Final_Plans_and_Specs.pdf

PDF 5 MB Posted

Attached to
REPLACE ROOF-LF MAINT BLDG & SHED Federal contract opportunity
Solicitation number
P17PS01363
Issued by
Department of the Interior National Park Service

About this file

SOW - Plans and Specifications

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE ROOF-LF MAINT BLDG & SHED, newest first.
File Type Posted
LF_Roofing_Clauses.docx DOCX document
Sol_P17PS01363.pdf PDF
2017_Construction_Williamson_County_.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work

Date: January, 2017

Location: Natchez Trace Parkway – MP 429

Leipers Fork Maintenance Building and Shed

Title: Replace Roof

1. These are historical structures and care shall be taken not to impact the structure and grounds any more than necessary.

2. Access the building and attic before any construction has taken place to inspect for water damage from leaks. All areas identified shall be repaired during construction.

3. All shingles and black paper will be removed and properly disposed of.

4. Replace any rotten wooden including decking and rafters. All fascia board shall be removed and replaced in kind. Replace any damaged flashing or trim.

All wood and flashing replaced shall be of same type and dimension.

Exposed wood shall be primed and painted to match existing exterior.

5. The existing gutter can be reused if not damaged during construction. If damaged, it will need to be replaced in kind.

6. Place 30# felt paper. Nail size and spacing shall be per building code.

7. Place shingles. Shingles shall be attached using nails. Shingles: Tamco Elite

Glass-Seal 25 year shingles, Color shall match existing shingles.

8. Care shall be taken to ensure all nails, wood, etc has been removed and properly disposed of. Any disturbed areas shall be seeded.

9. These buildings will remain open during construction. The contractor is responsible for ensuring that doorways and paths remain clear and safe for passage during construction. Areas where debris will be falling shall be secured and roped off.

10. Construction can only take place during our typical work day. The gates are open from 7:30 am to 4:00 pm. No work will be allowed on weekends or federal holidays.

11. Existing plans are provided for the contractors use. These are for information purpose only and shall not be used for material specifications.

Leipers Fork - Replace Roof - Scope of Work - 2016
Maint Building 18
Maint Building 19
Maint Building 23
Maint Building 24
Maint Building 26
Maint Building 27
Maint Building 28
Maint Building 31
Maint Building 37
Maint Building 39
Maint Building 40
Maint Building 44