SOW - Plans and Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| LF_Roofing_Clauses.docx | DOCX document | |
| Sol_P17PS01363.pdf | ||
| 2017_Construction_Williamson_County_.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work
Date: January, 2017
Location: Natchez Trace Parkway – MP 429
Leipers Fork Maintenance Building and Shed
Title: Replace Roof
1. These are historical structures and care shall be taken not to impact the structure and grounds any more than necessary.
2. Access the building and attic before any construction has taken place to inspect for water damage from leaks. All areas identified shall be repaired during construction.
3. All shingles and black paper will be removed and properly disposed of.
4. Replace any rotten wooden including decking and rafters. All fascia board shall be removed and replaced in kind. Replace any damaged flashing or trim.
All wood and flashing replaced shall be of same type and dimension.
Exposed wood shall be primed and painted to match existing exterior.
5. The existing gutter can be reused if not damaged during construction. If damaged, it will need to be replaced in kind.
6. Place 30# felt paper. Nail size and spacing shall be per building code.
7. Place shingles. Shingles shall be attached using nails. Shingles: Tamco Elite
Glass-Seal 25 year shingles, Color shall match existing shingles.
8. Care shall be taken to ensure all nails, wood, etc has been removed and properly disposed of. Any disturbed areas shall be seeded.
9. These buildings will remain open during construction. The contractor is responsible for ensuring that doorways and paths remain clear and safe for passage during construction. Areas where debris will be falling shall be secured and roped off.
10. Construction can only take place during our typical work day. The gates are open from 7:30 am to 4:00 pm. No work will be allowed on weekends or federal holidays.
11. Existing plans are provided for the contractors use. These are for information purpose only and shall not be used for material specifications.
| Leipers Fork - Replace Roof - Scope of Work - 2016 |
| Maint Building 18 |
| Maint Building 19 |
| Maint Building 23 |
| Maint Building 24 |
| Maint Building 26 |
| Maint Building 27 |
| Maint Building 28 |
| Maint Building 31 |
| Maint Building 37 |
| Maint Building 39 |
| Maint Building 40 |
| Maint Building 44 |
File details come from the government source that posted it. Updated .