Statement of Work / Technical Specifications

View the file

Other files

File Type Posted
Terms_and_Conditions_SECTION_C_-_I.docx DOCX document
P16PS02433_SF-1449.pdf PDF
Sol_P16PS02433.pdf PDF
Price_Schedule_-_SECTION_B.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Quotations #P16PS02433 San Juan Island NHP Attachment 1: Statement of Work and Schedule

1. Background and Purpose:

The mission of the National Park Service is to preserve unimpaired the natural and cultural resources and intrinsic values of the National Park System for the enjoyment, education, and inspiration of this and future generations. The NPS, in managing San Juan Island National Historical Park National Park, NPS has a need to preserve the native plant resources and revegetate parklands. The NPS requires that restoration of native plants will be accomplished using germplasm from populations as closely related genetically and ecologically as possible to park populations. Starting in 2015, NPS began restoration on 14 acres along the Cattle Point Road and approximately 6 acres associated with Island Marble Butterfly habitat improvement in nearby meadows at American Camp. The NPS does not have the personnel, expertise, space, or equipment needed to propagate sufficient quantities of the required seed and plants.

In this contract NPS will hire a contractor with appropriate personnel that is equipped to:

· Clean and propagate quantities of seed sufficient to meet NPS’ needs within the required time frames

· Conduct evaluations on the plant species listed below to determine cultural requirements for establishment. Many of these species do not have established propagation requirements, so the contractor will need to develop successful procedures for propagation.

· After seeds and plant materials are delivered annually to the park, provide continued guidance and advice about planting, growing, and maintaining the species in the park environment.

2. NPS to Provide

· Seed stock to the contractor for planting and seed increase production.

· Clear instructions on the amount, type, and timing of plant materials requested. Tables 1-4 define seed and plant propagation needs for the Island Marble Butterfly work and the Cattle Point road restoration work.

Contractor to Provide:

· Provide technical expertise, including field and laboratory assistance in the growing and cleaning of plant materials required by the NPS under this agreement.

· Provide isolated growing areas for seeds collected in the park and maintain genetic integrity of the plant materials; maintain the fields weed-free for optimum seed production; harvest, process, test and store the resulting seed in an environment controlled facility. Provide quantities of seed and plugs indicated in Tables 1 through 4.

· Provide seed cleaning and seed storage services for seed provided to contractor by NPS. Seeds may need to be stored for up to 3 years before they are sown.

· Prepare and submit an annual report at the end of each research/contract year that includes a detailed description of work implemented for the project as a whole.

Schedule.

DELIVERABLE FROM CONTRACTOR
DATE DUE

TO NPS

DATE NPS RESPONSE DUE

A.
Participate in planning meeting with Government project team. May last up to one day. It is preferred that Contractor attend in person at SAJH.
Prior to April 1, annually
N/A
B.
Develop implementation schedule for all project elements based on predicted weather conditions and plant phenology.
Prior to April 1, annually
N/A
C.
Meet with NPS Coordinator to review accomplishments.
August 30, annually
N/A
D.
Submit annual progress reports to the NPS Coordinator throughout the field season(s).
Annually
N/A
E.
Provide draft annual report to NPS Coordinator.
September 15, annually
October 15, annually
F.
Submit two hard copies of the field notes, maps and annual report, as well as an electronic version of the final report in PDF and Word formats.
December 15, annually
N/A

7. PAYMENT SCHEDULE

Payment Schedule: The Contractor may invoice no more frequently than monthly starting in May; the final invoice for each year may be submitted after all documents have been received and approved by NPS for the contract period.

Publications of Results of Studies: Neither the Contractor nor the Government will unilaterally publish a joint publication without consulting the other party. This restriction does not apply to popular publications of previously published technical matter. Publications pursuant to this document may be produced independently or in collaboration with others; however, in all cases proper credit will be given to the efforts of those parties’ contributions to the publication. In the event no agreement is reached concerning the manner of publication or interpretation of results, either party may publish data after due notice and submission of the proposed manuscripts to the other. In such instances, the party publishing the data will give due credit to the other party but assume full responsibility for any statements on which there is a difference of opinion.

TABLE 1:

SEED TREATMENT - Island Marble

Common Name
Minimum Grams of seed per year for 5 years
Total grams of seed
Achillea millefolium var. occidentalis
western yarrow
25
113
Anaphalis margaritacea
pearly everlasting
10
2.5
Cerastium arvense
field chickweed
70
14
Viola adunca
Hookedspur violet
230
46
Camas quamash
Common camas
1040 (2.3lbs)
85
Lomatium nudicaule
Barestem biscuitroot
2270 (5lbs)
680
Lomatium utriculatum
Spring gold
410
28
Delphinium menziesii
Menzies’ Larkspur
110
22
Amsinckia menziesii
Menzie’s fiddleneck
565
113

TABLE 2:

SEED TREATMENT - Cattle Point Road

Common Name
Minimum Grams of seed per year for 5 years
Total grams of seed
Achillea millefolium var. occidentalis
western yarrow
317.515
1270.06
Anaphalis margaritacea
pearly everlasting
317.515
1270.06
Cerastium arvense
field chickweed
476.27
1905.09

TABLE 3:

PLANTING TREATMENT Island Marble

Common Name
Life Stage at Planting
Number of bulbs/ plugs
Camas quamash
common camas
Bulb
750
Camas leichtlini
great camas
Bulb
750
Fritillaria affinis
chocolate lily
Bulb
750
Sisyrinchium angustifolium
Blue-eyed grass
Plug (4 cubic inch )
750
Allium acuminatum
Hooker’s onion
Plug (4 cubic inch )
750
Brodiaea coronaria
Harvest Brodiaea
Plug (4 cubic inch )
750
Triteleia howelli
Howell's brodiaea
Plug (4 cubic inch )
750
Triteleia hyacinthine
hyacinth triteleia
Plug (4 cubic inch )
750
Bromus sitchensis
Alaska Brome
Plug (4 cubic inch )
600
Elymus glaucus
Blue wildrye
Plug (4 cubic inch )
600
Festuca roemeri
Roemer’s Fescue
Plug (4 cubic inch )
600
Danthonia californica
California oatgrass
Plug (4 cubic inch )
600
Achnatherum lemonii
Lemmon's needlegrass
Plug (4 cubic inch )
600

TABLE 4:

PLANTING TREATMENT

Cattle Point Road

Common Name
Life Stage at Planting
Number of plugs per year for 4 years
Achillea millefolium var. occidentalis
western yarrow
Plug (4 in3)
1000
Anaphalis margaritacea
pearly everlasting
Plug (4 in3)
1000
Cerastium arvense
field chickweed
Plug (4 in3)
1000
Lomatium utriculatum
common lomatium
Plug (4 in3 )
1000