Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Drawings_CabinRoofdetail.pdf | ||
| BID_SHEET.docx | DOCX document | |
| Sol_P16PS01500.pdf | ||
| Construction_Clauses_.docx | DOCX document | |
| Eval_Matrix.xlsx | XLSX spreadsheet | |
| General_Decision_Number.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Natchez National Historic Park
STATEMENT OF WORK:
Stabilize Structure, Replace Logs and Roof on Log Cabin
DATED:
May 16, 2016
NATIONAL PARK SERVICE
SOUTHEAST REGION
WEST MAJOR ACQUISITION BUYING OFFICE
PROJECT SCOPE
1.0 BACKGROUND
The Old Fort Rosalie Gift Shop is the only remaining remnant of a 1939 tourist attraction constructed on the original site of the 18th-century French Fort Rosalie. The death of its entrepreneur-developer during World War II brought an end to the operation of this attraction, and the site has been home to a variety of functions since that time. This structure is best known locally at the 17-year home of Fat Mama’s Tamales prior to construction of their new location further down Canal Street.
Though historic photos show that the structure’s roof was originally wood shingles, the existing metal roof has been in place for many years.
Natchez NHP plans call for the structure to be rehabilitated for visitor services use as a venue for robust exhibits on the north end of the Fort Rosalie site. The NPS has completed HABS drawings and a Historic Structure Report for the building.
1.1 Scope of Services
In accordance with the terms and conditions of the Contract, the Contractor shall perform the work of this Request for Proposal (RFP) for the National Park Service (NPS) as described below.
All Services performed under this RFP shall be performed in accordance with applicable codes, accepted industry standards, and under the direct supervision of a licensed general contractor approved by the Contracting Officer.
1.2 Location
The log cabin is located at 502 Canal Street, near the intersection of D.A. Biglane Street, within the city limits of Natchez, MS.
1.3 Period of Performance
The work of this contract shall be completed in 120 days after Notice to Proceed and in accordance with the approved schedule.
1.4 Information
NPS Points of Contact:
Contractual:
Contracting Officer (CO) Yancey Davis: 662.680.4044 yancey_davis@nps.gov
Technical:
Project Manager and Contracting Officer’s Representative (COR) Larry Stewart: 601.445.0552 larry_stewart@nps.gov
1.5 Data and Materials to be provided by the NPS
The following data and materials will be provided and are included in Section 5 of this RFP:
Transmittal Form (CM-16) Roofing Architectural Drawing
2.0 PROJECT Requirements
2.1.1 Scope of Work and Project Summary/Requirements
Natchez National Historical Park Service needs to stabilize and protect the 1940 era log cabin. Metal roofing shall be removed and replaced with cedar shingles, along with carpentry repairs, drip edge, roof flashing and rafter replacement. Cabin will also need removal and replacement of four lower logs on the structure, complete with replicated notches and cuts. This will require raising, lowering and leveling the structure to its original elevation. The contractor shall be responsible for removal of all debris to an offsite location.
This Statement of Work is not meant to be an all-inclusive to do list for the project, but a list of the main items involved in the project. The contractor shall use this list to assist him in developing an estimate for the project.
2.1.2 Definition of Contract Line Items
The intent of this section is to explain, in general, what is included in each contract line item, limits or cut-off points where one item ends and another begins. If no item exists for a portion of the work, include the costs in a related line item.
CONTRACT LINE ITEM NO. 1 – Raise, level and support structure: lift structure with house jacks and dunnage to facilitate item No. 2. Support and level building when completed
CONTRACT LINE ITEM NO. 2 – Remove and replace lower four logs: the bottom seal and three lower logs have either disintegrated or show signs of exterior rot. Some logs will require additional half laps to replace rotten areas.
CONTRACT LINE ITEM NO. 3 - Replace rotting log rafters and ceiling joists: The original cabin, constructed from utility poles, will be replaced with in-kind materials using Roofing Architectural Drawing for guidance.
CONTRACT LINE ITEM NO. 4 - Replace 2000 SF of roof surface, decking and metal flashing as needed: Existing metal roof will be removed, decking added for stability, covered with #30 roofing felt and 18” cedar shingles installed for covering and protection. Metal flashing for fireplace and drip edge to be 22 gauge in thickness and fabricated from copper.
2.1.3 Payments
Payment shall be based on the stabilization work completed and accepted by NPS. Verification of the work complete shall be initiated by the Contractor and inspected by the park inspector and/or a representative of the Contracting Officer.
2.1.4 Project Meetings
Preconstruction Meeting(s)
After all submittals have been approved, and prior to start of construction, the CO may arrange an on-site preconstruction meeting or conference call with the contractor. The meeting agenda may include the following:
· Communication and correspondence procedures
· Roles and responsibilities
· Lines of Authority
· Payments
· Schedule
· Labor standards
· Payroll reports
· Schedule of Values
· Modifications
· List of Subcontractors
· Quality Control Plan (including a list of personnel responsible for quality control and assigned duties and a copy of a letter of direction to the Contractor’s Quality Control Supervisor outlining assigned duties).
· Accident Prevention Program (including name of responsible supervisor)
· Accident reporting
· Park Rules and Regulations to be provided
· Medical emergency processes, availability, emergency numbers, and contacts.
· Park permits, burning construction waste, rules of the road, alcohol use, housekeeping, firearms, pets, natural and cultural resource concerns.
· Access road and site constraints.
· Visitation and public relations.
· Environmental requirements for the Project
· Waste and Recycling Plan (if required)
· Saturdays, Sundays, holidays and night work
· Mobilization and Site Staging Areas
· Site Security
Progress Meetings
The contractor shall participate in weekly telephone conference calls with the Contracting Officer, and other project team members to update them on the following meeting agenda items:
· Requests for Information (RFI’s) and issues
· Modifications
· Work in progress and projected
· Schedule update
· Other business relating to work
2.1.5 Project Schedule
General: The Contractor shall provide a written summary construction schedule with important milestones before the pre-construction meeting or any work begins.
Purpose: The purpose of the project schedule is to ensure adequate planning, coordination, scheduling, and reporting during execution of the work of the contract.
The project schedule will assist the contractor and the Contracting Officer in monitoring the progress of the work and evaluating proposed changes.
The project schedule shall consist of procurement activities (including mobilization, submittal, and the delivery of key and long-lead procurement items) and construction activities.
The project schedule shall consist of, but not be limited to, the following for each activity:
· Concise description of the work represented by the activity. Avoid the use of non-standard abbreviations. The work related to each activity shall be limited to one work trade.
· Activity duration in whole working days including non-construction activities such as mobilization, shop drawing and sample submittals, delivery of materials and equipment.
In developing the project schedule, ensure that subcontractor work at all tiers, as well as contractor’s own work, is included in the project schedule.
Proposed durations assigned to each activity shall be the contractor's best estimate of time required to complete the activity considering the scope and resources planned for the activity.
Seasonal weather conditions shall be considered and included in the planning and scheduling of all work influenced by high or low ambient temperatures, wind and/or precipitation to ensure completion of all work within the contract time.
Time Impact Analysis for Contract Modifications, Changes, Delays, and Contractor Requests Requirements: When contract modifications or changes are initiated, delays are experienced, or the contractor desires to revise the project schedule, the contractor shall submit to the Contracting Officer a written time impact analysis illustrating the influence of each modification, change, delay, or request on the contract time.
Time Extensions: Activity delays shall not automatically mean that an extension of the contract time is warranted or due the contractor. It is possible that a modification, change, or delay will not affect existing critical activities or cause non-critical activities to become critical. A modification, change, or delay may result in only absorbing a part of the available total float that may exist within an activity chain of the project schedule, thereby not causing any effect on the contract time. Time extensions will be granted in accordance with the terms of the contract.
Float: Float is not for the exclusive use or benefit of either the National Park Service or the contractor. Extension of the contract time will be granted only to the extent the equitable time adjustments to the activity or activities affected by the modification, change, or delay exceeds the total (positive or zero) float available on a particular activity.
2.2 Environmental Requirements
Environmentally friendly products shall be used where possible. Conduct work operations with sensitivity to the natural surroundings.
Select materials that can be reused or recycled or materials with a significant percentage of recycled content. Avoid recycled content materials that are difficult to recycle. Use products with an extended lifecycle.
2.3 Construction Requirements
2.3.1 Environmental Requirements for Construction:
· Air: Employ construction practices that minimize dust production and combustion byproducts.
· Water: Avoid materials that can leach toxic chemicals into the ground water. Do not allow toxic chemicals to enter sewers or storm drains.
· Noise: Minimize noise generation during construction. Operate power equipment in accordance with local noise restrictions.
· Waste Management Goals: Employ processes that ensure the generation of as little waste as possible due to over-packaging, error, poor planning, breakage, mishandling, contamination, or other factors. 0f the inevitable waste that is generated, as many of the waste materials as economically feasible shall be reused, salvaged, or recycled. Waste disposal in landfills shall be minimized.
· Materials: Use resources efficiently. Select materials and use construction practices that achieve the most efficient use of resources and materials.
Recycling is not a requirement of this project. Local recycling is unavailable. All material unsuitable for recycling must be disposed of, in a legal manner, at public or private dumping areas outside the park.
2.3.2 Construction Limits
The following mitigation measures shall be implemented to minimize the area(s) affected by construction activities and to minimize the impacts of construction activities on the visitor experience:
Work Limits
Contractor access route and work limits area shall be established with the COR prior to commencing work on site.
Air and Water Pollution Control
Air quality impacts are expected to be temporary and localized. To minimize these impacts, the following actions shall be taken:
To reduce tailpipe emissions, construction equipment shall not be left idling any longer than is necessary for safety and mechanical reasons.
Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during construction. Keep volatile wastes in covered containers.
Special Construction Requirements
1. Resource Protection and Preservation: All efforts shall be made to protect natural resources, historic structures and surrounding cultural landscape from damage. Should any damage result, it shall be repaired to the satisfaction of the Contracting Officer at no cost to the Government.
2. Preservation of Natural Features: Confine all operations to work limits of the project. Prevent damage to natural surroundings.
Do not remove, injure, or destroy trees or other plants without prior approval. Consult with Contracting Officer and remove agreed on roots and branches that interfere with construction.
Do not fasten ropes, cables, or guys to existing trees.
3. Preservation of Cultural Resources: All historic materials found on National Park Service property are, and shall remain, the property of the National Park Service.
2.3.3 Construction Support
Staging Areas
Staging is limited adjacent designated area. All staging areas shall be returned to pre-construction conditions once construction is complete.
Construction Camp: Establishment of a construction camp will not be permitted.
Protection of Public: Fence, barricade, or otherwise block off the immediate work area from vehicular traffic as needed with COR approved construction barrier fencing, plastic or portable fencing to prevent unauthorized entry. Erect and maintain fencing, barricades before activity starts on site and until all work is complete.
Parking of Construction Vehicles
Parking of vehicles shall be limited to within approved staging and parking area(s) agreed prior to starting work on site.
2.3.4 Construction Submittals
Submittal and Approval Procedures:
The following construction submittals will require government approval prior to procurement or performance of the work:
· Division 1 Submittals – Safety Plan, Schedule, Spare Parts & Materials
· Materials Submittals
· Manufacturer’s Instructions
· Material Safety Data Sheets
· Material Samples / Mock ups (as needed)
· Other submittals as required by the Contracting Officer
Submit sufficient information based upon the performance specifications for the Government to make an informed decision on compliance or lack of compliance for the items above. Submittals shall be transmitted using National Park Service form CM-16. A copy of the form is included in Section 2.4 of this document.
Submit materials submittals a minimum of 15 days prior to the need for approval.
COR’s Review:
Any work done or orders for materials or services placed before approval shall be at the Contractor's own risk.
After reviewing submittals, the COR will return one copy of form CM-16 and one copy of applicable (marked up) submittal sheets to the Contractor. All submitted items will be retained. The contractor is responsible for providing any additional copies needed for his/her own use.
Samples: Samples shall be large enough to illustrate clearly the functional characteristics and full range of color, texture, or pattern.
Manufacturers' Information Sheets: Submit only pertinent pages; mark each copy of standard printed data to identify specific products proposed for use.
The Contracting Officer reserves the right to require additional submittals. After review, the COR shall notify the contractor of approval, approved with notations, or disapproved - resubmit.
The returned submittal will be marked in one of three ways as defined below:
APPROVED: Acceptable with no corrections.
APPROVED WITH NOTATIONS: Minor corrections or clarifications are required. All comments are clear and no further review is required. The Contractor shall address all review comments when proceeding with the work.
DISAPPROVED - RESUBMIT: Rejected as not in accordance with the contract or as requiring major corrections or clarifications. The COR will identify the reasons for disapproval. The Contractor shall revise and resubmit with changes clearly identified.
2.3.5 Construction Coordination
Notification: The Contracting Officer (CO) will provide all necessary written notification and/or direction to the contractor.
The contractor shall assign a full time on-site Project Superintendent who shall be responsible for project safety and shall co-ordinate the contractor’s on site work efforts with the park staff’s daily operations.
Neither the park staff nor the Contracting Officer’s Representative (COR) have authority to accept or reject work, or to authorize changes to the terms and conditions of the contracts, or to obligate the NPS for time or money.
2.3.7 Quality Control
General
The quality of all work shall be the responsibility of the Contractor.
Quality Control Staff
The Contractor's Quality Control Supervisor may also perform the duties of Project Superintendent.
The Contractor's designated Quality Control Supervisor shall be on the project site whenever contract work is in progress.
Execution
On-Site Control: Notify the Contracting Officer at least 48 hours in advance of the preparatory phase meeting and commencement of work on site.
Preparatory Phase: Before beginning work review control submittal requirements with personnel directly responsible for the quality control work. As a minimum, the Contractor's Quality Control Supervisor and the foreman responsible for the feature of work shall be in attendance.
Review all applicable specifications and manufacturer’s recommendations related to the feature of work.
Ensure that copies of all referenced standards related to execution of the work are available on site.
Examine the work area to ensure that all preliminary work has been completed.
Ensure that necessary equipment and materials are at the project site and that they comply with approved submittals.
Initial Phase: As soon as work begins, inspect a representative portion of the work for quality of workmanship.
Review quality control procedures to ensure compliance with contract requirements.
Follow-Up Phase: Inspect as work progresses to ensure compliance with contract requirements until completion of work.
Additional Preparatory and Initial Phases: Additional preparatory and initial phases may be required on the same feature of work for the following reasons:
· Quality of on-going work is unacceptable.
· Changes occur in the applicable quality control staff, on-site production supervision, or work crew.
· Work on a particular feature of work is resumed after a substantial period of inactivity.
Enforcement
The Contractor shall stop work on any item or feature pending satisfactory correction of any deficiency noted by the quality control staff or the COR.
2.3.8 Working Hour Restrictions
All work and deliveries shall be limited to the weekday hours of 6:00 am to 4:00 pm unless otherwise approved by the Contracting Officer. No work shall occur on National Park Service holidays or weekends without prior approval.
2.3.9 Temporary Services
Temporary materials (ladders, drop cloths, scaffolding, etc.) may be new or used, but must be adequate in capacity for the required usage, must not create unsafe conditions, and must not violate requirements of applicable codes and standards.
Fire Protection Equipment: Observe and enforce standards of fire prevention. No open fires shall be allowed.
Vehicles and Equipment: Provide one fire extinguisher on each vehicle or piece of equipment. Extinguishers shall have a minimum UL rating of 2-A:10-B:C. A capable and qualified person shall be placed in charge of fire protection.
Hazard Control: Take all necessary precautions to prevent fire. Do not store flammable or combustible liquids in existing structures. Provide adequate ventilation during use of volatile or noxious substances.
Spark Arresters: Equip all gasoline or diesel powered equipment used in potential forest or grass fire locations with spark arresters approved by the U. S. Forest Service. Locate internal combustion equipment so that exhausts discharge well away from combustible materials.
Smoking: Smoking on site / within buildings or temporary storage sheds is prohibited.
Electricity and Lighting: Service provided by NPS per contract.
Water: The NPS will provide water.
Sanitary Facilities: Use park public facilities identified by COR /Provide and maintain temporary toilet facilities in accordance with State Health Department and National Park Service regulations. Enclosures shall be weatherproof, sight proof and of sturdy construction. Completely remove sanitary facilities on completion of work.
2.3.10 Access
Coordinate construction efforts with the COR to assure there is minimal impact to the work of the National Park Service personnel and the visiting public.
During the work of this contract the Contractor shall have continuous access to the site.
Temporary shutdowns / special events – contractor will be notified two weeks in advance of any events.
2.3.11 Special Requirements
All of the structures at the Fort Rosalie site are historic and all work shall comply with the Secretary of the Interiors Standards for Historic Preservation: https://www.nps.gov/tps/standards.htm
2.3.12 Unforeseen Findings
An NPS monitor will be present or available at the work site during work hours. If historical or archeological resources not shown or otherwise designated or identified in these contract documents are discovered during the course of the work, they shall be brought to the attention of the COR immediately. Work may be stopped in the immediate area until the significance of the findings can be determined.
If historic or archeological resources are discovered at the project site while the monitor is absent, all work in the vicinity of the discovery must stop immediately, and the discovery must be reported to the Contracting Officer. Other areas of work may continue.
If any findings result in delays or additional work, the DBC shall be compensated by an equitable adjustment under the General Provisions of the contract.
2.3.13 Hauling Restrictions
Comply with all legal and local load restrictions in the hauling of materials and equipment.
2.3.14 Project Safety
Before on-site work begins, prepare an accident prevention plan that shall comply with OSHA and project requirements for the work of this contract including the hazards associated and methods proposed to ensure property protection, and safety of the public, National Park Service staff and Contractor employees; provide training and planning for possible emergency situations; housekeeping and fire protection.
Accident Reporting: Reportable accidents, defined as death, occupational disease, traumatic injury to contractor’s personnel, NPS employees or the public, property damage of any accident in excess of $100 and fires, must be reported within seven days. Complete an Accident/Property Damage Report (attached Form CM-22) and forward to the Contracting Officer.
Accident Prevention: The contractor shall conduct the operations, including those involving machinery and self-propelled vehicles and equipment, so as to prevent accidents, injuries and damages, and shall observe all pertinent provisions of the Occupational Safety and Health Act (OSHA) and shall comply with applicable state and local safety, health and sanitation laws.
Safety Equipment: All contractor personnel shall use approved personal protective equipment and other safety equipment appropriate for the contract work being performed. Safety equipment shall conform to OSHA Safety and Health Standards.
2.3.15 Temporary Controls
Housekeeping
Keep project neat, orderly, and in a safe condition at all times.
Weather Protection
Contractor shall continually monitor weather forecast. When inclement weather is expected, provide temporary protection. Inspect protective coverings frequently to ensure that they are functioning properly.
Contractor shall not commence painting when weather forecast is predicted outside of allowable range specified by Manufacturer.
The hurricane season begins June 1 and terminates November 30. Should a tropical storm or hurricane threaten the area, the construction site and the park shall be secured and closed at least 24 hours before anticipated storm landfall.
2.3.16 Project Close-out
Cleaning: Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Restore or refinish surfaces that are damaged due to work of this contract to original condition. Remove grease, dirt, stains, foreign materials, and labels from finished surfaces. Pick up and remove all construction debris from the site. At time of final inspection, project shall be thoroughly clean and ready for use.
Before submitting a request for final inspection, submit the following:
· Guarantees and Bonds: As specified in contract requirements and Specifications.
· Spare Materials: As specified in Specifications
2.3.17 Substantial Completion and Final Inspection
After receipt of written notice of substantial completion, the Contracting Officer (and/or COR) will complete an inspection within 10 days, or will advise the Contractor of items that prevent the project from being designated as substantially complete.
Once any deficiencies are corrected, contractor shall provide written certification and request for final inspection. Final inspection shall take place no more than 10 days after requested.
After all deficiencies have been corrected the Contracting Officer will issue a Letter of Acceptance.
Warrantee Period:
Warrantee period is one year from completion and specified in the Contract.