RICH_Rehab_Chimbo_SOW_revised.docx
DOCX document 373 KB Posted
- Solicitation number
- P16PS01509
About this file
J-1 Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_P16PS01509_Amd_000002.pdf | ||
| RICH_Rehab_Chimborazo_Drawings_2.pdf | ||
| RICH_Rehab_Chimbo_Drawings_3.pdf | ||
| RICH_Rehab_Chimbo_Map.pdf | ||
| RICH_Rehab_Chimbo_Drawings_2.pdf | ||
| Sol_P16PS01509.pdf | ||
| RICH_WD_Building_Construction_2016.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PMIS
National Park Service U.S. Department of the Interior
Northeast Region
REHABILITATE INTERIOR SPACES OF VISITOR CENTER
PMIS #: 162416
See next page of this document for Editing Instructions / Guidance.
PROJECT MANUAL
RICHMOND NATIONAL BATTLEFIELD PARK
RICHMOND, VA
June 13, 2016 (revised)
FRONT COVER:
CHIMBORAZO VISITOR CENTER – CIVIL WAR MEDICAL MUSEUM
Mailing Address:
Richmond National Battlefield Park Chimborazo Visitor Center 3215 East Broad Street Richmond, VA 23223
To review general information about
Richmond National Battlefield Park
Please visit:
www.nps.gov/rich/index.htm or
For more information scan the park’s QR Code with your QR Reader:
TABLE OF CONTENTS
The complete Project Manual for this Project consists of this entire bound volume which is not to be separated for any reason. The Contracting Officer is not responsible for any assumptions made by a Contractor (or Subcontractor) who does not receive a complete bound Project Manual containing all sections and documents listed in the Table of Contents, below.
The following listed documents comprise the Project Manual, entitled: Rehabilitate Interior Spaces of the Chimborazo Visitor Center. Where numerical sequence of sections or divisions is interrupted, such interruptions are intentional.
DIVISION 1- GENERAL REQUIREMENTS
| 011110 | Summary of Work |
| 013119 | Project Meetings |
| 013323 | Submittal Procedures |
| 013523 | Safety Requirements |
| 015000 | Temporary Utilities |
| 015600 | Barriers |
| 015700 | Temporary Controls |
| 016000 | Product Requirements |
| 017700 | Closeout Procedures |
DIVISION 2 – SITE WORK
024119 Selective Demolition
DIVISION 6 – WOOD & PLASTICS
| 061000 | Rough Carpentry |
| 062000 | Finish Carpentry |
| 062500 | Epoxy Consolidation and Patching |
DIVISION 7- THERMAL & MOISTURE PROTECTION
079000 Sealants
DIVISION 9 – FINISHES
| 090320 | Treatment of Plaster |
| 092900 | Gypsum Wallboard |
| 096800 | Carpet |
| 099000 | Painting and Coating |
DIVISION 13 – FIRE DETECTION & ALARM SYSTEM
138510 Fire Alarm: Smoke Detector
DIVISION 15 - MECHANICAL
158550 Diffusers, Registers, & Grilles
DIVISION 16 - ELECTRICAL
| 160100 | General Electrical Provisions |
| 165110 | Interior Lighting |
FORMS – Submittal: Submittal Form Template: Reference Section 013323 Part 1.2B
LIST OF DRAWINGS
All Drawings listed are a part of this Project Manual, and will not be issued separately. It is the responsibility of the Offeror to verify that this project manual is complete as listed with project drawing number #367/80048.
| 367/80046-1 | CS - Cover Sheet |
| 367/80046-2 | A1 – Second Floor Plan |
| 367/80046-3 | A2 – Finish Schedule |
| 367/80046-4 | E1 – Electrical/IT/HVAC Second Floor Plan |
SECTION 011110 - SUMMARY OF WORK
PART 1: GENERAL
2.3 DESCRIPTION
A. The work of this contract consists of the restoration of interior finishes for existing office rooms in the second floor of Chimborazo Visitor Center, Richmond Battlefield Park. The interior materials include ceilings, walls, floors, doors and windows. The work also encompasses the replacement/upgrade of the existing equipment and components of HVAC, electrical systems, information management-IT, alarm system, procurement and installation of new appurtenances.
B. All work of this project shall be in compliance with applicable laws, codes, standards, regulations and guidelines having jurisdiction.
C. Contractor is required to provide all labor, equipment, supplies, materials, miscellaneous items, and supervision necessary to complete the removals, repairs, and installation work as follows:
1. ARCHITECTURAL
a. Contractor shall provide minor selective demolition, removal, and salvage or disposal of designated portions of existing construction: walls, floor, ceiling, doors and windows.
b. Remove all existing wall paneling and restore existing plaster and wood wall base to match existing.
c. Replace existing carpet with new.
d. Provide enclosure for vertical pipe of sprinkler system.
e. Prime and paint: walls, ceilings, windows, doors, frames, and trims and exposed sprinkler pipes.
f. Coordinate all new construction work with Mechanical, Electrical and IT installations of contract.
2. MECHANICAL
a. Replace existing registers and grilles and reconnect them to associated ductwork for complete and operable HVAC system in second floor existing offices, stairs and hallways.
3. ELECTRICAL/IT/ALARM
a. Upgrade existing components of electrical system including but not limited to light switches, receptacles, sensor control devices and lighting fixtures, and wiring of second floor offices, stair and hallways.
b. Modify existing wiring and furnish and install all necessary controls, wiring and appurtenances as required by Electrical Codes to accommodate all electrical needs of the offices included in this contract.
c. Work also includes the upgrade of IT – telephone and network, alarm devices, HVAC and all related accessories.
d. Protection Fire Alarm System: existing sprinkler heads to remain.
D. All prospective Bidders, and their Subs, as appropriate are strongly encouraged to visit and examine the existing conditions of the Project prior to submission of Bid in order to better understand the Work and aid in forming any questions prior to the submission of Bid. Lack of knowledge of the existing conditions will not be allowed as a basis for extra compensation.
E. Permits: The contractor shall give all requisite notices, obtain and pay for all permits. He shall pay all deposits and fees for the installation of the work specified herein, and contained in the drawings if they are necessary.
LOCATION:
A. Richmond Battlefield Park, Chimborazo Visitor Center; Richmond, VA.
WORK COMPLETION:
The Contractor shall commence this contract within (90) ninety days after the receipt of Notice to Proceed. The time stated for completion shall include final clean-up of the premises.
Pre-Construction Conference: Before work begins, the Contracting Officer will arrange for a meeting with the Contractor to discuss the work in general including administrative matters, National Park Service, questions the Contractor may have, and points that need to be resolved before the work commences.
Contractor will be permitted to work Monday through Friday, 7:00 A.M. to 3:30 P.M. All work outside the above time period shall only occur with the written approval of Contracting Officer. No Work will occur at the site on days of the week that coincide with National Holidays or when the park is closed to the public due to weather emergencies.
Any weekend Work or overtime Work shall be verified in writing 48 (forty eight) hours in advance of that work being performed.
PARK RULES AND REGULATIONS:
At all times the contractor shall conduct his/her operation in conformance with the rules and regulations of the National Park Service and with such appropriate regulations as the Park Superintendent may prescribe.
Safety: The building is in the public area. Consequently great care must be taken during removal of roof materials to protect staff and visitors from injury, or nuisance of falling debris. All debris shall be removed from area periodically and at the end of each day.
Protecting Historical Building from Elements: Work shall be scheduled so the building, its contents and surrounding areas suffer no damage as result of action of the elements. At the end of each workday all exposed wall areas of area being worked on are to be sealed and the building to be water tight. Contractor will be held liable for any damage to the building due to inadequate protection.
Preservation of Natural Features: Confine all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
| 1. | Do not remove, injure, or destroy trees or other plants without prior approval. Consult with Contracting Officer and remove agreedon branches that interfere with construction. |
| 2. | Do not fasten ropes, cables, or guys to existing trees. |
| 3. | Contractor shall be responsible for locating and preventing damage to existing utilities. If damage occurs, repair utility at no additional expense to the Government. |
Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the CO. A special permit will not relieve Contractor of liability for damage, which may result from moving of equipment.
Storage and Protection: Store materials in accordance with manufacturer's instructions.
Removal of existing fabric shall be done carefully to preclude damage to remaining fabrics. Every precaution shall be taken to prevent damage to the existing structures and surrounding areas should any damage results, restore to the satisfaction of the CO.
SPECIAL CONSTRUCTION REQUIREMENTS:
A. Notify the Contracting Officer's Representative promptly of any conditions which need repairs by other trades.
FIELD VERIFICATION:
A. Field verify all new and existing dimensions affecting the work of this contract before ordering products.
CONTRACTORFURNISHED ITEMS:
A. All labor, equipment, tools and supervision shall be contractor-furnished from outside the park.
END OF SECTION 011110
RICH-FY16
SECTION 013119 - PROJECT MEETINGS
PART 1: GENERAL
1.1 PRECONSTRUCTION CONFERENCE: Before start of construction, Contracting Officer will arrange an onsite meeting with Contractor. The meeting agenda will include the following:
A. Minimum Agenda:
| Correspondence procedures | |
| Designation of responsible personnel | |
| Labor standards provisions | |
| Changes | |
| Payments to Contractor | |
| National Park Service regulations | |
| Accident prevention program (including name of responsible supervisor) | |
| Accident reporting | |
| Park rules and regulations | |
| Saturday, Sunday, holiday and night work | |
| Safety program (compliance with the "Accident Prevention" | |
| Clause of the General Provisions) | |
| Tentative construction schedule | |
| Relationship of Division 1 to other divisions |
1.2 PROGRESS MEETINGS: The Contracting Officer will schedule meetings with the Contractor and subcontractors.
A. Minimum Agenda:
| Approval of minutes of previous meetings |
| Review of work progress |
| Field observations, problems, and decisions |
| Identification of problems, which impede planned progress |
| Maintenance of progress schedule |
| Maintenance of quality and work standards |
| Effect of proposed changes on progress schedule and |
| coordination |
| Other business relating to work |
| END OF SECTION 013119 | |||
| RICH-FY15 | 013119-8 | ||
| Project Meetings |
SECTION 013323 – SUBMITTAL PROCEDURES
PART 1: GENERAL
1.1 DESCRIPTION
A. The work of this section consists of submittal requirements before and during construction.
1.2 RELATED REQUIREMENTS
A. Project Closeout Section 017700.
1.3 SCHEDULES
A. As soon as possible after Notice of Award and before beginning any work, submit Progress Schedule and Schedule of Values as a package. Contracting Officer will review the Progress Schedule and the Schedule of Values for format and content.
B. Progress Schedule: Submit four copies of Progress Schedule showing estimated starting and completion dates of the work. The first progress payment will not be issued until an acceptable progress schedule is submitted.
1.4 WASTE AND RECYCLING PLAN
A. Before beginning on-site work, submit a list of materials that might be recycled during the course of the contract. This list should name the material, recycling methods, and/or proposed disposal location. This list is for information only. Recycling is strictly voluntary, but highly encouraged.
1.5 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES:
A. General Procedures:
1. Forward submittals for approval of samples to park.
2. Contracting Officer reserves the right to require submittals in addition to those called for in individual sections.
B. Specific Procedures:
1. Shop Drawings: are not required.
2. Samples: Samples shall be minimum 12 inch square of all materials used for roofing to illustrate clearly the functional characteristics and full range of color, texture, or pattern.
3. Manufacturers' Literature: Submit only pertinent pages; mark each copy of standard printed data to identify products referenced in specification section.
C. Contracting Officer's Review:
1. If submittals are not approved, copies will be returned to contractor with reason for rejection. Resubmit, identifying changes.
2. Any work done before approval shall be at Contractor's own risk.
1.6 APPROVALS:
A. New Construction Materials: The Contractor is encouraged to submit for approval products made out of recycled or environmentally responsible material. Every effort will be made by the NPS to approve these materials.
1.7 MANUFACTURER'S INSTALLATION INSTRUCTIONS
A. When contract documents require compliance with manufacturer's printed instructions, provide one complete set of instructions for Contracting Officer and keep another complete set of instructions at the project site until substantial completion.
END OF SECTION 013323
| RICH-FY15 | 013323-10 | |
| SUBMITTAL PROCEDURES |
SECTION 013523 – SAFETY REQUIREMENTS
PART 1: GENERAL
1.1 DESCRIPTION:
A. The work of this section consists of establishing an effective accident prevention program and providing a safe environment for all personnel and visitors.
1.2 SUBMITTALS:
A. Accident Prevention Program: Before onsite work begins, submit for approval an accident prevention program. The Contracting Officer will review the proposed program for compliance with OSHA and project requirements. If the program requires any revisions or corrections, the Contractor shall resubmit the program within 10 days. No progress payments will be processed until the program is approved. The program shall include:
1. Name of responsible supervisor to carry out the program.
2. Safety meetings.
3. First aid procedures.
4. Upon request, submit proof of employees' qualifications to perform assigned duties in a safe manner.
1.3 QUALITY ASSURANCE:
A. Clauses entitled "Accident Prevention" and "Permits and Responsibilities" of the General Provisions. In case of conflicts between Federal, state and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with the requirements of this section and related sections may result in suspension of work.
B. Qualifications of Employees:
1. Ensure that employees are physically qualified to perform their assigned duties in a safe manner.
2. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
3. Operators of vehicles, mobile equipment, and hoisting equipment, shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment. Provide operating instructions for all equipment. Newly hired operators shall be individually tested by an experienced operator or supervisor to determine if they are capable of safely operating equipment.
1.4 ACCIDENT REPORTING:
A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of $100, and fires. Within 7 days of a reportable accident, fill out and forward to the Contracting Officer a DI134 form, which may be obtained from Contracting Officer.
B. All Other Accidents: The Contractor shall report all other accidents to the Contracting Officer as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.
PART 2: PRODUCTS
2.1 PERSONNEL PROTECTIVE EQUIPMENT:
A. Meet requirements of NIOSH and MSHA, where applicable, as well as ANSI.
PART 3: EXECUTION
3.1 EMERGENCY INSTRUCTIONS:
A. Contractor shall have available at the work site telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police.
3.2 SAFETY MEETINGS:
A. Conduct safety meetings for all levels of supervision. Notify the Contracting Officer. These meetings shall be used to review the effectiveness of the Contractor's safety effort to provide a forum for planning safe construction activities.
3.3 HARD HATS AND PROTECTIVE EQUIPMENT AREAS:
A. A hard hat area will be designated by the Contracting Officer. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.
B. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary protective equipment at all times. Provide hard hats for use by visitors. Change liners before reissuing hats.
END OF SECTION 013523
| RICH-FY15 | 013523-12 |
| SAFETY REQUIREMENTS |
SECTION 015000 - TEMPORARY UTILITIES
PART 1: GENERAL
1.1 DESCRIPTION:
A. The work of this section consists of providing temporary utilities required for Contractor's performance of the work of this Contract.
PART 2: PRODUCTS
2.1 GENERAL:
A. Temporary materials may be new or used, but must be adequate in capacity for the required usage, must not create unsafe conditions, and must not violate requirements of applicable codes and standards.
2.2 FIRE PROTECTION EQUIPMENT:
A. UL Class 2A, 21/2gallon water type, storedpressure extinguisher and UL Class 10, Type I, 15pound B: C carbon dioxide extinguisher.
2.3 BARRICADES AND SIGNS:
A. Park shall close area for the public.
2.4 TEMPORARY STAGING AND SCAFFOLDING:
A. The Contractor shall furnish, erect, and maintain in safe condition all exterior and interior staging and scaffolding required properly carrying out and completing all the work of the Contract.
PART 3: EXECUTION
3.1 ELECTRICITY AND LIGHTING:
A. Contractor shall provide generator for electrical power if required.
3.2 TELEPHONE:
A. No telephone service is available on site for Contractor's use. Make arrangements with the Telephone Company and pay all costs. Telephone for government's use will be provided and paid by the government.
3.3 WATER:
A. Furnish cool, potable water for construction personnel in locations convenient to work stations.
3.4 SANITARY FACILITIES:
A. Use facilities at the park.
3.5 FIRE PREVENTION AND PROTECTION:
A. A capable and qualified person shall be placed in charge of fire protection. The responsibilities shall include locating and maintaining fire protective equipment and establishing and maintaining safe torch cutting and welding procedures.
B. Hazard Control: Take all necessary precautions to prevent fire during construction. Do not store flammable or combustible liquids in historic structures. Provide adequate ventilation during use of volatile or noxious substances.
C. Spark Arresters: Equip all gasoline or diesel powered equipment used in potential forest or grass fire locations with spark arresters approved by the U. S. Forest Service. Written determinations of areas and periods of potential fire hazard will be issued by Contracting Officer.
D. Locate internal combustion equipment so that exhausts discharge well away from combustible materials.
E. Locate service areas a minimum of 50 feet from buildings. Shut down equipment before refueling.
F. Smoking: Smoking within buildings or temporary storage sheds is prohibited. Smoking is not allowed in historic area - lower village.
3.6 SCAFFOLDING.
A. Minor interior scaffolding shall comply in all respects to all-applicable safety rules, and regulations of legal bodies and individuals having jurisdiction over the work.
| END OF SECTION 015000 | |
| RICH-FY15 | 015000-14 |
| TEMPORARY UTILITIES |
SECTION 015600 - BARRIERS
PART 1: GENERAL
1.1 DESCRIPTION
A. The work of this section consists of furnishing, installing, and maintaining barriers to protect existing facilities and the public from construction operations.
PART 2: PRODUCTS
2.1 GENERAL
A. Material may be new or used, but shall be suitable for intended purpose. Fences and barriers shall be structurally adequate and neat in appearance.
2.2 BARRICADES AND SIGNS
A. Manual on Uniform Traffic Control Devices (MUTCD), Part VI, latest edition.
2.3 BARRIER TAPE
A. Banner Guard, imprinted with "CAUTION: CONSTRUCTION AREA", manufactured by Reef Industries, Inc., Houston, Texas, or approved equal.
PART 3: EXECUTION
3.1 PROTECTION OF PUBLIC:
A. Fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry.
3.2 BARRIER TAPE
A. Install where directed by Contracting Officer. Keep a minimum of two rolls on site at all times.
3.3 REMOVAL
A. Completely remove barriers no longer needed when approved by Contracting Officer.
| END OF SECTION 015600 | ||
| RICH-FY16 | 015600-15 | |
| BARRIERS |
SECTION 015700 - TEMPORARY CONTROLS
PART 1: GENERAL
1.1 DESCRIPTION: The work of this section consists of providing temporary controls.
PART 2: PRODUCTS
Not used.
PART 3: EXECUTION
3.1 HOUSEKEEPING:
A. Keep project neat, orderly, and in a safe condition at all times.
B. Provide individually marked containers for recycling personal items, such as aluminum cans, newspapers, glass, plastic, corrugated cardboard. These items may be recycled by the Contractor or turned over to the Park recycling committee. Coordinate with C.O.
C. Keep volatile wastes in covered containers.
D. Contractor shall clean up the work site daily. Contractor will remove all dirt and debris resulting from this work as it occurs and dispose of it as directed by the Contracting Officer or the Technical Representative. Daily Cleanup shall be accomplished by 4:30p.m. Daily clean up shall insure that park operations are not impaired and that no damage is incurred by the park.
3.2 AIR AND WATER POLLUTION CONTROL:
A. Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during construction.
B. Do not dispose of volatile wastes or oils in storm or sanitary drains.
C. Do not allow waste materials to be washed into streams or bodies of water.
END OF SECTION 015700
| RICH-FY16 | 015700-16 |
| TEMPORARY CONTROLS |
SECTION 016000 – PRODUCT REQUIREMENTS
PART 1: GENERAL
1.1 DESCRIPTION
A. The work of this section consists of the general procedures for handling, storing, and protecting material and equipment.
1.2 TRANSPORTATION AND HANDLING
A. Arrange deliveries of materials in accordance with construction schedules; coordinate to avoid conflict with work and conditions at the site. Deliver materials in undamaged condition, in manufacturer's original containers or packaging, with identifying labels intact and legible. Contractor is encouraged to obtain materials in biodegradable or recyclable/ reusable packaging which uses the minimum amount of packaging possible.
1.3 STORAGE AND PROTECTION
A. Store materials in accordance with manufacturer's instructions.
B. The park shall provide suitable storage for materials and equipment on the site to be maintained in a safe and orderly condition at a location approved by the Contracting Officer's Technical Representative. The Government assumes no liability for loss or damage to materials or equipment due to improper storage of or lack of protection from the elements or from any other cause whatsoever.
C. Interior Storage: Maintain temperature and humidity within the ranges required by manufacturer's instructions.
END OF SECTION 016000
| RICH-FY15 | 016000-17 | |
| PRODUCT REQUIREMENTS |
SECTION 017700 – CLOSEOUT PROCEDURES
PART 1: GENERAL
1.1 DESCRIPTION:
A. The work of this section consists of final cleanup, closeout submittals, and final inspection procedures.
PART 2: PRODUCTS
2.1 CLEANING MATERIALS:
A. As recommended by the manufacturer of surface to be cleaned.
2.2 POSTED OPERATING INSTRUCTIONS:
A. Frame instructions under nonglare glass or approved laminated plastic. In areas where operating instructions are subject to sunlight or moisture, provide weatherresisting materials.
PART 3: EXECUTION
3.1 CLEANING:
A. Remove all tools, equipment, surplus materials, and rubbish. Restore or refinish surfaces of existing facilities that are marred, scratched, or damaged due to the work of this contract to match original condition. Remove grease, dirt, stains, foreign materials, and labels from interior and exterior finished surfaces. Vacuum clean interior building areas. Do any require waxing and polishing? Sweep paved areas; rake grounds. At time of final inspection, project shall be thoroughly clean and ready for use.
3.2 POST-CONSTRUCTION INSPECTION:
A. Contracting Officer's Technical Representative will inspect project, and Contracting Officer will notify Contractor in writing of all deficiencies.
3.3 SUBSTANTIAL COMPLETION AND FINAL INSPECTION:
A. Submit written certification that project, or designated portion of project, is substantially complete, and request in writing a final inspection. Contracting Officer will make an inspection within 10 days of receipt of request.
1. When Contracting Officer determines that the work is substantially complete, he will prepare a list of deficiencies to be corrected before final acceptance and issue a Letter of Substantial Completion.
2. If Contracting Officer determines that the work is not substantially complete, he will immediately notify Contractor in writing, stating reasons. After completing work, Contractor shall resubmit certification and request a new final inspection.
3.4 ACCEPTANCE OF THE WORK:
After all deficiencies have been corrected, a Letter of Acceptance will be issued.
END OF SECTION 017700
| RICH-FY16 | 017700-19 |
| CLOSEOUT PROCEDURES |
SECTION 024119 - SELECTIVE DEMOLITION
| 1 | PART 1 | GENERAL | ||
| PART 1 | GENERAL | |||
| 1 .1 | DESCRIPTION | |||
| A. | The work of this section consists of demolition of existing wall paneling, acoustical ceiling tile 12”x12”, carpet, electrical lighting, surface mounted wiring and outlets, HVAC diffusers and grilles. Restore walls, ceiling, floor, doors, windows, utilities, electrical, IT, and alarm items and related accessories. | |||
| 1 .2 | RELATED WORK | |||
| A. | Sections 040322, 062000, and 090320. | |||
| 1 .3 | SUBMITTALS | |||
| A. | As specified in Section 013323. | |||
| B. | Submit schedule showing sequence of work and methods of demolition. Include schedule for shutting off and capping utilities and re-establishing utility services. | |||
| 1 .4 | QUALITY ASSURANCE | |||
| A. | Comply with safety requirements for demolition, ANSI A10. | |||
| 1 .5 | PROJECT CONDITIONS | |||
| A. | Keep dust and dirt pollution to a minimum. | |||
| B. | Ensure safety of persons in demolition area. Provide temporary barricades as required. | |||
| C. | Provide adequate fire protection. Keep area clear of hazardous substances and debris. | |||
| E. | Separate demolition area from portions of building to remain with temporary dustproof partitions. | |||
| F. | Provide temporary weather protection to prevent damage to structure and interior area. | |||
| 1 .6 | SCHEDULING | |||
| A. | Complete demolition that might damage new construction before starting new work. | |||
| 2 | PART 2 | PRODUCTS | Not used. | |
| PART 2 | PRODUCTS | Not used. | ||
| 3 | PART 3 | EXECUTION | ||
| PART 3 | EXECUTION | |||
| 3 .1 | PREPARATION | |||
| A. | Provide temporary supports and protection for portion of structure to remain. Protect fixtures and equipment to remain. Protect nearby structures as necessary. | |||
| B. | Cap or disconnect utilities. Provide bypass connections as necessary to maintain utility service to occupied areas of building. | |||
| 3 .2 | DEMOLITION | |||
| A. | Work systematically from top downward. | |||
| B. | Remove and dispose of existing wall paneling, acoustical ceiling tiles 12”x12”; electrical, HVAC, alarm items and related accessories. | |||
| C. | Avoid excessive loads on supporting framing by careful location of equipment and prompt removal of demolished materials. | |||
| 3 .3 | SALVAGE | |||
| A. | Items to be Reused: doors for prime and painting | |||
| B. | Carefully clean and store items to be salvaged or reused. | |||
| 3 .4 | RESTORATION AND CLEAN-UP | |||
| A. | Repair and clean adjacent surfaces damaged or soiled by demolition work | |||
| .B. | Restore utility service to normal operation. | |||
| C. | Remove equipment, temporary protection and barriers, and debris. Dispose of unsalvageable material as approved by COR. | |||
| 4 | PART 4 | MEASUREMENT AND PAYMENT |
END OF SECTION 024119
| RICH-FY16 | 024119-21 |
| SELECTIVE DEMOLITION |
SECTION 062000 - FINISH CARPENTRY
PART 1 GENERAL
1.1 DESCRIPTION
A. The work of this section consists of finish carpentry work of exterior fascia, trims and mouldings to match historic in kind for entire building.
1.2 RELATED WORK
A. Specification – Sections 061000.
1.3 SUBMITTALS
A. As specified in Section 013323.
B. Shop drawings: not required.
C. Samples
1. One linear foot of wood for exterior mouldings, face boards, trims, soffits components to reconstruct fascias and soffits.
2. Certifications
a. Certification by treating plant stating preservative chemicals and process used, net amount of salts retained, and compliance with applicable standards.
b. Certification by treating plant that fireretardant treatment materials will not bleed through finished surfaces.
c. Certificates for graded but unmarked lumber or plywood attesting that materials meet the grade requirements.
1.4 QUALITY ASSURANCE
A. Identify lumber by grade mark of a recognized association or an independent agency that is certified by the Board of Review, American Lumber Standards Committee. A certificate will be required for material left unmarked for reasons of appearance.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Protect materials from weather. Store materials a minimum of 6 inches above ground on framework or blocking and protect with waterproof covering allowing for adequate air circulation and ventilation. Do not store materials in damp portions of building.
B. Protect treated materials from high humidity and moisture during storage and erection.
PART 2 PRODUCTS
2.1 SIZES AND PATTERNS
A. Yard and board lumber sizes shall meet PS2070. Provide shaped lumber and millwork in patterns shown. Sizes, unless otherwise shown, are nominal; actual sizes shall be within manufacturing tolerances allowed by the applicable standard specified.
2.2 MOISTURE CONTENT
A. Airdry or kilndry lumber. The maximum moisture content at time of delivery shall be as follows:
1. Wood Products: Moisture content shall be within the ranges allowed by applicable woodworking standards.
2.3 TREATMENT OF WOOD PRODUCTS
A. Pressure Treatment: Treat exterior millwork and trim and lumber and plywood in contact with masonry or concrete. Refer to Specification Section 061000.
2.4 WOOD
A. Exterior fascia, trim and moulding grade: shall be premium select grade wood boards to match historic in kind.
B. Premium select grade board shall be for exterior use, as approved by CO.
PART 3 EXECUTION
3.1 GENERAL FINISH WORK
A. Where practicable, shop assemble and finish items of builtup millwork. Provide a liberal brush coat of preservative treatment to field cuts or holes in treated wood. Before installation of materials, prime surfaces as specified in Section 099000. Construct tight joints in a manner that will conceal shrinkage, placed over the centerlines of support. Miter trim and moldings at exterior angles and cope at interior angles and at returns. Material shall show no warp after installation. Install millwork and trim in the longest lengths possible, door and window trim in single lengths. Fasten finish work with finish nails. Provide blind nailing where practicable. Set face nails for putty.
B. Exterior: Machine sand exposed flat members and square edges. Machine finish semiexposed surfaces. Construct joints to exclude water. In addition to nailing, glue joints of builtup items as necessary for weatherresistant construction. Provide welldistributed end joints in builtup members. Shoulder joints in flat work. Glue miter joints.
3.2 FACE BOARDS
C. All face boards at look out base of new wood shall be to match existing historic tongue and groove boards fastened with exposed head stainless steel square drive trim screws to fasten properly.
END OF SECTION 062000
RICH-FY16 28
SECTION 062500 - EPOXY CONSOLIDATION AND PATCHING
PART 1 - GENERAL
| 1.1 | WORK DESCRIPTION: |
| A. | Work includes, but is not limited to, the following: |
1. Where deterioration is confined to small isolated areas, epoxy consolidation shall be performed in lieu of replacement of the affected wood wall base.
2. Deteriorated historic fabric beyond repair shall be replaced to match existing in kind.
1.2 RELATED SECTIONS: Section 099000 – Painting and Coating.
1.3 SUBMITTALS: Product Literature: Submit manufacturer’s product literature for all proprietary consolidation and patching materials to be used in restoration of deteriorated wood. Product literature shall include technical specifications, instructions for application and use and Material Safety Data Sheets.
1.4 DELIVERY, STORAGE AND HANDLING
| A. | Store epoxy-based wood consolidants and fillers indoors in a cool, dry location away from direct sunlight. Ensure that products remain within the temperature range specified by the manufacturer. |
| B. | Do not store associated solvents on site. |
| C. | Store wood materials for dutchman patching indoors and protect from damage. |
1.5 PROJECT / SITE CONDITIONS
A. The Contractor is responsible for protecting existing adjacent materials during the execution of the work. Provide all necessary protection and work procedures to avoid damage to existing material assemblies not a part of the work of this Section. At a minimum, the Contractor shall:
1. Protect adjacent masonry, glass and surrounding surfaces in work areas from epoxy drips and spatters during wood consolidation. Provide drop cloths to protect portico terrace.
2. Where possible, wood components to be consolidated should be removed and restored off premises. Any components removed from the premises shall be labeled with indelible marker on an inconspicuous surface to ensure reinstallation in the appropriate location.
3. Follow epoxy manufacturer’s instructions for curing including appropriate temperatures and time periods. Verify that epoxy has cured completely before imposing structural loads on repaired components.
B. Dispose of unused resin materials offsite on a daily basis in a manner consistent with local state and Federal environmental regulations.
PART 2 - PRODUCTS
2.1 MATERIALS
| A. | Wood Restoration Materials |
| 1. | Epoxy Consolidant: Epoxy consolidant shall be a type with regular and proven use for consolidation of decayed wood. Epoxy shall have low viscosity and be slow setting to allow for successive applications. When fully cured, epoxy shall be more flexible than wood at temperatures of 50 degrees to 100 degrees Fahrenheit range. |
| 2. | Adhesives and Fillers: |
| a. | Adhesives For General Woodwork Repair: Casein glue or carpenter’s glue per ASTM D4689-99. |
| b. | Epoxy filler for consolidated woodwork to be painted: Non-shrinking, moisture resistant, paintable epoxy wood filler. When fully cured, epoxy shall be more flexible than wood at temperatures of 50 degrees to 100 degrees Fahrenheit range. |
B. Wood Dutchman Materials
1. Restoration: Species of Dutchman repair material shall match the existing component to be restored/repaired. Softwood lumber shall be graded in accordance with the current edition of the AWI Quality Standards, Grade III unless indicated otherwise.
2. Coordinate with CO for selection of appropriate materials to match existing.
| 3. | Moisture content: |
| a. | Not to exceed 12% for trim and millwork 1¼ inch or less in thickness. |
| b. | Not to exceed 15% for trim and millwork 4 inches or less in thickness. |
| 4. | Grading: All species, C and better Select. |
PART 3 - EXECUTION
3.1 GENERAL
A. Contractor shall inspect each wood component to determine the amount of consolidation and/or Dutchman patching required. The following guidelines should be used to determine which treatment is required:
1. The word “assembly” shall refer to an element made up of multiple pieces of wood fastened together such as a door, window sash, etc.
2. The word “component” shall refer to individual pieces of wood within an assembly such as rails, stiles, louvers, panels, etc.
3. Where deterioration affects less than approximately 25% of the volume of the component, epoxy consolidation or dutchman patching is recommended. Where the deterioration exceeds 25%, replacement of the component is recommended.
4. Where deterioration extends deeper than 50% of the depth of the component, Dutchman patching is recommended.
5. Where deterioration extends less than 50% through the depth of the component, epoxy consolidation is recommended.
3.2 EPOXY CONSOLIDATION
| A. | Where major components exhibit moderate, localized deterioration, epoxy consolidation may be used in lieu of replacement to maximize the retention of original material. |
| B. | Remove paint down to bare wood. In deteriorated areas, all loose and soft wood decay must be removed prior to application of epoxy consolidant. Attempt to remove decay down to good solid wood. If not visible, 3/16-inch holes may be drilled at 2 inches O. C., approximately for better epoxy penetration. Remove all loose fragments and blow out all dust. |
| C. | Protect decayed area from moisture until consolidant has been applied and has completely set. Wood to be consolidated must be dry and have a moisture content of less than 18 percent within 3 inches of the decay area. |
D. Apply liberally to prepared decay area by pouring, brushing and/or spraying. Do not allow consolidant to touch adjacent areas, materials or building components not to be treated. Repeat application 4 to 6 times, or until surfaces cannot accept more epoxy. Allow 1 hour between applications unless directed otherwise by manufacturer’s instructions.
E. Keep epoxy consolidant out of direct sunlight at temperatures above 60 degrees Fahrenheit until fully cured.
3.3 EPOXY PATCHING
A. Consolidate deteriorated woodwork with epoxy, which has been approved by the CO., prior to performing any patching work.
B. Protect all finish surfaces from damaging spills or drips. Immediately remove any spills or drips using solvent as recommended by the manufacturer.
C. Prime decayed surfaces according to manufacturer’s instructions. Epoxy may be applied by brush or trowel. Saturate the treatment area for a minimum of 1 hour.
D. The epoxy filler may be contained during the curing process by constructing temporary forms or molds. Use manufacturer’s recommended mold release agent. Potters clay may be used to seal small openings or checks.
E. Fill open grain on heavily weathered surfaces, working filler full depth into checks and crevices. Scrape or sand filled areas back to match the surrounding surface.
F. Tool, shave or otherwise shape installed patching material as required to match the surface of the surrounding material with no variation in profile and flushness.
G. Protect treatment areas from moisture until all epoxy has cured.
H. Following application, leave all areas clean and free of epoxy. Discard unused epoxy, containers, tools and debris in accordance with local, state and federal environmental regulations.
I. Allow epoxy to cure a minimum of 48 hours at temperatures above 60 degrees Fahrenheit, or for 72 hours at temperatures in the 50 degrees Fahrenheit range. Keep epoxy out of direct sunlight at temperatures above 60 degrees Fahrenheit.
3.4 DUTCHMAN PATCHING
| A. | Cut out areas of deteriorated wood down to sound material, leaving mating surfaces smooth and flat for installation of wood dutchman materials. Square off areas to receive patches. |
| B. | The grain of dutchman material shall align with the grain of member to be patched. Dutchman patches shall fit snugly on all sides, leaving only hairline gaps. Affix patches with wood glue or finish nails depending on the size and location of patch. |
C. Where entire ends of wood members must be replaced, new dutchman material shall be dowelled into original fabric, leaving no variation in surface plane or edges. Diameter of the wood dowels shall be no greater than 1/3 the thickness of the wood pieces to be joined. Dowels shall extend a minimum of 1 inch into both the old and new wood. Where conditions permit, dowelled connections may be reinforced with wood cleats on concealed face.
END OF SECTION 062500
Copyright 2010 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA
SECTION 079000 – SEALANTS
PART 1: GENERAL
1.1 DESCRIPTION:
A. The work of this section consists of furnishing and installing sealants to provide a barrier against air, water, moisture, or dirt, for interior work.
1.2 SUBMITTALS: As specified in Section 013323.
A. Manufacturer’s technical data and application instructions.
B. Samples of sealant colors as approved by CO.
1.3 QUALITY ASSURANCE: Contractor shall have copies of referenced ASTM standards available on the job site.
1.4 DELIVERY, STORAGE, AND HANDLING: Deliver materials in manufacturer's original, unopened containers and store in a protected area at temperatures recommended by manufacturer.
1.5 ENVIRONMENTAL CONDITIONS: Install sealants only in favorable weather conditions as defined in ASTM C962latest edition. To help balance extension and compression of sealants in interior working joints, install sealants at substrate temperatures as near as possible to 55 degrees F.
PART 2: PRODUCTS
2.1 APPROVED MAFACTURERS: Other manufacturer's products may be used provided they are approved as equal.
A. Dow Corning Corporation, Midland, Michigan. Dow Conrning 795 silicone structural glazing and weatherproofing sealant.
2.2 EXTERIOR SEALANTS:
A. Horizontal Roof Seam: Silicone Building Sealant in accordance with ASTM E 119.
PART 3: EXECUTION
3.1 INSTALLATION OF SEALANTS:
A. Follow sealant manufacturer's instructions for installation of sealants. Tool joints concave.
B. Apply a thin bead of silicone sealant no thicker than 1/2" and no thinner than 1/8", as recommended by manufacturer.
END OF SECTION 079000
Copyright 2012 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA
SECTION 090320 - TREATMENT OF PLASTER
Revise this Section by deleting and inserting text to meet Project-specific requirements.
This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.
GENERAL
DESCRIPTION
Section Includes: Repair of interior plaster of walls and ceilings due to removal of wall paneling and adhered ceiling tiles.
Retain subparagraphs below to cross-reference requirements Contractor might expect to find in this Section but are specified in other Sections.
Retain one or both subparagraphs below if additional requirements are necessary; include information about conference.
ACTION SUBMITTALS
Product Data: For each type of product.
Paragraph below assumes manufacturer's standard-size Samples are acceptable. Revise to suit Project.
Samples: For each exposed product and for each color and texture specified to match existing in kind.
QUALITY ASSURANCE
Treatment Specialist Qualifications: A qualified plastering specialist with expertise in matching and performing the types of plasterwork repairs required. Experience only in installing and repairing new plasterwork, veneer plaster, or gypsum board is insufficient experience for plaster treatment work of this project.
Retain "Cast-Plaster Manufacturer Qualifications" Paragraph below only if cast-plaster fabrications are required.
Retain required mockups in "Mockups" Paragraph below; insert others to suit Project.
Retain one or more of three subparagraphs below if required; insert others to suit Project.
PRODUCTS
LIME-PLASTER MATERIALS
Hydrated Lime: ASTM C 202, similar to existing.
Retain "Finish-Coat Sand" Subparagraph below for sieve requirements different from ASTM C 897; retain option below only if required for exposed lime plaster.
Type S.
Type N Lime Putty: similar to existing.
Retain "Finish-Coat Sand" Subparagraph below for sieve requirements different from ASTM C 897; retain option below only if required for exposed lime plaster.
Slaked hydrated lime.
Factory prepared lime putty according to ASTM 1489.
Sand Aggregates: ASTM C 897.
Retain "Finish-Coat Sand" Subparagraph below for sieve requirements different from ASTM C 897; retain option below only if required for exposed lime plaster.
Finish-Coat Sand: Match to similar and compatible size, texture, and gradation of existing sand as closely as possible.
Pigments for Colored Plaster: ASTM C 979/C 979M and having a satisfactory performance in lime plaster.
Retain "Fiber" Paragraph below for base-coat plaster; revise to suit Project.
Fiber: Verify and match existing, free of grease, waxes, and oils; and beaten well to separate fibers before blending into unfibered plaster material.
Proportion of Fiber to Unfibered Plaster Material: adjust proportion as required to produce a well-fibered, cohesive, spreadable, stiff mix with fibers uniformly distributed.
TRIM ACCESSORIES
General: According to: ASTM C 1063 for lime plaster; coordinate depth of trim and accessories with thicknesses and number of plaster coats required.
MISCELLANEOUS MATERIALS
Water that contains salt, alum, or plaster residue accelerates plaster set and may cause efflorescence. Water that contains organic or vegetable matter may retard plaster set, cause staining, and interfere with plaster bond.
Water for Mixing and Finishing Plaster: Potable and free of substances capable of affecting plaster set or of damaging plaster, lath, or accessories.
Fasteners for Attaching Lath to Substrates:
For Lime Plaster: ASTM C 1063.
For Gypsum Plaster: ASTM C 841.
For Wood Lath: ASTM C 841 requirements for wood-floor-runner or wood-furring fasteners unless otherwise indicated on Drawings.
Generally, retain "Wire Ties" Paragraph below. Wire, in various diameters, is used for tying expanded-metal lath to framing and supports.
Wire Ties: ASTM A 641/A 641M, Class 1 zinc coating, soft temper, not less than 0.0475-inch diameter, unless similar to existing.
EXECUTION
TREATMENT OF PLASTER, GENERAL
General: In treating historic plaster, disturb it as minimally as possible and as follows unless otherwise indicated:
Dismantle loose, damaged, or deteriorated plaster, lath, and support systems that cannot be repaired.
Verify that substrate surface conditions are suitable for repairs.
Provide lath, furring, and support systems for plaster included in the work of this Section.
Replace lost details in new, wet-applied and cast plaster that replicate existing or indicated plaster configurations.
Leave repaired plasterwork in proper condition for painting or applying other finishes as indicated.
Install temporary protective measures to protect plaster surfaces that shall be treated later.
PATCH-TYPE REPAIR
Patch-type repair mixes can vary widely depending on base plaster type, patch size and shape, and Installer's preferences. A repair mix should finish well and shrink little. Often, gypsum products are used with cracked lime-plaster to speed setting and reduce shrinkage.
General: Patch voids, fractured surfaces, and crushed areas as a result of removal and installation work of double doors.
Inspect for deterioration of supporting plaster and lath, and repair or replace deteriorated material as required for a sound substrate.
Rake perimeter of hole to sound plaster, and slightly undercut existing plaster to enable replacement plaster to tuck behind existing plaster.
Replace missing lath in kind. Bridge gaps in wood lath with expanded-metal lath, overlapping wood by 6 inches and fastening them together.
Clean hole to remove loose materials and other foreign matter and deposits that could impair bond with repair material.
Wet substrate to damp condition, but without visible water droplets, then install patch material to original profiles.
First option in "Lime-Plaster Mix" Paragraph below is sometimes used for small patches; revise to suit Project. Retain last option below if using fiber in first coat of two-coat patch.
Lime-Plaster Mix: shall be similar to existing in kind, type and plaster material components.
First option in "Gypsum-Plaster Mix" Paragraph below is sometimes used for small patches; revise to suit Project. Retain last option below if using fiber in first coat of two-coat patch.
Finishing: Finish flat surfaces flush and with same texture as adjacent existing plaster. For molded plaster shapes, tool surface to restore the sharp edges and the shape of the molded shape to original contours.
Hairline cracking within the plaster or plaster separation at edge of a patch is unacceptable. Completely dismantle such work and reinstall or repair.
END OF SECTION 090320
SECTION 092900 - GYPSUM BOARD
1. This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.
Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.
1. GENERAL
SUMMARY
This Section includes the following:
Adjust list below to suit Project.
Work includes the installation enclosure with interior gypsum board, fire rated, to enclose exposed vertical sprinkler pipe.
Backing panels.
Gypsum board and panels shall match existing adjacent surfaces.
Related Sections include the following:
Section 024119 – Selective Structure Demolition for work related to Hazardous Materials.
List below only products and construction that the reader might expect to find in this Section but are specified elsewhere.
Division 06 Section "Rough Carpentry" for wood framing and furring that supports gypsum board.
ACTION SUBMITTALS
Product Data: For each type of product indicated.
Samples: For the following products:
Retain first subparagraph below if special trim types and profiles are required. Generally, delete if only standard-type trims are required.
Trim Accessories: Full-size Sample in 12-inch- long length for each trim accessory indicated.
Delete paragraph and subparagraphs below if not required. If retaining, indicate location and other details of mockups on Drawings or by inserts. Revise wording if only one mockup is required.
STORAGE AND HANDLING
Store materials inside under cover and keep them dry and protected against damage from weather, condensation, direct sunlight, construction traffic, and other causes. Stack panels flat to prevent sagging.
PROJECT CONDITIONS
Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board manufacturer's written recommendations, whichever are…