B09_Amendment_One_20170228.pdf

PDF 2 MB Posted

Attached to
Rehabilitate Toklat Utility Infrastructure, DENA 209505
Solicitation number
P17PS00201
Issued by

About this file

Amendment One

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

P17PS00201

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

DENA 20950502/13/2017000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/13/2017

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Legacy Doc #: NPS

DENA 209505 - Rehabilitate Toklat Utility Infrastructure

Denali National Park and Preserve, Alaska

The purpose of this amendment is to correct information regarding site visits and answer questions received. Please see attached pages.

All questions must be submitted in writing to sharon_miner@nps.gov. The deadline for questions is 7 March 2017.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Raymond Prazak

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation P17PS00201 Amendment One

In order to edit the site visit information and answer questions received, the above numbered solicitation is hereby amended as follows:

1. In Section L, Instructions, Conditions and Notice to Offerors, Clause 52.236-27, Site Visit (Construction), the Park point of contact is replaced with the following: Raymond Moore, 907- 683-6407. See also response to question one regarding site accessibility.

2. The following questions regarding the solicitation have been received and answers provided:

Q1. We would like to know if we can access the site on Snowmobiles next week riding the park road?

A1: Snowmobiles are not permitted to be used within the Wilderness areas of Denali National Park, which includes the road corridor and the Toklat Road Camp area. Access at this time of year is only possible via non-motorized means, in accordance with Park regulations. Given the remote location of Toklat, winter access is not typically feasible. Please see https://www.nps.gov/dena/planyourvisit/winter-activities.htm for more information.

Q2. Where exactly is the borrow site located?

A2: The Material Processing site is located due north of the project site as indicated, for example, on Drawing G3.0. This site is immediately adjacent to the work area.

Q3. Are any photographs of the project site or borrow area available?

A3: The project site is adequately described by the Contract Documents and additional photographs are not provided. Photographs of the Material Processing Site are being provided as an attachment to this Amendment.

Q4. In order to meet bridge weight requirements can an excavator be tracked across a bridge independent of a truck?

A4: Please reference Specification 01 11 00, Section 1.4.F, Paragraphs 4 through

6. Application for an official park permit would be required for loads exceeding the listed load limits. Accommodation of heavier than listed loads via separate transit of equipment from the transport vehicle may be permissible under a special permit, depending on equipment weight and configuration. Please note that "A special permit will not relieve Contractor of liability for damage which may result from moving of equipment".

3. All other terms and conditions, including the solicitation due date, remain unchanged.

https://www.nps.gov/dena/planyourvisit/winter-activities.htm

DENA 209505 – Photographs of Material Processing Site. Taken late 2016.

NOTE: SITE CONDITIONS MAY HAVE CHANGED SINCE PHOTOGRAPHS WERE TAKEN.

Figure 1 - Southern Portion of Material Processing Site; Dormitory 545 visible in center background. Contractor Staging Area per G3.0 in foreground.

Approximate location of drainfield visible on right/rear of photo.

Figure 2 - Southern Portion of Material Processing Site; Photo looks across driving path and “Additional Contractor Staging Area with Approval of Contracting Officer” shown on G3.0.

Figure 3 - Material Processing area, looking West from East side.

Figure 4 - Material Processing area, Same Location as Figure 1, looking slightly more to North.

Figure 5 - Material processing area, looking North from East side. “Back” of site visible in background, far pile is located at far North end of pit.

Same Location as Figure 1.

Figure 6 - Material processing area, better detail & zoom of far North end of Site.

P17PS00201.pdf
B09_Amendment One_20170228
Amendment 1 text
Amendment One DENA 209505 Material Processing Site Photographs

File details come from the government source that posted it. Updated .