S08_40307025_Attach_4_Construction_Cost_Estimate_Breakdown.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
OZAR Asphalt Overlay, Van Buren, MO Federal contract opportunity
Solicitation number
P16PS02265
Issued by
Department of the Interior National Park Service

About this file

Attach 4 Construction Cost Estimate Breakdown.xlsx

View the file

Other files for this federal contract opportunity

Other files attached to OZAR Asphalt Overlay, Van Buren, MO, newest first.
File Type Posted
Sol_P16PS02265_Amd_000004.pdf PDF
S09_40307025_P16PS02265_04_Body.rtf RTF text file
Sol_P16PS02265_Amd_000003.pdf PDF
S11_40307025_Attach_1_Specs _2016-11-25.docx DOCX document
Sol_P16PS02265_Amd_000002.pdf PDF
S11_40307025_Pre-proposal_Site_Visit_Minutes _2016-11-25.docx DOCX document
S11_40307025_Attach_10_Pre-proposal_Site_Visit_Minutes.docx DOCX document
S09_P16PS02265_01_Body.rtf RTF text file
S11_40307025_Attach_11_Site_Visit_Sign_In_Sheet _2016-11-03.pdf PDF
Sol_P16PS02265_Amd_000001.pdf PDF
S08_40307025_Attach_2_Drawings.pdf PDF
S08_40307025_Attach_6_Consent_Letter_Sample.docx DOCX document
S08_40307025_Attach_7_Order_of_Execution.pdf PDF
S08_40307025_Attach_9_Gov_Field_Measurements.docx DOCX document
S08_40307025_Attach_5_PPQ.docx DOCX document
S08_40307025_Attach_8_Manhole_List.docx DOCX document
S08_40307025_Attach_3_Construction_Wage_Determination _2016-09-30.docx DOCX document
Sol_P16PS02265.pdf PDF
S08_40307025_Attach_1_Specs _2016-10-27.pdf PDF
S08_DRAFT_Attachments.pdf PDF
S008_P16PS02265_Draft_SF1442.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Construction Cost Estimate BreakdownDate:
Contractor Name:Address:
Contract Description:Address2:
Solicitation/Contract Number:Work Location:
Proposed Total Contract Price
Line No.Item
(1)Unit of Measure
(2)Qty
(3)Material CostLabor CostOther Direct Costs
(9)Line Total

(10)

Unit
(4)Total
(5)MNHRS
(6)Average Rate
(7)Total

(8)

11 1/2 Pavement Overlay on Raods, turnouts and camping pads, this includes all prep work, cleaning pre and post projectSY16,929
$ - 0
21 1/2 Pavement Overlay on Parking Lots and Sidwalks, this includes all prep work, cleaning pre and post projectSY6,806
$ - 0
3Full depth pavement repairSF580$ - 0
4Crack Seal 1/4 and larger cracksLF1,000$ - 0
5New Wheel StopsEA50$ - 0
6Pull 38 Wheel Stops and reinstallEA38$ - 0
75 Man Holes, total 4 need liftedEA4$ - 0
8Double Yellow LinesLF4,440$ - 0
9Fog Lines (White)LF7,642$ - 0
10Parking Lines (White)LF4,010$ - 0
11Handicap Symbol (White)EA3$ - 0
12Hashed out painted islands (White)LF400$ - 0
13Reflective Glass Beads on all paintLF1,700$ - 0
14$ - 0
15$ - 0
SumSheet TotalLS$ - 0$ - 0$ - 0$ - 0
ItemDescription
1TOTAL MATERIAL COSTS:$ - 0(Column 5 Total)
2TOTAL LABOR COSTS(Column 8 Total)
3TOTAL OTHER DIRECT COSTS(Column 9 Total)
4TOTAL DIRECT COSTS(Column 10 Total, = Items 1 + 2 + 3)
5OVERHEAD(Item 4 x Item 5 %)
6PROFIT(Item 4 x Item 6 %)
7SUBTOTAL(Item 4 + 5 + 6)
8BOND @ ____________%(Item 7 x Item 8 %)
9TOTAL PRICE:(Item 7 + 8)