Amend2.pdf
PDF 156 KB Posted
- Solicitation number
- P86543F19R00002
About this file
Amendment #0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 86543F19R00002_Amend_2_DAPIA_Body.doc | DOC document | |
| MH_DAPIA_PWS_20180116_OS_Removed_Amend_2.doc | DOC document | |
| Questions_and_Answers_DAPIA_86543F19R00002.docx | DOCX document | |
| Atch_8_Subcontracting-Plan-Template_DAPIA.docx | DOCX document | |
| 86543F19R00002_DAPIA_Body.doc | DOC document | |
| Atch_4_Past_Performance_Information_Chart.docx | DOCX document | |
| Atch_5_Past_Performance_Survey.docx | DOCX document | |
| Copy_of_Copy_of_Atch_3_Sample_Price_Breakdown_minus_rates.xlsx | XLSX spreadsheet | |
| MH_DAPIA_PWS_20180116_OS_Removed.doc | DOC document | |
| Copy_of_Copy_of_Atch_2_Sample_Price_Breakdown_rates.xlsx | XLSX spreadsheet | |
| MH_DAPIA_QASP_20180116_OS_Removed.doc | DOC document | |
| Amendment_0001.pdf | ||
| Atch_1_Contract_Line_Item_Numbers_DAPIA.doc | DOC document | |
| SF_1449_(2_2012).pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD FORM 0 (REV. 10-’B3)
Prescribed by GSA
FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE O PAGES
ii 2
2. AMENDMENT/MODIFICATION NO. 3, EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO: (if applicable)
0002 04/15/2019
6. ISSUED BY CODE HUD—NPH 7. ADMINISTERED BY (If other than Item 6) CODE
US DEPARTMENT OF MUD
OFFICE OF THE CHIEF PROCUREMENT
OFFICER
451 SEVENTH STREET SW
ROOM 5256
WASHINGTON DC 20410—1000
8. NAME AND ADDRESS OF CONTRACTOR (No., stmel, county, State and ZIP Code)
(x)
9A. AMENDMENT OF SOLICITATION NO.
86543F19R00002 x 9B. DATED (SEE ITEM 71)
03/25/2019
— iDA. MODIFICATION OF CONTRACT/ORDER NO.
lOB. DATED (SEE ITEM 73)
CODE FACILITY CODE
11. ThIS ITEM ONLY APPLIES TO u.,.E,.3MENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers .X, is extended. E. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER If by virtue of this amendment you desire to change en offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THtS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTSIORDERS. IT MODIFIES THE CONTRACTIORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACTORDER NO. IN ITEM iDA.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office,appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify te of modification end euthonty)
B. IMPORTANT: Contractor E is not. Is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
THE PURPOSE OF THIS AMENDMENT IS AS FOLLOWS:
1. To distribute Attachment 8, Subcontracting Plan Template, as documented in Section IV, Contract Documents, Exhibits or Attachments.
2. To revise Section V, Instructions:
a. Sections 3.1., 3.2. and D.1. copies to be submitted have been corrected.
b. Section D.2. Email Address is changed from “Email Address (Send via M/S Outlook Office 365 if file is over 20MB)” to Email Address (Email size cannot exceed 25MB).
c. Socioeconomic Participation, to add the following last paragraph:
Continued
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or iDA, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND QF CONTRACTING OFFICER (Type or print)
DONA M. MR
158. CONTRACTOR/OFFEROR 15C. DATE SIGNED 168. IT O’A 16C. DATE SIGNED
zL._ rectgOfflc)
NSN 7540-01-152-8070
Previous edition unusable
I REFERENCE NO. OF DOCUMENT BEING CONTINUED AGE OFCONTINUATION
SHEETI86S43F1SR00002/0002 2 2
NAME OF OFFEROR OR CONTRACTOR
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(A) (B) (C) (D) (E) (F)
“Offerors are to identify the anticipated State subcontracting dollars separate from all other subcontracting dollars, and not include in amounts used to calculate subcontracting goal participation as defined in paragraph (1) . The subcontracting plan must include total subcontracting dollars inclusive of the anticipated state subcontracted dollars.
Subcontracting with State entities will be categorized as “Other than small” when calculating small business subcontracting participation.”
3. To revise Section V1 Evaluation Criteria, Socioeconomic Participation, to add the following paragraph after “The government will evaluate this factor as follows’:
“For evaluation purposes only, state subcontracting dollars will not be included in calculating socioeconomic participation. In accordance with Section V, Instructions, the total anticipated for subcontracting to state governments will be identified separately but excluded from the calculation.”
4. To revise Attachment 6, Performance Work Statement (PWS)
a. All references to GTR and GTM have been removed.
b. Section 1.13, Transition In, the number of days is changed from 90 days to 60 days.
c. Section 1.14, Transition Out, the number of days is changed from 90 days to 60 days.
d. Section 6, Deliverables, Line A017, has been corrected to reflect a frequency of 4 per exchange.
e. Section 8, Related Documents, Performance
Requirement Summary (PRS), 5.1.2.7, New Task Element, has been deleted.
5. The solicitation response date is changed to May 1, 2019.