PADDS W56HZV-20-Q-0128.pdf
PDF 130 KB Posted
- Attached to
- 4 and 10 ton Hydraulic Jacks, Dolly type
- Solicitation number
- W56HAV
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
Offeror To Complete Block 12, 17, 23, 24, & 30
1. Requisition Number Page Of
2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date
7. For Solicitation Information Call:
A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time
9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:
Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program
Hubzone Small Business EDWOSB
Service-Disabled Veteran-Owned Small Business NAICS:
Email: 8(A) Size Standard:
11. Delivery For FOB Destination Unless Block Is Marked
12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating
See Schedule 14. Method Of Solicitation RFQ IFB RFP
15. Deliver To Code 16. Administered By Code
Telephone No.
17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code
Telephone No.
17b. Check If Remittance Is Different And Put Such Address In Offer
18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
(Use Reverse and/or Attach Additional Sheets As Necessary)
25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)
27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.
27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.
28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.
Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:
30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)
30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed
Authorized For Local Reproduction Previous Edition Is Not Usable
Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212
W56HZV-20-Q-0128 2021NOV02
RISING ORIS (586)282-3523
RISING.M.ORIS.CIV@MAIL.MIL
2021NOV26
W56HZV
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
X
X 100
333999
X DOA4
X
SEE SCHEDULE
SEE SCHEDULE
X X
X 1
1 61
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
32a. Quantity In Column 21 Has Been
Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________
32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative
32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative
32g. E-Mail of Authorized Government Representative
33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final
38. S/R Account No. 39. S/R Voucher Number 40. Paid By
41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)
42c. Date Rec’d (YY/MM/DD) 42d. Total Containers
Standard Form 1449 (Rev. 2/2012) Back
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: RISING ORIS
Buyer Office Symbol/Telephone Number: CCTA-HDB-S/(586)282-3523
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
This solicitation is intended to result in the award of a single Requirements Contract for the estimated supplies specified. The resulting contract will establish pricing to be utilized through issuance of delivery orders for discrete quantities for the period stated in the schedule. The Government bears no responsibility to issue an initial minimum order upon base contract award. For further ________________________ guidance related to a Requirements type contract, see FAR clause 52.216-21, Requirements.
Jack, Dolly Type Hyd (4Ton) and (10 Ton) with Part Number 0579B0000 is In accordance with Army TDPL 0579A0000:59678, dated 01 November
2019. With the following exceptions: Drawing 0579B0000:is Other Managed Component of Tool Sets (Shop Equipment Support Items).
All contractors are to quote the required part for shipment to the Government. DCMA may monitor the loading/shipment.
THIS IS A SOLICITATION NOTICE
The U.S. Army Contracting Command, Warren Michigan intends to issue an 18 month Requirement Contract with an Estimated Maximum Quantity of 1425 Each, and 2100 Each for the following:
Proposed procurement for CLIN 0011:
NSN: 4910-00-516-5806
P/N: HW93657, GGG-J-1564, 884 and MS16284-4
Cage: 1WDP3, 81348, 79260 and 96906
Noun: JACK,DOLLY TYPE,HYD (4 Ton)
NAICS: 333999
Proposed procurement for CLIN 0021:
NSN: 4910-00-289-7233
P/N: HW93660, GGGJ1564, 780 and 93660
Cage: 1WDP3, 81348, 79260 and 36251
Noun: JACK,DOLLY TYPE,HYD (10 Ton)
NAICS: 333999
Firm Fixed Price Contract (FFP)
Estimated Qty for CLIN 0011: 1,425 Each
Estimated Qty for CLIN 0021: 2,100 Each
Note: THE ORDERING PERIOD QUANTITY IS AN ESTIMATE THAT MAY BE ORDERED
OVER AN 18 MONTH PERIOD
EST = ESTIMATE
All shipment will be FOB Destination.
A.1.This Solicitation, W56HZV-20-Q-0128, is being issued under the authority of the Federal Acquisition Regulations (FAR) Part 12. This
Solicitation will be issued as a Small Business Set Aside and will result in a single Firm-Fixed Price Requirement Contract over an 18 month period for the following items:
Item Name: Jack, Dolly Type Hyd (4 ton)
The Jack, Dolly Type Hyd is a commercial Jack Dolly used for lifting trucks and other vehicles up to four (4) tons.
NSN: 4910-00-516-5806 under the following Part Numbers: HW93657, GGG-J-1564, 884, MS16284, HW93660, GGGJ1564, 780, 93660
Item Name: Jack, Dolly Type Hyd (10 ton)
This Jack, Dolly Type Hyd is a commercial Jack Dolly used for lifting trucks and other vehicles up to ten (10) tons. NSN: 4910-00-289-
2 61
W56HZV-20-Q-0128 REPRINT
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
7233 under the available part numbers: HW93657, GGG-J-1564, 884, MS16284
A.1.2 QUANTITIES FOR ORDERING: THIS EFFORT WILL BE AWARDED WITH THE FOLLOWING QUANTITIES FOR CLIN 0011, AND CLIN 0021 IF ORDERED UPON
AWARD:
CLIN 0011
Quantity:
Estimated Qty: 1428 EACH
CLIN 0021
Quantity:
Estimated Qty: 2100 EACH
A.1.3 UNIQUE ASPECTS OF THIS SOLICITATION: We shall award no more than one Contract under this RFP.
Packaging shall be in accordance with commercial or as otherwise specified.
A.1.4 NOTICE REGARDING FILL-INS: Please note that this solicitation contains several clauses and provisions which require you to complete a fill-in or representation. If you don't complete these fill-ins, your offer may be determined ineligible for award. So, please be careful to read and complete each such clause and provision, especially Section K of the solicitation. The completed Section K should be returned with your proposal.
A.1.5 NOTICE REGARDING CAGE CODES: DFARS provision 252.204-7001 requires you to include your Commercial and Government Entity (CAGE)code in block 15A on page one (1) of this solicitation, along with your name and address. If it will not fit in the space provided in block
15A please insert it here: ___________________________________________________________________.
A.1.6 REQUIRED NOTIFICATION TO SUBCONTRACTORS: If awarded the contract, you should advise all potential suppliers and subcontractors of the DO/DX Rating assigned to orders resulting from your subcontractors. The Rating can be found next to Block 1 on the first line of the
Standard Form 1449 (SF1449).
A.1.7 ACKNOWLEDGEMENT OF AMENDMENTS: Please acknowledge any amendments to this solicitation in the space provided in A.5 below. Include the number and date of each amendment. Acknowledgment of all amendments received is important because failure to do so may make your offer ineligible for award. A.1.8 REQUIRED COPIES IN RESPONSE TO THIS SOLICITATION: To be considered for award, you must return one signed original of your offer, completed and properly executed, by the time and date shown in block 8 of the SF1449.
A.1.9 QUESTION/PROBLEM RESOLUTION: Routine questions regarding this solicitation should be directed to the buyer identified in Block 9 of the SF1449.
A.1.10 INCONSISTENCIES BETWEEN THE ADMINISTRATIVE SUMMARY AND THE SOLICITATION: This administrative summary has been prepared as an aid to you the potential offeror. We have made every attempt to accurately reflect the requirements and information contained in the balance of this solicitation. However, if you find any inconsistency between this administrative summary and the solicitation, please contact the buyer identified in Block 9 of the SF1449.
A.2. Electronic Contracting
(a) All Army Contracting Command Warren solicitations will be publicized on the System for Award Management website
(https://www.sam.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) As of 10 August 2015, vendors are required to submit a quote or proposal beta.SAM.gov, however until beta.SAM.gov can accept proposals offerors should follow the instructions in paragraph (c) below.
(c) With the recent transition from www.FBO.gov to www.beta.sam.gov the site have been experiencing a number of issues. Interested Offerors shall submit a proposal via email to the Contract Specialist William Spengler
(william.spengler4.civ@mail.mil) and cc the corresponding Contracting Officer James Jones (james.r.jones3.civ@usa.army.mil) with the subject header: Proposal Submission - W56HZV-20-Q-0128 (company name). Once a proposal is received, the Contract Specialist/Contracting
Officer will reply with the respective Offeror stating receipt of proposal submission.
(1) Maximum size of each e-mail shall be 10 megabytes. You may use multiple e-mail messages for each bid/submission, however, you must annotate the subject lines as described above for each message, and number them in this manner: Message 1 of 3, 2 of 3, 3 of 3. Bids can be submitted can be submitted using any of the following electronic formats:
3 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(2) Microsoft Office Products ; Word, Excel, or PowerPoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.
(3) Files in Adobe PDF (Portable Document Format). Scanners should be set to 300 dots per inch.
(4) Files in HTML (Hypertext Markup Language). HTML documents must not contain active links to live Internet sites or pages. All linked information must be contained within your electronic bid/offer and be accessible offline.
(5) Other electronic formats are not acceptable. Ensure that filenames of attachments DO NOT contain spaces to limit virus scanners rejecting the email as unscannable.
(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR
15.208(a),offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the
Government office designated in the solicitation by the time specified.
(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission. Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
(f) Solicitations may remain posted on beta.SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the
Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A.3. ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
A.4. ARMY CONTRACTING COMMAND WARREN (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website:
http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html
A.5. ALL OR NONE-COMMERCIAL ITEM ACQUISITION
(a) This provision serves as an addendum that modifies paragraph (h) of FAR 52.212-1, entitled INSTRUCTIONS TO OFFERORS--COMMERCIAL
ITEMS. Paragraph (h) is modified to say that the proposal or quote must offer to provide the total quantity of the items in this solicitation.
4 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(b) Only one award will be made as a result of this solicitation. Offers submitted for less than the total quantities of all the items in this solicitation will NOT be considered for award.
*** END OF NARRATIVE A0001 ***
5 61
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0011 ORDERING PERIOD ONE 1425 (E) EA $ ____________________ __________________
See Range Pricing
NSN: 4910-00-516-5806
COMMODITY NAME: JACK, DOLLY TYPE, HYD, 4 TON
CLIN CONTRACT TYPE:
Firm Fixed Price
SUPPLIES AND PRICES/COSTS:
THIS IS A REQUIREMENTS CONTRACT, FAR 52.216-21
IN THE FOUR DIGIT ITEM NUMBERS
(CLINS) THAT FOLLOW, THE NUMBERING SYSTEM
THAT IS USED IS AS FOLLOWS:
THE FIRST THREE DIGITS SIGNIFY ITEM AND
THE FOURTH (LAST) DIGIT SIGNIFIES THE
APPLICABLE CONTRACT YEAR, i.e., CLIN 0011
IS FOR THE FIRST ITEM - FIRST ORDERING
YEAR.
THE FOLLOWING DEFINITIONS APPLY TO THE
ENTIRE SOLICITATION AND RESULTING CONTRACT:
FIRST ORDERING YEAR OF THE CONTRACT IS THE DATE___________________
OF AWARD PLUS 548 DAYS (18 MONTHS).
NOTE: THE PRICE APPLICABLE TO AN INDIVIDUAL
ORDER IS THE PRICE FOR THE ORDERING YEAR IN
WHICH THE ORDER IS ISSUED. THE DELIVERY DATE
DOES NOT DETERMINE THE ORDERING YEAR.
The information presented below applies to
CLIN 0011.
Estimated Quantity: 1425 Each
Note:
There is no Guaranteed quantity
6 61
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative B003)
Range Quantities ________________
FROM TO UNIT PRICE ____ __ __________
39 228 $
229 457 $
458 685 $
686 913 $
914 1425 $
PRODUCT ENGINEERING REQUIREMENTS
The following Item Description, Drawing(s) and/or
Specification(s) represent minimum
Government requirements and are applicable to this Procurement.
National Stock Number (NSN):
4910-00-516-5806
Item: HYDRAULIC JACK, 4 TON In
Accordance With: Army TDPL
(Technical Data Package List)
0579A0000:59678, dated 01 November
2019 with the following exceptions:
Drawing 0579B0000
Note 2: Change to IDENTIFICATION OF THE
SUGGESTED SOURCES OF SUPPLY HEREON IS
NOT TO BE CONSTRUED AS A GUARANTEE OF
PRESENT OR CONTINUED AVAILABILITY AS A
SOURCE OF SUPPLY FOR THE ITEM(S).
Change from APPROVED SOURCE(S) to
SUGGESTED SOURCE(S) OF SUPPLY
Change from SOURCE CONTROL DRAWING to
VENDOR ITEM CONTROL DRAWING
End Article Application: Hydraulic Jack, 4
Ton, NSN: 4910-00-516-5806
(End of narrative B002)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS
LEVEL PRESERVATION: Military
7 61
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
8 61
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0021 ORDERING PERIOD ONE EST 2100 EA $ ___________________ __________________
See Range Pricing
NSN: 4910-00-289-7233
COMMODITY NAME: JACK, DOLLY TYPE, HYD, 10 TON
CLIN CONTRACT TYPE:
Firm Fixed Price
Range Quantities ________________
FROM TO UNIT PRICE ____ __ __________
72 336 $
337 673 $
674 1010 $
1011 1347 $
1348 2100 $
SUPPLIES AND PRICES/COSTS:
THIS IS A REQUIREMENTS CONTRACT, FAR 52.216-21
IN THE FOUR DIGIT ITEM NUMBERS
(CLINS) THAT FOLLOW, THE NUMBERING SYSTEM
THAT IS USED IS AS FOLLOWS:
THE FIRST THREE DIGITS SIGNIFY ITEM AND
THE FOURTH (LAST) DIGIT SIGNIFIES THE
APPLICABLE CONTRACT YEAR, i.e., CLIN 0021
IS FOR THE FIRST ITEM - FIRST ORDERING
YEAR.
THE FOLLOWING DEFINITIONS APPLY TO THE
ENTIRE SOLICITATION AND RESULTING CONTRACT:
FIRST ORDERING YEAR OF THE CONTRACT IS THE DATE___________________
OF AWARD PLUS 548 DAYS (18 MONTHS).
NOTE: THE PRICE APPLICABLE TO AN INDIVIDUAL
ORDER IS THE PRICE FOR THE ORDERING YEAR IN
WHICH THE ORDER IS ISSUED. THE DELIVERY DATE
DOES NOT DETERMINE THE ORDERING YEAR.
The information presented herein applies to
CLIN 0021.
Estimated Quantity: 2,100 Each
Note:
There is no Guaranteed quantity
9 61
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative B001)
PRODUCT ENGINEERING REQUIREMENTS
The following Item Description, Drawing(s) and/or
Specification(s) represent minimum
Government requirements and are applicable to this Procurement.
National Stock Number (NSN):
4910-00-289-7233
Item: HYDRAULIC JACK, 4 TON In
Accordance With: Army TDPL
(Technical Data Package List)
0579A0000:59678, dated 01 November
2019 with the following exceptions:
Drawing 0579B0000
Note 2: Change to IDENTIFICATION OF THE
SUGGESTED SOURCES OF SUPPLY HEREON IS
NOT TO BE CONSTRUED AS A GUARANTEE OF
PRESENT OR CONTINUED AVAILABILITY AS A
SOURCE OF SUPPLY FOR THE ITEM(S).
Change from APPROVED SOURCE(S) to
SUGGESTED SOURCE(S) OF SUPPLY
Change from SOURCE CONTROL DRAWING to
VENDOR ITEM CONTROL DRAWING
End Article Application: Hydraulic Jack, 10
Ton, NSN: 4910-00-289-7233
(End of narrative B003)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
10 61
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
11 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C._01_ TECHNICAL DATA PACKAGE INFORMATION
The following Xd item applies to this solicitation:
[X] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ ] 2. The TDP for this solicitation resides within the Beta System for Award Management (SAM) (https://beta.SAM.gov ) associated with this solicitation number:
W56HZV-20-Q-0128
To access the data through Beta.SAM:
a. Log on to the Beta.SAM web site: https://beta.SAM.gov .
b. Search for the solicitation number.
c. Click on the attachment you would like to view.
d. If the attachment is restricted, request access to the document.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec
2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). To obtain certification, go to https://public.logisticsinformationservice.dla.mil/jcp/search.aspx
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the
Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the Contract
Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. Beta.SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.
f. If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP. Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted.
Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-
8220. Vendors are responsible for placing correct information in Beta.SAM.
g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed Use and Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
C. 02 DRAWING LIMITATIONS
(a) The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are adequate to permit manufacture, and:
(1) depict the completed (item(s), and
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit
12 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
for the contract item could result.
(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.
(d) The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the
Government and no delivery schedule extension.
*** END OF NARRATIVE C0001 ***
PACKAGING AND MARKING
D. 01. PACKAGING REQUIREMENTS (SPECIFICATIONS/STANDARDS)
(a) The preservation, packing, and marking requirements for this contract/order shall be accomplished in accordance with the requirements in the specification/standard defined below.
(b) The following requirements shall apply:
(1) LEVEL OF PRESERVATION: Commercial
(2) LEVEL OF PACKING: Commercial
(3) QUANTITY PER UNIT PACKAGE: 001
(4) SPECIFICATION/STANDARD: MIL-STD-1916
(c) The specification/standard cited is intended to give a clear and accurate description of the technical packaging requirements for the item being procured, including the procedure by which it can be determined that the requirements have been met. Specific instructions and/or tailoring of the specification/standard is detailed in the supplemental instructions below. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing and without affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO with copies to the ACO.
The government reserves the right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing.
(d) Marking:
In addition to any special markings called out by the specification /standard above, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not.
Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive material will not identify the nature of the material. NOTE: Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see
"http://www.acq.osd.mil/log/sci/ait.html " l (best viewed with Internet Explorer 11 or higher) for the current DoD Suppliers
Passive
RFID Information Guide and Supplier Implementation Plan. When an item has Unique Item Identifier (UII) markings as indicated by the inclusion of contract clause DFARS 252.211-7006, refer to the DoD Guide to Uniquely Identifying Items for development of the UII and
MILSTD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
(e) Heat Treatment and Marking of Wood Packaging Materials (WPM):
13 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging
Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging
Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:
http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The
ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
(f) Hazardous Materials (As applicable):
(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) When applicable, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments)
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the
United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(g) SUPPLEMENTAL INSTRUCTIONS: Packaging shall be MIL-STD-2073-1, HYDRAULIC JACK shall be packed and shipped in wooden crates built in accordance with ASTM D6251/D6251M, Type III, Class 2, Style A. Blocking and bracing shall be used within the crates to prevent movement/shifting of items during shipping and transportation. Drywall screws can be used as an alternative fastening method for crate construction. Skids shall be affixed to the wooden crates. Skids shall be designed to accommodate multiple forklift moves from the front and rear of the crates. Skid planks will not protrude past the footprint of the load for shipment and load shall not extend past the edges of skid.
*** END OF NARRATIVE D0001 ***
14 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
2 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984
3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
MyriadPro-(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2015 (21 Oct 2015) or equivalent Tailored by excluding paragraph(s) 8.3
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
ES6333
E._01_ INSPECTION AND ACCEPTANCE (FIRST ARTICLE APPROVAL)
In addition to inspection requirements specified in applicable drawings and/or specifications, the following provisions shall apply to this contract:
(a) FIRST ARTICLE APPROVAL-CONTRACTOR TESTING: First Article Approval-Contractor Testing shall be performed in accordance with -1-
(b) The First Article Test Report (FATR) shall be compiled by the contractor to the contractor's own format. The FATR shall document the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable).
The FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the contractor to allow the designated
Government representative to determine that the First Article Test was successfully completed.
ES6304
E._02_ NOTICE REGARDING FIRST ARTICLE TEST SAMPLE
(a) The approved first article items, as described elsewhere in this contract, consist of a quantity of -1- that will be consumed or destroyed in testing. Any items consumed or destroyed in testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of any items that are consumed or destroyed shall be included in the overall offer or contract price. A quantity of -2- that successfully passes all specified tests, less the destructive tests, if any, -3- serve as a manufacturing standard for the remainder of the contract.
(b) A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as 1) an aid in identifying configuration changes not controlled by the contractual design. 2) an aid in identifying any process changes, or 3) the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.
(c) The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the contractor will notify the contracting officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.
15 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
ES7001
E._03_ INSPECTION AND ACCEPTANCE POINTS: ORIGIN
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ES6026
E._04_ SUPPLEMENTAL REQUIREMENTS TO FIRST ARTICLE APPROVAL (CONTRACTOR TESTING)
(a) In accordance with the requirements under FAR clause 52.209-3, found in Section I of this document, the first article approval item(s) shall be examined and tested as required by the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.
(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
(c) The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.
(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the First Article Test Report.
(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.
(5) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
(d) Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
(e) A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including
16 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to -1-.
(f) Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the
Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the
Government shall be borne by the Contractor.
*** END OF NARRATIVE E0001 ***
DELIVERIES OR PERFORMANCE
5 52.242-15 STOP-WORK ORDER AUG/1989
6 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
7 52.247-34 F.O.B. DESTINATION NOV/1991
8 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
9 52.211-8 TIME OF DELIVERY JUN/1997
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE__________________________
CLIN 0011 Ordering Periof One Deliveries shall begin 90 days after receipt of Delivery Order at a rate of 250 each per month.
CLIN 0021 Ordering Period One Deliveries shall begin 90 days after receipt of Delivery Order at a rate of 250 each per month.
EARLY DELIVERY IS ACCEPTABLE AT NO ADDITIONAL COST TO THE GOVERNMENT
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFERORS PROPOSED DELIVERY SCHEDULE___________________________________
17 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the
Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the
Contractors date of receipt of the contract or notice of award by adding
(1) five calendar days for delivery of the award through the ordinary mails, or
(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(End of Clause)
18 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
CONTRACT ADMINISTRATION DATA
10 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS DEC/2018
(a) Definitions. As used in this clause--
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and
Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and
Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov ; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the
WAWF home page at https://wawf.eb.mil/ .
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer
Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items--
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Combo
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Combo
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some Combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in
WAWF when creating payment requests and receiving reports in the system.
19 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC TBD
Issue By DoDAAC W56HZV
Admin DoDAAC W56HZV
Inspect By DoDAAC TBD
Ship To Code W25G1U
Ship From Code TBD
Mark For Code TBD
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and
Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
CONTACT THE ACO
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
20 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
CONTRACT CLAUSES
11 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER MAY/2011
12 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT/2018
13 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE AUG/2020
14 52.212-4 CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS OCT/2018
15 52.219-13 NOTICE OF SET-ASIDE OF ORDERS MAR/2020
16 52.223-6 DRUG-FREE WORKPLACE MAY/2001
17 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS DEC/2013
18 52.249-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (SHORT APR/1984
FORM)
19 252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING DEC/2019
20 252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT MAY/2016
21 252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS DEC/2019
EQUIPMENT OR SERVICES
22 252.225-7001 BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM--BASIC DEC/2017
23 252.227-7013 RIGHTS IN TECHNICAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .