S08_40307025_Attach_4_Construction_Cost_Estimate_Breakdown.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- OZAR Asphalt Overlay, Van Buren, MO Federal contract opportunity
- Solicitation number
- P16PS02265
About this file
Attach 4 Construction Cost Estimate Breakdown.xlsx
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Construction Cost Estimate Breakdown | Date: | ||||
| Contractor Name: | Address: | ||||
| Contract Description: | Address2: | ||||
| Solicitation/Contract Number: | Work Location: | ||||
| Proposed Total Contract Price | |||||
| Line No. | Item | ||||
| (1) | Unit of Measure | ||||
| (2) | Qty | ||||
| (3) | Material Cost | Labor Cost | Other Direct Costs | ||
| (9) | Line Total |
(10)
| Unit | ||
| (4) | Total | |
| (5) | MNHRS | |
| (6) | Average Rate | |
| (7) | Total |
(8)
| 1 | 1 1/2 Pavement Overlay on Raods, turnouts and camping pads, this includes all prep work, cleaning pre and post project | SY | 16,929 | |||||
| $ - 0 | ||||||||
| 2 | 1 1/2 Pavement Overlay on Parking Lots and Sidwalks, this includes all prep work, cleaning pre and post project | SY | 6,806 | |||||
| $ - 0 | ||||||||
| 3 | Full depth pavement repair | SF | 580 | $ - 0 | ||||
| 4 | Crack Seal 1/4 and larger cracks | LF | 1,000 | $ - 0 | ||||
| 5 | New Wheel Stops | EA | 50 | $ - 0 | ||||
| 6 | Pull 38 Wheel Stops and reinstall | EA | 38 | $ - 0 | ||||
| 7 | 5 Man Holes, total 4 need lifted | EA | 4 | $ - 0 | ||||
| 8 | Double Yellow Lines | LF | 4,440 | $ - 0 | ||||
| 9 | Fog Lines (White) | LF | 7,642 | $ - 0 | ||||
| 10 | Parking Lines (White) | LF | 4,010 | $ - 0 | ||||
| 11 | Handicap Symbol (White) | EA | 3 | $ - 0 | ||||
| 12 | Hashed out painted islands (White) | LF | 400 | $ - 0 | ||||
| 13 | Reflective Glass Beads on all paint | LF | 1,700 | $ - 0 | ||||
| 14 | $ - 0 | |||||||
| 15 | $ - 0 | |||||||
| Sum | Sheet Total | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Item | Description | |||||||
| 1 | TOTAL MATERIAL COSTS: | $ - 0 | (Column 5 Total) | |||||
| 2 | TOTAL LABOR COSTS | (Column 8 Total) | ||||||
| 3 | TOTAL OTHER DIRECT COSTS | (Column 9 Total) | ||||||
| 4 | TOTAL DIRECT COSTS | (Column 10 Total, = Items 1 + 2 + 3) | ||||||
| 5 | OVERHEAD | (Item 4 x Item 5 %) | ||||||
| 6 | PROFIT | (Item 4 x Item 6 %) | ||||||
| 7 | SUBTOTAL | (Item 4 + 5 + 6) | ||||||
| 8 | BOND @ ____________% | (Item 7 x Item 8 %) | ||||||
| 9 | TOTAL PRICE: | (Item 7 + 8) |