Request for Proposal

View the file

Other files for this federal contract opportunity

Other files attached to Prepare a Historic Resource Study an, newest first.
File Type Posted
Sol_P16PS02315.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number - P16PS02315

OCMU HRS & NRN

SECTION A – SOLICITATION, OFFER AND AWARD

Award will be made on SF-1447, Solicitation/Contract. This is a competitive acquisition that is 100% set aside to small businesses.

The NAICS is 541330, Engineering Services with a size standard of $15 million. The PSC is F099, Other Natural Resources and Conservation Services.

A certificate of insurance is also required and coverage must be at a minimum of: $200,000 per person; $500,000 per occurrence; and $20,000 per property. The insurance must be provided within ten calendar days of receipt of the award. The contractor shall be insured in accordance with the respective insurance regulations of the state work is being performed in. The government is not responsible for damage to contractor’s equipment, vehicles, tools or materials or their employees and the personal property brought on-site. The government will not accept any liability due to contractor employee negligence.

· Workers Compensation: The contractor shall furnish proof of workers compensation insurance to the CO for those employees performing work related to this contract and shall comply with the Workman’s Compensation Laws of the State work is being performed in.

· Liability: The contractor shall maintain a level of insurance that will protect the contractor and the government from any claims as a result of bodily injury (including death) and property damage which may arise from and during the performance of this contract, and shall submit proof of insurance to the CO.

Contractors must be registered in SAM.gov prior to award.

SECTION B - SUPPLIES OR SERVICES AND PRICES

The contractor shall provide all labor, supervision, transportation, etc. necessary to provide the services as described herein. The contractor will be required to self-perform, at a minimum, 35% of the work. The price proposal shall include a lump sum price for each component for all of the work required herein along with a cost break down showing the hourly rates for the prime and consultants; overhead and profit; and insurance.

The proposal due date is August 30, 2015 at 4:00pm (edt) and the deadline for submitting questions August 23, 2016 at 2:00 p.m. (edt). Questions received after this date may not receive a response.

Section C – Scope of Services

Phase I – Historic Resource Study

SCOPE

In accordance with the terms and conditions of the contract, the contractor shall perform the work of this task order for the National Park Service (NPS) as described below.

Confidentiality The information developed under this task order is the property of the U.S. government and shall be kept in strict confidence.

Performance Period The work shall begin following the issuance of the delivery/task order, proceed in accordance with the schedule for submittals.

Introduction This scope of services directs the contractor to prepare a Historic Resource Study and an updated National Register nomination for Ocmulgee National Monument (OCMU) and surrounding areas.

The Contractor shall provide all materials, supplies, labor, supervision, coordination, and management necessary to complete the work as and when required, as specified in this scope of services.

Points of Contact:

Contractual: Contracting Officer (CO): Laurie Chestnut Contracting Officer’s Representative (COR) and NPS Project Manager: Turkiya L. Lowe, Chief, SERO CR Research and Science, 404-507-5805, turkiya_lowe@nps.gov Park Contacts: Lonnie Davis, Cultural Resources Specialist, 478-752-8257 x. 224, Lonnie_davis@nps.gov. Kevin Wyrick, Chief of Operations, 478-752-8257 x. 213, kevin_wyrick@nps.gov Southeast Archeological Center (SEAC): Contact TBD, 2035 E. Paul Dirac Drive, Johnson Building, Suite 120, Tallahassee, FL 32312, 850-580-8424.

Purpose The purpose of this project is to produce a Historic Resource Study (HRS) and National Register nomination for Ocmulgee National Monument (OCMU) and an additional proposed 2,100 acre area that includes part of the Ocmulgee Old Fields Traditional Cultural Property. The project will be completed in two phases: preparation of the Historic Resource Study (Phase I) and preparation of the National Register nomination (Phase II). Phase II is scheduled to begin in Fiscal Year 2018 and is dependent on funding.

A HRS provides a historical overview of a park or region and identifies and evaluates a park's cultural resources within historic contexts. It synthesizes all readily available cultural resource information from all disciplines in a narrative designed to serve managers, planners, interpreters, cultural resource specialists, and interested public as a reference for the history of the region and the historic resources within a park. Entailing both documentary research and field investigations to determine and describe the integrity, authenticity, associative values, and significance of resources, the HRS supplies data for resource management and interpretation. The HRS also identifies any need for special history studies, cultural landscape reports, ethnographic reports, archeological investigations, or other detailed studies and may make recommendations for resource management and interpretation as appropriate.

The HRS should also establish historic contexts that can be used for preparation of a National Register nomination.

Section 110 of the National Historic Preservation Act of 1966 requires inventory and evaluation of all cultural resources–not merely the most prominent or interpretable. These resources should be evaluated according to National Register of Historic Places criteria found in National Register Bulletin 15. The study will enhance and broaden existing National Register documentation as well as provide historical context for the future National Register work.

The HRS will contain historic contexts with sufficient historical background information to identify and evaluate previously unidentified and/or unevaluated extant structures that are more than fifty years old and structures of exceptional importance that are less than fifty years old. It is expected that the researcher(s) will consult primary and secondary sources related to the history of the park to inform the aforementioned historic contexts.

Below-ground archeological resources will not be evaluated in this study; however, known below ground archeological data from the property will be described and developed into historical contexts including the historical development of scientific archeology as a field of study as associated with the national monument’s extant historic structures; the 12,000 years of habitation of the site; and the significance of archeology to understanding Native American lifeways, trade and interaction throughout the Macon Plateau and greater Southeast.

Background Ocmulgee National Monument (OCMU) was authorized by Congress on June 14, 1934, and established by presidential proclamation on December 23, 1936. President Franklin D. Roosevelt established the monument after local citizens purchased property along the Ocmulgee River and donated it to the federal government. Expanded in 1941 and 1991, the OCMU now encompasses 701 acres in two separate units. In 2016, Congressional legislation was introduced for a proposed boundary change that will expand OCMU by an additional 2,100 acres within the Ocmulgee Old Fields Traditional Cultural Property. This HRS would include examination of historic contexts associated with resources within the current park boundaries and the proposed expanded boundary.

Currently, the main unit (656 acres) includes a portion of the Macon Plateau and is bisected by the Norfolk Southern Railroad. The upland portion of the unit is characterized by rolling hills, grassy fields, and forest patches. To the south and southwest, the unit includes wetlands associated with Walnut Creek and the Ocmulgee River. Within the main unit are seven prehistoric mounds, a funeral mound, a reconstructed earth lodge, prehistoric trenches, and numerous archeological features. This unit also includes the site of a colonial (1690) British trading post (which the Creek Indians frequented), the historic Dunlap House, an Art Moderne visitor center, Civil War earthworks, substantial urban green space, six miles of hiking trails, and a picnic area.

The smaller Lamar Mounds unit is located about two and one-half miles southeast of the main unit and lies in the floodplain of the Ocmulgee River. This unit is the type site of the so-called Lamar culture, a Late Mississippian agricultural society. The Lamar Mounds unit sits on a hummock slightly elevated from the surrounding floodplain and a nearby oxbow lake. Two large mounds (Mounds A and B) and the site of a palisaded village are present on this 45-acre tract. A rectangular levee, constructed in the 1930s, encloses two and one-half sides of the Lamar site but remains unfinished. Mound B is ascended by a spiral ramp—the only such ramp known to exist in the United States.

Today, the park welcomes approximately 120,000 visitors per year. Interpretive programs, exhibits, and artifacts educate visitors about the relationship of people to the land in the area once known as the Ocmulgee Old Fields. Each year culminates with the annual Ocmulgee Indian Celebration, a sharing of Southeast American Indian culture featuring traditional and contemporary dancing, singing, storytelling, games, and crafts.

As a historic unit of the National Park Service the site was automatically listed in the National Register of Historic Places. OCMU completed a NR historic district nomination in December 1978 (66000099) and an amendment in May 1996 that included 3 individually listed National Register properties: the Dunlap House, Civil War Earthworks, and its Art Moderne-style Visitor Center. The Railroad Overpass within OCMU was individually listed on the NR on December 18, 1979. In addition, the Ocmulgee Old Fields was determined eligible by the Keeper of the National Register through a Federal Determination of Eligibility in 1997 (65008971) as a Traditional Cultural Property (TCP), the first location in the eastern United States to receive this determination. However, no official NR nomination has been prepared. The TCP extends well beyond the current boundaries of the park to encompass areas traditionally associated with the cultural beliefs and practices of the Muscogee (Creek) Nation and related tribes.

The 2016 proposed boundary expansion (2,100 acres) includes areas within the Ocmulgee Old Fields TCP and contains multiple cultural and historic resources, some of which are individually listed in the National Register or have been otherwise determined eligible for the National Register. Other sites remain unevaluated.

Despite these multiple NR listings, a comprehensive Historic Resource Study has not been completed for the park and its associated areas. Phase II NR project would nominate previously unlisted, eligible historic sites within the park and the proposed OCMU expanded boundary based on information gathered in the Phase I HRS.

he List of Classified Structures (LCS) is the NPS list of all above ground resources that are listed in or have been determined eligible for listing in the National Register. OCMU has 18 historic resources within the current park boundary listed in the LCS:

Preferred Structure Name
Structure Number
LCS ID
Dunlap Mound
HS-07
1180
McDougal Mound
HS-05
1181
Earthlodge
HS-08
1186
Lamar Mound A
HS-11
1187
Funeral Mound
HS-03
1188
Great Temple Mound
HS-01
5086
Lesser Temple Mound
HS-02
5087
Cornfield Mound
HS-04
5088
Southeast Mound
HS-06
5089
Dunlap House
HS-09
5090
Civil War Fortifications
HS-10
5091
Lamar Mound-Small Spiral Mound
HS-12
5092
Palisade Trenches
HS-16
91394
Mound X
HS-17
91395
Prehistoric Trenches
HS-19
91396
Corn Storage Pits
HS-18
91397
Flagstaff
HS-15
91398
Visitor Center
HS-14
91399

Scope of Work In consultation with the NPS, the contractor shall determine areas of inquiry that will best guide later, more specific historical narratives and will form chapters of the HRS. Areas of inquiry should include, but not necessarily be limited to, the following specific periods and topics:

· Human inhabitation of the Ocmulgee Old Fields and surrounding area has existed for over 12,000 years, particularly Mississippian culture in the Southeastern region.

· American Indian life and culture, particularly within the multiple tribes that formed the Muscogee (Creek) Nation illustrated by pre-contact mounds and related features.

· Early protohistoric, contact period, and colonial history illustrated by Creek village and British colonial trading post structures.

· Civil War-era history illustrated by the Dunlap House and multiple historic earthworks from the period.

· 20th Century settlement and development of the Fields and surrounding area.

· The development of the field of scientific archeology at the Ocmulgee Old Fields, as the monument and surrounding area is the site of one of the largest archeological investigations in North American history.

· The Ocmulgee Old Fields Project (Civilian Conservation Corp era, 1933–1941) employed one of the largest numbers of workers on an archeological investigation in the history of the Works Progress Administration (WPA) (more than 800, including an all-female African American crew). The work at this site served as a field school for several archeologists who had an impact on the field of archeology for generations.

· Significant architecture, such as that illustrated by the pre-contact mounds and the current park Visitor Center.

· Other historic contexts as identified.

The contexts listed above will provide information through which National Register documentation can be created in the next phase of the project.

The HRS shall illustrate and enumerate the park’s historic resources. Park staff and staff at the NPS Southeast Regional Office (SERO) in Atlanta, GA, the NPS Southeast Archeological Center (SEAC) in Tallahassee, FL and Ocumulge National Monument (OCMU) will assist the researchers in this part of the study by providing cultural resource data from various internal databases (LCS, CLI, ASMIS) as well as access to relevant archives, maps and photographs. The researcher/s shall include digital images documenting the present setting and condition of the cultural resources. The researchers shall also prepare an appropriate number of maps, using GIS, to illustrate the narrative.

Research Sites and Level of Effort

LEVEL OF EFFORT

Research will meet NPS standards for a thorough investigation, i.e., research will be done in selected published and documentary sources of known or presumed relevance that are readily accessible without extensive travel (though travel to OCMU, SERO and SEAC to gather data is expected) and that promise expeditious extraction of relevant data. Findings will be presented in no greater detail than required by this scope of work.

The contractor will contact and consult with the park’s Affiliated Tribes during the research process to seek input, gather and access available Tribal information and documentary sources related to associated historic contexts and resources within the study scope.

Previous Research Previous research and documentation on OCMU is substantial, and may provide valuable background information on specific historic contexts. The Southeast Archeological Center (SEAC) will provide a list and access to previous NPS archeological studies. A sample of sources are below:

· Ocmulgee National Monument, National Register nomination, December 8, 1978. 66000099. Amended 1996.

· Railroad Overpass at Ocmulgee, National Register nomination, December 18, 1979. 79000699.

· Ocmulgee Old Fields Boundary Study & Environmental Assessment: Ocmulgee National Monument, January 2014. NPS report.

· “Ocmulgee National Monument: The Earth Lodge Historic Structure Report” (2005).

· Cultural Landscape Report (2007). NPS.

· Ocmulgee Archaeology, 1936–1986 by David J. Hally

· Antiquities of the Southern Indians, Particularly of the Georgia Tribes, Charles C. Jones, Jr. (1873, reprinted 1999).

· Archeology of the Funeral Mound, Charles Fairbanks (1956).

· Archeological Investigations for the Proposed Pedestrian Bridge and Mound Steps, Ocmulgee National Monument, Macon, Georgia, by Kidd, McNeil, Moses (2004)

· “Archeological Overview and Assessment of the Lamar Mounds Unit of Ocmulgee National Monument, Macon, Georgia.” NPS Southeast Archeological Center, 1991.

· “An Early Mississippian Settlement History of Ocmulgee,” Ph.D. dissertation (2012) by Dan Bigman

· “Post-Hole and Magnetic Susceptibility Testing Near Mound X, Ocmulgee National Monument, Bibb County, Georgia,” report (2012) by Dan Bigman.

· The Archeology of Ocmulgee Old Fields, Macon, Georgia, by Carol I. Mason (2005).

· “Archeological Report on the Middle Plateau,” by Hale G. Smith (1973).

· “Archaeological Investigations on the Middle Plateau, Ocmulgee National Monument, Bibb County,” by Jessica McNeil (2006).

Products and Format

All research files and notes made during production of this study is the property of the NPS and will be turned over to the NPS upon completion of the contract. Excluded from the research notes that will be provided to the NPS will be copies of either photographs or documents for which another institution has either the copyright or has placed restrictions on its distribution. The researcher/s final draft, including all photographs, maps, etc. shall become the intellectual property of the NPS.

The study will include a separate bibliography and a list of repositories. Appendices, including relevant existing documentation, tables, maps, and sources will be included as noted above.

Front matter will include a table of contents, list of illustrations, and executive summary.

The researcher/s will deliver the final version of the HRS to the NPS as a paper copy and as an electronic file or files (in Microsoft Word and/or Adobe Acrobat as requested). The final format of the document will be agreed upon between the PI and NPS. All illustrations used in the final document will be credited. If any of the illustrations carry restrictions (such as one-time use limitations), the researcher/s will provide this information to the NPS. The electronic file(s) supplied to NPS will be adequate for transmission to a printer or for incorporation into a final file or files to be prepared by NPS for transmission to a printer to be selected by the NPS. A common sequence of contents for an HRS is as follows:

Figure Credits List of Figures Acknowledgements Introduction Chapter One Chapter Two Chapter Three, etc.

National Register Issues & Management Recommendations Bibliography

Project Schedule (these dates are tentative and depend upon the completion of contract paperwork)

DELIVERY ITEM
DATE
Start-up Meeting
To be determined
Site Visit(s)
To be determined
Submission of Outline of HRS and preliminary Bibliography
Within three months of first Site visit
Submission of three draft chapters
Within six months from when consolidated NPS comments are returned on Outline and Bibliography
Submission of first complete draft of study
Within ten months from when consolidated NPS comments are returned on three draft chapters.
Submission of final draft and related documentation to NPS
Within three months from when consolidated NPS comments are returned on draft

Fee and Payment Progress payments to the Contractor shall be made on the basis of proper and acceptable invoices submitted consistent with the quality requirements described in Stipulation 6 above.

DELIVERY ITEM
PAYMENT

Start-up Meeting

Site Visit(s)
Up to 5% of total
Submission of outline of HRS and preliminary bibliography
Up to 20% of total
Submission of three draft chapters
Up to 50% of total
Submission of first complete draft of study
Up to 85% of total
Submission of final draft and related documentation to NPS
Up to 100% of total

Phase II – National Register Nomination Scope In accordance with the terms and conditions of the contract, the contractor shall perform the work of this task order for the National Park Service (NPS) as described below.

Confidentiality The information developed under this task order is the property of the U.S. government and shall be kept in strict confidence.

Performance Period The work shall begin following the issuance of the delivery/task order, proceed in accordance with the schedule for submittals.

Introduction This scope of services directs the contractor to prepare updated National Register of Historic Places (NRHP) documentation for above ground historic resources within the current boundary of OCMU (approximately 701 acres) and for previously non-listed resources within the 2016 proposed expanded boundary (2,100 acres) at the start of Phase II in accord with current standards and scholarship. The nomination should rely on historic contexts developed for the Historic Resource Study (Phase I of this project).

The Contractor shall provide all materials, supplies, labor, supervision, coordination, and management necessary to complete the work as and when required, as specified in this scope of services.

Points of Contact:

Contractual: Contracting Officer (CO): Laurie Chestnut Contracting Officer’s Representative (COR) and Project Manager: Turkiya L. Lowe, Chief, SERO CR Research and Science, 404-507-5805, Turkiya_lowe@nps.gov.

Park Contact: Lonnie Davis, Cultural Resources Specialist, 478-752-8257 x. 224, Lonnie_davis@nps.gov. Kevin Wyrick, Chief of Interpretation, 478-752-8257 x. 213, kevin_wyrick@nps.gov Southeast Archeological Center (SEAC): Contact TBD, 2035 E. Paul Dirac Drive, Johnson Building, Suite 120, Tallahassee, FL 32312, 850-580-8424.

Specific Tasks

1) Prepare National Register documentation The contractor shall use all readily available primary and secondary source material, including NPS reports and sources obtained from Affiliated Tribes, and perform non-invasive physical investigations as necessary, to prepare new documentation for a district nomination for the property described in the addendum to this scope of work.

The submission will include a statement pertaining to site-specific museum collections. OCMU Museum collection is composed of artifacts that were collected from several Registered Archeology sites that were not on Federal property as well as those on Federal property. Since these non-Federal sites were excavated utilizing Federal funds the recovered artifacts were retained by the Federal Government (NPS). The statement will be prepared in consultation with SEAC and OCMU staff. See for more information, NPS 28- Cultural Resources Management Guideline, Appendix Q: Preparing National Register Forms, “Objects, Collections, and the National Register Form.” https://www.nps.gov/parkhistory/online_books/nps28/28appenq.htm

The documentation will be based on National Register criteria for significance and the integrity of historic resources, and it will consider appropriate historic contexts. This may include Criterion D, potential to yield significant data from documented and undocumented archeological sites illustrating the significance of prehistoric architecture, mounds, and the significance of Native American sacred sites and TCPs.

The contractor will utilize and incorporate into the submission the park’s Affiliated Tribe(s) input, available Tribal information and documentary sources, and will address comments related to associated historic contexts and resources within the nomination scope as directed by the NPS.

The information shall be submitted on a Form 10-900 (see Stipulation 4 below).

The contractor shall include photographic views that are representative of each resource type. Views shall include the buildings and structures and important landscape features and patterns. The contractor shall adhere to “Guidelines for Photographic Coverage” described in National Register Bulletin How to Complete a National Register Form, page 63-5. http://www.nps.gov/nr/publications/index.htm#bulletin

Views shall include:

· Front and rear elevations of all contributing and non-contributing buildings and structures

· Representative views of historic and non-historic land areas

· Views of important topographical or spatial elements defining the character of the district

· Views of primary interior spaces

· Views of additions, alterations, intrusions, and dependencies

The contractor shall notate a scaled map identifying all contributing and non-contributing resources by name and number.

2) NPS Review of Detailed Outline and Final Draft National Register Forms The contractor shall electronically submit the Detailed Outline of National Register Sections 7 and 8 and a Preliminary Data Sheet listing Contributing and Non-Contributing Resources; Draft Statement of Significance and Bibliography; Draft National Register form for NPS Review; Revised Draft National Register form for NPS Review; Final Draft National Register Form for SHPO/THPO Comment; and Final National Register Form for submission to the Federal Preservation Officer (FPO) to the Contracting Officer’s Representative (COR) and Project Manager: Turkiya L. Lowe. Oversized materials, if any, will be submitted in hard copy.

The contractor shall revise/supplement the respective submittals in response to consolidated written comments.

4) Revised Draft and Final Draft National Register Form for SHPO/Affiliated Tribe(s) Comment The contractor shall submit the revised and Final Draft National Register form for SHPO and Affiliated Tribe(s) (THPOs, etc.) comment to the COR. The contractor will address SHPO and Tribes comments, if deemed necessary by the NPS. If no comments are received from the SHPO and Affiliated Tribes, the Final Draft National Register Form will constitute the Final National Register Form for submission to the Federal Preservation Officer (FPO).

PROJECT SCHEDULE AND SUBMISSION OF DELIVERABLES

1. Project Schedule The NPS will provide comments to the contractor on all submittals within 45 days of receipt of the submission.

DELIVERY ITEM
DATE
Start-up Meeting
To be determined
Site visit(s)
To be determined

Detailed Outline of Sections 7 and 8 and a Preliminary Data Sheet listing Contributing & Non-Contributing Within 12 weeks after the start-up meeting

Draft Statement of Significance, Section 8 and Preliminary Bibliography Within 8 weeks after comments are returned on the Detailed Outline

First Draft National Register form for NPS Review
Within 12 weeks after comments are returned on the Draft Statement of Significance

Revised Draft National Register form For NPS, SHPO, and Tribe Comment Within 8 weeks after comments on the Draft National Register Form

Final Draft National Register Form for SHPO, Tribe, and NPS concurrence
Within 8 weeks after comments on Revised Draft National Register form are returned.
Final National Register Form for Submission to the Federal Preservation Officer (FPO)
Within 14 calendar days after comments on Final National Register Form for SHPO/THPO/NPS review are returned.

2. Submittals

1. Submittal of draft forms and interim submittals: the contractor shall post one as an electronic copy of each (in a current version of MS Word) on a site to be designated by the NPS. Oversized graphic material (larger than 8.5” by 11”), if any, shall be submitted in hard copy.

1. Submittal of final form: Forms 10-900 and 10-900a shall be submitted electronically as indicated in 2(a) above (in a current version of MS Word) on a form with the template information entered as a header. All forms and graphic materials, including USGS maps, photographs, and other graphics, will meet the archival requirements for submittal to the National Register of Historic Places. The contractor shall submit two sets of the Final National Register Form and graphic material for SHPO Comment and may modify and revise this submission for purposes of the Final National Register Form for Submission to the Federal Preservation Officer (FPO). An additional set of all forms and graphic materials will be submitted for purposes of the Final National Register Form for Submission to the Federal Preservation Officer (FPO). Three sets of forms and graphic materials as described above in this paragraph will constitute the Final National Register Form for Submission to the Federal Preservation Officer (FPO).

1. In addition to prints, all photographs for the final form shall also be submitted as uncompressed .TIF (tagged image file format) files on CD-R media, in accordance with the March, 2005 National Register of Historic Places and National Historic Landmarks Survey Photo Policy Expansion (http://www.nps.gov/history/nr/policyexpansion.htm).

STIPULATIONS

1. The contractor and key team members will meet the requirements specified in 36 CFR Appendix A, Professional Qualification Standards and the intent of Section 112 (a)(1)(of the National Historic Preservation Act of 1966, as Amended through1992. http://www.nps.gov/history/local-law/arch_stnds_9.htmB)

1. The Contractor shall coordinate with the COR as necessary to complete the work as and when required and determine park point of contact. This will include participating in conference calls and product review meetings. Product review meetings may also include SHPO and/or Affiliated Tribes at the determination of the COR.

1. All work shall be technically and legally defensible. The Contractor shall apply the guidelines the National Register of Historic Places bulletins including: 15, How to Apply the National Register Criteria for Evaluation; 16A, How to Complete the National Register Registration Form; 21, Defining Boundaries for National Register Properties (with Appendix, Definition of National Register Boundaries for Archeological Properties); 38, Guidelines for Evaluating and Documenting Traditional Cultural Properties, revised 1998 at:http://www.nps.gov/nr/publications/index.htm#bulletins The contractor shall also consult the guidelines contained in NPS 28- Cultural Resources Managment Guideline, Appendix Q: Preparing National Register Forms. http://www.nps.gov/history/history/online_books/nps28/28appenq.htm

1. Documentation shall be submitted on form 10-900 which may be downloaded from: http://www.nps.gov/nr/publications/forms.htm. The Contractor shall take note that the electronic form is a revision and that both Sections 7 and 8 now provide space for summary paragraphs as described in Bulletin 16A and that the narrative description and statement of significance text spaces are continuous.

1. All digital photography, including printing on acceptable ink and paper combination for digital images, shall be accomplished in accordance with the March, 2005 National Register of Historic Places and National Historic Landmarks Survey Photo Policy Expansion (http://www.nps.gov/history/nr/policyexpansion.htm).

1. The Contractor's quality control efforts shall ensure that all draft and final deliverables are completed documents, as specified, that have been peer reviewed for academic excellence, professional and copy quality, and technical accuracy. Documents not displaying such efforts will not be accepted.

1. The contractor is advised that Section 9 of the Archeological Resources Protection Act of 1979 (as amended) prohibits the release of information concerning the nature or location of archeological properties unless specifically authorized by the Federal Land Manager. Unauthorized release may result in penalties described in Section 7 of that Act. Section 304 of the National Historic Preservation Act also applies. Documentation of restricted information will adhere to National Register of Historic Places Bulletin 29, Guidelines for Restricting Information and Historic and Prehistoric Resources. http://www.nps.gov/nr/publications/index.htm#bulletins If possible, sensitive information will be separately reported.

1. Research files, negatives and photographs, and other material produced as a result of this project shall be delivered to and become the property of OCMU upon completion of the contract.

1. The National Park Service will provide a draft Collections Management Statement consistent with the guidelines contained in NPS-28 (Cultural Resource Management Guideline): Appendix Q, “Preparing a National Register Registration Form,” to the contractor for inclusion in the document.

FEE AND PAYMENT

Progress payments to the Contractor shall be made on the basis of proper and acceptable invoices submitted consistent with the quality requirements described in Stipulation 6 above.

Estimated Schedule of Payments New National Register Documentation

SUBMITTAL ITEM
PAYMENT
Combined Start-up Mtg/Site visit
Up to 5% of total

Detailed Outline of Sections 7 and 8 and Preliminary Data Sheet Listing Contributing and Non-Contributing sites Up to 15% of total

Draft Statement of Significance and Bibliography
Up to 25% of total
First Draft National Register Form for NPS Review
Up to 50% of total

Revised Draft National Register Form For NPS/SHPO/THPO Review Up to 75% of total

Final Draft National Register Form for SHPO/THPO concurrence
Up to 95% of total
Final National Register Form for Submission to the Federal Preservation Officer (FPO)
Up to 100% of total

Additional Requirements:

Required Services. The contractor shall provide all labor, supervision, transportation, etc. necessary to provide the services as described herein. The contractor will be required to self-perform, at a minimum, 35% of the work.

Contractor Responsibilities. Contractor must perform in accordance with the Statement of Work in Section C. above and as stated herein.

COR.

Management. The contractor shall manage the total work effort in accordance with effective and efficient management principles and safe working practices to ensure on-time completion of this contract.

Safety & Environmental Compliance. The contractor shall comply with pertinent provisions of the Occupational Safety and Health Act (OSHA), and state, local, safety, laws. The contractor shall comply with pertinent Environmental Protection Agency laws and regulations. The Park safety officer has the authority to issue restraint or cease-and-desist orders to the contractor when violations or unsafe acts are present and threaten government and contractor employees or damage to government property. The contractor shall immediately report to the CO, COR and Park safety officer all accidents resulting in employee injury or death or damage to property while performing this contract.

Motor Vehicle & Traffic Regulations. Contractor employees operating motor vehicles shall possess a valid driver's license. Driver and vehicle permits, licenses, registrations and proof of insurance shall be maintained in the vehicle at all times and made available upon request. Contractor employees shall comply with federal vehicle motor law requiring seat belts be worn at all times. Contractor employees shall adhere to the posted speed limits.

Replacement of Contractor Employee for Security Reasons. The Government retains the right to request removal of the contractor’s employee(s), regardless of prior clearances.

Non-Payment for Additional Work. Any additional contractor performed services not specified in contract, either at its own volition or at the request of an individual other than an appointed CO, except as may be explicitly authorized in the contract, shall be performed at the financial risk of the contractor. Only an appointed CO is authorized to bind the government to a change in specifications, contract terms, or conditions.

Conflict of Interest. The contractor shall not employ off-duty COR’s or other Government employees if such employment would create a conflict of interest or be contrary to the policies contained in conflict-of-interest directives.

Packing and Marking All postage and fees related to submitting information forms, reports, etc., to the CO or the COR shall be paid by the contractor. All information submitted to the Contracting Officer or the Contracting Officer's Representative shall clearly indicate the Contract Number of the contract for which the information is being submitted.

Inspection and Acceptance The Contracting Officer (CO) alone, without delegation, is authorized to amend, modify or deviate from the contract. Other responsibilities may be delegated to an authorized representatives. The Contracting Officer is Laurie Chestnut, NPS SER East MABO, 1924 Building, 100 Alabama St., S.W. 5th Floor, Atlanta GA 30303; laurie_chestnut@nps.gov; 404-507-5745; laurie_chestnut@nps.gov.

The Contracting Officer's Representative (COR) will be designated in writing at the time of award along with his responsibilities and limitations. The COR assists in the administration of the contract and other duties as assigned by the Contracting Officer.

Inspection of Services—Fixed-Price.

As prescribed in 46.304, insert the following clause:

INSPECTION OF SERVICES—FIXED-PRICE (AUG 1996)

(a) Definition. “Services,” as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

(e) If any of the services do not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by re-performance, the Government may—

(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

(2) Reduce the contract price to reflect the reduced value of the services performed.

(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may—

(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or

(2) Terminate the contract for default. (End of clause)

Deliveries or Performance Place of Performance. The services to be provided by this contract shall be accomplished at: TUIA – Tuskegee Airmen National Historic Site in Tuskegee, AL

Deliverables. The contractor will produce a 100% complete report as outlined in the schedule on page 10 above.

Administrative Data Travel. Contractor will be responsible for all travel related expenses for this project, including mobilization of equipment, tools, materials, manpower, lodging, meals, and per diem in accordance with federal travel regulations.

Special Contract Requirements

Executive Order 13513 Prohibition on Text Messaging and Using Electronic Equipment Supplied by the Government While Driving as prescribed in Federal Leadership on Reducing Text Messaging While Driving

Prohibition on Text Messaging and Using Electronic Equipment Supplied by the Government while Driving (Oct, 2009) This Executive Order introduces a Federal Government-wide Prohibition on the use of text messaging while driving on official business or while using Government –supplied equipment. Additional guidance enforcing the ban will be issued at a later date. In the meantime, please adopt and enforce policies that immediately ban text messaging while driving company-owned or –rented vehicles, government-owned or leased vehicles, or while driving privately owned vehicles when on official government business or when performing any work for or on the behalf of the government. (End of order)

GENERIC GENDER TERMINOLOGY

Except where stipulated by the Federal Acquisition Regulations, the use of terms such as he, she, his, and her are not to be interpreted as implying other than neutral gender terms such as "it" or "their".

SAFETY

The contractor is responsible for establishing and maintaining compliance with all applicable laws, regulations, rules, and standards, including without limitation, those regulations, rules, and standards, promulgated for the administration and enforcement of the following laws: the Occupational Safety and Health Act (OSHA) or Federally approved State equivalent(s) thereof; the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) as amended by Superfund Amendments and Reauthorization Act (SARA); Emergency Planning and Community Right-to-Know Act (EPCRA); Clean Air Act (CAA); Clean Water Act (CWA) and Toxic Substances Control Act (TSCA); and Solid Waste Disposal Act (SWDA), as amended by Resource Conservation and Recovery Act (RCRA).

DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Internet Payment Platform (IPP) APRIL 2011

Beginning May 1, 2011, payment requests for all new awards must be submitted electronically through the U. S. Department of the Treasury's Internet Payment Platform System (IPP). Payment terms for existing contracts and orders awarded prior to May 1 remain the same. The Contractor must use IPP for contracts and orders awarded May 1 and later, and must use the non-IPP invoicing process for those contracts and orders awarded prior to May 1.

Copy of the Vendor’s Commercial Invoice Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (April 2013)

Payment requests must be submitted electronically through the U. S. Department of the Treasury’s Invoice Processing Platform System (IPP).

“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

The contractor must submit to the CO and the COR the payroll for the general contractor and any applicable sub-contractors and an updated schedule.

The contractor must us the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instruction via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 – 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment the Contractor must submit a waiver request in writing to the Contracting Office with its proposal or quotation. (End of Local Clause)

Section I – Contract Clauses

1452.237-70 Information Collection - Information Collection—Department of the Interior (JUL 1996) 52.202-1 Definitions (NOV 2013) 52.203-2 Certificate of Independent Price Determination (APR 1985) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant against Contingent Fees (APR 1984) 52.203-7 Anti-Kickback Procedures (OCT 2010) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (JAN 1997) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (JAN 1997) 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions (SEPT 2007) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) 52.203-13 Contractor Code of Business Ethics and Conduct (APR 2010) 52.203-14 Display of Hotline Poster(s) (DEC 2007) 52.204-1 Approval of Contract (DEC 1989) This contract is subject to the written approval of Contracting Officer and shall not be binding until so approved. (End of clause) 52.204-2 Security Requirements (AUG 1996) – Alternate II (APR 1994) 52.204-3 Taxpayer Identification (OCT 1998) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) 52.204-6 Data Universal Numbering System Number (JUL 2013) 52.204-7 System for Award Management (JUL 2013) 52.204-8 Annual Representations and Certifications (JAN 2014) 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (AUG 2012) 52.207-1 Notice of Standard Competition (MAY 2006) 52.208-8 Required Sources for Helium and Helium Usage Data (APR 2002) 52.208-9 Contractor Use of Mandatory Sources of Supply or Services (OCT 2008) 52.209-5 Certification Regarding Responsibility Matters (APR 2010) 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (AUG 2013) 52.209-7 Information Regarding Responsibility Matters (JUL 2013) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (FEB 2012) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (MAY 2012) 52.211-7 Alternatives to Government-Unique Standards (NOV 1999) 52.211-8 Time of Delivery (JUNE 1997) 52.211-14 Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use (APR 2008) 52.211-15 Defense Priority and Allocation Requirements (APR 2008) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.214-34 Submission of Offers in the English Language (APR 1991) 52.214-35 Submission of Offers in U.S. Currency (APR 1991) 52.215-1 Instruction to Offerors – Competitive Acquisition (JAN 2004) -- Alternate I (OCT 1997) 52.215-2 Audit and Records - Negotiation (OCT 2010) -- Alternate I (MAR 2009) 52.215-6 Place of Performance (OCT 1997) 52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:

(a) The Schedule (excluding the specifications).

(b) Representations and other instructions.

(c) Contract clauses.

(d) Other documents, exhibits, and attachments.

(e) The specifications. (End of clause) 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data (AUG 2011) 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data—Modifications (AUG 2011) 52.215-12 Subcontractor Certified Cost or Pricing Data (OCT 2010) 52.215-13 Subcontractor Certified Cost or Pricing Data—Modifications (OCT 2010) 52.215-14 Integrity of Unit Prices (OCT 2010) 52.215-19 Notification of Ownership Changes (OCT 1997) 52.215-20 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data (OCT 2010) 52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data - Modifications (OCT 2010) 52.215-22 Limitations on Pass-Through Charges—Identification of Subcontract Effort (OCT 2009) 52.215-23 Limitations on Pass-Through Charges (OCT 2009) 52.216-1 Type of Contract (APR 1984) 52.216-24 Limitation of Government Liability (APR 1984) 52.216-25 Contract Definitization (OCT 2010) 52.219-1 Small Business Program Representations (APR 2012) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2011)

(d) That payments to be made under any subcontract awarded under this contract will be made directly to the subcontractor by the DOI, NPS, Southeast Region.

(e) That the subcontractor awarded a subcontract hereunder shall have the right of appeal from decisions of the Contracting Officer cognizable under the Disputes clause of said subcontract.

(f) To notify the DOI, NPS, Southeast Region, Atlanta GA. Contracting Officer immediately upon notification by the subcontractor that the owner or owners upon whom 8(a) eligibility was based plan to relinquish ownership or control of the concern. (End of clause) 52.219-8 Utilization of Small Business Concerns (JUL 2013) 52.219-9 Small Business Subcontracting Plan (JUL 2013) 52.219-14 Limitations on Subcontracting (NOV 2011) 52.222-1 Notice to the Government of Labor Disputes (FEB 1997) 52.222-2 Payment for Overtime Premiums (JULY 1990) 52.222-3 Convict Labor (JUN 2003) 52.222-12 Contract Termination - Debarment (FEB 1988) 52.222-20 Walsh-Healey Public Contracts Act (OCT 2010) 52.222-21 Prohibition of Segregated Facilities (FEB 1999) 52.222-22 Previous Contracts and Compliance Reports (FEB 1999) 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999) 52.222-24 Pre-award On-Site Equal Opportunity Compliance Evaluation (FEB 1999) 52.222-25 Affirmative Action Compliance (APR 1984) 52.222-26 Equal Opportunity (MAR 2007) 52.222-29 Notification of Visa Denial (JUN 2003) 52.222-35 Equal Opportunity for Veterans (SEP 2010) 52.222-36 Affirmative Action for Workers with Disabilities (OCT 2010) 52.222-37 Employment Reports on Veterans (SEP 2010) 52.222-38 Compliance with Veterans’ Employment Reporting Requirements (SEP 2010) 52.222-41 Service Contract Act of 1965 (NOV 2007) 52.222-50 Combating Trafficking in Persons (FEB 2009) 52.222-54 Employment Eligibility Verification (AUG 2013) 52.223-1 Bio-based Product Certification (MAY 2012) 52.223-2 Affirmative Procurement of Bio-based Products under Service and Construction Contracts

(SEPT 2013)

52.223-3 Hazardous Material Identification and Material Safety Data (JAN 1997) 52.223-4 Recovered Material Certification (MAY…