P24-054 Wire Mesh Safety Fence for Balancers Item Description revised 4.docx

DOCX document 73 KB Posted

Attached to
Wire Mesh Safety Fence
Solicitation number
FA813224QWMF1
Issued by

About this file

This document is an Item Description for Wire Mesh Safety Fencing required for five American Hofmann Balancer machines at Tinker Air Force Base. The fencing must include access doors with interlocks that prevent operator access during machine operation and automatically shut off the machine if the interlock is compromised. The contractor is required to provide the fencing panels and wiring, interlock switch, brackets, installation, wiring/relay/logic changes, electrical interlock tie-in, and performance verification. The related federal contract opportunity, Solicitation Number FA813224QWMF1, is being issued by the Department of the Air Force Materiel Command Air Force Sustainment Center for the purchase of the specified Wire Mesh Safety Fence.

View the file

Other files

File Type Posted
CSS - Wire Mesh Fence (revised).pdf PDF
CSS - Wire Mesh Fence.pdf PDF
P24-054 Saftey Fence Balance machine SOW 3.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

76th MAINTENANCE SUPPORT GROUP (76 PMXG)

TINKER AIR FORCE BASE, OKLAHOMA

Item Description

P24-054 Wire Mesh Safety Fence for Balancers

76 PMXG Request for the purchase of Wire Mesh Safety Fence. The Wire Mesh Safety Fence shall include the following:

· Wire Mesh Safety Fencing for five (5) American Hofmann Balancer Models HM-24.2J (2), HM-24.1J, HD242J, and HM machines requiring fully enclosed wire mesh fencing with access doors and interlocks. The interlocks shall prevent operator access during machine operation and automatically shut off if the interlock is compromised.

· Contractor shall provide Electrically interlocked to balancers, Fencing Panels and Wiring, Interlock Switch, Brackets, and any other material needed to complete requirement.

· Onsite Commissioning to include:

· Contractor shall provide Onsite Commissioning

· Contractor shall provide installation of Fencing to Floor

· Contractor shall provide Wiring / Relay / Logic Changes

· Contractor shall provide Tie-In Electrical Interlock

· The contractor shall provide Performance Verification.

Contractor must meet all requirements outlined in the Statement of Work (SOW).

image1.png image10.png

File details come from the government source that posted it. Updated .