utility interconnections, environmental compliance, safety protocols, operational testing with baseline data documentation, two days of on-site operator and maintenance training, and provision of system documentation including drawings, user manuals, and recommended spare parts lists. The contractor must warrant workmanship for 365 calendar days after Government acceptance, respond to deficiency reports within 24 hours, and correct deficiencies within 10 calendar days unless otherwise approved.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

AIRCRAFT PAINT BOOTH, MIXING ROOM,

AND AIR SHOWER INSTALLATION SERVICES

1.0 General:

1.1 Scope: The contractor shall supply all labor, supervision, transportation, tools, equipment, materials, supplies, factory-certified personnel, and incidental services, except as specified in Paragraph 3.0 as Government Furnished, necessary to install, integrate, test, start up, train Government personnel, and commission the Government-furnished heated semi down-draft aircraft paint booth system with attached mixing room.

The contractor shall supply all labor, supervision, transportation, tools, equipment, materials, supplies, factory-certified personnel, and incidental services necessary to install, integrate, test, start up, train Government personnel, and commission the Government-furnished VES NIOSH Compliant Personnel Air Shower at the Nose Dock Repair Facility located at the Delaware Air National (DANG) Guard Base, New Castle County, DE. This line item is being procured as an option line item, funding dependent.

1.2 Background: The Government is constructing a new fuel cell to house this equipment. Installation timelines may be dependent on construction progress. The Government has separately procured the paint booth, mixing room, and air shower that require installation.

The Government-furnished paint booth system is:

- VES Part Number: PB-100-000, National Stock Number: 4940-01-707-5264

The Government-furnished personnel air shower:

- VES Part Number: 965-100-001, National Stock Number: 4460-01-698-7874

1.3 Period of Performance (PoP): The Contractor shall complete the base installation within sixty (60) calendar days after Government notification that the paint booth system is available at the installation site.

1.4 General Information:

1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0700-1700 Monday through Thursday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at Delaware Air National (DANG) Guard Base, New

Castle County, DE 19720. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Teleworking is not authorized.

1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.

1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.

The contractor shall not perform services on these days:

1.4.2.1 New Year’s Day: January 1st

1.4.2.2 Martin Luther King, Jr.’s Birthday

1.4.2.3 President’s Day

1.4.2.4 Memorial Day

1.4.2.5 Juneteenth National Independence Day: June 19th

1.4.2.6 Independence Day: July 4th

1.4.2.7 Labor Day

1.4.2.8 Columbus Day

1.4.2.9 Veteran’s Day: November 11th

1.4.2.10 Thanksgiving Day

1.4.2.11 Christmas Day: December 25th

1.4.3 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1. The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

2. The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing.

When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver s license, current vehicle registration, valid vehicle insurance certificate, and [insert any additional requirements to comply with local security procedures] to obtain a vehicle pass.

3. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

4. Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

5. Failure to comply with these requirements may result in withholding of final payment.

1.4.4 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.6 Special Qualifications: The contractor shall be VES or shall use VES factory-trained and certified personnel to perform installation services. Before beginning work, the contractor shall provide written VES factory-training and certification documents for each installer, written certification signed by the President of VES for each VES-certified installer, written confirmation that a VES factory-trained and certified field engineer will be on site to supervise installation and perform start-up and training, and written confirmation that the proposed installation approach will preserve the manufacturer warranty.

1.4.7 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.

The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the KO, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.8 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.

1.4.9 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the KO within 14 days of an employee’s departure.

1.4.10. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at

FAR 22.17.

1.4.11 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the

PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms:

AT/OPSEC Antiterrorism/Operational Security CM Contract Manager DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DSCA Defense Counterintelligence and Security Agency FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HSPD Homeland Security Presidential Directive IA Information Assurance IS Information System(s) KO Contracting Officer NGB National Guard Bureau OCI Organizational Conflict of Interest PII Personally Identifiable Information POC Point of Contact PWS Performance Work Statement QC Quality Control DANG Delaware Air National Guard DANGI Delaware Air National Guard Instruction CFR Code of Federal Regulations NIOSH National Institute for Occupational Safety and Health NEMA National Electrical Manufacturers Association NESHAP National Emissions Standard for Hazardous Air Pollutants

NFPA National Fire Prevention Association OSHA Occupational Safety and Health Administration PPE Personal Protective Equipment

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):

The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: The Government will furnish the necessary workspace for the contractor to perform services outlined in this PWS to include desk space, telephones, computers and other items necessary to maintain an office environment.

3.2 Materials, Equipment, & Services:

The Government-furnished paint booth system is:

- VES Part Number: PB-100-000, National Stock Number: 4940-01-707-5264

The Government-furnished personnel air shower:

- VES Part Number: 965-100-001, National Stock Number: 4460-01-698-7874

3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

5.0 Requirements: The contractor shall:

5.1 Provide the labor required to install the Government furnished paint booth, associated mixing room, and air shower. The intent of this project is to secure painting of all related airborne accessories such as engine cowlings, doors, tabs, rudder, elevators, hatches, flaps, ailerons, fairings, spoilers, and other aircraft structures.

Ventilation, filtration, lighting, electrical devices, and fire protection shall be provided by the contractor as required for compliance with UFC, AFOSH, NIOSH, NESHAP, NFPA, DANGI and OSHA requirements. The services performed by the contractor shall include the following major items:

5.1.1 Contractor Responsibilities

The contractor shall be VES or shall use VES factory-trained and certified personnel to perform installation services. Before beginning work, the contractor shall provide written VES factory-training and certification documents for each installer, written certification signed by the President of VES for each VES-certified installer, written confirmation that a VES factory-trained and certified field engineer will be on site to supervise installation and perform start-up and training, and written confirmation that the proposed installation approach will preserve the manufacturer warranty.

5.1.2 Installation

The contractor shall provide all personnel, equipment, tools, supervision, transportation, materials, structural installation requirements, field testing, site oversight, waste handling/transportation/disposal and any other incidentals necessary to install the Government-furnished paint booth system with attached mixing room.

Installation includes, at a minimum:

- Equipment assembly, positioning, leveling, alignment, anchoring, sealing, and securing.

- Installation of furnished doors, access panels, lighting, filters, blowers, motors, heaters, controls, alarms, safety interlocks, and accessories.

- Installation of required ventilation, supply-air, exhaust, filtration, heating, and control components.

- Installation of required supports, fasteners, gaskets, seals, ductwork, fittings, transitions, and equipment connections.

- Manufacturer-required installation checks, start-up, testing, training, and commissioning.

If the option is exercised, the contractor shall install the Government-furnished personnel air shower, including associated structural, mechanical, electrical, filtration, blower, control, lighting, door, and safety components.

The contractor shall complete the base installation within sixty (60) calendar days after equipment availability. The contractor shall not modify Government-furnished equipment or facility components without written approval from the Contracting Officer.

5.1.3 Emergency Point of Contact

An Emergency and Project Point of Contact Telephone List shall be jointly developed. A list of emergency and project contact telephone list shall be provided by the contractor to the government inspector.

5.1.4 Clean up

Job Completion/Cleanup. Daily and upon completion of job, contractor will ensure that the area has been cleaned of all debris. This is to include all packaging materials, removed parts, wiring, papers, etc. The contractor shall remove from the property and properly dispose of old equipment, material and debris from the worksite. Disposal of materials must follow all local, state, and federal laws and guidance. Entire worksite must be completely clean of any building materials before final acceptance.

5.1.5 Off-Loading

The contractor shall furnish all labor and material handling equipment required for off-loading the equipment and components both at the designated storage warehouse (if necessary) and the final destination. The contractor shall be responsible for the disposal of all crating, skids and packing materials. The contractor shall furnish all personnel, equipment, tools and materials necessary to off-load, clean, set on-site equipment components and the associated assembly of said components with the supervision of factory representatives.

5.1.6 Alignment/Accuracy Tests

The contractor shall provide all labor, equipment and materials necessary to insure the alignment and accuracy IAW manufacturer’s standard requirements. Test showing the paint booth and mixing room meet specifications shall be provided by the contractor.

5.1.7 Chemicals and Safety Data Sheets

All chemicals utilized during construction shall be approved by the DANG’s HAZMAT office prior to the contractor bringing chemicals on base. The Safety Data Sheets (SDS) of proposed chemicals shall be furnished to the government representative nine (9) working days in advance to obtain the necessary authorization of proposed chemicals.

The contractor shall submit safety data sheets (SDS) and a list for any chemicals or hazardous materials that will be used while working on the installation. The list shall state the commercial name, manufactures’ name, chemical name, and quantity to be used or stored on government property to the Government representative 90 days in advance to obtain the necessary authorization of chemical use.

5.1.8 Utilities Interconnection

Utilities shall include water, compressed air, eye wash water, water, natural gas. The contractor shall furnish all personnel, equipment and materials necessary to connect the booth, mixing room and air shower to DANG provided “rough-in” utilities that are available within twenty-five (25) feet of final connection points. Contractor may have to run HVAC/Ductwork required for installation. All utility interconnections shall be performed by personnel who are licensed in their field of activity.

5.1.9 Environmental

Contractor shall submit a Waste Management Report describing quantities of waste materials recycled and disposed of as C&D material. (include weight tickets and receipts as supporting documentation).

Prior to starting work, the Site Manager shall meet with the 166 AW Delaware Air National Guard Environmental manager to become aware of installation specific environmental policies and procedures on the installation.

As a contractor, you are obligated to comply with federal, state, and local environmental regulations/requirements, and DANG Environmental Management System (EMS) requirements. Some of the environmental issues to be considered while completing your job at DEANG ANG including, but not limited to:

- Hazardous Material usage & management

- Recovered Materials usage

- Protection of native plants and birds

- Dust control (caused by activities such as land stripping, trenching, sandblasting, etc.)

- Painting or cleaning operations air emissions control

- Stormwater Discharges

- C&D waste recycling / disposal

- Other Waste management activities

- Spill Reporting

Contractors shall take immediate corrective action to comply with environmental regulations/requirements if informed of a violation by the Contracting Officer or Contracting Officer Representative (COR). If necessary, appropriate actions will be initiated through Contract Management to correct substandard environmental practices or conditions.

Pursuant to 7 Delaware Admin Code Section 1106 contractors must take controls to prevent dust emissions during land clearing, construction, and demolition activities.

Prior to starting work describe how you plan to suppress dust during the project.

5.1.10 Safety

The contractor is advised that natural gas piping is in the work area. The contractor is advised that electric service are in the work area. Fall protection, PPE, and any other safety related material needed shall be provided by the contractor for contract employees. Hard hats shall be required in the facility, due to the ongoing construction, as well as hearing and eye protection and safety glasses.

5.1.11 Operational Test

After installation and utility interconnection, the contractor shall perform manufacturer-required testing, start-up, and commissioning under on-site supervision of a VES factory-trained and certified field engineer.

The contractor shall:

- Verify operation of blowers, motors, heaters, filters, doors, lighting, controls, alarms, safety interlocks, ventilation, and exhaust systems.

- Establish and document baseline operating data for blowers, motors, ventilation, exhaust, and other manufacturer-required systems.

- Perform required air-balance and ventilation testing.

- Correct installation deficiencies at no additional cost to the Government.

- Submit functional-test results, start-up checklists, air-balance reports, and commissioning documentation before requesting final acceptance.

5.1.12 Bioenvironmental Acceptance

Occasionally, ventilation systems must be replaced, or a new industrial facility is constructed to house a process, which requires ventilation to control a health hazard.

An initial acceptance or commissioning test is performed on any new system to verify it is operating properly before putting the system into service. In the case when a civilian contractor installs a system, commissioning occurs before the base Contracting Officer accepts the work as being completed according to the contract. The purpose of the test is to evaluate the system performance as compared to the key parameters defined by the applicable VS plate in the ACGIH Design Manual or contract specifications. If the ventilation system is performing within the appropriate parameters, it is considered acceptable. In some cases, workplaces will purchase pre-built or Commercial Off-the- Shelf (COTS) ventilation equipment; in these instances, an acceptance survey may not be applicable, and a Baseline survey will be the first step in assessing the system’s performance.

5.1.13 Training

The contractor shall provide the following on-site training: two (2) days of operator and maintenance training, review of system documentation, operation procedures, trouble shooting, preventative maintenance, operator maintenance and daily check sheet, optimal performance adjustments (rules of thumb for balancing the system). On-site training shall be conducted during the respective shop’s operating hours of 0700 to 1430 hours and be scheduled to not conflict with Government holidays. Training shall be conducted after successful completion of operational testing and bioenvironmental acceptance. Anticipate four (4) government personnel to attend each training session.

The contractor shall provide all training materials in the English language.

5.1.14 Documentation

The contractor shall provide system documentation IAW the following specifications.

Drawings The contractor shall use Government-furnished paint booth system drawings and manufacturer installation documentation. The contractor shall provide record drawings identifying approved field changes, if any.

User Manual(s) The contractor shall supply a user manual as follows. The user manual shall include an overall description for the paint booth system and, if exercised, the air shower.. The user manual shall include the basic operational characteristics. The user manual shall include a description of the control panel features, operation, and maintenance guide.

All monitoring, thermocouples, and measurement devices/equipment shall include the manufactures user manuals, technical data, calibration technical data, and verification of calibration. User Manual(s) shall be delivered by electronic (CD) and three (3) copies in hard form. In addition, the contractor shall provide a list of recommended or long lead items that the Government may want to keep spares in the event of parts failure.

Include the price and suggested sources for each item.

5.1.15 Warranty

The contractor shall preserve the full manufacturer warranty for the paint booth system and, if exercised, the air shower. Before final acceptance, the contractor shall provide written confirmation from VES that the installation, start-up, testing, commissioning, and training were completed in accordance with VES requirements and that manufacturer warranty coverage remains in effect. The contractor shall warrant contractor-performed workmanship for 365 calendar days after Government acceptance. The contractor shall respond to Government-reported workmanship deficiencies within 24 hours and correct deficiencies within ten (10) calendar days, unless otherwise approved by the Government.

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

Publication (Chapter/Page)

Website

Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar Defense Federal Acquisition Regulation

Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/inde x.html or https://www.acquisition.gov/dfars Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/travelreg.cfm

DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b) http://www.esd.whs.mil/Directives/issuances/dodm

Federal Information Processing Standards (FIPS) Publication 201-2

Personal Identity Verification (PIV) of Federal Employees and Contractors

(paragraph 9) http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201- 2.pdf

DoDM 5200.2 Procedures for the DoD Personnel Security Program (PSP) https://www.esd.whs.mil/Directives/issuances/dodm/

DoDI 5200.46 DoD Investigative and Adjudicative

Guidance for Issuing the Common Access Card (CAC) https://www.esd.whs.mil/Directives/issuances/dodi/

Homeland Security Presidential Directive

(HSPD)-12

Policy for a Common Identification Standard for Federal Employees and Contractors https://www.dhs.gov/homeland-security-presidential-directive-12

DoDI 5400.11 Department of Defense Privacy and Civil

Liberties Programs https://www.esd.whs.mil/Directives/issuances/dodi/

DoD 5400.11-R Department of Defense Privacy Program https://www.esd.whs.mil/Directives/issuances/dodm/

DoDD 8140.01 Cyberspace Workforce Management https://www.esd.whs.mil/Directives/issuances/dodd/

DoD 8570.01-M Information Assurance Workforce

Improvement Program

DoD 5220.22-M National Industrial Security Program

Operating Manual (NISPOM)

AFI 10-245

Antiterrorism https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series=-

1&modID=449&tabID=131

AFI 31-101

Security Forces Standards and Procedures https://www.e-publishing.af.mil/Product-

Index/#/?view=pubs&orgID=10141&catID=1&series=- 1&modID=449&tabID=131

AFMAN 31-113

Security Forces Standards and Procedures https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series=-

1&modID=449&tabID=131

AFPD 17-1

Information Dominance Governance and Management https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series=-

1&modID=449&tabID=131

AFMAN 17-1301

Computer Security (COMPUSEC) https://www.e-publishing.af.mil/Product-

Index/#/?view=pubs&orgID=10141&catID=1&series=- 1&modID=449&tabID=131

AFI 10-701

Operations Security https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series=-

1&modID=449&tabID=131

DAFMAN 91-203 AIR FORCE OCCUPATIONAL SAFETY, FIRE, AND

HEALTH STANDARDS

NFPA 13 Standard for the Installation of Sprinkler Systems https://www.nfpa.org/ NFPA 30 Flammable and Combustible Liquids Code (storage) https://www.nfpa.org/ NFPA 33 Standard for Spray Application Using Flammable or

Combustible Materials https://www.nfpa.org/

NFPA 70 National Electric Code https://www.nfpa.org/

NFPA 72 National Fire Alarm and Signaling Code https://www.nfpa.org/

NFPA 80 Standard for Fire Doors and other Opening Protectives https://www.nfpa.org/

NFPA 86 Standard for Ovens and Furnaces https://www.nfpa.org/ NFPA 91 Standard for Exhaust Systems for Air Conveying of

Vapors, Gases, Mists, and Particulate Solids https://www.nfpa.org/

NFPA 101 Life Safety Code https://www.nfpa.org/

NFPA 654 Standard for the Prevention of Fire and Dust Explosions from the Manufacturing, Processing, and

Handling of Combustible Particulate Solids.

https://www.nfpa.org/

ICS6-1993 Enclosures for Industrial Control Systems (NEMA) http://www.nema.org/index_nema.cfm/1260/

29 CFR 1910.106

& .107

OSHA Spray Finishing Using Flammable and Combustible Materials http://www.osha.gov/pls/oshaweb/owastand.display_st andard_ group?p_toc_level=1&p_part_number=1910&p_text_ve rsion=

FALSE

40 CFR 63

Subpart GG

National Emission Standards for Aerospace Manufacturing and Rework Facilities (NESHAP) http://www.tnrcc.state.tx.us/air/opd/63/ UFC 3-600-01 Unified Facilities Criteria (UFC) Fire Protection

Engineering for Facilities http://www.wbdg.org/ccb/DOD/UFC/ufc_3_600_01.pdf UFC 3-410-04 Unified Facilities Criteria (UFC) Industrial Ventilation

Book Industrial Ventilation by AHGIH, Chapter 5,10,&13

1926.501 OSHA Duty to have fall protection regulation

1926.1053 OSHA Ladder regulation