Amendment 00001.pdf

PDF 129 KB Posted

Attached to
Roybal Flooring Replacement Federal contract opportunity
Solicitation number
P20140358_P20180023
Issued by
Department of Health and Human Services Centers for Disease Control and Prevention Office of Acquisition Services

About this file

This document provides details for a federal contract opportunity to replace flooring at multiple buildings on the Roybal campus. The Centers for Disease Control and Prevention requires the removal and replacement of existing carpet, tiles, flooring, base, and area rugs across three buildings totaling over 500,000 square feet. Services include demolition, furniture moving, floor preparation, and installation of new carpet tiles, luxury vinyl tiles, base, and lobby area rugs. The estimated price range for the single award contract is between $1,000,000 to $5,000,000 with a one year period of performance. This is a total small business set-aside limited to small business concerns under NAICS 238330 with a size standard of $15.5 million. The pre-proposal meeting is scheduled for February 18, 2020 and questions should be directed to the named contracting specialist.

View the file

Other files for this federal contract opportunity

Other files attached to Roybal Flooring Replacement, newest first.
File Type Posted
Amendment 00004.pdf PDF
Amendment 00003.pdf PDF
Amendment 00002.doc DOC document
A9 _Contractor_Visit_Form.docx DOCX document
A4 HazMat.docx DOCX document
75D301-20-R-67864.pdf PDF
A6 General References.docx DOCX document
A8 Project Experience.docx DOCX document
A5 Bid Bond.pdf PDF
A7 Deliverables_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
A2 Proposal Pricing Format.docx DOCX document
A3 Past Performance.docx DOCX document
A1 Wage Determination GA20200126.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

00001

3. EFFECTIVE DATE

02/26/2020

4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 8219 7. ADMINISTERED BY (If other than Item 6) CODE

Centers for Disease Control and Prevention

(CDC)

Office of Acquisition Services (OAS)

2900 Woodcock Blvd, MS TCU-4

Atlanta, GA 30341-4004

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

X

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (See Item 11)

02/07/2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (See Item 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGMENT

TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT

IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, 1 is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to answer questions provided by prospective vendors.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED

16B. UNITED STATES OF AMERICA

BY ___________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE 30-105 Prescribed by GSA

FAR (48 CFR) 53.243

ITEM 10A.

Error! Reference source not found.64 00001

Roybal Flooring Questions:

1. Will contractors be allowed to invoice for all the carpet at one time providing the mill ships all the materials to the contactor warehouse at once?

Answer: If the company orders and receives the material and the government can verify receipt of the material, you can invoice for it.

2. Is the loading dock 100 feet or 100 yards away from the Auditorium in Building 19?

Answer: Around 150 feet.

3. Will 4” cove base be used to replace the 2.5” cove base? It wasn’t clear if it was a definite decision or not. If so, please specify where.

Answer: For 21 in Building 19 there is the risers that are different sizes.4” will be used and drawings will be provided.

4. Can the AREA RUGS be cleaned on site versus removed and cleaned?

Answer: The rugs will more than likely need to be removed due to the extent of cleaning necessary. Area rugs shall be professionally cleaned to include a dusting treatment, shampoo and spot/stain remover, immersion wash, and drying. Rugs shall be treated with a stain protector after drying is completed.

5. Can we clearly define which areas will be done at night versus daytime hours?

Answer: Daytime: Building 19 (Auditorium A), Building 21 (Basement, 4, 5, 6, 7, 8, 9, 11) –

Nighttime: Building 21 (1, 2, 3, 10 and 12)

6. Will there be a staging area for the carpet? Where in each building?

Answer: They can deliver the carpet when they are working on each floor during the day only. If doing it at night, we will have to see how much space is available on the Loading dock for the carpet. They might have to just deliver it per phase.

******************************End of Amendment 00001*******************************