S08_40307025_Attach_4_Construction_Cost_Estimate_Breakdown.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
OZAR Asphalt Overlay, Van Buren, MO
Solicitation number
P16PS02265
Issued by

About this file

Attach 4 Construction Cost Estimate Breakdown.xlsx

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Construction Cost Estimate BreakdownDate:
Contractor Name:Address:
Contract Description:Address2:
Solicitation/Contract Number:Work Location:
Proposed Total Contract Price
Line No.Item
(1)Unit of Measure
(2)Qty
(3)Material CostLabor CostOther Direct Costs
(9)Line Total

(10)

Unit
(4)Total
(5)MNHRS
(6)Average Rate
(7)Total

(8)

11 1/2 Pavement Overlay on Raods, turnouts and camping pads, this includes all prep work, cleaning pre and post projectSY16,929
$ - 0
21 1/2 Pavement Overlay on Parking Lots and Sidwalks, this includes all prep work, cleaning pre and post projectSY6,806
$ - 0
3Full depth pavement repairSF580$ - 0
4Crack Seal 1/4 and larger cracksLF1,000$ - 0
5New Wheel StopsEA50$ - 0
6Pull 38 Wheel Stops and reinstallEA38$ - 0
75 Man Holes, total 4 need liftedEA4$ - 0
8Double Yellow LinesLF4,440$ - 0
9Fog Lines (White)LF7,642$ - 0
10Parking Lines (White)LF4,010$ - 0
11Handicap Symbol (White)EA3$ - 0
12Hashed out painted islands (White)LF400$ - 0
13Reflective Glass Beads on all paintLF1,700$ - 0
14$ - 0
15$ - 0
SumSheet TotalLS$ - 0$ - 0$ - 0$ - 0
ItemDescription
1TOTAL MATERIAL COSTS:$ - 0(Column 5 Total)
2TOTAL LABOR COSTS(Column 8 Total)
3TOTAL OTHER DIRECT COSTS(Column 9 Total)
4TOTAL DIRECT COSTS(Column 10 Total, = Items 1 + 2 + 3)
5OVERHEAD(Item 4 x Item 5 %)
6PROFIT(Item 4 x Item 6 %)
7SUBTOTAL(Item 4 + 5 + 6)
8BOND @ ____________%(Item 7 x Item 8 %)
9TOTAL PRICE:(Item 7 + 8)