Amendment_0001_Spec_01_27_00_Volume_I_WWTP.pdf
PDF 23 KB Posted
- Attached to
- GRTE 149677 Moose Waste Water/Water Plant
- Solicitation number
- P16PS01023
About this file
Amendment 0001_Spec 01 27 00_Vol I Moose Wastewater System Improvements
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0001
P16PS01023
GRTE 149677
GRTE - 149677 – WWTP
021216
01 27 00 - 1
DEFINITION OF CONTRACT LINE ITEMS
SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS
PART 1 - GENERAL
1.1 SUMMARY
A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.
B. If no contract line item exists for a portion of the work, include the costs in a related item.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 LIST OF CONTRACT LINE ITEMS
A. Contract Line Item No. 1: Lower Valley Energy Work Order
1. This item consists of payment of Lower Valley Energy’s work order/connection fees. The work includes, but is not limited to, furnishing and installing the power vault, primary conduit and cabling, transformer and meter to complete the electrical service to the new WWTP. Work completed by the Contractor, associated with this item, is included in Contract Line Item No. 2, below. Measurement for payment will be the actual work order price charge by Lower Valley Energy.
2. Payment will be made for the actual payments made to Lower Valley Energy (without any markups).
B. Contract Line Item No. 2: Electrical Service
1. This item consists of furnishing all materials, equipment and labor for construction of the electrical service to the WWTP site. The work includes coordinating with Lower Valley Energy, furnishing and installing the transformer pad, trench excavation, bedding, backfill, trench resurfacing, and installation of temporary and permanent disconnects, secondary conductors and conduits for power to the new WWTP building, temporary lift station and dewatering system.
2. Measurement for payment will be the complete Electrical Service installed, tested, and accepted including but not limited to all excavation, bedding, backfill, pad construction, disconnects, conduit, conductors, connections and incidentals.
3. Payment will be made at the contract lump sum price bid for “Electrical Service”. This lump sum price and payment shall be full compensation for all, materials, labor, transportation, equipment, and incidentals necessary to complete the work described herein and shown on the Drawings.
C. Contract Line Item No. 3: Temporary Construction Dewatering System
GRTE 149677
GRTE - 149677 – WWTP
021216
01 27 00 - 2
1. This item consists of furnishing all materials, equipment and labor for installation of the dewatering system required to construct the Moose WWTP and temporary lift station.
The work includes planning, design, construction, equipment operation and maintenance, and power. Work also includes removal of the dewatering system and cleanup of impacted areas subsequent to construction of the WWTP building.
2. Measurement for payment will be all wells, piping, pumps, electrical, generators, discharge permits, excavation, backfill, equipment and material removal, clean up, and incidentals required to lower the groundwater for construction of the Moose WWTP and temporary lift station.
3. Payment will be made at the contract lump sum price bid for “Temporary Construction Dewatering System”. This lump sum price and payment shall be full compensation for all materials, labor, transportation, equipment, fuel, power, fees and incidentals necessary to complete the work.
D. Contract Line Item No. 4: Temporary Lift Station and Force Main
1. This item consists of furnishing all materials, equipment and labor for construction of the Temporary Lift Station, Force Main and demolition of the existing lift station. The work includes, but is not limited to, installation of the temporary lift station and force main complete with piping, wet well, electrical, pumps and controls.
Work also includes removal of the existing lift station consisting of, equipment salvage (if any) and delivery to the Park, complete removal and transportation of recyclable materials to authorized recycling centers, complete removal and transportation of non recyclable deleterious materials to the Teton County Transfer Station, complete removal and transportation of non deleterious materials such as concrete and concrete block to approved disposal site outside of Grand Teton National Park, and incidentals complete and accepted.
2. Measurement for payment will be for installation of the temporary lift station and force main, complete, operational, tested and accepted, including, but not limited to, excavation, bedding, backfill, the precast concrete wet well, piping, pumps, controls, O&M manuals, warrantees and incidentals. Measurement for payment shall also include demolition of the existing wet well, including but not limited to, salvage of materials (if any), demolition, removal and disposal of waste materials outside the Park.
3. Payment will be made at the contract lump sum price bid for “Temporary Lift Station and Force Main”. This lump sum price and payment shall be full compensation for all materials, labor, tippage fees, transportation, equipment, royalties, warranties, O&M manuals, and incidentals necessary to complete the work described herein and shown on the Drawings.
E. Contract Line Item No. 5: New Sewer Mains to Wastewater Treatment Plant
1. This item consists of furnishing all materials, equipment and labor for construction of the new gravity sewer mains to the new Moose Wastewater Treatment Plant. The work includes but is not limited to trench excavation, bedding, and backfill, installation of pipe and manholes, trench surface restoration, and testing of the installed sewer main and manholes.
2. Measurement for payment will be the complete New Sewer Mains to Wastewater Treatment Plant installed, tested, and accepted including, but not limited to, all excavation, bedding, backfill, pipe, manholes, surface restoration, and incidentals.
GRTE 149677
GRTE - 149677 – WWTP
021216
01 27 00 - 3
3. Payment will be made at the contract lump sum price bid for “New Sewer Mains to Wastewater Treatment Plant”. This lump sum price and payment shall be full compensation for all materials, labor, plant, transportation, equipment, and incidentals necessary to complete the work described and shown on the Drawings.
F. Contract Line Item No. 6: Moose Wastewater Treatment Plant
1. This item consists of furnishing all materials, equipment and labor for construction of the Moose Wastewater Treatment Plant. The work includes, but is not limited to, a poured in place concrete foundation and masonry building to house headworks facilities consisting of integral screen washer compactors, lift station pumps, and dry chemical feeder, anoxic tanks, preaeration tanks, membrane biological reactors, treated effluent clear well, biosolids aerobic digesters, treated effluent permeate pumps, rotary lobe biosolids pumps, treated effluent discharge pumps, blowers, aerators, submersible mixers, ionization odor control equipment, electrical equipment, process and control equipment, stand by diesel generator, potable water service, wastewater treatment plant sewer service, communications facilities, WWTP SCADA, and buried Grand Teton Park communication service.
2. Measurement for payment will be the concrete, piping, building components and equipment in place, complete, operational, tested and accepted, including but not limited to, all excavation, forming, concrete, backfill, masonry, reinforcing steel, structural steel, grating, roof, equipment, piping, electrical, controls, SCADA, O&M manuals, warrantees and incidentals.
3. Payment will be made at the contract lump sum price bid for “Moose Wastewater Treatment Plant”. This lump sum price and payment shall be full compensation for all materials, labor, plant, transportation, equipment, royalties, warranties, O&M manuals, and incidentals necessary to complete the work described herein and shown on the Drawings.
G. Contract Line Item No. 7: WWTP Discharge Force Main
1. This item consists of furnishing all materials, equipment and labor for construction of WWTP Discharge Force Main from the connection at the Moose WWTP to the connection to the existing force main. This item also includes replacement of valves at the existing leach field distribution manhole. The work includes existing utility locates, surface removal, trench excavation and backfill, pipe, pipe locator tape, bedding, manholes, valves, connection to the existing force main, and asphalt resurfacing.
2. Measurement for payment will be the complete “WWTP Discharge Force Main” install, tested, and accepted including but not limited to, all excavation, bedding, backfill, pipe, manholes, valves, surface restoration, and incidentals.
3. Payment will be made at the contract lump sum price bid for “WWTP Discharge Force Main”. This lump sum price and payment shall be full compensation for all materials, labor, plant, transportation, equipment, and incidentals necessary to complete the work described herein and shown on the Drawings.
H. Contract Line Item No. 8: Visitor’s Center Gravity Sewer and IT Office Pressure Sewer
1. This item consists of furnishing all materials, equipment and labor for construction of Visitors Center gravity sewer and IT Office pressure sewer service. The work includes
GRTE 149677
GRTE - 149677 – WWTP
021216
01 27 00 - 4 existing utility locates, surface removal, trench excavation and backfill, pipe, pipe locator tape, bedding, valves, manholes, connections to the existing force main and/or pressure sewer, and concrete, sand pathway and asphalt resurfacing.
2. Measurement for payment will be the complete Visitor’s Center Gravity Sewer and IT Office Pressure Sewer installed, tested, and accepted including, but not limited to, all excavation, bedding, backfill, pipe, manholes, valves, surface restoration, and incidentals.
3. Payment will be made at the contract lump sum price bid for “Visitor’s Center Gravity Sewer and IT Office Pressure Sewer”. This lump sum price and payment shall be full compensation for all materials, labor, plant, transportation, equipment, and incidentals necessary to complete the work described and shown on the Drawings.
I. Contract Line Item No. 9: Removal of the Temporary Lift Station
1. This item consists of removal of the temporary lift station after the new Moose WWTP and related facilities are complete, accepted and operational. The work includes equipment salvage and delivery to the Park, complete removal and transportation of recyclable materials to authorized recycling centers, complete removal and transportation of non recyclable deleterious materials to the Teton County Transfer Station, complete removal and transportation of non deleterious materials such as concrete and concrete block to approved disposal site outside of Grand Teton National Park, backfill excavation, finish grading, and incidentals complete and accepted.
2. Measurement for payment will be for salvage of equipment and the complete demolition, removal and disposal of the existing temporary lift station including, equipment, and foundations, backfill, grading of the disturbed site, and incidentals necessary to complete the demolition.
3. Payment will be made at the contract lump sum price bid for “Removal of the Temporary Lift Station”. This lump sum price and payment shall be full compensation for all materials, labor, plant, transportation, equipment, tippage fees and incidentals necessary to complete the work described.
J. Contract Line Item No. 10: Bid Option A - Demolition of the Existing WWTP and Water Lab Building
1. This item consists of demolition of the existing Moose WWTP and Water Lab Building after the new Moose WWTP and related facilities are complete, accepted and operational.
The work includes equipment salvage and delivery to the Park, complete removal and transportation of recyclable materials to authorized recycling centers, complete removal and transportation of non recyclable deleterious materials to the Teton County Transfer Station, complete removal and transportation of non deleterious materials such as concrete and concrete block to approved disposal site outside of Grand Teton National Park, backfill foundation excavation, finish grading, and incidentals complete and accepted.
2. Measurement for payment will be for salvage of equipment and the complete demolition, removal and disposal of the existing WWTP and water lab building, equipment, and foundations, backfill, grading of the disturbed site, and incidentals necessary to complete the demolition.
3. Payment will be made at the contract lump sum price bid for “Bid Option A - Demolition of the Existing WWTP and Water Lab Building”. This lump sum price and payment shall
GRTE 149677
GRTE - 149677 – WWTP
021216
01 27 00 - 5 be full compensation for all materials, labor, plant, transportation, equipment, tippage fees and incidentals necessary to complete the work described.
END OF SECTION 01 27 00
File details come from the government source that posted it. Updated .