Pages from South Wells Subcontractor Prequal Package (002).pdf

PDF 373 KB Posted

Attached to
South Wells Water Treatment Facility, DWSRF# 19217, Contract ENG25-0918-Sub Prequal
Solicitation number
BD-27-1296-SB-MIDSB-134280
Issued by
Massachusetts

About this file

This is a subcontractor prequalification package for the South Wells Water Treatment Facility project in Massachusetts, administered under the state's Drinking Water State Revolving Fund (DWSRF) program, Contract ENG25-0918-Sub. The project encompasses construction of a new 13,500 square foot water treatment plant designed to remove iron, manganese, and PFAS (per- and polyfluoroalkyl substances) from groundwater, along with upgrades to seven existing groundwater well stations that will include new piping, valves, and instrumentation. Subcontractor prequalification is required prior to bidding on this project; prospective subcontractors must complete and submit the prequalification package according to specified timelines and requirements outlined in the documentation.

The prequalification package establishes criteria and procedures for subcontractors seeking to participate in the South Wells Water Treatment Facility project. Applicants are evaluated based on relevant experience, financial stability, equipment capabilities, safety records, and other qualifications deemed necessary for the successful completion of assigned work. The prequalification process serves as a gatekeeping mechanism to ensure only qualified entities are permitted to bid on subcontract scopes, thereby mitigating project risk and supporting delivery of the water infrastructure improvements funded through the DWSRF program.

View the file

Other files

File Type Posted
South Wells WTP - Prequalifications RFQ Ad.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

i

COMMONWEALTH OF MASSACHUSETTS

STANDARD FORMS

FOR

SUBCONTRACTOR PREQUALIFICATION

(pursuant to M.G.L. c. 149, § 44D¾ and 810 CMR 10.00)

REQUEST FOR QUALIFICATIONS

and

STATEMENT OF QUALIFICATIONS

Town of Middleborough

South Wells Water Treatment Facility, DWSRF #19217, Contract ENG25-0918 42 Miller Street, Middleborough, MA 02346 ii

INDEX

Part One: Request for Qualifications

Section I: General Project Information

Section II: Detailed Project Description

Section III: General Instructions

Section IV: Overview Of Prequalification Process

Section V: Administration/Schedule For Prequalification Process

Section VI: Evaluation Procedure/Criteria For Prequalification Selection

Section VII: Additional Information

Part Two: SOQ Application Forms/Schedules (to be completed by Subcontractor)

Sub SOQ Form 1: RFQ Interest Form

Sub SOQ Form 2: SOQ Application Form

Schedule A: Business Owner Information

Schedule B: Management Personnel Information

Schedule C: Similar Project Experience

Schedule D: Terminations

Schedule E: Legal Proceedings

Schedule F: Safety Record

Schedule G: Project References

Schedule H: Credit References

Schedule I: Public Project References

Schedule J: Prior Revenue

Schedule K: Revenue Under Contract

Sub SOQ Form 3: RFQ Response Checklist

Part One: RFQ

Section I: General Project Information

A. General Information

Awarding Authority: Town of Middleborough

Project No.: DWSRF #19217, Contract ENG25-0918

Project Name: South Wells Water Treatment Facility

Project Location: 42 Miller Street, Middleborough, MA 02346

Project Description:

The scope of work includes construction of a new 13,500 square foot water treatment plant designed for iron, manganese, and PFAS removal.

Seven existing groundwater well stations will be upgraded with new piping, valves and instrumentation.

RFQ Questions Deadline: 10/23/2026

Response to Questions Deadline: 10/30/2026

Submission Deadline:

(for submission of SOQs in response to this RFQ)

11/13/2026 at 11AM

Submission Address:

Electronic Only www.projectdog.com Project Code = 262193

Estimated Construction Cost: $ 45.7 million

Estimated Project Duration: 915 calendar days from Notice to Proceed

Owner’s Project Manager:

Wright-Pierce 78 Blanchard Road Burlington MA, 01803

Project Architect/Engineer:

Weston & Sampson 55 Walkers Brook Drive, Suite 100 Reading, MA 01867

Project Specific Requirements (if applicable):

Massachusetts Drinking Water State Revolving Fund (DWSRF) Requirements DCAMM Certification (as applicable) Build America Buy America (BABA)

B. Subtrades Subject to Prequalification

This RFQ is to prequalify Subcontractors in accordance with M.G.L. c. 149, § 44D¾ and 810 CMR 10.00. Subcontractors in the following subtrades will be prequalified for this Project:

“X” Below All Trades Subject To Prequalification On The Project

Section # Trade Category Estimated Construction Cost for Subtrade

X 04 00 01 Masonry $1,200,000 X 05 00 01 Miscellaneous and Ornamental Iron $255,000

X 07 00 01

Waterproofing Damp Proofing and Caulking

$550,000

X 07 00 02 Roofing and Flashing $815,000 X 08 00 01 Metal Windows $30,000 X 09 90 00 Painting $195,000 X 21 00 00 Fire Suppression $250,000 X 22 00 00 Plumbing $535,000

X 23 00 00 HVAC $1,105,000

X 26 00 00 Electrical $4,930,000